OEE-When to use

1. Does your production have bottlenecks that you
   are not aware of?

2. Could one machine be dragging down the entire
   facility?

3. Does your equipment have excess capacity that
   could be easily and inexpensively tapped?
OEE-Benefits




HELPS YOU INSTANTLY
MAKE MORE WITH WHAT
      YOU HAVE
OEE- What is it


OEE is just a Best Practice that
 helps you monitor and improve
    the effectiveness of your
            processes
OEE- Guide



 OEE        Six Big     World
Factors     Losses    Class OEE

Formulas     OEE        Visual
            Example     OEE
OEE-Factors


                                                                                  Time Available
              Plant Operating Time                                                i.e. LMI Mex
                                                                                  10hrs

                                                                 Planned          Subtract
         Plant Operating Time                                   Shutdown
                                                                                  Lunch,Breaks,
                                                                                  Maintenace
                                                             Subtract
                                            Down Time
        Operating Time                        Loss
                                                             •Equipment failure
                                                             •Mat. Shortages,
                                                             •Changeover time
                                   Speed    Subtract
    Net Operating Time             Loss     •Different material, machine wear,
                                            operator inefficiency
                         Quality   Subtract
Fully Productive Time     Loss     •Rework time
                                   •Scrap



                               OEE Goal is to Maximize Fully
                               Productive Time
OEE-Factors

 The following table is a review of the interpretation of the core concepts.

      OEE LOSS                                           OEE Factor
Planned Shutdown     *Not part of the calculation
Down Time Loss       *Availability=Ratio of Operating Time to Planned Production Time
                     (Operating Time=Planned Production Time-Down Time Loss)
                     *100% Availability means the process has been running without any recorded stops
Speed Loss           *Performance= Ratio of Net Operating time to Operating Time
                     (Net Operating Time=Operating Time-Speed Loss)
                     *Interpreted as Ideal Cycle Time to Actual Cycle Time
                     *100% Performance means the process has been consistently running at its
                     theoretical maximun speed
Quality Loss         *Quality=Ratio of Fully Productive Time to Net Operating Time
                     (Fully Productive Time=Net Operating Time-Quality Loss)
                     *Interpreted as the ratio of Good Pieces to Total Pieces
                     *100% Qaulity means there have been no reject or rework pieces

               This factor can then drill down into productivity losses
OEE-6 Big Losses
                  Six Big Loss      OEE Loss
                   Category         Category          Event Examples              Comment
                 Breakdowns      Down Time Loss Tooling failures            There is flexibility to
                                                Unplanned maintenance         decide between a
                                                General breakdowns          breakdown and small
                                                Equipment failure                    stop
    Those        Set Up and
                 Adjustments     Down Time Loss Setup/changeover
 productivity                                   Material shortages
                                                                         This loss is adressed
                                                                            through set up
 Losses are                                     Operator shortages
                                                                          reduction projects
                                                Major adjustments
called the SIX                                  Warm-Up Time
BIG LOSSES       Small Stops       Speed Loss   Obstructed product flow
                                                Component jams
                                                                        Typically includes stops
                                                Misfeeds
                                                                          that are under five
                                                Sensored blocked
                                                                                minutes
                                                Delivery blocked
                                                Cleaning / Checking
                 Reduced
                 Speed             Speed Loss     Rough running
                                                                           Anything that prevents
                                                  Under nameplate capacity
                                                                            the process running
                                                  Under designed capacity
                                                                                normal speed
                                                  Equipment wear
                                                  Operator inefficiency
                 1.Startup                                                 1.Rejects during warm
                 Rejects           Quality Loss   Scrap                     up, start up and early
                 2.Production                     Rework                          production
                 Rejects                          In process damage           2. Rejects during
                                                  In process expiration          steady-state
                                                  Incorrect assembly              production
OEE-World Class




    Accepted World Class            OEE Factor     World Class
    Performance per Factor is:    Availability    90.0%
                                  Performance     95.0%
                                  Quality         99.9%
                                  OEE             85.0%


Studies indicate that most manufacturing plants are around 60% performance
in OEE. A world class is considered to be 85% or more.
OEE-Formulas


Availability= Operating Time / Planned Production Time




Performance = Ideal Cycle Time / (Operating Time/Total Pieces)




Quality = Good Pieces / Total Pieces




OEE = Availability x Performance x Quality
OEE-Example
                          Item                Data
                    Shift Length     10 hrs = 600 min
                    Short Breaks     2 at 10min = 20min
                    Meetings         30 min
                    Meal Break       1 at 30 min = 30 min
                    Down Time        47 min
                    Ideal Run Rate   60 pieces per minute
                    Total Pieces     19,271 pieces
                    Reject Pieces    423


•Planned Production Time= [Shift Length –Breaks] =[600-80]=520min
•Operating Time= [Planned Production Time-Down Time]=[480-47]=433
•Good Pieces= [Total Pieces – Reject Pieces]=[19,271-423]=18,848
OEE-Example

Availability   =             Operating Time/Planned Production Time
               =   433/520
               =    0.8326923          83.3%

Performance =               (Total Pieces/operating Time)/Ideal Run Rate
            =      (19,271pieces/433minutes)/60 pieces per minute
            =       0.7417629           74.2%

Quality        =                     Good Pieces/ Total Pieces
                   18,848 / 19,271
                    0.9780499          97.8%


OEE            =                Availability x Performance x Quality
                   .8326 x .7417 x .978
               =     0.6041026          60.4%
OEE-Visual

It is very important to have performance data
          Available and In Real Time to
                  EVERYONE
 Benefits:

 •Operators quickly respond to problems
 •Gauge to make adjustments that lead to incremental
 improvements
 •Empowers operators to take immediate action
 •Helps monitor plant floor activity in real time

Contenu connexe

Tendances

Tendances (20)

Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 
Autonomous maintenance preview
Autonomous maintenance previewAutonomous maintenance preview
Autonomous maintenance preview
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectiveness
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
OEE
OEEOEE
OEE
 
OEE vs TEEP.pdf
OEE vs TEEP.pdfOEE vs TEEP.pdf
OEE vs TEEP.pdf
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
Overall Equipment efficiency
Overall Equipment efficiencyOverall Equipment efficiency
Overall Equipment efficiency
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
My machine camp
My machine campMy machine camp
My machine camp
 
Mistake proofing smpl_1
Mistake proofing smpl_1Mistake proofing smpl_1
Mistake proofing smpl_1
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 

Similaire à Oee guide

What are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBizWhat are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBizKavika Roy
 
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionD3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionMannyjg5
 
World Class Manufacturing Asset Utilization
World Class Manufacturing Asset UtilizationWorld Class Manufacturing Asset Utilization
World Class Manufacturing Asset Utilizationlksnyder
 
Ff Presdentation User Conference Mumbai Automation 2008
Ff Presdentation   User Conference Mumbai Automation 2008Ff Presdentation   User Conference Mumbai Automation 2008
Ff Presdentation User Conference Mumbai Automation 2008Jasbir Singh
 
Scheduled Shutdown Maintenance
Scheduled Shutdown MaintenanceScheduled Shutdown Maintenance
Scheduled Shutdown Maintenancejdparfett
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementAnupam Kumar
 
The role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readinessThe role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readinessMichael Parsons
 
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostrediaEMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostrediaASBIS SK
 
Bayonne packaging case report
Bayonne packaging case reportBayonne packaging case report
Bayonne packaging case reportKivanc Ozuolmez
 

Similaire à Oee guide (20)

Set up reduction
Set up reductionSet up reduction
Set up reduction
 
What are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBizWhat are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBiz
 
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionD3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
 
NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
World Class Manufacturing Asset Utilization
World Class Manufacturing Asset UtilizationWorld Class Manufacturing Asset Utilization
World Class Manufacturing Asset Utilization
 
Ff Presdentation User Conference Mumbai Automation 2008
Ff Presdentation   User Conference Mumbai Automation 2008Ff Presdentation   User Conference Mumbai Automation 2008
Ff Presdentation User Conference Mumbai Automation 2008
 
Scheduled Shutdown Maintenance
Scheduled Shutdown MaintenanceScheduled Shutdown Maintenance
Scheduled Shutdown Maintenance
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Tpm training
Tpm trainingTpm training
Tpm training
 
BLUE BELT -NIBM.pp
BLUE BELT  -NIBM.ppBLUE BELT  -NIBM.pp
BLUE BELT -NIBM.pp
 
Scrum and Lean - Om Band
Scrum and Lean - Om BandScrum and Lean - Om Band
Scrum and Lean - Om Band
 
Guia oee
Guia oeeGuia oee
Guia oee
 
Jit
JitJit
Jit
 
The role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readinessThe role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readiness
 
Oee part 2
Oee part  2 Oee part  2
Oee part 2
 
TPM
TPMTPM
TPM
 
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostrediaEMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
 
Bayonne packaging case report
Bayonne packaging case reportBayonne packaging case report
Bayonne packaging case report
 
Office Pull Sample
Office Pull SampleOffice Pull Sample
Office Pull Sample
 
Agile Metrics Driven Management
Agile Metrics Driven ManagementAgile Metrics Driven Management
Agile Metrics Driven Management
 

Dernier

Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 

Dernier (20)

(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

Oee guide

  • 2. OEE-When to use 1. Does your production have bottlenecks that you are not aware of? 2. Could one machine be dragging down the entire facility? 3. Does your equipment have excess capacity that could be easily and inexpensively tapped?
  • 3. OEE-Benefits HELPS YOU INSTANTLY MAKE MORE WITH WHAT YOU HAVE
  • 4. OEE- What is it OEE is just a Best Practice that helps you monitor and improve the effectiveness of your processes
  • 5. OEE- Guide OEE Six Big World Factors Losses Class OEE Formulas OEE Visual Example OEE
  • 6. OEE-Factors Time Available Plant Operating Time i.e. LMI Mex 10hrs Planned Subtract Plant Operating Time Shutdown Lunch,Breaks, Maintenace Subtract Down Time Operating Time Loss •Equipment failure •Mat. Shortages, •Changeover time Speed Subtract Net Operating Time Loss •Different material, machine wear, operator inefficiency Quality Subtract Fully Productive Time Loss •Rework time •Scrap OEE Goal is to Maximize Fully Productive Time
  • 7. OEE-Factors The following table is a review of the interpretation of the core concepts. OEE LOSS OEE Factor Planned Shutdown *Not part of the calculation Down Time Loss *Availability=Ratio of Operating Time to Planned Production Time (Operating Time=Planned Production Time-Down Time Loss) *100% Availability means the process has been running without any recorded stops Speed Loss *Performance= Ratio of Net Operating time to Operating Time (Net Operating Time=Operating Time-Speed Loss) *Interpreted as Ideal Cycle Time to Actual Cycle Time *100% Performance means the process has been consistently running at its theoretical maximun speed Quality Loss *Quality=Ratio of Fully Productive Time to Net Operating Time (Fully Productive Time=Net Operating Time-Quality Loss) *Interpreted as the ratio of Good Pieces to Total Pieces *100% Qaulity means there have been no reject or rework pieces This factor can then drill down into productivity losses
  • 8. OEE-6 Big Losses Six Big Loss OEE Loss Category Category Event Examples Comment Breakdowns Down Time Loss Tooling failures There is flexibility to Unplanned maintenance decide between a General breakdowns breakdown and small Equipment failure stop Those Set Up and Adjustments Down Time Loss Setup/changeover productivity Material shortages This loss is adressed through set up Losses are Operator shortages reduction projects Major adjustments called the SIX Warm-Up Time BIG LOSSES Small Stops Speed Loss Obstructed product flow Component jams Typically includes stops Misfeeds that are under five Sensored blocked minutes Delivery blocked Cleaning / Checking Reduced Speed Speed Loss Rough running Anything that prevents Under nameplate capacity the process running Under designed capacity normal speed Equipment wear Operator inefficiency 1.Startup 1.Rejects during warm Rejects Quality Loss Scrap up, start up and early 2.Production Rework production Rejects In process damage 2. Rejects during In process expiration steady-state Incorrect assembly production
  • 9. OEE-World Class Accepted World Class OEE Factor World Class Performance per Factor is: Availability 90.0% Performance 95.0% Quality 99.9% OEE 85.0% Studies indicate that most manufacturing plants are around 60% performance in OEE. A world class is considered to be 85% or more.
  • 10. OEE-Formulas Availability= Operating Time / Planned Production Time Performance = Ideal Cycle Time / (Operating Time/Total Pieces) Quality = Good Pieces / Total Pieces OEE = Availability x Performance x Quality
  • 11. OEE-Example Item Data Shift Length 10 hrs = 600 min Short Breaks 2 at 10min = 20min Meetings 30 min Meal Break 1 at 30 min = 30 min Down Time 47 min Ideal Run Rate 60 pieces per minute Total Pieces 19,271 pieces Reject Pieces 423 •Planned Production Time= [Shift Length –Breaks] =[600-80]=520min •Operating Time= [Planned Production Time-Down Time]=[480-47]=433 •Good Pieces= [Total Pieces – Reject Pieces]=[19,271-423]=18,848
  • 12. OEE-Example Availability = Operating Time/Planned Production Time = 433/520 = 0.8326923 83.3% Performance = (Total Pieces/operating Time)/Ideal Run Rate = (19,271pieces/433minutes)/60 pieces per minute = 0.7417629 74.2% Quality = Good Pieces/ Total Pieces 18,848 / 19,271 0.9780499 97.8% OEE = Availability x Performance x Quality .8326 x .7417 x .978 = 0.6041026 60.4%
  • 13. OEE-Visual It is very important to have performance data Available and In Real Time to EVERYONE Benefits: •Operators quickly respond to problems •Gauge to make adjustments that lead to incremental improvements •Empowers operators to take immediate action •Helps monitor plant floor activity in real time