AMG ADVANCED METALLURGICAL GROUP N.V.
$307,200,000
OHIO AIR QUALITY DEVELOPMENT AUTHORITY
STATE OF OHIO
EXEMPT FACILITIES REVENUE BONDS
(AMG VANADIUM PROJECT)
SERIES 2019
THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION AND IS BEING PROVIDED SOLELY FOR INFORMATION PURPOSES BY AMG ADVANCED
METALLURGICAL GROUP N.V. (THE “COMPANY”) AND MAY NOT BE REPRODUCED IN ANY FORM OR FURTHER DISTRIBUTED TO ANY OTHER PERSON OR
PUBLISHED, IN WHOLE OR IN PART, FOR ANY PURPOSE, EXCEPT WITH THE PRIOR WRITTEN CONSENT OF THE COMPANY. FAILURE TO COMPLY WITH THIS
RESTRICTION MAY CONSTITUTE A VIOLATION OF APPLICABLE SECURITIES LAWS.
This presentation does not constitute or form part of, and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the
Company or any of its subsidiaries nor should it or any part of it, nor the fact of its distribution, form the basis of, or be relied on in connection with, any contract or commitment
whatsoever.
This presentation has been prepared by, and is the sole responsibility of, the Company. This document, any presentation made in conjunction herewith and any
accompanying materials are for information only and are not a prospectus, offering circular or admission document. This presentation does not form a part of, and should not
be construed as, an offer, invitation or solicitation to subscribe for or purchase, or dispose of any of the securities of the companies mentioned in this presentation. These
materials do not constitute an offer of securities for sale in the United States or an invitation or an offer to the public or form of application to subscribe for securities. Neither
this presentation nor anything contained herein shall form the basis of, or be relied on in connection with, any offer or commitment whatsoever. The information contained in
this presentation has not been independently verified. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness,
accuracy or completeness of the information or the opinions contained herein. The Company and its advisors are under no obligation to update or keep current the information
contained in this presentation. To the extent allowed by law, none of the Company or its affiliates, advisors or representatives accept any liability whatsoever (in negligence or
otherwise) for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection with the presentation.
Certain statements in this presentation constitute forward-looking statements, including statements regarding the Company's financial position, business strategy, plans and
objectives of management for future operations. These statements, which contain the words "believe,” “expect,” “anticipate,” “intends,” “estimate,” “forecast,” “project,” “will,”
“may,” “should” and similar expressions, reflect the beliefs and expectations of the management board of directors of the Company and are subject to risks and uncertainties
that may cause actual results to differ materially. These risks and uncertainties include, among other factors, the achievement of the anticipated levels of profitability, growth,
cost and synergy of the Company’s recent acquisitions, the timely development and acceptance of new products, the impact of competitive pricing, the ability to obtain
necessary regulatory approvals, and the impact of general business and global economic conditions. These and other factors could adversely affect the outcome and financial
effects of the plans and events described herein.
Neither the Company, nor any of its respective agents, employees or advisors intend or have any duty or obligation to supplement, amend, update or revise any of the
forward-looking statements contained in this presentation.
The information and opinions contained in this document are provided as at the date of this presentation and are subject to change without notice.
This document has not been approved by any competent regulatory or supervisory authority.
2
COMPANY DISCLAIMER
AMG OVERVIEW
AMG AT A GLANCE
FY 2018 REVENUE OF ~$1.3 BILLION
BY END MARKET: BY REGION:BY SEGMENT:
GLOBAL TRENDS DRIVING CRITICAL MATERIALS DEMAND
DEMAND
Material science-based solutions
for energy efficiency (lighter,
stronger, temperature resistant)
SUPPLY
AMG sources, processes, and
supplies the materials which are
critical to our customer’s end-
product performance
GLOBAL TRENDS
Need to contain CO2 emissions;
Industrial growth and increasing
affluence need a technology
counterbalance
AMG CORE PRINCIPLES
• Leading producer in all our markets
• Low-cost producer in all our markets
• Innovation driven
• Intensive risk management system and control structure
WHAT AMG DOES
• Expert global value chain manager in sourcing critical
materials from complex locations, providing value-add
processing, and serving Fortune 100 customers
• Produces market-leading vacuum furnaces for specialized
alloying applications and provides heat treatment services
42% Europe
37% North America
16% Asia
5% ROW
33% Technologies
67% Critical
Materials
30% Infrastructure
21% Specialty Metals
& Chemicals
40% Transportation
9% Energy
4
Market leading producer of specialty metals and vacuum furnace systems
AMG
TECHNOLOGIES
AMG
CRITICAL MATERIALS
AMG’s conversion, mining,
and recycling businesses
AMG’s titanium alloys, vacuum
systems and services business
• Spent Catalyst Recycling (Vanadium)
• Superalloys (Chrome)
• Aluminum (Master Alloys)
• Brazil (Tantalum & Lithium)
• Antimony
• Graphite
• Silicon Metal
• Titanium Alloys & Coatings
• Furnaces
• Heat treatment services
5
36% Infrastructure 22% Specialty Metals
& Chemicals
32%
Transportation
10% Energy
4% Infrastructure
15% Specialty Metals
& Chemicals
70%
Transportation
11% Energy
2018 Revenue:
$873 million
AMG BUSINESS SEGMENTS
2018 Revenue:
$437 million
AMG IS A LEADER IN CO2 REDUCTION
Total net CO2 reduction (2018): 50.7 million MT
Enabled CO2 Reduction - 2018
Business Unit
Net CO2 Reduction
(MT) *
Technology / Product
Engineering 43.5 million
Thermal Barrier Coatings & Turbocharger
Wheel Castings
Titanium Alloys &
Coatings
5.0 million Titanium Aluminides
Vanadium 1.2 million Steel Alloying / Lightweighting
Graphite 1.0 million Graphite Insulation
* Net of operating emissions 6
AMG: ENABLING TECHNOLOGIES
Products and processes saving CO2
emissions during use:
• Aerospace Engine Fuel Efficiency
• Automotive Light-weighting
AMG: MITIGATING TECHNOLOGIES
Products and processes saving raw
materials, energy and CO2 emissions during
manufacturing:
• Ferrovanadium Recycling
• Graphite Insulation Materials
AMG STRATEGIC DEVELOPMENT TIMELINE
2012 2013 2014 to 2015 2016 to 2017 2018 to 2020
COST REDUCTION
PRODUCT MIX
OPTIMIZATION
TARGETED W/C &
DEBT LEVELS
FOCUSED ON
ORGANIC GROWTH
SPODUMENE I AND
CAMBRIDGE II
Cost-reduction and capex discipline in
response to global economic
slowdown
Further reduction in both working
capital and net debt, strengthening the
balance sheet
$350M Adj.
EBITDA in
5 years
Streamlined operations
and improved operating performance
by eliminating low-margin product
lines
Properly positioned, financially and
operationally, to pursue growth targets
across portfolio
PORTFOLIO CREATION
& INTEGRATION
Acquisition of family-run
businesses benefiting
from CO2 reduction
trends, 100+ years of
existence, attractive
valuation, high know-how,
strong supply chain, and
Fortune 100 customers
Low-cost lithium and vanadium
organic growth projects increasing
scope and scale
7
CAMBRIDGE II
PROJECT
CAMBRIDGE II PROJECT RENDERING
9
LOW RISK CAMBRIDGE II PROJECT INCREASES SCOPE AND SCALE
THE
OPPORTUNITY
• Double AMG’s spent catalyst recycling capacity in order to take advantage of
the closure of a competitor and service the North American refining industry
SUPPLIER
RATIONALE
• Refineries are better off recycling their resid catalysts with AMG than landfilling
• Zero residual liability associated with recycling (as opposed to landfilling)
TECHNOLOGY
• Technology risk is minimized, as AMG is replicating existing Cambridge I
operations
• Significant technological barriers to entry
LOCATION
• Near AMG’s current Cambridge facility – taking advantage of personnel
efficiencies such as shared oversight and management / control
CAPITAL COST • Total project costs expected to be ~$300 million
PROFITABILITY • Spent catalyst processing fees have increased significantly
TRACK RECORD
• AMG Vanadium installed a new roaster in 2013, increasing capacity by 60%
• AMG Brazil built and started up Spodumene I
10
EXISTING CAMBRIDGE, OHIO RECYCLING FACILITY: OPERATIONAL SINCE 1952
11
Total 2018 Consumption = ~97k MT
WHAT IS VANADIUM USED FOR?
• The predominant use of vanadium is
as a microalloy for the production of
high strength steels (e.g. rebar) and
tool steels
• In the aerospace sector, vanadium
ensures low density, high strength
and resiliency to high operating
temperatures
• Vanadium redox flow batteries
(VRFBs) require liquid vanadium
electrolyte to store energy
Source: TTP Squared Inc., AMG analysis
Total 2018 Production = ~89k MT
HOW IS VANADIUM PRODUCED?
• Vanadium is present in the Earth’s
crust and is produced either from
processing iron ore or crude oil
• Vanadium coming from iron ore is
either the result of steel co-
production, or primary mining
• Vanadium coming from crude oil is
either extracted using catalyst or
from processing the residue of
burning/ gasification of heavy oil for
power generation
Steel
88%
Vanadium Production Vanadium Consumption
12
WHAT IS VANADIUM?
China
59%
Russia
9% South
Africa
9%
North
America
3%
Europe
10%
Other
4%
Europe
17%
North
America
12%
China
46%
CIS
6% Other
9%
Energy Storage
3%
Chemicals
4%Aerospace
Alloys
5%
Iron Ore
Co-Product
67%
Primary
Mining
16%
Recycling
17%
India
4%
Japan
6%
Brazil
6%
PRODUCTS VALUE PROPOSITION APPLICATIONS
Ferovan®
(Ferrovanadium)
• High strength low alloy (HSLA) steel used for
construction, shipbuilding, pipeline, bridges, energy,
automotive, etc.
• Rail steels, tool and die steels
• Rebar
FeNiMoly®
(Ferronickel-
molybdenum)
Alloy addition for stainless steel and NiMo low-alloy
steels
Revan™
(Calcium Aluminate)
Slag-conditioner for the steel industry
LimeAdd™
(Calcium Sulfate) Solidification and stabilization of drilling waste
13
• The majority of profitability is associated with Ferrovanadium and Ferronickel-molybdenum
• The sale of Revan™ and LimeAdd™ allow AMG Vanadium to avoid landfilling costs
99% of the hazardous waste that AMG Vanadium receives is converted into salable product
AMG VANADIUM PRODUCTS
Ferrovanadium
Key Competitors:
High Strength Steel Steel Products
• Automotive
• Suspension Components
• Building Structures
• Bridges
• Vehicles & Transportation
• Oil & Gas
• Tubular Components
• Off Shore Platforms
• Ship Making
• Heavy Equipment
• Long-span Structures
Spent Refinery
Catalyst
Power Plant
Residues
14
• AMG Vanadium processes spent catalyst in a roasting facility in order to remove the sulfur
• The roasted catalyst is then melted in an electric arc furnace (EAF) where the Ferronickel-molybdenum
is extracted
• The molten material is passed to a second EAF furnace where the ferrovanadium is extracted
• The Ferrovanadium is sold to domestic steel producers
AMG Vanadium is the largest processor of spent catalyst in North America
AMG SPENT CATALYST VALUE CHAIN – A “CRADLE-TO-GRAVE” SOLUTION
• Because of the income the refineries receive from the sale of finished products,
utilizing AMG is the cheapest and most environmentally-sound way to dispose of their
hazardous spent catalyst waste
• The tipping fee AMG Vanadium receives makes its operation significantly lower cost
than primary mining
• AMG Vanadium and Cambridge II are profitable at all ferrovanadium prices
% of sales price
Ferrovanadium
FeNiMoly
Spent Catalyst
Tipping FeeRefinery
15
AMG Vanadium business model ensures long-term profitability
SPENT CATALYST CONTRACT STRUCTURE
16
VANADIUM MARKET DYNAMICS – SUPPLY AND DEMAND DRIVERS
STEEL
CHINESE REBAR
STANDARD
CHINA
FACILITY
CLOSURES
BARRIERS TO ENTRY
• Steel production
accounted for 88%
of vanadium
consumption in
2017
• Use of vanadium
in steel continues
to rise with market
share of high
strength steel
• Modernization of
developing
countries will only
further increase
the demand for
high strength steel
• The Grade 3
rebar standard in
China went into
effect in late 2018
and compliance
will necessitate
the use of an
additional 20,000
MT of vanadium
in 2021,
compared to
2018
• Beginning in 2017, China
banned imports of
vanadium slag, reducing
Chinese feedstocks by
3,000 MT
• Chinese environmental
regulators have refused to
issue permits for stone coal
operations, eliminating
further potential vanadium
production of ~3,000 MT
• A gradual shift away from
blast furnaces (BOF) to
electric arc furnaces (EAF)
as the Chinese domestic
scrap supply grows has
also reduced vanadium
production
• During 2015/16, South
African producers Evraz
Highveld and Vanchem
were liquidated, reducing
global production by
11,000 MT (~13%)
• China forced the closure
of several high-cost, low-
quality domestic iron ore
mines resulting in
increased imports of non
vanadium-containing
iron ore
• Gulf Chemical, a large
spent catalyst processor
in North America,
declared bankruptcy and
shut operations in 2016
• There are no new
vanadium projects under
construction. Once
undertaken, new projects
typically require 3-5 years
to have an impact on
supply
• Financing for greenfield
projects is challenging due
to significant capex
($300M+) and a lack of
understanding of vanadium
by capital markets
• Mining projects contain
significant downside
pricing risk while recycling
operations (e.g., AMG-V)
rely on complex technology
Demand Supply
Sources: - Fe-V price: CRU Ryan’s Notes – average monthly US FeV 80% V Mid
- Inventory: TTP Squared Inc. 17
Slight under-supply position is forecasted to continue for the next several years, driving
down global inventories to near-record lows
VANADIUM: INVENTORY VS. FEV PRICE
$0
$10
$20
$30
$40
$50
$60
$70
0
1
2
3
4
5
6
7
8
9
Vanadium
Inventory
VanadiumInventory
(MonthsofConsumption)
FeVPrice(US$/lbV)
Nov 2018: Revised
standards for Chinese
rebar enacted
2015: Chinese rebar
producers switch to
Quench and Temper
avoiding the use of
vanadium
Sep 2008: Lack of
electrical power in South
Africa negatively impacts
vanadium production
2004: Introduction of
Grade 3 rebar standard in
China
CRU current FeV
price ($19/lb V)
Source: TTP Squared
18
Ongoing market deficit expected for the next several years, continuing drawdown in
global inventories
PROJECTED VANADIUM SUPPLY DEFICIT
89,355
99,054
104,79096,870
103,987
111,533
75,000
90,000
105,000
120,000
2018 2019E 2020E
Supply
Demand
MTVanadium
7,500 MT
deficit
5,000 MT
deficit
1,700 MT
deficit
Uncertain
High Cost
Production
109,790

Contenu connexe

Tendances

AMG Investor Presentation - November 2016
AMG Investor Presentation - November 2016AMG Investor Presentation - November 2016
AMG Investor Presentation - November 2016gstubel
 
Capital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation finalCapital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation finalgstubel
 
Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017gstubel
 
September 2017 Presentation
September 2017 PresentationSeptember 2017 Presentation
September 2017 Presentationgstubel
 
January 2018 Investor Update
January 2018 Investor UpdateJanuary 2018 Investor Update
January 2018 Investor Updategstubel
 
Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017gstubel
 
September 2020 ECO2RP presentation
September 2020 ECO2RP presentationSeptember 2020 ECO2RP presentation
September 2020 ECO2RP presentationgstubel
 
AMG Lithium & Tantalum Project Update
AMG Lithium & Tantalum Project UpdateAMG Lithium & Tantalum Project Update
AMG Lithium & Tantalum Project Updategstubel
 
November 2017 Investor Update
November 2017 Investor UpdateNovember 2017 Investor Update
November 2017 Investor Updategstubel
 
AMG Investor Presentation August 2017
AMG Investor Presentation August 2017AMG Investor Presentation August 2017
AMG Investor Presentation August 2017gstubel
 
Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017gstubel
 
Houlihan Lokey Presentation May 17 2018
Houlihan Lokey Presentation May 17 2018Houlihan Lokey Presentation May 17 2018
Houlihan Lokey Presentation May 17 2018gstubel
 
AMG Lithium
AMG LithiumAMG Lithium
AMG Lithiumgstubel
 
Amg agm presentation - 2013
Amg   agm presentation - 2013Amg   agm presentation - 2013
Amg agm presentation - 2013jdiluzio
 
AMG Investor Presentation May 2017
AMG Investor Presentation May 2017AMG Investor Presentation May 2017
AMG Investor Presentation May 2017gstubel
 
AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016gstubel
 
AMG Investor Presentation - May 2016
AMG Investor Presentation - May 2016AMG Investor Presentation - May 2016
AMG Investor Presentation - May 2016gstubel
 
Investor Presentation - May 2015
Investor Presentation - May 2015Investor Presentation - May 2015
Investor Presentation - May 2015gstubel
 
AMG for Investors - September 2016
AMG for Investors - September 2016AMG for Investors - September 2016
AMG for Investors - September 2016gstubel
 
AMG Investor Presentation - November 2015
AMG Investor Presentation - November 2015AMG Investor Presentation - November 2015
AMG Investor Presentation - November 2015gstubel
 

Tendances (20)

AMG Investor Presentation - November 2016
AMG Investor Presentation - November 2016AMG Investor Presentation - November 2016
AMG Investor Presentation - November 2016
 
Capital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation finalCapital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation final
 
Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017
 
September 2017 Presentation
September 2017 PresentationSeptember 2017 Presentation
September 2017 Presentation
 
January 2018 Investor Update
January 2018 Investor UpdateJanuary 2018 Investor Update
January 2018 Investor Update
 
Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017
 
September 2020 ECO2RP presentation
September 2020 ECO2RP presentationSeptember 2020 ECO2RP presentation
September 2020 ECO2RP presentation
 
AMG Lithium & Tantalum Project Update
AMG Lithium & Tantalum Project UpdateAMG Lithium & Tantalum Project Update
AMG Lithium & Tantalum Project Update
 
November 2017 Investor Update
November 2017 Investor UpdateNovember 2017 Investor Update
November 2017 Investor Update
 
AMG Investor Presentation August 2017
AMG Investor Presentation August 2017AMG Investor Presentation August 2017
AMG Investor Presentation August 2017
 
Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017
 
Houlihan Lokey Presentation May 17 2018
Houlihan Lokey Presentation May 17 2018Houlihan Lokey Presentation May 17 2018
Houlihan Lokey Presentation May 17 2018
 
AMG Lithium
AMG LithiumAMG Lithium
AMG Lithium
 
Amg agm presentation - 2013
Amg   agm presentation - 2013Amg   agm presentation - 2013
Amg agm presentation - 2013
 
AMG Investor Presentation May 2017
AMG Investor Presentation May 2017AMG Investor Presentation May 2017
AMG Investor Presentation May 2017
 
AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016
 
AMG Investor Presentation - May 2016
AMG Investor Presentation - May 2016AMG Investor Presentation - May 2016
AMG Investor Presentation - May 2016
 
Investor Presentation - May 2015
Investor Presentation - May 2015Investor Presentation - May 2015
Investor Presentation - May 2015
 
AMG for Investors - September 2016
AMG for Investors - September 2016AMG for Investors - September 2016
AMG for Investors - September 2016
 
AMG Investor Presentation - November 2015
AMG Investor Presentation - November 2015AMG Investor Presentation - November 2015
AMG Investor Presentation - November 2015
 

Similaire à AMG-V Bond Roadshow

Amg investor presentation august 2013
Amg   investor presentation august 2013Amg   investor presentation august 2013
Amg investor presentation august 2013jdiluzio
 
Investor Deck March 2023.pdf
Investor Deck March 2023.pdfInvestor Deck March 2023.pdf
Investor Deck March 2023.pdfgstubel
 
2015 Investor Day - Graphite Presentation
2015 Investor Day - Graphite Presentation2015 Investor Day - Graphite Presentation
2015 Investor Day - Graphite Presentationgstubel
 
Amg -investor_presentation_november_2010
Amg  -investor_presentation_november_2010Amg  -investor_presentation_november_2010
Amg -investor_presentation_november_2010AMG
 
November 10 2010
November 10 2010November 10 2010
November 10 2010AMG
 
AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013jdiluzio
 
Amg investor presentation november 2014 final
Amg   investor presentation november 2014 finalAmg   investor presentation november 2014 final
Amg investor presentation november 2014 finaljdiluzio
 
AMG Investor Presentation
AMG Investor PresentationAMG Investor Presentation
AMG Investor Presentationgstubel
 
AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023gstubel
 
AMG Investor Presentation November 2017
AMG Investor Presentation November 2017AMG Investor Presentation November 2017
AMG Investor Presentation November 2017gstubel
 
AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017gstubel
 
Equity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdfEquity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdfgstubel
 
AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024gstubel
 
AMG Investor Presentation March 2018
AMG Investor Presentation March 2018AMG Investor Presentation March 2018
AMG Investor Presentation March 2018gstubel
 
June 2018 Investor Update
June 2018 Investor UpdateJune 2018 Investor Update
June 2018 Investor Updategstubel
 
AMG Lithium and Tantalum
AMG Lithium and TantalumAMG Lithium and Tantalum
AMG Lithium and Tantalumgstubel
 
AMG Investor Presentation May 2018
AMG Investor Presentation May 2018AMG Investor Presentation May 2018
AMG Investor Presentation May 2018gstubel
 

Similaire à AMG-V Bond Roadshow (17)

Amg investor presentation august 2013
Amg   investor presentation august 2013Amg   investor presentation august 2013
Amg investor presentation august 2013
 
Investor Deck March 2023.pdf
Investor Deck March 2023.pdfInvestor Deck March 2023.pdf
Investor Deck March 2023.pdf
 
2015 Investor Day - Graphite Presentation
2015 Investor Day - Graphite Presentation2015 Investor Day - Graphite Presentation
2015 Investor Day - Graphite Presentation
 
Amg -investor_presentation_november_2010
Amg  -investor_presentation_november_2010Amg  -investor_presentation_november_2010
Amg -investor_presentation_november_2010
 
November 10 2010
November 10 2010November 10 2010
November 10 2010
 
AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013
 
Amg investor presentation november 2014 final
Amg   investor presentation november 2014 finalAmg   investor presentation november 2014 final
Amg investor presentation november 2014 final
 
AMG Investor Presentation
AMG Investor PresentationAMG Investor Presentation
AMG Investor Presentation
 
AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023
 
AMG Investor Presentation November 2017
AMG Investor Presentation November 2017AMG Investor Presentation November 2017
AMG Investor Presentation November 2017
 
AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017
 
Equity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdfEquity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdf
 
AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024
 
AMG Investor Presentation March 2018
AMG Investor Presentation March 2018AMG Investor Presentation March 2018
AMG Investor Presentation March 2018
 
June 2018 Investor Update
June 2018 Investor UpdateJune 2018 Investor Update
June 2018 Investor Update
 
AMG Lithium and Tantalum
AMG Lithium and TantalumAMG Lithium and Tantalum
AMG Lithium and Tantalum
 
AMG Investor Presentation May 2018
AMG Investor Presentation May 2018AMG Investor Presentation May 2018
AMG Investor Presentation May 2018
 

Plus de gstubel

AMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfAMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfgstubel
 
AMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfAMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfgstubel
 
CMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdfCMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdfgstubel
 
Quarterly Slides February 22 2023
Quarterly Slides February 22 2023Quarterly Slides February 22 2023
Quarterly Slides February 22 2023gstubel
 
Qtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfQtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfgstubel
 
AMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfAMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfgstubel
 
Quarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdfQuarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdfgstubel
 
AMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdfAMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdfgstubel
 
Quarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdfQuarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdfgstubel
 
Quarterly slides February 2022
Quarterly slides February 2022Quarterly slides February 2022
Quarterly slides February 2022gstubel
 
Capital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium PresentationCapital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium Presentationgstubel
 
Quarterly Slides October 2021
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021gstubel
 
Quarterly Slides July 2021
Quarterly Slides July 2021Quarterly Slides July 2021
Quarterly Slides July 2021gstubel
 
Quarterly Slides May 2021
Quarterly Slides May 2021Quarterly Slides May 2021
Quarterly Slides May 2021gstubel
 
Berenberg SDG Presentation
Berenberg SDG PresentationBerenberg SDG Presentation
Berenberg SDG Presentationgstubel
 
Quarterly slides February 2021
Quarterly slides February 2021Quarterly slides February 2021
Quarterly slides February 2021gstubel
 
Quarterly Slides October 2020
Quarterly Slides October 2020Quarterly Slides October 2020
Quarterly Slides October 2020gstubel
 
Quarterly Slides July 2020
Quarterly Slides July 2020Quarterly Slides July 2020
Quarterly Slides July 2020gstubel
 
Q1 2020 Investor Presentation
Q1 2020 Investor PresentationQ1 2020 Investor Presentation
Q1 2020 Investor Presentationgstubel
 
Quarterly Slides February 2020
Quarterly Slides February 2020Quarterly Slides February 2020
Quarterly Slides February 2020gstubel
 

Plus de gstubel (20)

AMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfAMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdf
 
AMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfAMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdf
 
CMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdfCMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdf
 
Quarterly Slides February 22 2023
Quarterly Slides February 22 2023Quarterly Slides February 22 2023
Quarterly Slides February 22 2023
 
Qtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfQtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdf
 
AMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfAMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdf
 
Quarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdfQuarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdf
 
AMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdfAMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdf
 
Quarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdfQuarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdf
 
Quarterly slides February 2022
Quarterly slides February 2022Quarterly slides February 2022
Quarterly slides February 2022
 
Capital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium PresentationCapital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium Presentation
 
Quarterly Slides October 2021
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021
 
Quarterly Slides July 2021
Quarterly Slides July 2021Quarterly Slides July 2021
Quarterly Slides July 2021
 
Quarterly Slides May 2021
Quarterly Slides May 2021Quarterly Slides May 2021
Quarterly Slides May 2021
 
Berenberg SDG Presentation
Berenberg SDG PresentationBerenberg SDG Presentation
Berenberg SDG Presentation
 
Quarterly slides February 2021
Quarterly slides February 2021Quarterly slides February 2021
Quarterly slides February 2021
 
Quarterly Slides October 2020
Quarterly Slides October 2020Quarterly Slides October 2020
Quarterly Slides October 2020
 
Quarterly Slides July 2020
Quarterly Slides July 2020Quarterly Slides July 2020
Quarterly Slides July 2020
 
Q1 2020 Investor Presentation
Q1 2020 Investor PresentationQ1 2020 Investor Presentation
Q1 2020 Investor Presentation
 
Quarterly Slides February 2020
Quarterly Slides February 2020Quarterly Slides February 2020
Quarterly Slides February 2020
 

Dernier

VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsgwenoracqe6
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 

Dernier (20)

Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 

AMG-V Bond Roadshow

  • 1. AMG ADVANCED METALLURGICAL GROUP N.V. $307,200,000 OHIO AIR QUALITY DEVELOPMENT AUTHORITY STATE OF OHIO EXEMPT FACILITIES REVENUE BONDS (AMG VANADIUM PROJECT) SERIES 2019
  • 2. THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION AND IS BEING PROVIDED SOLELY FOR INFORMATION PURPOSES BY AMG ADVANCED METALLURGICAL GROUP N.V. (THE “COMPANY”) AND MAY NOT BE REPRODUCED IN ANY FORM OR FURTHER DISTRIBUTED TO ANY OTHER PERSON OR PUBLISHED, IN WHOLE OR IN PART, FOR ANY PURPOSE, EXCEPT WITH THE PRIOR WRITTEN CONSENT OF THE COMPANY. FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF APPLICABLE SECURITIES LAWS. This presentation does not constitute or form part of, and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the Company or any of its subsidiaries nor should it or any part of it, nor the fact of its distribution, form the basis of, or be relied on in connection with, any contract or commitment whatsoever. This presentation has been prepared by, and is the sole responsibility of, the Company. This document, any presentation made in conjunction herewith and any accompanying materials are for information only and are not a prospectus, offering circular or admission document. This presentation does not form a part of, and should not be construed as, an offer, invitation or solicitation to subscribe for or purchase, or dispose of any of the securities of the companies mentioned in this presentation. These materials do not constitute an offer of securities for sale in the United States or an invitation or an offer to the public or form of application to subscribe for securities. Neither this presentation nor anything contained herein shall form the basis of, or be relied on in connection with, any offer or commitment whatsoever. The information contained in this presentation has not been independently verified. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy or completeness of the information or the opinions contained herein. The Company and its advisors are under no obligation to update or keep current the information contained in this presentation. To the extent allowed by law, none of the Company or its affiliates, advisors or representatives accept any liability whatsoever (in negligence or otherwise) for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection with the presentation. Certain statements in this presentation constitute forward-looking statements, including statements regarding the Company's financial position, business strategy, plans and objectives of management for future operations. These statements, which contain the words "believe,” “expect,” “anticipate,” “intends,” “estimate,” “forecast,” “project,” “will,” “may,” “should” and similar expressions, reflect the beliefs and expectations of the management board of directors of the Company and are subject to risks and uncertainties that may cause actual results to differ materially. These risks and uncertainties include, among other factors, the achievement of the anticipated levels of profitability, growth, cost and synergy of the Company’s recent acquisitions, the timely development and acceptance of new products, the impact of competitive pricing, the ability to obtain necessary regulatory approvals, and the impact of general business and global economic conditions. These and other factors could adversely affect the outcome and financial effects of the plans and events described herein. Neither the Company, nor any of its respective agents, employees or advisors intend or have any duty or obligation to supplement, amend, update or revise any of the forward-looking statements contained in this presentation. The information and opinions contained in this document are provided as at the date of this presentation and are subject to change without notice. This document has not been approved by any competent regulatory or supervisory authority. 2 COMPANY DISCLAIMER
  • 4. AMG AT A GLANCE FY 2018 REVENUE OF ~$1.3 BILLION BY END MARKET: BY REGION:BY SEGMENT: GLOBAL TRENDS DRIVING CRITICAL MATERIALS DEMAND DEMAND Material science-based solutions for energy efficiency (lighter, stronger, temperature resistant) SUPPLY AMG sources, processes, and supplies the materials which are critical to our customer’s end- product performance GLOBAL TRENDS Need to contain CO2 emissions; Industrial growth and increasing affluence need a technology counterbalance AMG CORE PRINCIPLES • Leading producer in all our markets • Low-cost producer in all our markets • Innovation driven • Intensive risk management system and control structure WHAT AMG DOES • Expert global value chain manager in sourcing critical materials from complex locations, providing value-add processing, and serving Fortune 100 customers • Produces market-leading vacuum furnaces for specialized alloying applications and provides heat treatment services 42% Europe 37% North America 16% Asia 5% ROW 33% Technologies 67% Critical Materials 30% Infrastructure 21% Specialty Metals & Chemicals 40% Transportation 9% Energy 4 Market leading producer of specialty metals and vacuum furnace systems
  • 5. AMG TECHNOLOGIES AMG CRITICAL MATERIALS AMG’s conversion, mining, and recycling businesses AMG’s titanium alloys, vacuum systems and services business • Spent Catalyst Recycling (Vanadium) • Superalloys (Chrome) • Aluminum (Master Alloys) • Brazil (Tantalum & Lithium) • Antimony • Graphite • Silicon Metal • Titanium Alloys & Coatings • Furnaces • Heat treatment services 5 36% Infrastructure 22% Specialty Metals & Chemicals 32% Transportation 10% Energy 4% Infrastructure 15% Specialty Metals & Chemicals 70% Transportation 11% Energy 2018 Revenue: $873 million AMG BUSINESS SEGMENTS 2018 Revenue: $437 million
  • 6. AMG IS A LEADER IN CO2 REDUCTION Total net CO2 reduction (2018): 50.7 million MT Enabled CO2 Reduction - 2018 Business Unit Net CO2 Reduction (MT) * Technology / Product Engineering 43.5 million Thermal Barrier Coatings & Turbocharger Wheel Castings Titanium Alloys & Coatings 5.0 million Titanium Aluminides Vanadium 1.2 million Steel Alloying / Lightweighting Graphite 1.0 million Graphite Insulation * Net of operating emissions 6 AMG: ENABLING TECHNOLOGIES Products and processes saving CO2 emissions during use: • Aerospace Engine Fuel Efficiency • Automotive Light-weighting AMG: MITIGATING TECHNOLOGIES Products and processes saving raw materials, energy and CO2 emissions during manufacturing: • Ferrovanadium Recycling • Graphite Insulation Materials
  • 7. AMG STRATEGIC DEVELOPMENT TIMELINE 2012 2013 2014 to 2015 2016 to 2017 2018 to 2020 COST REDUCTION PRODUCT MIX OPTIMIZATION TARGETED W/C & DEBT LEVELS FOCUSED ON ORGANIC GROWTH SPODUMENE I AND CAMBRIDGE II Cost-reduction and capex discipline in response to global economic slowdown Further reduction in both working capital and net debt, strengthening the balance sheet $350M Adj. EBITDA in 5 years Streamlined operations and improved operating performance by eliminating low-margin product lines Properly positioned, financially and operationally, to pursue growth targets across portfolio PORTFOLIO CREATION & INTEGRATION Acquisition of family-run businesses benefiting from CO2 reduction trends, 100+ years of existence, attractive valuation, high know-how, strong supply chain, and Fortune 100 customers Low-cost lithium and vanadium organic growth projects increasing scope and scale 7
  • 9. CAMBRIDGE II PROJECT RENDERING 9
  • 10. LOW RISK CAMBRIDGE II PROJECT INCREASES SCOPE AND SCALE THE OPPORTUNITY • Double AMG’s spent catalyst recycling capacity in order to take advantage of the closure of a competitor and service the North American refining industry SUPPLIER RATIONALE • Refineries are better off recycling their resid catalysts with AMG than landfilling • Zero residual liability associated with recycling (as opposed to landfilling) TECHNOLOGY • Technology risk is minimized, as AMG is replicating existing Cambridge I operations • Significant technological barriers to entry LOCATION • Near AMG’s current Cambridge facility – taking advantage of personnel efficiencies such as shared oversight and management / control CAPITAL COST • Total project costs expected to be ~$300 million PROFITABILITY • Spent catalyst processing fees have increased significantly TRACK RECORD • AMG Vanadium installed a new roaster in 2013, increasing capacity by 60% • AMG Brazil built and started up Spodumene I 10
  • 11. EXISTING CAMBRIDGE, OHIO RECYCLING FACILITY: OPERATIONAL SINCE 1952 11
  • 12. Total 2018 Consumption = ~97k MT WHAT IS VANADIUM USED FOR? • The predominant use of vanadium is as a microalloy for the production of high strength steels (e.g. rebar) and tool steels • In the aerospace sector, vanadium ensures low density, high strength and resiliency to high operating temperatures • Vanadium redox flow batteries (VRFBs) require liquid vanadium electrolyte to store energy Source: TTP Squared Inc., AMG analysis Total 2018 Production = ~89k MT HOW IS VANADIUM PRODUCED? • Vanadium is present in the Earth’s crust and is produced either from processing iron ore or crude oil • Vanadium coming from iron ore is either the result of steel co- production, or primary mining • Vanadium coming from crude oil is either extracted using catalyst or from processing the residue of burning/ gasification of heavy oil for power generation Steel 88% Vanadium Production Vanadium Consumption 12 WHAT IS VANADIUM? China 59% Russia 9% South Africa 9% North America 3% Europe 10% Other 4% Europe 17% North America 12% China 46% CIS 6% Other 9% Energy Storage 3% Chemicals 4%Aerospace Alloys 5% Iron Ore Co-Product 67% Primary Mining 16% Recycling 17% India 4% Japan 6% Brazil 6%
  • 13. PRODUCTS VALUE PROPOSITION APPLICATIONS Ferovan® (Ferrovanadium) • High strength low alloy (HSLA) steel used for construction, shipbuilding, pipeline, bridges, energy, automotive, etc. • Rail steels, tool and die steels • Rebar FeNiMoly® (Ferronickel- molybdenum) Alloy addition for stainless steel and NiMo low-alloy steels Revan™ (Calcium Aluminate) Slag-conditioner for the steel industry LimeAdd™ (Calcium Sulfate) Solidification and stabilization of drilling waste 13 • The majority of profitability is associated with Ferrovanadium and Ferronickel-molybdenum • The sale of Revan™ and LimeAdd™ allow AMG Vanadium to avoid landfilling costs 99% of the hazardous waste that AMG Vanadium receives is converted into salable product AMG VANADIUM PRODUCTS
  • 14. Ferrovanadium Key Competitors: High Strength Steel Steel Products • Automotive • Suspension Components • Building Structures • Bridges • Vehicles & Transportation • Oil & Gas • Tubular Components • Off Shore Platforms • Ship Making • Heavy Equipment • Long-span Structures Spent Refinery Catalyst Power Plant Residues 14 • AMG Vanadium processes spent catalyst in a roasting facility in order to remove the sulfur • The roasted catalyst is then melted in an electric arc furnace (EAF) where the Ferronickel-molybdenum is extracted • The molten material is passed to a second EAF furnace where the ferrovanadium is extracted • The Ferrovanadium is sold to domestic steel producers AMG Vanadium is the largest processor of spent catalyst in North America AMG SPENT CATALYST VALUE CHAIN – A “CRADLE-TO-GRAVE” SOLUTION
  • 15. • Because of the income the refineries receive from the sale of finished products, utilizing AMG is the cheapest and most environmentally-sound way to dispose of their hazardous spent catalyst waste • The tipping fee AMG Vanadium receives makes its operation significantly lower cost than primary mining • AMG Vanadium and Cambridge II are profitable at all ferrovanadium prices % of sales price Ferrovanadium FeNiMoly Spent Catalyst Tipping FeeRefinery 15 AMG Vanadium business model ensures long-term profitability SPENT CATALYST CONTRACT STRUCTURE
  • 16. 16 VANADIUM MARKET DYNAMICS – SUPPLY AND DEMAND DRIVERS STEEL CHINESE REBAR STANDARD CHINA FACILITY CLOSURES BARRIERS TO ENTRY • Steel production accounted for 88% of vanadium consumption in 2017 • Use of vanadium in steel continues to rise with market share of high strength steel • Modernization of developing countries will only further increase the demand for high strength steel • The Grade 3 rebar standard in China went into effect in late 2018 and compliance will necessitate the use of an additional 20,000 MT of vanadium in 2021, compared to 2018 • Beginning in 2017, China banned imports of vanadium slag, reducing Chinese feedstocks by 3,000 MT • Chinese environmental regulators have refused to issue permits for stone coal operations, eliminating further potential vanadium production of ~3,000 MT • A gradual shift away from blast furnaces (BOF) to electric arc furnaces (EAF) as the Chinese domestic scrap supply grows has also reduced vanadium production • During 2015/16, South African producers Evraz Highveld and Vanchem were liquidated, reducing global production by 11,000 MT (~13%) • China forced the closure of several high-cost, low- quality domestic iron ore mines resulting in increased imports of non vanadium-containing iron ore • Gulf Chemical, a large spent catalyst processor in North America, declared bankruptcy and shut operations in 2016 • There are no new vanadium projects under construction. Once undertaken, new projects typically require 3-5 years to have an impact on supply • Financing for greenfield projects is challenging due to significant capex ($300M+) and a lack of understanding of vanadium by capital markets • Mining projects contain significant downside pricing risk while recycling operations (e.g., AMG-V) rely on complex technology Demand Supply
  • 17. Sources: - Fe-V price: CRU Ryan’s Notes – average monthly US FeV 80% V Mid - Inventory: TTP Squared Inc. 17 Slight under-supply position is forecasted to continue for the next several years, driving down global inventories to near-record lows VANADIUM: INVENTORY VS. FEV PRICE $0 $10 $20 $30 $40 $50 $60 $70 0 1 2 3 4 5 6 7 8 9 Vanadium Inventory VanadiumInventory (MonthsofConsumption) FeVPrice(US$/lbV) Nov 2018: Revised standards for Chinese rebar enacted 2015: Chinese rebar producers switch to Quench and Temper avoiding the use of vanadium Sep 2008: Lack of electrical power in South Africa negatively impacts vanadium production 2004: Introduction of Grade 3 rebar standard in China CRU current FeV price ($19/lb V)
  • 18. Source: TTP Squared 18 Ongoing market deficit expected for the next several years, continuing drawdown in global inventories PROJECTED VANADIUM SUPPLY DEFICIT 89,355 99,054 104,79096,870 103,987 111,533 75,000 90,000 105,000 120,000 2018 2019E 2020E Supply Demand MTVanadium 7,500 MT deficit 5,000 MT deficit 1,700 MT deficit Uncertain High Cost Production 109,790