Clients:
Dr Robin North         Group members:
Dr Margherita Mascia   Vinh Phuong Hoang; Angelos Kozonis; Michael Lau;
Dr Sonal Ahuja         Qader Majali; James Musgrave; Dominic Peter; Ai Sun;
                       Saajid Sahabdeen; Xiaojie Wang;
Development of
Opportunity Area
Transport needs development in Nine Elms
   Transport needs development in Nine Elms
               Transport issues
            Public Transport Accessibility in the Opportunity Area




               2006                                      2026

 REF: Vauxhall Nine Elms Battersea Opportunity Area – Transport Study (2009)
Alternative transport proposals
   Northern Line Extension              Light Rail Transit




Enhancements to Walking & Cycling   Improvements to Bus Service
Personal Rapid Transport
Fully automated vehicles

Small vehicles

Cheaper than traditional options

Greater service

Sustainable and environmentally
friendly

Revolutionary
Project Aims
     Analyse feasibility of PRT system

     Design comprehensive network
     to improve transport to the Nine
     Elms region

     Evaluate economics of the
     project including fare structure

     Present a convincing argument
     for PRT including cost-benefit
     analysis
Work to date
Initial research
Site visit
Analysis of existing
transport options
Investigation into existing
PRT systems
Choice of system for our
project
Initial route proposals
Track & station design

Detailed demand study
VECTUS



                                    Disadvantages
        Advantages


                             High energy consumption
Linear induction motor
                             Large space required
High speed & good
acceleration
                             Cost not known
Applications

                             Masdar City (PRT)
        Characteristics


Infrastructure

• 1.85m width
                             Rivium Business Park (GRT)
Cost

• £6.5 mil – £8.1 mil / km

Mixing Systems
ULTRA
     Characteristics              Application: Heathrow Terminal 5

Infrastructure
• 2.1m width

Cost
• £4.5-£9.5 million / km

Benefits
• Low capital and operational
  costs
• Energy efficiency
POD Comparison
              Parameter                 ULTRA      Score    2GETTHERE      Score
Energy Consumption at 30 km/h           0.09        1          0.17         0
(empty) [kWh/km]
System Flexibility (ability to take    Freight      0      Freight/large    1
different types of vehicle)
Weight – empty and (maximum) [kg]     850 (1300)   0.9     1400 (2050)      0

Track Width [m]                          2.1        0          1.85        0.7
Vehicle Guidance Method                 Kerbs      0.7      Magnetic        0
                                                            Markers
                   .
                   .                                 .
                                                     .                       .
                                                                             .
                   .                                 .                       .
Total                                               5                      2.6
Demand
• Initial demand estimation
• Light Rail Transit (LRT) demand in 2026




• Want PRT system to accommodate this
• Total 4367 passengers per hour
Demand


   Detailed demand study



   Origin destination matrix
Route Requirements
Route to Waterloo & Victoria along
     river, roads and railways
Route to Waterloo & Pimlico above
         river and roads
Route to Waterloo & Pimlico along river
          and existing bridge
Route to Waterloo & Pimlico along
       river and new bridge
Project Schedule
Team Structure
                      Dominic Peter                                            James Musgrave
                       Project Manager                                           Project Manager




                       POD System                                               System Route
              Pods, Stations, Guideways, IT etc...                      Demand Study, route locations etc…




Angelos Kozonis    Qader Majali     Saajid Sahabdeen   Ai Sun   Xiaojie Wang    Vinh Phuong Hoang      Michael Lau
References:
• Wandsworth Council. (2012). Nine Elms on the South Bank.
  Retrieved 2012, from Wandsworth:
  http://www.wandsworth.gov.uk/info/200079/regeneration/
  371/
• North, R. (2012). Riverside link: Personal Rapid Transit.
  London: Imperial College London
• SKM. (2009). Vauxhall Nine Elms Battersea Opportunity
  Area –Transport Study.

Contenu connexe

Tendances

MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
guylundy
 
Keep it moving - construction phase transport planning
Keep it moving - construction phase  transport planningKeep it moving - construction phase  transport planning
Keep it moving - construction phase transport planning
JumpingJaq
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
YAU MEE LIM
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
Norma Nun
 

Tendances (20)

MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
 
02 - Ultra Global PRT Past Present Future Low Carbon Business Breakfast - En...
02 - Ultra Global PRT Past Present Future  Low Carbon Business Breakfast - En...02 - Ultra Global PRT Past Present Future  Low Carbon Business Breakfast - En...
02 - Ultra Global PRT Past Present Future Low Carbon Business Breakfast - En...
 
Transit Options - Amherst Buffalo
Transit Options - Amherst BuffaloTransit Options - Amherst Buffalo
Transit Options - Amherst Buffalo
 
Open houseboards
Open houseboardsOpen houseboards
Open houseboards
 
Keep it moving - construction phase transport planning
Keep it moving - construction phase  transport planningKeep it moving - construction phase  transport planning
Keep it moving - construction phase transport planning
 
AN M.ENG PRESENTATION ON ROAD NETWORK
AN M.ENG PRESENTATION ON ROAD NETWORKAN M.ENG PRESENTATION ON ROAD NETWORK
AN M.ENG PRESENTATION ON ROAD NETWORK
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
TEST4-SLIDESHARE
TEST4-SLIDESHARETEST4-SLIDESHARE
TEST4-SLIDESHARE
 
Brett herron
Brett herronBrett herron
Brett herron
 
Transportation Challenges Alberta
Transportation Challenges AlbertaTransportation Challenges Alberta
Transportation Challenges Alberta
 
The Need For Rail And Ports Integration Pmaesa
The Need For Rail And Ports Integration PmaesaThe Need For Rail And Ports Integration Pmaesa
The Need For Rail And Ports Integration Pmaesa
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
 
BC Ministry of Transportation Transit Presentation
BC Ministry of Transportation Transit PresentationBC Ministry of Transportation Transit Presentation
BC Ministry of Transportation Transit Presentation
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Triangle Transit's presentation to EDPP on Orange County Draft Plan
Triangle Transit's presentation to EDPP on Orange County Draft PlanTriangle Transit's presentation to EDPP on Orange County Draft Plan
Triangle Transit's presentation to EDPP on Orange County Draft Plan
 
Rail and Port Integration
Rail and Port IntegrationRail and Port Integration
Rail and Port Integration
 
Logistics 2013: Mark Basnett
Logistics 2013: Mark Basnett Logistics 2013: Mark Basnett
Logistics 2013: Mark Basnett
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 

En vedette

Group 05 Development Presentation
Group 05 Development PresentationGroup 05 Development Presentation
Group 05 Development Presentation
GP Design PS
 
Group 08 Development Presentation
Group 08 Development PresentationGroup 08 Development Presentation
Group 08 Development Presentation
GP Design PS
 
Group 01 Development Presentation
Group 01 Development PresentationGroup 01 Development Presentation
Group 01 Development Presentation
GP Design PS
 
Group 09 Development Presentation
Group 09 Development PresentationGroup 09 Development Presentation
Group 09 Development Presentation
GP Design PS
 
Group 04 Development Presentation
Group 04 Development PresentationGroup 04 Development Presentation
Group 04 Development Presentation
GP Design PS
 
Group 12 Development Presentation
Group 12 Development PresentationGroup 12 Development Presentation
Group 12 Development Presentation
GP Design PS
 
Group 07 Development Presentation
Group 07 Development PresentationGroup 07 Development Presentation
Group 07 Development Presentation
GP Design PS
 
Group 02 Development Presentation
Group 02 Development Presentation Group 02 Development Presentation
Group 02 Development Presentation
GP Design PS
 
Group 03 Development Presentation
Group 03 Development PresentationGroup 03 Development Presentation
Group 03 Development Presentation
GP Design PS
 

En vedette (9)

Group 05 Development Presentation
Group 05 Development PresentationGroup 05 Development Presentation
Group 05 Development Presentation
 
Group 08 Development Presentation
Group 08 Development PresentationGroup 08 Development Presentation
Group 08 Development Presentation
 
Group 01 Development Presentation
Group 01 Development PresentationGroup 01 Development Presentation
Group 01 Development Presentation
 
Group 09 Development Presentation
Group 09 Development PresentationGroup 09 Development Presentation
Group 09 Development Presentation
 
Group 04 Development Presentation
Group 04 Development PresentationGroup 04 Development Presentation
Group 04 Development Presentation
 
Group 12 Development Presentation
Group 12 Development PresentationGroup 12 Development Presentation
Group 12 Development Presentation
 
Group 07 Development Presentation
Group 07 Development PresentationGroup 07 Development Presentation
Group 07 Development Presentation
 
Group 02 Development Presentation
Group 02 Development Presentation Group 02 Development Presentation
Group 02 Development Presentation
 
Group 03 Development Presentation
Group 03 Development PresentationGroup 03 Development Presentation
Group 03 Development Presentation
 

Similaire à Group 11 Development Presentation

Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
satish choudhari
 

Similaire à Group 11 Development Presentation (20)

H046405864
H046405864H046405864
H046405864
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdf
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
A Survey on Vehicular Ad hoc Networks
A Survey on Vehicular Ad hoc Networks A Survey on Vehicular Ad hoc Networks
A Survey on Vehicular Ad hoc Networks
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
Highway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptxHighway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptx
 
BRTS - Ahmadabad (Janmarg)
BRTS - Ahmadabad (Janmarg)BRTS - Ahmadabad (Janmarg)
BRTS - Ahmadabad (Janmarg)
 
Metro Rail final.pptx
Metro Rail final.pptxMetro Rail final.pptx
Metro Rail final.pptx
 
Real time path planning based on hybrid vanet enhanced transportation system
Real time path planning based on hybrid vanet enhanced transportation systemReal time path planning based on hybrid vanet enhanced transportation system
Real time path planning based on hybrid vanet enhanced transportation system
 
Survey of mirp for vehicular ad hoc networks in urban environments
Survey of mirp for vehicular ad hoc networks in urban environmentsSurvey of mirp for vehicular ad hoc networks in urban environments
Survey of mirp for vehicular ad hoc networks in urban environments
 
VANET Clustering
VANET ClusteringVANET Clustering
VANET Clustering
 
UK Rail_(c) Arup
UK Rail_(c) ArupUK Rail_(c) Arup
UK Rail_(c) Arup
 
Vanet modeling and clustering design under practical traffic, channel and mob...
Vanet modeling and clustering design under practical traffic, channel and mob...Vanet modeling and clustering design under practical traffic, channel and mob...
Vanet modeling and clustering design under practical traffic, channel and mob...
 
Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 

Plus de GP Design PS

[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering
GP Design PS
 
[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management
GP Design PS
 
[Group 04] Offshore Platform
[Group 04] Offshore Platform[Group 04] Offshore Platform
[Group 04] Offshore Platform
GP Design PS
 
[Group 02] Safer Crossings
[Group 02] Safer Crossings[Group 02] Safer Crossings
[Group 02] Safer Crossings
GP Design PS
 
[Group 08] Project W
[Group 08] Project W[Group 08] Project W
[Group 08] Project W
GP Design PS
 
[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital
GP Design PS
 
[Group 06] Imperial War Museum
[Group 06] Imperial War Museum[Group 06] Imperial War Museum
[Group 06] Imperial War Museum
GP Design PS
 
[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office
GP Design PS
 
[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power
GP Design PS
 
Group 10 Development Presentation
Group 10 Development PresentationGroup 10 Development Presentation
Group 10 Development Presentation
GP Design PS
 
Group 06 Development Presentation
Group 06 Development PresentationGroup 06 Development Presentation
Group 06 Development Presentation
GP Design PS
 

Plus de GP Design PS (11)

[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering
 
[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management
 
[Group 04] Offshore Platform
[Group 04] Offshore Platform[Group 04] Offshore Platform
[Group 04] Offshore Platform
 
[Group 02] Safer Crossings
[Group 02] Safer Crossings[Group 02] Safer Crossings
[Group 02] Safer Crossings
 
[Group 08] Project W
[Group 08] Project W[Group 08] Project W
[Group 08] Project W
 
[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital
 
[Group 06] Imperial War Museum
[Group 06] Imperial War Museum[Group 06] Imperial War Museum
[Group 06] Imperial War Museum
 
[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office
 
[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power
 
Group 10 Development Presentation
Group 10 Development PresentationGroup 10 Development Presentation
Group 10 Development Presentation
 
Group 06 Development Presentation
Group 06 Development PresentationGroup 06 Development Presentation
Group 06 Development Presentation
 

Dernier

Dernier (20)

2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Group 11 Development Presentation

  • 1. Clients: Dr Robin North Group members: Dr Margherita Mascia Vinh Phuong Hoang; Angelos Kozonis; Michael Lau; Dr Sonal Ahuja Qader Majali; James Musgrave; Dominic Peter; Ai Sun; Saajid Sahabdeen; Xiaojie Wang;
  • 3. Transport needs development in Nine Elms Transport needs development in Nine Elms Transport issues Public Transport Accessibility in the Opportunity Area 2006 2026 REF: Vauxhall Nine Elms Battersea Opportunity Area – Transport Study (2009)
  • 4. Alternative transport proposals Northern Line Extension Light Rail Transit Enhancements to Walking & Cycling Improvements to Bus Service
  • 5. Personal Rapid Transport Fully automated vehicles Small vehicles Cheaper than traditional options Greater service Sustainable and environmentally friendly Revolutionary
  • 6. Project Aims Analyse feasibility of PRT system Design comprehensive network to improve transport to the Nine Elms region Evaluate economics of the project including fare structure Present a convincing argument for PRT including cost-benefit analysis
  • 7. Work to date Initial research Site visit Analysis of existing transport options Investigation into existing PRT systems Choice of system for our project Initial route proposals Track & station design Detailed demand study
  • 8. VECTUS Disadvantages Advantages High energy consumption Linear induction motor Large space required High speed & good acceleration Cost not known
  • 9. Applications Masdar City (PRT) Characteristics Infrastructure • 1.85m width Rivium Business Park (GRT) Cost • £6.5 mil – £8.1 mil / km Mixing Systems
  • 10. ULTRA Characteristics Application: Heathrow Terminal 5 Infrastructure • 2.1m width Cost • £4.5-£9.5 million / km Benefits • Low capital and operational costs • Energy efficiency
  • 11. POD Comparison Parameter ULTRA Score 2GETTHERE Score Energy Consumption at 30 km/h 0.09 1 0.17 0 (empty) [kWh/km] System Flexibility (ability to take Freight 0 Freight/large 1 different types of vehicle) Weight – empty and (maximum) [kg] 850 (1300) 0.9 1400 (2050) 0 Track Width [m] 2.1 0 1.85 0.7 Vehicle Guidance Method Kerbs 0.7 Magnetic 0 Markers . . . . . . . . . Total 5 2.6
  • 12. Demand • Initial demand estimation • Light Rail Transit (LRT) demand in 2026 • Want PRT system to accommodate this • Total 4367 passengers per hour
  • 13. Demand Detailed demand study Origin destination matrix
  • 15. Route to Waterloo & Victoria along river, roads and railways
  • 16. Route to Waterloo & Pimlico above river and roads
  • 17. Route to Waterloo & Pimlico along river and existing bridge
  • 18. Route to Waterloo & Pimlico along river and new bridge
  • 20. Team Structure Dominic Peter James Musgrave Project Manager Project Manager POD System System Route Pods, Stations, Guideways, IT etc... Demand Study, route locations etc… Angelos Kozonis Qader Majali Saajid Sahabdeen Ai Sun Xiaojie Wang Vinh Phuong Hoang Michael Lau
  • 21.
  • 22. References: • Wandsworth Council. (2012). Nine Elms on the South Bank. Retrieved 2012, from Wandsworth: http://www.wandsworth.gov.uk/info/200079/regeneration/ 371/ • North, R. (2012). Riverside link: Personal Rapid Transit. London: Imperial College London • SKM. (2009). Vauxhall Nine Elms Battersea Opportunity Area –Transport Study.