We offer House & Lot, Beach Lot, Condominium etc.
For site visit call/text: DAISY MENDEZ 0906-4753779/0922-4417886
Log on to: http//daisy.bahay.ph
We accept: CASH, BANK& PAG-IBIG FINANCING,IN-HOUSE
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Grand Cenia CONDOMINIUM IN CEBU CITY
1.
2. • a 25-storey hotel and residential tower • located at Archbishop Reyes, corner Apitong Street, Lahug, Cebu City and strategically located within the Cebu Central Business District.
20. The condotel will provide temporary living spaces for the buyers whenever they visit Cebu, whether for business or pleasure, and an investment tool that earns for them when not in use. Condotel owners enjoy: • a unit in a very prime location • a very good return on investment • free nights / discounted rates Condotel Units • internationally-managed hotel operations
21. Condotel Income Computation A condotel unit owner’s share of the Rental Pool Income is computed on a per square meter basis. A square meter of actual condotel unit area is equivalent to full square meter for purposes of income computation. Such as 25 sqm of actual condotel unit has 25 square meters of area share. The formula for the computation of a condotel unit owner’s share of the Rental Pool Income is as follows; A= Quarterly Rental Pool Income B= Number of Days Condotel was Operational for the Quarter C= Total Contributed Area to the Rental Pool per unit owner D= Total Area of Rental Pool (all the member’s units combined) E= Number of Days the Unit is in the Pool The Individual’s Usages Income shall be computed as follows: A x C x E B D
22.
23. 1 Bedroom unit - 50.52 sqm • Dining area • Living and receiving area • Kitchen • Main bedroom • Toilet and bath Residential Condominium Unit Floor Plans
24. 2 bedroom unit - 75.78 sqm • Master’s bedroom • 2 toilet and bath • Bedroom • Dining area • Kitchen • Living and receiving area • Utility/maid’s room Residential Condominium Unit Floor Plans
25. 3 bedroom unit - 107.37 sqm • Master’s bedroom with walk-in closet • 2 bedrooms • 2 toilet and bath • Dining area • Kitchen • Living and receiving area • Utility/maid’s room Residential Condominium Unit Floor Plans
26. List of Design Consultants : Architectural Design: R. VILLAROSA Partners and Associates List of Achievements: EDSA Shangri-la hotel One McKinley place Malayan Plaza The Palms Country Club Tektite Building – Philippine Stock Exchange Structural Design: AROMIN & SY + ASSOCIATES, INC. (ASAI) List of Achievements: Rockwell Center (all existing buildings) PBCom Tower (tallest bldg. in the Philippines) Pacific Plaza Towers Citibankard Center LKG Tower Forbes Tower Ayala Triangle Roxas Triangle all Makro stores Urban Bank Plaza, Petron Mega Plaza SM Megamall Ayala Center Cebu Greenbelt Redevelopment, The Residences at Greenbelt The Columns at Legaspi Village
27. List of Design Consultants : Interior Design: C.T. Onglao Architects List of Achievements: Asia Tower (Hanoi) Serendra Phase 2 The Residences 2 8 Wack Wack Road Condominiums Coconut Palace Baguio Country Club Ballroom Holiday Inn Clark Hotel Millenium Plaza Hotel Tagaytay Highlands Condominium Model Units Zobel de Ayala Residence Landscape Design: H.E. Dimanlig List of Achievements: Filinvest Alabang Center Metrobank Shanghai St. Luke’s Hospital
28. List of Design Consultants : MEPF Design : VM Design Associates List of Consulting Clients: Belle Corporation for Tagaytay Midlands Golf Clubhouse Filinvest Alabang, Inc. for South Station Hotel Intercontinental Manila Bangko Sentral ng Pilipinas Philippine Long Distance Telephone Company Philippine Orthopedic Center Siemens Building Technology SM Mall of Asia Texas Instruments The Peninsula Manila University of the Philippines, Diliman
29.
30. Construction Milestones for Structural Works: Construction Duration 35 – 36 months: - 610 Days for Structural Package - MEPF entire duration of the project less excavation period - 360 Days for Architectural (overlapping structural works) - 6 months for punchlistings and turn-over MEPF – Mechanical / Electrical / Plumbing / Fire Protection Works 4 th Week of April Site Mobilization August 2008 First Concrete Pouring November 2009 Topping Off (Completion of Structural Works) Timetable Construction Activities
31.
32. We offer House & Lot, Beach Lot, Condominium etc. For site visit call/text: DAISY MENDEZ 0906-4753779/0922-4417886 Log on to: http//daisy.bahay.ph We accept: CASH, BANK& PAG-IBIG FINANCING, IN-HOUSE