53. Standards-based management (ITIL) GSSA will drive cost efficiencies and operational effectiveness through the optimization of the underlying infrastructure technologies, as well as the supporting operational processes, based upon ITIL V3, and tools. 12
70. High-Skilled Work ForceS E R V I C E S Build/Deploy Upgrade Consolidate Platform Migration Monitor & Manage Proven & Tested Transition framework Offshore – Onsite Hybrid Model Industry Best Practices Tool Based Approach 5
71. GSS Storage Services S E R V I C E S Design SAN / NAS with HA / DR Installation and configuration of HBAs, LUNs Storage provisioning & consolidation including Dynamic Multipath Security configurations Monitor & Manage Proven & Tested Transition framework Offshore – Onsite Hybrid Model Industry Best Practices Tool Based Approach 5
72.
73. Proposal with agreed SLAs, SoW, Responsibility matrix, and Project plan for transitioning, etc, including the suggestions to improve existing setup/ processes, etc.
80. GSS Remote Server Monitoring & Management Datacenters – Distributed / Centralized Windows, Unix & Linux Servers Monitoring & Management Console GOCC Remote Management & Monitoring Infrastructure GOCC Support team GSS Global Operations Command Center System Management User Environment Management Backup Management Performance Management Server Monitoring 7
81.
82. Regulatory requirement
83. Business service risk mitigation plan
84. Newer datacenter operations strategy
85. Legacy datacenter environments incapable of hosting modern & dense IT Infrastructure GSS America bring together years of combined industry experience, required expertise straightforward strategies and cost-saving solutions to ensure that your migration is a success. …. 12
90. GSS – Data Center Migration Services Cont… Executing the migration plan – Our Approach Operational Support Transition to Ops Move to Production UAT Restore Data Re-Install and configure Pack & ship Datacenter equipment Stand-by arrangements for business continuity 12
93. Review the Customer’s Strategic needs: Understanding the IT Road map of the customer (Conducting the tests / audits on the existing IT setup and processes, etc)
94. Develop detailed consolidation Plan: Submitting the solution with detailed BoM and probable savings / value additions out of implementing the new solution. This also includes the Project Plan with detailed SoW statement.
96. Sign-off: Organizing UAT, Handholding and User Trainings including handing over SOPs and finally handing over to the Operations team.12
97.
98. Review the Customer’s Strategic needs: Understanding the IT Road map of the customer (Conducting the tests / audits on the existing IT setup and processes, etc)
99. Develop detailed consolidation Plan: Submitting the solution with detailed BoM and probable savings / value additions out of implementing the new solution. This also includes the Project Plan with detailed SoW statement.
106. GSS – Datacenter Compliance Audit The datacenter compliance Certification is an extensive survey of the datacenter according to internationally recognized standards. The output of the Datacenter Compliance Audit is an extensive report with findings, risk analysis and recommendations for risk reduction, all in accordance with International standards. You will receive a Report indicating a “rating” in each measured area and an overall rating of the total datacenter environment. 12
The first two phases constitute the PLAN portion of the process, which translates the original stated need into a detailed design and a list of components on a purchase order.The PLAN portion of the process lays the foundation for the projectThe last two phases are the BUILD portion of the process, taking the project from hardware acquisition to operational system.
Requirements and StudyReview Business requirements and assumptionsDetermine IT parametersIdentify risk areasDevelop ConceptDevelop system conceptCreate budgetary estimate
Site CoordinationReview physical site for delivery requirements and constraintsReview subcontractor installation requirementsInspect shipmentEquipment DeliveryReceive Shipment confirmationLoading dock unpack/detrashConfirm on-site delivery