INTRODUCTION
The Ro-Ro facility was build with the intention to improve the
connectivity between Vallarpadam (ICTT) and Willingdon Island. The
Cochin Port Trust jointly with IWAI had formed a joint management
committee (JMC) for the purpose. LOTS shipping, a Cochin-based
shipping company had won the 10 year contract for ferrying the
containers between Willingdon Island and Vallarpadam by Roll on-Roll
off (RO-RO) and Lift On-Lift Off (LO-LO) modes. The time for
transporting container trucks by RO-RO mode was expected to be 20-25
min. The service enables the movement of containers preventing hundreds
of trucks from the crowding the Cochin roads and has reduced
transportation distance of 38 Km to 2.5Km
“Even though the Ro-Ro provides a window for easier and speedy
movement of container especially from the south of Kerala towards
ICTT Vallarpadam this facility is not being optimally utilized as a
result the actual estimated container moves of 750 containers per
day has fallen down to a maximum of 150 containers per day
therefore the service is suffering from continuous losses”
RESEARCH ISSUESRESEARCH ISSUES
1. Why the Ro-Ro service is unable to perform to its optimal level and
why is it incurring so much of loss in spite of its immense potential?
2. Why is the Ro-Ro service unable to get the expected amount of
cargo for its optimal functioning?
3. Why is the Ro-Ro service incapable of rendering continuous
service and also unable to stick on to their scheduled service time?
OBJECTIVESOBJECTIVES
1.To understand the reason for the incapability of Ro-Ro service in
rendering continuous service?
2.To understand the reasons why the service is not following a strict
time schedule?
3.To identify the reason why is the Ro-Ro service unable to get the
expected amount of cargo for its optimal functioning?
4.To recognize the reasons why the Ro-Ro service is unable to
perform to its optimal level and why is it incurring so much of loss
in spite of its immense potential?
5. To offer suggestions for improvement in the performance of the
service
METHODOLOGYMETHODOLOGY
In order to measure the performance of Ro-Ro service in Cochin Port Trust the
stratified disproportionate random sampling method has been adopted.
At the first level major stake holders of Ro-Ro have been grouped under two
sections namely
1.The service providers
2.Service users
At the second level Ro-Ro operators and Cochin Port Trust are considered as
service providers the truck operators, drivers and freight forwarders are
considered as the major users of Ro-Ro.
Cont…..Cont…..
At the third level in each category 5-15 samples have been surveyed with
help of pre-tested structured interview schedule.
For the purpose of comparison of the monthly performances and the
overall performance of the Ro-Ro service with the expected performance,
secondary data of the Ro-Ro operation and cargo movement have been
collected and analyzed.
SAMPLES SELECTEDSAMPLES SELECTED
SL.NO DEAILS
1 USERS TRUCK OPERATORS 5
TRUCK DRIVERS 10
FREIGHT
FORWARDERS
10
2 SERVICE
PROVIDERS
PORT EMPLOYEES 15
RO-RO EMPLOYEES 5
TOTAL 45
THE RESULT AND DISCUSSION
OF THE STUDY
Cargo handled in Ro-Ro fromCargo handled in Ro-Ro from 23rd
February 2011 to 30th
April
2015
SL.NO TYPE OF CONTAINER NUMBER OF TEU’S
LOADED CONTAINER
1 20 FOOT 64,532
2 40 FOOT 36,253
EMPTY CONTAINER
3 20 FOOT 15,688
4 40 FOOT 12,364
TOTAL 1,28,837
THE CURRENT RO-RO SCENARIOTHE CURRENT RO-RO SCENARIO
Total number of days =1528 days
Total no of working day =1239 days (Excluding Sundays and
customs .
holidays)
Expected or predicted container movement per day = 750 TEU’s
Expected total movement for 1239 days = 9, 29,250 TEU’s (approx.)
Actual movement for 1239 days = 1, 28,837 TEU’s
Therefore average movement per day = Less than 150 TEU’s
SUGGESTIONS PUT FORWARD BY THE SAMPLES TOSUGGESTIONS PUT FORWARD BY THE SAMPLES TO
IMPROVE THE PERFORMANCE OF THE RO-RO SERVICEIMPROVE THE PERFORMANCE OF THE RO-RO SERVICE
1.To improve the quality of the service
i. 62.22% of the population suggested to take measures reduce the
waiting time.
ii. 20% had suggested about increasing by introducing user friendly
services.
iii. 17.77 % of the samples suggested to offer customer oriented
services to improve the overall performance.
Cont…..Cont…..
2.To improve the reliability
i. 37.77% of the population suggested that reliability can be attained
by following a strict time schedule.
ii. Another 37.77% suggested that reliability can be attained by
offering un interrupted services
iii. Remaining 24.44%suggested both above mentioned aspects need
to be incorporated together in order to offer a reliable service.
Cont…..Cont…..
3. For infrastructural development
i. 42.22% suggested to improve the overall infrastructure by modifying or
changing the existing Ro-Ro vessel or by introducing an additional Ro-Ro
vessel.
ii. 4.44% suggested on performance improvement by recruiting trained
employees for the service.
iii. 35.55% believes that technological up gradation can bring about
efficiency and development in the service.
iv. 17.77% suggests all the three above mentioned aspects must be
inculcated together for the best performance .
FINDINGS AND CONCLUSIONS
ADVANTAGES OF USING RO-RO SERVICEADVANTAGES OF USING RO-RO SERVICE
i. Cost efficient and speedier movement
ii. Pollution Reduction
iii. Reducing Traffic Congestion
iv. Enables Eco-friendly transportation
v. Reduction of operation and maintenance cost
vi. Safer mode of transport
REASON FOR THE REDUCTION IN DEMAND OFREASON FOR THE REDUCTION IN DEMAND OF
RO-RORO-RO
i. Trailer drivers have an affinity to wait for Ro-Ro ferry.
ii. The service in not following a proper time schedule hence timely delivery
of cargo can’t be assured
iii. The waiting time for Ro-Ro service is very high
iv. Ro-Ro unable to offer uninterrupted service due to frequently breaks
downs.
v. The present Ro-Ro tariff is not very attractive as the profit made compared
to Road only mode of transport in terms of fuel cost
vi. Lower cargo movement at Vallarpadam container terminal than what was
expected from the facility.
SUGGESTIONS TO IMPROVE THE PERFORMANCESUGGESTIONS TO IMPROVE THE PERFORMANCE
OF RO-RO SERVICEOF RO-RO SERVICE
i. The potential opportunity for highest performance during the peak hours
(8AM-11AM & 4PM-8PM) must be utilized at the most optimal level by
attracting more customers with offers/schemes or special peak time prices .
ii. Waiting time between two consecutive services need to be brought down,
either by reducing the transit time (25 min) or by introducing an additional
Ro-Ro service, at least during the peak hours
iii. Providing refreshment stalls for the waiting trailer drivers reducing their
boredom.
iv. Advanced technological Vessels capable of rendering uninterrupted service
which is more fuel efficient and cost efficient.
Cont…..Cont…..
v. Concession price must be offered for regular Ro-Ro users which help in
retaining these customers
vi. Agreements may be made with the regular users. Credit facility can be made
available for these users with whom agreements have been made which can
further interest the transport operators in using the facility.
vii. Government initiatives must be taken to support the initial performance of
Ro-Ro.
viii. The Ro-Ro service lack proper marketing hence the potential users of the
Ro-Ro must be identified and made aware of the advantages of the facility
.They can be offered attractive packages for using the facility and can be made
loyal customers of the Ro-Ro facility.
THANK YOU….THANK YOU….

Contenu connexe

Tendances

Connectivity between Bangladesh and Sri Lankan ports
Connectivity between Bangladesh and Sri Lankan portsConnectivity between Bangladesh and Sri Lankan ports
Connectivity between Bangladesh and Sri Lankan portsAhamedul Karim Chowdhury
 
Traffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationTraffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationDanilign Mekonnen
 
Presentation-on-Water-Transport-System
Presentation-on-Water-Transport-SystemPresentation-on-Water-Transport-System
Presentation-on-Water-Transport-SystemMahjabeen Rahman Mim
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project reportshehri_cbe
 
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGESELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGESSABYASACHI DALAI
 
Zctoms committee meeting
Zctoms committee meetingZctoms committee meeting
Zctoms committee meetingApple Go
 
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Ibrahim Al-Hudhaif
 
Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Abeer Ray
 
Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Ahamedul Karim Chowdhury
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation Kiran K.V.S.
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultransConsultrans, S.A.
 
Delta Marine Highway Presentation
Delta Marine Highway PresentationDelta Marine Highway Presentation
Delta Marine Highway Presentation3GIntermodal
 
Feeder services from and into Mangalore (India)
Feeder services from and into Mangalore (India)Feeder services from and into Mangalore (India)
Feeder services from and into Mangalore (India)RAGHUNANDAN RAMACHANDRAN
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Reportgiap0083
 
Asset Velocity
Asset VelocityAsset Velocity
Asset Velocityfindram
 
2 q review
2 q review2 q review
2 q reviewJOCNews
 
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway ManagementBridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway ManagementOliviaModisakeng
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationDavid Sun
 
DeltaMarine Highway Report
DeltaMarine Highway ReportDeltaMarine Highway Report
DeltaMarine Highway Report3GIntermodal
 

Tendances (20)

Connectivity between Bangladesh and Sri Lankan ports
Connectivity between Bangladesh and Sri Lankan portsConnectivity between Bangladesh and Sri Lankan ports
Connectivity between Bangladesh and Sri Lankan ports
 
Traffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationTraffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentation
 
Presentation-on-Water-Transport-System
Presentation-on-Water-Transport-SystemPresentation-on-Water-Transport-System
Presentation-on-Water-Transport-System
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project report
 
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGESELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
 
Zctoms committee meeting
Zctoms committee meetingZctoms committee meeting
Zctoms committee meeting
 
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
 
Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22
 
Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
Delta Marine Highway Presentation
Delta Marine Highway PresentationDelta Marine Highway Presentation
Delta Marine Highway Presentation
 
Feeder services from and into Mangalore (India)
Feeder services from and into Mangalore (India)Feeder services from and into Mangalore (India)
Feeder services from and into Mangalore (India)
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Report
 
Asset Velocity
Asset VelocityAsset Velocity
Asset Velocity
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
2 q review
2 q review2 q review
2 q review
 
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway ManagementBridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
DeltaMarine Highway Report
DeltaMarine Highway ReportDeltaMarine Highway Report
DeltaMarine Highway Report
 

Similaire à Roll On-Roll Off service

Study of port performance in india
Study of port performance in indiaStudy of port performance in india
Study of port performance in indiaHeisenberg26
 
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)O'Carroll Group
 
Multimodal Transport in an Indian Perspective
Multimodal Transport in an Indian PerspectiveMultimodal Transport in an Indian Perspective
Multimodal Transport in an Indian PerspectiveFarhan Khan
 
NJFuture Redevelopment Forum 2016 Rooney
NJFuture Redevelopment Forum 2016 RooneyNJFuture Redevelopment Forum 2016 Rooney
NJFuture Redevelopment Forum 2016 RooneyNew Jersey Future
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLift Events
 
moloy roy sea and air logistics presentation
moloy roy   sea and air logistics presentationmoloy roy   sea and air logistics presentation
moloy roy sea and air logistics presentationAkash Maurya
 
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet Port Terminals
 
Pipeline Overview (Pipeline Operations)
Pipeline Overview (Pipeline Operations)Pipeline Overview (Pipeline Operations)
Pipeline Overview (Pipeline Operations)Nikhil Shekhar
 
Transnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic DirectionTransnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic DirectionTristan Wiggill
 
The Port Metro Vancouver Interface
The Port Metro Vancouver InterfaceThe Port Metro Vancouver Interface
The Port Metro Vancouver Interfacejodyalkema
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
Tata_steel[1].pptx
Tata_steel[1].pptxTata_steel[1].pptx
Tata_steel[1].pptxganeshjilo
 
BCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdfBCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdfssuser455a701
 
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,IndiaAsia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,IndiaDinesh Kumar
 
Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Anuj Singh
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilitiesSrinivasaRao Guduru
 
Clc presentation jjb 01.29.2014 fv
Clc presentation jjb 01.29.2014 fvClc presentation jjb 01.29.2014 fv
Clc presentation jjb 01.29.2014 fvjodyalkema
 

Similaire à Roll On-Roll Off service (20)

Study of port performance in india
Study of port performance in indiaStudy of port performance in india
Study of port performance in india
 
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
 
Multimodal Transport in an Indian Perspective
Multimodal Transport in an Indian PerspectiveMultimodal Transport in an Indian Perspective
Multimodal Transport in an Indian Perspective
 
NJFuture Redevelopment Forum 2016 Rooney
NJFuture Redevelopment Forum 2016 RooneyNJFuture Redevelopment Forum 2016 Rooney
NJFuture Redevelopment Forum 2016 Rooney
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
 
Trade and Investment Forum
Trade and Investment ForumTrade and Investment Forum
Trade and Investment Forum
 
moloy roy sea and air logistics presentation
moloy roy   sea and air logistics presentationmoloy roy   sea and air logistics presentation
moloy roy sea and air logistics presentation
 
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
 
Pipeline Overview (Pipeline Operations)
Pipeline Overview (Pipeline Operations)Pipeline Overview (Pipeline Operations)
Pipeline Overview (Pipeline Operations)
 
Transnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic DirectionTransnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic Direction
 
The Port Metro Vancouver Interface
The Port Metro Vancouver InterfaceThe Port Metro Vancouver Interface
The Port Metro Vancouver Interface
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
African seaports expansion summit
African seaports expansion summitAfrican seaports expansion summit
African seaports expansion summit
 
Tata_steel[1].pptx
Tata_steel[1].pptxTata_steel[1].pptx
Tata_steel[1].pptx
 
BCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdfBCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdf
 
Measuring and evaluating port performance and productivity
Measuring and evaluating port performance and productivityMeasuring and evaluating port performance and productivity
Measuring and evaluating port performance and productivity
 
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,IndiaAsia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
 
Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)
 
Report on running room facilities
Report on running room facilitiesReport on running room facilities
Report on running room facilities
 
Clc presentation jjb 01.29.2014 fv
Clc presentation jjb 01.29.2014 fvClc presentation jjb 01.29.2014 fv
Clc presentation jjb 01.29.2014 fv
 

Dernier

AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfSkillCertProExams
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lodhisaajjda
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatmentnswingard
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...amilabibi1
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Baileyhlharris
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...David Celestin
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityHung Le
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIINhPhngng3
 
Zone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptxZone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptxlionnarsimharajumjf
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfMahamudul Hasan
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoKayode Fayemi
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...ZurliaSoop
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.thamaeteboho94
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalFabian de Rijk
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 

Dernier (17)

AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait Cityin kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
Zone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptxZone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptx
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 

Roll On-Roll Off service

  • 1. PERFORMANCE & PROSPECTS OF ROLL-ON/ROLL-OFF SERVICE:PERFORMANCE & PROSPECTS OF ROLL-ON/ROLL-OFF SERVICE: A STUDY WITH SPECIAL REFERENCE TO COCHIN PORT TRUSTA STUDY WITH SPECIAL REFERENCE TO COCHIN PORT TRUST INDIAN MARITIME UNIVERSITY SCHOOL OF MARITIME MANAGEMENT COCHIN CAMPUS 29th May 2015
  • 3. The Ro-Ro facility was build with the intention to improve the connectivity between Vallarpadam (ICTT) and Willingdon Island. The Cochin Port Trust jointly with IWAI had formed a joint management committee (JMC) for the purpose. LOTS shipping, a Cochin-based shipping company had won the 10 year contract for ferrying the containers between Willingdon Island and Vallarpadam by Roll on-Roll off (RO-RO) and Lift On-Lift Off (LO-LO) modes. The time for transporting container trucks by RO-RO mode was expected to be 20-25 min. The service enables the movement of containers preventing hundreds of trucks from the crowding the Cochin roads and has reduced transportation distance of 38 Km to 2.5Km
  • 4. “Even though the Ro-Ro provides a window for easier and speedy movement of container especially from the south of Kerala towards ICTT Vallarpadam this facility is not being optimally utilized as a result the actual estimated container moves of 750 containers per day has fallen down to a maximum of 150 containers per day therefore the service is suffering from continuous losses”
  • 5. RESEARCH ISSUESRESEARCH ISSUES 1. Why the Ro-Ro service is unable to perform to its optimal level and why is it incurring so much of loss in spite of its immense potential? 2. Why is the Ro-Ro service unable to get the expected amount of cargo for its optimal functioning? 3. Why is the Ro-Ro service incapable of rendering continuous service and also unable to stick on to their scheduled service time?
  • 6. OBJECTIVESOBJECTIVES 1.To understand the reason for the incapability of Ro-Ro service in rendering continuous service? 2.To understand the reasons why the service is not following a strict time schedule? 3.To identify the reason why is the Ro-Ro service unable to get the expected amount of cargo for its optimal functioning? 4.To recognize the reasons why the Ro-Ro service is unable to perform to its optimal level and why is it incurring so much of loss in spite of its immense potential? 5. To offer suggestions for improvement in the performance of the service
  • 7. METHODOLOGYMETHODOLOGY In order to measure the performance of Ro-Ro service in Cochin Port Trust the stratified disproportionate random sampling method has been adopted. At the first level major stake holders of Ro-Ro have been grouped under two sections namely 1.The service providers 2.Service users At the second level Ro-Ro operators and Cochin Port Trust are considered as service providers the truck operators, drivers and freight forwarders are considered as the major users of Ro-Ro.
  • 8. Cont…..Cont….. At the third level in each category 5-15 samples have been surveyed with help of pre-tested structured interview schedule. For the purpose of comparison of the monthly performances and the overall performance of the Ro-Ro service with the expected performance, secondary data of the Ro-Ro operation and cargo movement have been collected and analyzed.
  • 9. SAMPLES SELECTEDSAMPLES SELECTED SL.NO DEAILS 1 USERS TRUCK OPERATORS 5 TRUCK DRIVERS 10 FREIGHT FORWARDERS 10 2 SERVICE PROVIDERS PORT EMPLOYEES 15 RO-RO EMPLOYEES 5 TOTAL 45
  • 10. THE RESULT AND DISCUSSION OF THE STUDY
  • 11. Cargo handled in Ro-Ro fromCargo handled in Ro-Ro from 23rd February 2011 to 30th April 2015 SL.NO TYPE OF CONTAINER NUMBER OF TEU’S LOADED CONTAINER 1 20 FOOT 64,532 2 40 FOOT 36,253 EMPTY CONTAINER 3 20 FOOT 15,688 4 40 FOOT 12,364 TOTAL 1,28,837
  • 12. THE CURRENT RO-RO SCENARIOTHE CURRENT RO-RO SCENARIO Total number of days =1528 days Total no of working day =1239 days (Excluding Sundays and customs . holidays) Expected or predicted container movement per day = 750 TEU’s Expected total movement for 1239 days = 9, 29,250 TEU’s (approx.) Actual movement for 1239 days = 1, 28,837 TEU’s Therefore average movement per day = Less than 150 TEU’s
  • 13. SUGGESTIONS PUT FORWARD BY THE SAMPLES TOSUGGESTIONS PUT FORWARD BY THE SAMPLES TO IMPROVE THE PERFORMANCE OF THE RO-RO SERVICEIMPROVE THE PERFORMANCE OF THE RO-RO SERVICE 1.To improve the quality of the service i. 62.22% of the population suggested to take measures reduce the waiting time. ii. 20% had suggested about increasing by introducing user friendly services. iii. 17.77 % of the samples suggested to offer customer oriented services to improve the overall performance.
  • 14. Cont…..Cont….. 2.To improve the reliability i. 37.77% of the population suggested that reliability can be attained by following a strict time schedule. ii. Another 37.77% suggested that reliability can be attained by offering un interrupted services iii. Remaining 24.44%suggested both above mentioned aspects need to be incorporated together in order to offer a reliable service.
  • 15. Cont…..Cont….. 3. For infrastructural development i. 42.22% suggested to improve the overall infrastructure by modifying or changing the existing Ro-Ro vessel or by introducing an additional Ro-Ro vessel. ii. 4.44% suggested on performance improvement by recruiting trained employees for the service. iii. 35.55% believes that technological up gradation can bring about efficiency and development in the service. iv. 17.77% suggests all the three above mentioned aspects must be inculcated together for the best performance .
  • 17. ADVANTAGES OF USING RO-RO SERVICEADVANTAGES OF USING RO-RO SERVICE i. Cost efficient and speedier movement ii. Pollution Reduction iii. Reducing Traffic Congestion iv. Enables Eco-friendly transportation v. Reduction of operation and maintenance cost vi. Safer mode of transport
  • 18. REASON FOR THE REDUCTION IN DEMAND OFREASON FOR THE REDUCTION IN DEMAND OF RO-RORO-RO i. Trailer drivers have an affinity to wait for Ro-Ro ferry. ii. The service in not following a proper time schedule hence timely delivery of cargo can’t be assured iii. The waiting time for Ro-Ro service is very high iv. Ro-Ro unable to offer uninterrupted service due to frequently breaks downs. v. The present Ro-Ro tariff is not very attractive as the profit made compared to Road only mode of transport in terms of fuel cost vi. Lower cargo movement at Vallarpadam container terminal than what was expected from the facility.
  • 19. SUGGESTIONS TO IMPROVE THE PERFORMANCESUGGESTIONS TO IMPROVE THE PERFORMANCE OF RO-RO SERVICEOF RO-RO SERVICE i. The potential opportunity for highest performance during the peak hours (8AM-11AM & 4PM-8PM) must be utilized at the most optimal level by attracting more customers with offers/schemes or special peak time prices . ii. Waiting time between two consecutive services need to be brought down, either by reducing the transit time (25 min) or by introducing an additional Ro-Ro service, at least during the peak hours iii. Providing refreshment stalls for the waiting trailer drivers reducing their boredom. iv. Advanced technological Vessels capable of rendering uninterrupted service which is more fuel efficient and cost efficient.
  • 20. Cont…..Cont….. v. Concession price must be offered for regular Ro-Ro users which help in retaining these customers vi. Agreements may be made with the regular users. Credit facility can be made available for these users with whom agreements have been made which can further interest the transport operators in using the facility. vii. Government initiatives must be taken to support the initial performance of Ro-Ro. viii. The Ro-Ro service lack proper marketing hence the potential users of the Ro-Ro must be identified and made aware of the advantages of the facility .They can be offered attractive packages for using the facility and can be made loyal customers of the Ro-Ro facility.