PLASTERING
PRESENTED BY
GAYATHRY SATHEESAN
1
INTRODUCTION
 Plaster definition is - a medicated or protective
dressing that consists of a film (as of cloth or
plastic) spread with a usually medicated substance;
broadly : something applied to heal and soothe.
How to use plaster in a sentence.
2
OBJECTIVES OF PLASTERING
1. To provide an even,smooth,regular,clean and
durable finished surface.
2. To preserve and protect the surfaces from
atmospheric influences
3. To cancel the defective workmanship.
3
4. To cover up the porous materials and the joints formed in
the masonry works.
5. To provide a satisfactory base by applying whitewashing ,
painting, distempering.
6. In internal plastering, the basic objective is to protect from
dust and verminnuissance.
4
• Before plastering , the surface should be prepared 
• All masonry joints should be cleaned
• All unevenness should be removed
• Mortar drop and dust is removed with wire brushes
• The surface is washed and kept wet
5
NUMBER OF COAT AND THICKNESS OF
PLASTER
 2 or 3 coat
 Brick work and stone masonry need minimum 2 coat
 Wood or metal need atleast 3 coat
 First coat is known as undercoat or rendering
(thickness is 10-15 mm)  seals surface
 Second coat is called floating coat (thickness 6-9
mm)
 Third coat is the finishing coat (thickness is 2-3mm)
 Thickness of the external wall is 20 mm
6
 Lime plaster
 Cement plaster
 Gypsum plaster
 Lime cement plaster
 Heat resistant plaster
7
LIME PLASTER
 Lime plaster is a mixture of calcium hydroxide and
sand (or other inert fillers).
 Carbon dioxide causes the plaster to set by
transforming the calcium hydroxide into calcium
carbonate (limestone).
 Whitewash is based on the same chemistry.
 To make lime plaster, limestone (calcium carbonate)
is heated to produce quicklime (calcium oxide).
8
9
• Water is added to produce slaked lime (calcium hydroxide), 
as a wet putty or a white powder.
• Additional water is added to form a paste .
• When exposed to the atmosphere, the calcium hydroxide turn back
to calcium carbonate through reaction with carbon dioxide.
•Thus the strength of plaster increases.
 MORTAR is splashed with trowel and is rubbed
 The surface is scratched criss cross  to get bond
with next layer
 After drying  surface is cleaned and wetted
slightly
 Second coat is applied
 Finishing coat of white lime and sand (1:2) is
provided
10
11
CEMENT PLASTER
 Cement plaster  a mixture of sand + portland cement and
water .
 Ratio 1:4 - 1:6.
 Applied to masonry interiors and exteriors to achieve a
smooth surface.
 Walls constructed with stock bricks are cement plastered
while face brick walls are not plastered.
12
13
 Various cement-based plasters are also used as proprietary
spray fireproofing products.
 Heavy version of cement plasters are in use for exterior
fireproofing, to protect LPG vessels, pipe bridges and vessel
skirts.
 The advantages of cement plaster were its
 strength,
 hardness,
 quick setting time and
 durability
14
15
GYPSUM PLASTER
Gypsum plaster or plaster of paris is produced By heating
gypsum to about 150 degree celsius.
Caso4.2h2o+heatcaso40.5h2o+1.5h2o(released as steam)
Dry plaster powder mixed with water reforms into gypsum.
 The setting of plaster starts about 10 mins of mixing &
completes after 45 mins.
If gypsum is heated about 130 dc anhydrite is formed.
16
*Anhydrite will reform as gypsum if mixed with water.
*A large gypsum deposit ay montmartre in paris led calcine
gypsum to be commonly known as “plaster of paris”.
TOOLS
17
FIRE RESISTANT PLASTER
 Heat resistant plaster is a building material used for
coating walls and chimney.
 Its purpose is to replace conventional gypsum plasters in
cases where the temperature can get too high .
 Heat resistant plaster should be used in cases where the
temperature exceeds 50 °C.
18
INTERNAL WALL PLASTERING
PROCEDURE
 Surface where plastering is to be done will be
cleaned.
 Level pegs on walls will be fixed (Using centre
plumb bob and nylon thread).
 All the brick walls will be watered before pasting
mortar on walls.
 First coat mortar filling (1:4 Cement and Sand) upto
15 mm will be applied on surfaces where required
mortar thickness exceed 25mm.
 Walls and columns will be plastered 1:4 Cement and
Sand to achieve semi rough finished surface.
19
20
 Vertical joint of structural columns / walls & brick walls will
be treated by fixing 200mm width chicken mesh with wire
nails / concrete nails by centering the mesh to the vertical
wall joint.
 The embedded service lines and provisions (Conduits,
Boxes and etc. ) will be completed on brick walls .
 Joints between walls and beams will be formed up to a
maximum of 20mm and will be sealed using 30 minutes fire
rated flexible filler.
 Internal plastering on surfaces of concrete columns, beams
& walls aligned with surfaces of brick walls will be
plastered and concrete surfaces will be finished with
cement base easy plaster.
EXTERNAL WALL PLASTERING
PROCEDURE
 Level pegs on external wall surfaces will be fixed using
surveying instrument / centre plumb bobs.
 Projections on the wall surfaces will be chipped off and
cleaned after completing the level pegs on walls.
 First coat mortar filling (1:4 Cement and Sand) upto 15
mm will be applied on surfaces where required mortar
thickness exceed 25mm.
21
• Maximum width of 20mm horizontal grooves
between
walls and beams will be formed by cutting using
grinders with diamond wheels after plastering the
wall
surface.This groove will be filled with approved
weather sealant.
• External wall plaster will be finished with rough
surface.
• Cement paste on concrete surfaces will be
applied
to improve the bonding of plaster to the
concrete
surfaces .
22
PRECAUTIONS
 Precautions to be taken to avoid unevenness,
efflorescence, cracking 
 Poor workmanship
 Surface not prepared
 Presence of lime
 Too thickness
 Poor curing
23
THANK YOU….
24

Contenu connexe

Tendances

Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
KHUSHBU SHAH
 

Tendances (20)

Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Tile Flooring
Tile FlooringTile Flooring
Tile Flooring
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
Masonry work
Masonry workMasonry work
Masonry work
 
Stone masonry
Stone masonryStone masonry
Stone masonry
 
Cement as Building material
Cement as Building materialCement as Building material
Cement as Building material
 
Types of bricks and its bonds
Types of bricks and its bondsTypes of bricks and its bonds
Types of bricks and its bonds
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
Pointing and finishing
Pointing and finishingPointing and finishing
Pointing and finishing
 
Plastering by mani
Plastering by maniPlastering by mani
Plastering by mani
 
Building construction materials -Tiles
Building construction materials -TilesBuilding construction materials -Tiles
Building construction materials -Tiles
 
Flooring
FlooringFlooring
Flooring
 
Shoring
ShoringShoring
Shoring
 
Dampness
DampnessDampness
Dampness
 
Brick bond
Brick bondBrick bond
Brick bond
 
Plastering
PlasteringPlastering
Plastering
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
Brick as building materials
Brick as building materialsBrick as building materials
Brick as building materials
 
Bricks
BricksBricks
Bricks
 

Similaire à Plastering ppt

Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
Waqas Aslam
 
MASONRY -Building Technology and Construction
MASONRY -Building Technology and ConstructionMASONRY -Building Technology and Construction
MASONRY -Building Technology and Construction
mbermudez3
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
Zairul Zaiky
 
MODULE 4 PART 1.pdf
MODULE 4 PART  1.pdfMODULE 4 PART  1.pdf
MODULE 4 PART 1.pdf
AnoHossey
 

Similaire à Plastering ppt (20)

pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
 
Unit 5 bmc
Unit 5 bmcUnit 5 bmc
Unit 5 bmc
 
Building suerface finishes
Building suerface finishesBuilding suerface finishes
Building suerface finishes
 
Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Building Materials & Construction Module - 5
Building Materials & Construction Module - 5
 
Advanced construction technologies.pptx
Advanced construction technologies.pptxAdvanced construction technologies.pptx
Advanced construction technologies.pptx
 
Types of plaster
Types of plasterTypes of plaster
Types of plaster
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx
 
DAMP PROOFING TREATMENT FOR FLAT ROOF.
DAMP PROOFING TREATMENT FOR FLAT ROOF.DAMP PROOFING TREATMENT FOR FLAT ROOF.
DAMP PROOFING TREATMENT FOR FLAT ROOF.
 
Plastering_work.pptx
Plastering_work.pptxPlastering_work.pptx
Plastering_work.pptx
 
MASONRY -Building Technology and Construction
MASONRY -Building Technology and ConstructionMASONRY -Building Technology and Construction
MASONRY -Building Technology and Construction
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
Trabajo de tecnologia construction materials
Trabajo de tecnologia   construction materialsTrabajo de tecnologia   construction materials
Trabajo de tecnologia construction materials
 
MODULE 4 PART 1.pdf
MODULE 4 PART  1.pdfMODULE 4 PART  1.pdf
MODULE 4 PART 1.pdf
 
Flooring.pptx
Flooring.pptxFlooring.pptx
Flooring.pptx
 
1.plastering
1.plastering1.plastering
1.plastering
 
Cons122
Cons122Cons122
Cons122
 
Flooring.ppt
Flooring.pptFlooring.ppt
Flooring.ppt
 
Low-Cost-Housing.ppt
Low-Cost-Housing.pptLow-Cost-Housing.ppt
Low-Cost-Housing.ppt
 

Plus de gayathrysatheesan1

Plus de gayathrysatheesan1 (20)

Tourist places in ooti
Tourist places in ootiTourist places in ooti
Tourist places in ooti
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
BENEFITS OF PLANING
BENEFITS OF PLANINGBENEFITS OF PLANING
BENEFITS OF PLANING
 
National capital region
National capital regionNational capital region
National capital region
 
CONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORYCONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORY
 
Tourist places in banglore
Tourist places in bangloreTourist places in banglore
Tourist places in banglore
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Kochi city as an organism
Kochi city as an organismKochi city as an organism
Kochi city as an organism
 
Garden city
Garden cityGarden city
Garden city
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
 
Town development plan
Town development planTown development plan
Town development plan
 
Space standards for facility areas and utilites
Space standards for facility areas and utilitesSpace standards for facility areas and utilites
Space standards for facility areas and utilites
 
Precincts
PrecinctsPrecincts
Precincts
 
Multiple nuclei theory
Multiple nuclei theoryMultiple nuclei theory
Multiple nuclei theory
 
Classification of cost
Classification of costClassification of cost
Classification of cost
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
 
Zoning
ZoningZoning
Zoning
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
 
Regional problems and their solutions ppt
Regional problems and their solutions pptRegional problems and their solutions ppt
Regional problems and their solutions ppt
 
Presentation skills ppt
Presentation skills pptPresentation skills ppt
Presentation skills ppt
 

Dernier

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 

Plastering ppt

  • 2. INTRODUCTION  Plaster definition is - a medicated or protective dressing that consists of a film (as of cloth or plastic) spread with a usually medicated substance; broadly : something applied to heal and soothe. How to use plaster in a sentence. 2
  • 3. OBJECTIVES OF PLASTERING 1. To provide an even,smooth,regular,clean and durable finished surface. 2. To preserve and protect the surfaces from atmospheric influences 3. To cancel the defective workmanship. 3
  • 4. 4. To cover up the porous materials and the joints formed in the masonry works. 5. To provide a satisfactory base by applying whitewashing , painting, distempering. 6. In internal plastering, the basic objective is to protect from dust and verminnuissance. 4
  • 5. • Before plastering , the surface should be prepared  • All masonry joints should be cleaned • All unevenness should be removed • Mortar drop and dust is removed with wire brushes • The surface is washed and kept wet 5
  • 6. NUMBER OF COAT AND THICKNESS OF PLASTER  2 or 3 coat  Brick work and stone masonry need minimum 2 coat  Wood or metal need atleast 3 coat  First coat is known as undercoat or rendering (thickness is 10-15 mm)  seals surface  Second coat is called floating coat (thickness 6-9 mm)  Third coat is the finishing coat (thickness is 2-3mm)  Thickness of the external wall is 20 mm 6
  • 7.  Lime plaster  Cement plaster  Gypsum plaster  Lime cement plaster  Heat resistant plaster 7
  • 8. LIME PLASTER  Lime plaster is a mixture of calcium hydroxide and sand (or other inert fillers).  Carbon dioxide causes the plaster to set by transforming the calcium hydroxide into calcium carbonate (limestone).  Whitewash is based on the same chemistry.  To make lime plaster, limestone (calcium carbonate) is heated to produce quicklime (calcium oxide). 8
  • 9. 9 • Water is added to produce slaked lime (calcium hydroxide),  as a wet putty or a white powder. • Additional water is added to form a paste . • When exposed to the atmosphere, the calcium hydroxide turn back to calcium carbonate through reaction with carbon dioxide. •Thus the strength of plaster increases.
  • 10.  MORTAR is splashed with trowel and is rubbed  The surface is scratched criss cross  to get bond with next layer  After drying  surface is cleaned and wetted slightly  Second coat is applied  Finishing coat of white lime and sand (1:2) is provided 10
  • 11. 11
  • 12. CEMENT PLASTER  Cement plaster  a mixture of sand + portland cement and water .  Ratio 1:4 - 1:6.  Applied to masonry interiors and exteriors to achieve a smooth surface.  Walls constructed with stock bricks are cement plastered while face brick walls are not plastered. 12
  • 13. 13
  • 14.  Various cement-based plasters are also used as proprietary spray fireproofing products.  Heavy version of cement plasters are in use for exterior fireproofing, to protect LPG vessels, pipe bridges and vessel skirts.  The advantages of cement plaster were its  strength,  hardness,  quick setting time and  durability 14
  • 15. 15 GYPSUM PLASTER Gypsum plaster or plaster of paris is produced By heating gypsum to about 150 degree celsius. Caso4.2h2o+heatcaso40.5h2o+1.5h2o(released as steam) Dry plaster powder mixed with water reforms into gypsum.  The setting of plaster starts about 10 mins of mixing & completes after 45 mins. If gypsum is heated about 130 dc anhydrite is formed.
  • 16. 16 *Anhydrite will reform as gypsum if mixed with water. *A large gypsum deposit ay montmartre in paris led calcine gypsum to be commonly known as “plaster of paris”.
  • 18. FIRE RESISTANT PLASTER  Heat resistant plaster is a building material used for coating walls and chimney.  Its purpose is to replace conventional gypsum plasters in cases where the temperature can get too high .  Heat resistant plaster should be used in cases where the temperature exceeds 50 °C. 18
  • 19. INTERNAL WALL PLASTERING PROCEDURE  Surface where plastering is to be done will be cleaned.  Level pegs on walls will be fixed (Using centre plumb bob and nylon thread).  All the brick walls will be watered before pasting mortar on walls.  First coat mortar filling (1:4 Cement and Sand) upto 15 mm will be applied on surfaces where required mortar thickness exceed 25mm.  Walls and columns will be plastered 1:4 Cement and Sand to achieve semi rough finished surface. 19
  • 20. 20  Vertical joint of structural columns / walls & brick walls will be treated by fixing 200mm width chicken mesh with wire nails / concrete nails by centering the mesh to the vertical wall joint.  The embedded service lines and provisions (Conduits, Boxes and etc. ) will be completed on brick walls .  Joints between walls and beams will be formed up to a maximum of 20mm and will be sealed using 30 minutes fire rated flexible filler.  Internal plastering on surfaces of concrete columns, beams & walls aligned with surfaces of brick walls will be plastered and concrete surfaces will be finished with cement base easy plaster.
  • 21. EXTERNAL WALL PLASTERING PROCEDURE  Level pegs on external wall surfaces will be fixed using surveying instrument / centre plumb bobs.  Projections on the wall surfaces will be chipped off and cleaned after completing the level pegs on walls.  First coat mortar filling (1:4 Cement and Sand) upto 15 mm will be applied on surfaces where required mortar thickness exceed 25mm. 21
  • 22. • Maximum width of 20mm horizontal grooves between walls and beams will be formed by cutting using grinders with diamond wheels after plastering the wall surface.This groove will be filled with approved weather sealant. • External wall plaster will be finished with rough surface. • Cement paste on concrete surfaces will be applied to improve the bonding of plaster to the concrete surfaces . 22
  • 23. PRECAUTIONS  Precautions to be taken to avoid unevenness, efflorescence, cracking   Poor workmanship  Surface not prepared  Presence of lime  Too thickness  Poor curing 23