1. Benicia High School
3
Form 27.1 Section 1. a. (3) (a) Students: Goals for Student Computer Knowledge and Skills
Goal:Goal: Students will develop a wide variety of technical skills and learn a broad range of software applications that will increase their
potential for learning and success in high school, college, and the job market.
Objective Annual Benchmarks
By end of year three, 80-percent of Benicia High and Liberty High students will
demonstrate proficiency in the following technical skills: network and Internet
navigation and research, information literacy, copyright and fair use, personal file
management, use of presentation software and hardware, advanced word-
processing, desktop publishing, class-specific courseware, email, and spreadsheet
design.
• End of year 1: 50-percent will demonstrate proficiency through projects,
exams, and campus-wide surveys
• End of year 2: 60-percent will demonstrate proficiency through projects,
exams, and campus-wide surveys
• End of year 3: 80-percent will demonstrate proficiency through projects,
exams, and campus-wide surveys
Evaluation Instruments and Data to be
collected
Schedule for Evaluation Program Analysis and Modification
Process
Persons
Responsible
Freshmen orientation week requires a final
project and objective exam; freshman Intro to
Computers semester-long class will give
project grades and course grades to measure
overall proficiencies; Project log will gather
data from all teachers assigning technology-
based projects. Campus-wide surveys will
measure skills, access beyond school, and
attitude. Annual 70-question survey will help
evaluate overall technical integration..
September orientation and objective
evaluation of BHS freshmen; fall
orientation and objective evaluation of
LHS students. January survey evaluation
during spring Faculty Technology
Support committee (FTS) and Parent
Technology Support committee (PTS)
meetings; May data collection of
departmental technology project grade
results.
September orientation exam results will guide
us in modifying orientation week's activities;
January's Intro to Computer final grades will
help to modify the course; January surveys will
give us the big picture of people's overall
technical experience and temperament. May
project results will help determine which
departments/teachers need additional support;
results of all data will be analyzed in monthly
FTS/PTS meetings.
Steve Gibbs --
BHS DHS
Coordinator, Terry
Abreu -- LHS
DHS Coordinator,
department chairs,
administrators,
parent/teacher
technology
support members
(b) Students: Goals Related to Improved Academic Achievement
Goal:Goal: Students will improve their understanding of course content by accessing the multitude of resources made available through
technology, and will thus score higher in standardized tests.
Objective Annual Benchmarks
#1 of 2: By end of year three, BHS's API
score of 759 will rise six points to 765, which
is roughly 15-percent of the gap toward the
state goal for all schools of 800; BHS AP
scores will rise 10-percent; SAT scores will rise
6-percent; and the number of students taking the
Golden State Exams will go up 10-percent. LHS
STAR scores will rise by 10-percent
• End of year 1: API will rise to 761; AP scores will rise 3-percent; SAT will rise 2-percent; and the number
of students taking the GSE will rise by 3-percent; LHS STAR will rise by 3-percent.
• End of year 2: API will rise to 763; AP scores will rise 3-percent; SAT will rise 2-percent; and the number
of students taking the GSE will rise by 3-percent; LHS STAR will rise by 3-percent.
• End of year 3: API will rise to 765; AP scores will rise 4-percent; SAT will rise 2-percent; and the number
of students taking the GSE will rise by 3-percent; LHS STAR will rise by 4-percent
Evaluation Instruments and
Data to be collected
Schedule for Evaluation Program Analysis and Modification
Process
Person(s) Responsible
2. Benicia High School
4
Standardized test results will be
matched against original 2000
baseline and each previous year's
results
As test results are provided
by the state or testing agency,
they will be reviewed during
monthly FTS/PTS meetings.
Based on benchmark successes concerted efforts
will be focused where needed; modifications
will be shared with the entire faculty. Results
will be presented by our district curriculum
coordinator at the monthly FTS/PTS meetings.
District curriculum coordinator;
counseling department, site
administrators; DHS Coordinators at
BHS and LHS
Objective Annual Benchmarks
#2 of 2: By end of year three, 75-percent of BHS seniors
will have completed a minimum of five extended
technology-based projects in at least three different classes
(English, business, math, science, history, art and so on).
The projects must include the use of at least five software
applications; 75-percent of LHS students will have
completed a minimum of three technology-based projects in
at least two different classes. In subsequent years, all BHS
seniors will be required to complete a Senior Digital
Portfolio -- five best high school projects, a career search
and digital resume compiled.
• End of year 1: 40-percent of BHS seniors will have completed at least two technology-based
projects, each in a different class; 50-percent of LHS students will have completed at least one
technology-based project
• End of year 2: 60-percent of BHS seniors will have completed at least three technology-based
projects, s[read over at least two different classes using at least three different software
applications; 60-percent of LHS students will have completed at least two technology-based
projects, each in a different class
• End of year 3: 75-percent of BHS seniors will have completed a minimum of five technology-
based projects in at least three different classes using at least five different software applications;
75-percent of LHS students will have completed a minimum of three technology-based projects
in at least two different classes using at least three different software applications
Evaluation Instruments and Data to be
collected
Schedule for Evaluation Program Analysis and Modification
Process
Persons Responsible
Project Log data will provide details to
measure our benchmarks by documenting the
teachers, grade level, nature of the assigned
projects, number of students involved,
applications used, the time spent, open-ended
observations, and an over class grade
performance; January teacher and student
surveys will provide additional data on project
quantity and quality.
Project Log will be updated
regularly from September through
June, and posted online for
teachers to review and use for
collaborative efforts; January
teacher and student surveys will be
administered; results will be
reviewed during monthly FTS/PTS
meetings.
Project Log data, as well as being
available online, will be shared with
faculty at each of the four annual training
sessions, and monthly at the Parent
Technology Support (PTS) and Faculty
Technology Support (FTS) meetings.
Suggestions and modifications will be
made at these times. In May we will share
with faculty Project Log, benchmarks,
success, weaknesses
BHS Lab technician Annette
Fewins and LHS DHS
Coordinator Terry Abreu will
maintain the Project Log.
DHS Coordinators and FTS
members will oversee the
administering of surveys, and
the collection of data.
3. Benicia High School
5
Section 1. b. (2) (a) Staff: Goals for Staff Development Related to Staff Technology Proficiencies
GoaGoa l:l: Teachers will learn to use their classroom and home computers for regular daily functions, both personal and professional,
which will enhance their productivity and classroom success, and simplify their lives.
Objective Annual Benchmarks
By end of year three, 70-percent of BHS/LHS faculty will demonstrate proficiency in the following
technical skills: network and Internet navigation and information gathering with adherence to copyright
and fair use policies, personal file management, online testing and grading, peer email and Web
collaboration, Web design; tech-based lesson planning, use of presentation software and hardware for
lecture support, advanced word-processing, desktop publishing, class-specific courseware, and
spreadsheet design.
• End of year 1: 40-percent will demonstrate
proficiency
• End of year 2: 55-percent will demonstrate
proficiency
• End of year 3: 70-percent will demonstrate
proficiency
Evaluation Instruments and Data to
be collected
Schedule for
Evaluation
Program Analysis and Modification Process Persons Responsible
The four annual teacher training sessions
–August, November, March, May -- will
culminate with objective exams; the
annual January surveys and objective
questionnaires will provide proficiency
data; individual mentoring by the DHS
Coordinator and FTS members will reveal
specific needs.
At the end of each teacher
training session; during the
March review of the
January survey results;
during monthly FTS/PTS
meetings.
Analysis and modification process will be the core
purpose of our monthly FTS/PTS meetings.
Modifications will be shared and implemented
during the four annual teacher training sessions.
Specific concerns will be directed to department
chairs after each monthly meeting.
DHS Coordinators, FTS and
PTS members, department
chairpersons, campus
administrators
(b) Staff: Goals for Staff Development Related to Student Computer Knowledge and Skills Goals
Goal:Goal: Teachers will incorporate technology into more of their lesson plans, putting the keyboards into the hands of more students.
Technology-based lessons will instruct students in the use of multiple software applications, as well as guiding them toward better
understanding of the content through technology.
Objective Annual Benchmarks
#1 of 2: By the end of year three, 70-percent of BHS/LHS teachers will have incorporated
into their curriculum at least one annual extended technology project that is practiced in at
least three of their classes. The project must include: a) class trips to the general purpose
lab, b) Internet research, evaluation of validity, and data retrieval, c) manipulation of data
using at least one of the following applications: PowerPoint, desktop publishing, advanced
word processing, spreadsheet and web page design, d) sharing of the presentation with
classmates, e) saving of the presentation to include in the student's Senior Portfolio
Project, f) class project scores must give a grade for content and a grade for technical
proficiency that proves students have learned the required skills, and g) project must align
itself with three or more ESLRs and at least one goal from the state frameworks
• End of year 1: 40-percent of teachers will have an annual
technology project written into their curriculum that is used in
three or more classes
• End of year 2: 50-percent of teachers will have an annual
technology project written into their curriculum that is used in
three or more classes
• End of year 3: 70-percent of teachers will have an annual
technology project written into their curriculum that is usedin
three or more classes
Evaluation Instruments and Data
to be collected
Schedule for Evaluation Program Analysis and Modification
Process
Person(s)
Responsible
4. Benicia High School
6
Lab logs; Project Log; student survey
results; individual mentoring by DHS
Coordinator; review of departmental
curriculum revisions to include
technology; student project
accomplishments
Lab logs and Project Log will be
monitored regularly; mentoring will run
from September through June;
departmental curriculum changes will be
examined each spring semester before
May training..
Lab logs and Project Log will identify teachers
not using technology; departmental curriculum
changes will identify departments in need;
student achievements and projects will identify
weak areas for additional focus.
DHS Coordinators,
FTS and PTS
members,
department
chairpersons
Objective Annual Benchmarks
# 2 of 2: By the end of year three, 70-percent of BHS/LHS teachers
will have used their classroom's integrated equipment
(computer/TV/Internet connection) to support a lecture and allowed
students to use the equipment to share presentations with their
classmates.
• End of year one: 40-percent will have used their classroom's integrated equipment.
• End of year two: 50-percent will have used their classroom's integrated equipment.
• End of year three: 70-percent will have used their classroom's integrated equipment.
Evaluation Instruments and Data to be
collected
Schedule for
Evaluation
Program Analysis and Modification Process Person(s) Responsible
Annual teacher survey; annual student
survey; DHS Coordinator monitoring. Data
will include how the equipment was used and
how smoothly the lesson went.
January Teacher and
Student Survey;
ongoing monitoring
from August through
June.
Based on teacher and student survey results and
testimonials, additional mentoring and team-teaching
will be scheduled; review will take place monthly
during FTS/PTS meetings.
DHS Coordinators, FTS
members, department
chairpersons.
(c) Staff: Goals for Staff Development Related to Improved Student Academic Achievement Goals
Goal:Goal: Teachers will develop departmental curriculum that integrates technology into lessons and projects required of all students;
using technology in the classroom will become frequent and comfortable and provide a vast increase in content resources
Objective Annual Benchmarks
By the end of year three, 90-percent of BHS/LHS departments
will have written into their curriculum at least one technology-
based, content-specific goal and annual project; goals and
projects must meet the following requirements: a) focus on
content that will help students perform better on standardized
exams, b) meet three of seven ESLRs, c) match one or more of
the goals described in the state frameworks, and d) require a
minimum of one week of hands-on technology use
• End of year one: 40-percent of departments will have modified their curriculum to include
one or more technology-based, content-specific goal that meets objective requirements
• End of year two: 60-percent of departments will have modified their curriculum to include
one or more technology-based, content specific goal that meets objective requirements
• End of year three: 90-percent of departments will have modified their curriculum to include
one or more technology-based, content specific goal that meets objective requirements
Evaluation Instruments and Data to be collected Schedule
for
Evaluation
Program Analysis and Modification
Process
Person(s) Responsible
Revised departmental curriculum will be reviewed prior to May
training. Data will include the type of projects and the types of
applications, hardware, and research techniques used. This
information will come from Project Log.
May of
2001,
2002,
2003
Analysis and modification will come from a
panel discussion and review involving FTS and
departmental faculty members during May
training.
DHS Coordinators, members
of FTS, department
chairpersons, campus
administrators