SlideShare une entreprise Scribd logo
1  sur  26
(Simulation with Cycle-Tempo)
Presented by :-
Govind Kumar Mishra
Roll No.-14/ME/32
1
1. Introduction
2. Power Plant Configurations
i. SubC power plant
ii. SupC power plant
iii. USC power plant
3. Fuel Characteristics
4. Modelling of thermal Power Plant
5. Simulation of SubC power plant with Cycle-Tempo
6. Exergy destruction in power plant
7. Comparison among SubC, SupC and USC power plant
8. Conclusion
9. References
2
 What does 3-E analysis mean ?
E
E
E
3
 There are 3 basic power plant configurations
based on operating conditions:
1. Sub Critical power plant
2. Super Critical power plant
3.Ultrasuper Critical power plant
 These configurations are based on operating
temprature and pressure of power plant.
 Till now ultrasupercritical power plant is
limited to concept only.It is also known by the
name ‘The AD700 cycle’.
4
 A typical SubC power plant has following
parameters:
 500MW/166.7 bar/537 C/537 C
 Final FW temp.253 C
 Single stage reheating
 3 LPFWHs and 2 HPFWHs
 Efficiency :36%-38%
 Boiler drum is needed
 1 single flow HP
1 double flow IP
1double flow LP used.
5
 A typical SuperC power plant has following
parameters:
 660MW/242.2 bar/537 C/565 C
 Final FW temp. 280 C
 Single stage reheating
 4 LPFWHs and 3 HPFWHs
 Efficiency: 38%-40%
 No boiler drum needed
 1 single flow HP
1 double flow IP
2 double flow LP used.
6
 Design parameters of a conceptual ultrasupC
power plant:
 430MW/350 bar/700 C/720 C
 It is also called ‘The AD700 cycle’.
 Final FW temp. 330 C
 Single stage reheating
 5 LPFWHs and 3 HPFWHs
 Efficiency:42%-43%
 No boiler drum needed
 1 single flow HP
1 single flow IP
1 double flow LP used.
7
 There are mainly two types of coal used in
India.
1. Indian coal:Indian coal is high ash (HA) because it
consists of high amount of ash,minerals but low
quantity of fixed carbon(approax.40%).Its LHV
is15.2 MJ/kg and specific exergy is 17.3MJ/kg.
But in practice,plant efficiency is considered on
basis of HHV.Specific exergy of coal (EXcoal) is
estimated by :
8
2.Imported coal:It is generally low ash (LA) coal
as because it consists approax 70% fixed
carbon and less amount of ash or
minerals.Its LHV is 26.6 MJ/kg and specific
exergy is 28.5 MJ/kg.
 Sulphur content in both the coals are
comparable.
 Nitrogen content in imported coal is 1%
higher than Indian coal.
 Indian (HA) coal consumption is higher
than imported (LA) coal for same capacity of
power plant.
9
 Assumptions made before carrying out
simulation are :
10
 Governing equations used in this modelling
are:
 Where,
11
 Performance parameters:
12
 All the operating parameters are analysed
with Cycle_Tempo and effects of various
factors are carefully plotted,such as:
• Flue gas emissions w.r.t ambient pressure
• System efficiencies w.r.t ambient temperature
• System efficiencies w.r.t loading
• Efficiencies vs condender pressure
• Efficiencies vs excess air
• Efficiencies vs combustor pressure
• Efficiencies vs steam temperature
• Efficiencies vs cooling water temperature difference
13
 It means on inceasing ambient pressure
SOx, NOx, CO2 emmissions decreases.
0
1
2
3
4
5
6
7
8
9
10
0 5 10 15 20 25
Emmissions(%)
Ambient pressure (bar)
Emission of SOx , NOx , CO2 in SubC power plant
SO2
NO2
CO2
14
Above graph clearly tells that on high loading
working efficiencies of power plant is high.
0
5
10
15
20
25
30
35
40
0 20 40 60 80 100 120
Systemefficiencies(%)
Loading(%)
System efficiencies vs loading
Plant efficiency(%)
Exergy efficiency(%)
15
Working efficiencies decrease as excess air %
is increased beyond 20%.
31
32
33
34
35
36
37
38
0 20 40 60 80 100 120
Efficiency(in%)
Excess air(in %)
Efficiencies vs excess air
Energy efficiency(%)
Exergy efficiency(%)
16
It means upon decreasing
condenser pressure system
efficiencies increase.
Here upon increasing combustor
pressure efficiencies increase.
0
10
20
30
40
50
60
0 5 10Efficiency(in%)
combustor pressure(bar)
Efficiencies vs combustor
pressure
energy
efficiency(%)
exergy
efficiency(%)
32
33
34
35
36
37
38
0 5 10 15
Efficiencies(%)
Condenser pressure(kpa)
Efficiencies vs condenser
pressure
Plant
efficiency(%)
Exergy
efficiency(%)
17
On increasing cooling water
temperature gain efficiency
increases slightly.
But on incresing steam temperature
system efficiency increases
appreciably.
32
33
34
35
36
37
38
0 10 20 30
Efficiency(%)
Cooling water temperature gain(C)
Efficiencies vs cooling eater
temperature gain
Energy
efficiency(%)
Exergy
efficiency(%)
34
35
36
37
38
39
40
41
42
500 600 700
Efficiency(%)
steam tempreture(In c)
Efficiencies vs steam
tempreture
Energy
efficiency(%)
Exergy
efficiency(%)
18
Thermal efficiency is maximum at
50% loading and decreses with
increase in loading.
2nd law efficiency or exergy efficiency is
also maximum at 50% loading and it
decreases with increase in loading
19
 From 1st law analysis energy losses in condenser is maximum
about 55% of total input energy but due to its low grade
quality exergy destruction in condenser is only (20%-28%).
 Exergy destruction is highest is in turbine operating at
highest tempeerature.
20
21
 System efficiencies are highest in USC and lowest in SubC
power plant.
22
 Final feed water temperature is maximum in
USC and minimum in SubC power plant.
23
 The thermal power plant has highest thermal and
exergetic efficiencies at 50% loading.
 The turbine has maximum exergy destruction and pump
the least,i.e at 50% loading exergy destruction is 46% in
turbine.
 The maximum energy loss is in condenser (57%) and
condenser together with feed water heater also accounts
for maximum exergy loss(52%) .
 There is reduction of (3%-5%) and (15%-17%) in emmision
of CO2,SOx and NOx in SupC and USC power plant in
comparison to SubC power plant.
 There is a substantial increase of 43% fuel consumption
and a significant decrease of 3% plant exergy efficiency
using HA coal as compared to LA coal.
24
 ‘3-E analysis of pressurised pulverised combined
cycle(PPCC) power plant using high ash Indian
coal’ by Selvam Kalimuthu,Sujit Karmakar and
others: Energy 128 (2017) 634e648
 ‘3-E analysis of advanced power plant based on
high ash coal’ by M.V.J.j Suresh and others
 ‘Investigating theperformance of a steam power
plant’ by Ahmad Rashad and others
25
26

Contenu connexe

Tendances

Combiled cycle ppt
Combiled cycle pptCombiled cycle ppt
Combiled cycle pptJoydeep Paul
 
Brayton cycle for gas turbine
Brayton cycle for gas turbineBrayton cycle for gas turbine
Brayton cycle for gas turbineNikhil Nagdev
 
REVIEW OF POWER PLANT
REVIEW OF POWER PLANTREVIEW OF POWER PLANT
REVIEW OF POWER PLANTCharltonInao1
 
Prashant ppt on ntpc anta
Prashant ppt on ntpc antaPrashant ppt on ntpc anta
Prashant ppt on ntpc antaprashant shukla
 
Chapter (5) gas turbine power plants
Chapter (5) gas turbine power plantsChapter (5) gas turbine power plants
Chapter (5) gas turbine power plantsAzam Ali
 
Binary cycle & co generation power plants
Binary cycle & co generation power plantsBinary cycle & co generation power plants
Binary cycle & co generation power plantsPalanivel rajan
 
combine cycle power plant
combine cycle power plantcombine cycle power plant
combine cycle power planttanuj jhankal
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power PlantSmile Hossain
 
Combined cycle power project,dholpur
Combined cycle power project,dholpurCombined cycle power project,dholpur
Combined cycle power project,dholpurRajessh Garhwal
 
integrated brayton and rankine cycle
integrated brayton and rankine cycle integrated brayton and rankine cycle
integrated brayton and rankine cycle UPENDRA YADAV
 
Power Cycles and power plants
Power Cycles and power plantsPower Cycles and power plants
Power Cycles and power plantsSarthak Kohli
 
Combine cycle power plant
Combine cycle power plant Combine cycle power plant
Combine cycle power plant Khizar Siddique
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - ManualSheel Shah
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power PlantMd. Rimon Mia
 
Lecture 6 _ Brayton cycle
Lecture 6 _ Brayton cycle Lecture 6 _ Brayton cycle
Lecture 6 _ Brayton cycle Sijal Ahmed
 

Tendances (20)

Combiled cycle ppt
Combiled cycle pptCombiled cycle ppt
Combiled cycle ppt
 
Brayton cycle for gas turbine
Brayton cycle for gas turbineBrayton cycle for gas turbine
Brayton cycle for gas turbine
 
REVIEW OF POWER PLANT
REVIEW OF POWER PLANTREVIEW OF POWER PLANT
REVIEW OF POWER PLANT
 
Prashant ppt on ntpc anta
Prashant ppt on ntpc antaPrashant ppt on ntpc anta
Prashant ppt on ntpc anta
 
Chapter (5) gas turbine power plants
Chapter (5) gas turbine power plantsChapter (5) gas turbine power plants
Chapter (5) gas turbine power plants
 
Binary cycle & co generation power plants
Binary cycle & co generation power plantsBinary cycle & co generation power plants
Binary cycle & co generation power plants
 
combine cycle power plant
combine cycle power plantcombine cycle power plant
combine cycle power plant
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
Combined cycle power project,dholpur
Combined cycle power project,dholpurCombined cycle power project,dholpur
Combined cycle power project,dholpur
 
integrated brayton and rankine cycle
integrated brayton and rankine cycle integrated brayton and rankine cycle
integrated brayton and rankine cycle
 
Ambrish
AmbrishAmbrish
Ambrish
 
Brayton cycle
Brayton cycleBrayton cycle
Brayton cycle
 
Power Cycles and power plants
Power Cycles and power plantsPower Cycles and power plants
Power Cycles and power plants
 
Combine cycle power plant
Combine cycle power plant Combine cycle power plant
Combine cycle power plant
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Micro turbine ppt
Micro turbine pptMicro turbine ppt
Micro turbine ppt
 
GAS TURBINE
GAS TURBINEGAS TURBINE
GAS TURBINE
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
Gas turbine cycles
Gas turbine cyclesGas turbine cycles
Gas turbine cycles
 
Lecture 6 _ Brayton cycle
Lecture 6 _ Brayton cycle Lecture 6 _ Brayton cycle
Lecture 6 _ Brayton cycle
 

Similaire à 3 e analysis of thermal power plants

Investigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power PlantInvestigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power PlantIJMERJOURNAL
 
Cogeneration systems
Cogeneration systemsCogeneration systems
Cogeneration systemsrishabarani
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantIRJET Journal
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportIshan Khandelwal
 
Cogeneration
CogenerationCogeneration
Cogenerationskdass23
 
IRJET- Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
IRJET-	 Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...IRJET-	 Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
IRJET- Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...IRJET Journal
 
Gas turbine advisors review of a 9 e.03 ccgt power plant
Gas turbine advisors review of a 9 e.03 ccgt power plant Gas turbine advisors review of a 9 e.03 ccgt power plant
Gas turbine advisors review of a 9 e.03 ccgt power plant Gasturbineconsultants
 
Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...
Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...
Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...IJMER
 
Handbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccHandbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccRAULCARDENASHUAMAN
 
Thermodynamic Chapter 6 Thermal Power Plant
Thermodynamic Chapter 6 Thermal Power PlantThermodynamic Chapter 6 Thermal Power Plant
Thermodynamic Chapter 6 Thermal Power PlantMuhammad Surahman
 
08b combined cycle-systems-jbc
08b combined cycle-systems-jbc08b combined cycle-systems-jbc
08b combined cycle-systems-jbcRajesh Sheoran
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Yuvraj Singh
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
CESC SGS project report
CESC SGS project reportCESC SGS project report
CESC SGS project reportSayanSarkar55
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET Journal
 

Similaire à 3 e analysis of thermal power plants (20)

X10694 (me8391)
X10694 (me8391)X10694 (me8391)
X10694 (me8391)
 
Investigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power PlantInvestigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power Plant
 
Cogeneration systems
Cogeneration systemsCogeneration systems
Cogeneration systems
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plant
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
IRJET- Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
IRJET-	 Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...IRJET-	 Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
IRJET- Energy and Exergy Analysis of Multiple Extraction Cum Condensing Stea...
 
Gas turbine advisors review of a 9 e.03 ccgt power plant
Gas turbine advisors review of a 9 e.03 ccgt power plant Gas turbine advisors review of a 9 e.03 ccgt power plant
Gas turbine advisors review of a 9 e.03 ccgt power plant
 
Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...
Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...
Energy Based Analysis of a Thermal Power Station for Energy Efficiency Improv...
 
ICMA2013-103-asli
ICMA2013-103-asliICMA2013-103-asli
ICMA2013-103-asli
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
Handbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccHandbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calcc
 
Thermodynamic Chapter 6 Thermal Power Plant
Thermodynamic Chapter 6 Thermal Power PlantThermodynamic Chapter 6 Thermal Power Plant
Thermodynamic Chapter 6 Thermal Power Plant
 
08b combined cycle-systems-jbc
08b combined cycle-systems-jbc08b combined cycle-systems-jbc
08b combined cycle-systems-jbc
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
CESC SGS project report
CESC SGS project reportCESC SGS project report
CESC SGS project report
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power Plant
 

Dernier

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 

Dernier (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 

3 e analysis of thermal power plants

  • 1. (Simulation with Cycle-Tempo) Presented by :- Govind Kumar Mishra Roll No.-14/ME/32 1
  • 2. 1. Introduction 2. Power Plant Configurations i. SubC power plant ii. SupC power plant iii. USC power plant 3. Fuel Characteristics 4. Modelling of thermal Power Plant 5. Simulation of SubC power plant with Cycle-Tempo 6. Exergy destruction in power plant 7. Comparison among SubC, SupC and USC power plant 8. Conclusion 9. References 2
  • 3.  What does 3-E analysis mean ? E E E 3
  • 4.  There are 3 basic power plant configurations based on operating conditions: 1. Sub Critical power plant 2. Super Critical power plant 3.Ultrasuper Critical power plant  These configurations are based on operating temprature and pressure of power plant.  Till now ultrasupercritical power plant is limited to concept only.It is also known by the name ‘The AD700 cycle’. 4
  • 5.  A typical SubC power plant has following parameters:  500MW/166.7 bar/537 C/537 C  Final FW temp.253 C  Single stage reheating  3 LPFWHs and 2 HPFWHs  Efficiency :36%-38%  Boiler drum is needed  1 single flow HP 1 double flow IP 1double flow LP used. 5
  • 6.  A typical SuperC power plant has following parameters:  660MW/242.2 bar/537 C/565 C  Final FW temp. 280 C  Single stage reheating  4 LPFWHs and 3 HPFWHs  Efficiency: 38%-40%  No boiler drum needed  1 single flow HP 1 double flow IP 2 double flow LP used. 6
  • 7.  Design parameters of a conceptual ultrasupC power plant:  430MW/350 bar/700 C/720 C  It is also called ‘The AD700 cycle’.  Final FW temp. 330 C  Single stage reheating  5 LPFWHs and 3 HPFWHs  Efficiency:42%-43%  No boiler drum needed  1 single flow HP 1 single flow IP 1 double flow LP used. 7
  • 8.  There are mainly two types of coal used in India. 1. Indian coal:Indian coal is high ash (HA) because it consists of high amount of ash,minerals but low quantity of fixed carbon(approax.40%).Its LHV is15.2 MJ/kg and specific exergy is 17.3MJ/kg. But in practice,plant efficiency is considered on basis of HHV.Specific exergy of coal (EXcoal) is estimated by : 8
  • 9. 2.Imported coal:It is generally low ash (LA) coal as because it consists approax 70% fixed carbon and less amount of ash or minerals.Its LHV is 26.6 MJ/kg and specific exergy is 28.5 MJ/kg.  Sulphur content in both the coals are comparable.  Nitrogen content in imported coal is 1% higher than Indian coal.  Indian (HA) coal consumption is higher than imported (LA) coal for same capacity of power plant. 9
  • 10.  Assumptions made before carrying out simulation are : 10
  • 11.  Governing equations used in this modelling are:  Where, 11
  • 13.  All the operating parameters are analysed with Cycle_Tempo and effects of various factors are carefully plotted,such as: • Flue gas emissions w.r.t ambient pressure • System efficiencies w.r.t ambient temperature • System efficiencies w.r.t loading • Efficiencies vs condender pressure • Efficiencies vs excess air • Efficiencies vs combustor pressure • Efficiencies vs steam temperature • Efficiencies vs cooling water temperature difference 13
  • 14.  It means on inceasing ambient pressure SOx, NOx, CO2 emmissions decreases. 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 20 25 Emmissions(%) Ambient pressure (bar) Emission of SOx , NOx , CO2 in SubC power plant SO2 NO2 CO2 14
  • 15. Above graph clearly tells that on high loading working efficiencies of power plant is high. 0 5 10 15 20 25 30 35 40 0 20 40 60 80 100 120 Systemefficiencies(%) Loading(%) System efficiencies vs loading Plant efficiency(%) Exergy efficiency(%) 15
  • 16. Working efficiencies decrease as excess air % is increased beyond 20%. 31 32 33 34 35 36 37 38 0 20 40 60 80 100 120 Efficiency(in%) Excess air(in %) Efficiencies vs excess air Energy efficiency(%) Exergy efficiency(%) 16
  • 17. It means upon decreasing condenser pressure system efficiencies increase. Here upon increasing combustor pressure efficiencies increase. 0 10 20 30 40 50 60 0 5 10Efficiency(in%) combustor pressure(bar) Efficiencies vs combustor pressure energy efficiency(%) exergy efficiency(%) 32 33 34 35 36 37 38 0 5 10 15 Efficiencies(%) Condenser pressure(kpa) Efficiencies vs condenser pressure Plant efficiency(%) Exergy efficiency(%) 17
  • 18. On increasing cooling water temperature gain efficiency increases slightly. But on incresing steam temperature system efficiency increases appreciably. 32 33 34 35 36 37 38 0 10 20 30 Efficiency(%) Cooling water temperature gain(C) Efficiencies vs cooling eater temperature gain Energy efficiency(%) Exergy efficiency(%) 34 35 36 37 38 39 40 41 42 500 600 700 Efficiency(%) steam tempreture(In c) Efficiencies vs steam tempreture Energy efficiency(%) Exergy efficiency(%) 18
  • 19. Thermal efficiency is maximum at 50% loading and decreses with increase in loading. 2nd law efficiency or exergy efficiency is also maximum at 50% loading and it decreases with increase in loading 19
  • 20.  From 1st law analysis energy losses in condenser is maximum about 55% of total input energy but due to its low grade quality exergy destruction in condenser is only (20%-28%).  Exergy destruction is highest is in turbine operating at highest tempeerature. 20
  • 21. 21
  • 22.  System efficiencies are highest in USC and lowest in SubC power plant. 22
  • 23.  Final feed water temperature is maximum in USC and minimum in SubC power plant. 23
  • 24.  The thermal power plant has highest thermal and exergetic efficiencies at 50% loading.  The turbine has maximum exergy destruction and pump the least,i.e at 50% loading exergy destruction is 46% in turbine.  The maximum energy loss is in condenser (57%) and condenser together with feed water heater also accounts for maximum exergy loss(52%) .  There is reduction of (3%-5%) and (15%-17%) in emmision of CO2,SOx and NOx in SupC and USC power plant in comparison to SubC power plant.  There is a substantial increase of 43% fuel consumption and a significant decrease of 3% plant exergy efficiency using HA coal as compared to LA coal. 24
  • 25.  ‘3-E analysis of pressurised pulverised combined cycle(PPCC) power plant using high ash Indian coal’ by Selvam Kalimuthu,Sujit Karmakar and others: Energy 128 (2017) 634e648  ‘3-E analysis of advanced power plant based on high ash coal’ by M.V.J.j Suresh and others  ‘Investigating theperformance of a steam power plant’ by Ahmad Rashad and others 25
  • 26. 26