Danish Offshore Wind Experience




            Anne Højer Simonsen
          Deputy Director General
           Danish Energy Agency
       Ministry of Climate and Energy
Advantages of Wind Power

• Security of supply
  • Alleviation of
    energy imports
• Environment
  • climate change
    mitigation
  • conservation of
    biodiversity
• Export options
• New jobs
16 years of experience offshore

• First Danish offshore wind
  farm 1991
• Strategic mapping 1995
• Capacity now 423 MW.
  (3100 MW incl. onshore)
• Strategic assessment for
  future location of 5200 MW
  offshore wind power
• 2 x 200 MW being built to go
  on-line in 2009 and 2011.
  The projects are on track
• 2011 app. 850 MW offshore
Wind Power Production
        National average
at normal wind conditions 20% of
       electricity demand


        National average
          2006 - 17%

        National average
      January 2007 - 36%

       Western Denmark
      January 2007 - 41%
Challenge: To Feed the Grid with Wind Power
        (Western Denmark as an example)
Key Instruments to promote RE
              Historic perspective

 Public support to research, development and
 demonstration of RE-technologies
 Investment grants for standardized RE-equipment
 Favourable prices for electricity fed into the public
 grid
 A suitable legislative and planning framework -
 supporting the local initiative
 Agreements between the Government and the
 utilities: Wind power programmes and biomass
 agreement
Large scale integration

• Denmark has very strong interconnectors
  to neighbouring countries
• Nord Pool is a level playing field
• Short gate closure times to allow trades
  close to real time
• Further integration is possible
• Storage and demand side management
  could serve as future options
• EU: cross border solutions
Decoupling of economic growth
           and energy consumption
        160


        140


        120                                                  Primary Energy
Index




                                                             GDP
                                                             Intensity
        100


        80


        60
              1980 1983 1986 1989 1992 1995 1998 2001 2004
Tendering
     Aim to bring down financial risk
• Screening for site suitability
• Tender: Fixed price in 10-12 years
• TSO to finance, construct and operate transformer
  station and sea cable
• TSO obliged to connect wind power and strengthen
  grid if necessary
• Security that grid connection is available in due time
• Financial compensation if the power produced is
  curtailed
• One stop shop communication
Support scheme for offshore

• Tender – Cheapest, fastest and most
  beautiful
• Fixed price in 50.000 full load hours
  • = 10-15 years of production
• Low bids:
• Horns Rev 2 = € cent 6,7 per kWh
• Rødsand 2 = € cent 8,3 per kWh
Preparing for the future 2025
                  • 26 sites of 200 MW
                    identified
                  • 5200 MW
                  • Equivalent to 8 % of
                    total demand or 50%
                    of electricity demand
                  • Consultation answers
                    is taken into account
                  • A sensitivity analysis
                    is too be conducted
                    and used in the
                    decision-making
                    process for the actual
                    site selection
Conclusions from the Environmental
              programme
• Public acceptance
• Migrating birds avoid
  collision
• Seals behaviour not
  affected
• Harbour porpoises
  return to the sites
• Significant artificial
  wreck effect
  observed
New site: Djursland-Anholt
In conclusion

• Large scale integration possible
• A doubling of offshore capacity on track
  for 2009-2011
• Tender procedure combined with TSO-grid
  financing and one stop shop brings down
  financial risks
• Future locations identified
• Environment no problem if sites are
  planned properly
• One-stop-shop approval procedure
Thank you for your attention




Figures and further
information available from
www.ens.dk/wind

Contenu connexe

Tendances

Investor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass ProjectInvestor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass Projectenergydialog
 
Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...
Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...
Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...Invest Northern Ireland
 
Towards Zero Carbon Scenarios: Application of an Australian TIMES model
Towards Zero Carbon Scenarios: Application of an Australian TIMES modelTowards Zero Carbon Scenarios: Application of an Australian TIMES model
Towards Zero Carbon Scenarios: Application of an Australian TIMES modelIEA-ETSAP
 
2013 05 bristol channel energy - johnny gowdy
2013   05 bristol channel energy - johnny gowdy2013   05 bristol channel energy - johnny gowdy
2013 05 bristol channel energy - johnny gowdySevernEstuary
 
Energy storage 2017 - 8-9 Feb 2017 in Paris - Levisys
Energy storage 2017 - 8-9 Feb 2017 in Paris - LevisysEnergy storage 2017 - 8-9 Feb 2017 in Paris - Levisys
Energy storage 2017 - 8-9 Feb 2017 in Paris - LevisysMichael Willemot, Msc, MBA
 
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
SUMMARY: Feasibility of Maximizing Renewables at LNG FacilitiesSUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
SUMMARY: Feasibility of Maximizing Renewables at LNG FacilitiesClean Energy Canada
 
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...Place North West
 
Utility Scale to Domestic Energy Storage
Utility Scale to Domestic Energy StorageUtility Scale to Domestic Energy Storage
Utility Scale to Domestic Energy StorageJustin Hayward
 
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear PowerEnergy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear PowerPlace North West
 
UK CCS Policy Analysis
UK CCS Policy AnalysisUK CCS Policy Analysis
UK CCS Policy AnalysisKarthik A
 
James Beal Bwea 08 Presentation
James Beal Bwea 08 PresentationJames Beal Bwea 08 Presentation
James Beal Bwea 08 PresentationJames Beal
 
LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014Balint Laszlo
 
HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)
HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)
HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)Paul Litten
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Global CCS Institute
 

Tendances (19)

Investor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass ProjectInvestor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass Project
 
Future Role of Gas. Seen from the Danish Gas TSO. Torben Bravo, CEO GAS TSO E...
Future Role of Gas. Seen from the Danish Gas TSO. Torben Bravo, CEO GAS TSO E...Future Role of Gas. Seen from the Danish Gas TSO. Torben Bravo, CEO GAS TSO E...
Future Role of Gas. Seen from the Danish Gas TSO. Torben Bravo, CEO GAS TSO E...
 
Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...
Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...
Enterprise Europe Network | Benefits of dual fuel vehicles for Northern Irela...
 
Towards Zero Carbon Scenarios: Application of an Australian TIMES model
Towards Zero Carbon Scenarios: Application of an Australian TIMES modelTowards Zero Carbon Scenarios: Application of an Australian TIMES model
Towards Zero Carbon Scenarios: Application of an Australian TIMES model
 
2013 05 bristol channel energy - johnny gowdy
2013   05 bristol channel energy - johnny gowdy2013   05 bristol channel energy - johnny gowdy
2013 05 bristol channel energy - johnny gowdy
 
Energy storage 2017 - 8-9 Feb 2017 in Paris - Levisys
Energy storage 2017 - 8-9 Feb 2017 in Paris - LevisysEnergy storage 2017 - 8-9 Feb 2017 in Paris - Levisys
Energy storage 2017 - 8-9 Feb 2017 in Paris - Levisys
 
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
SUMMARY: Feasibility of Maximizing Renewables at LNG FacilitiesSUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
 
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
 
Utility Scale to Domestic Energy Storage
Utility Scale to Domestic Energy StorageUtility Scale to Domestic Energy Storage
Utility Scale to Domestic Energy Storage
 
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear PowerEnergy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
 
UK CCS Policy Analysis
UK CCS Policy AnalysisUK CCS Policy Analysis
UK CCS Policy Analysis
 
James Beal Bwea 08 Presentation
James Beal Bwea 08 PresentationJames Beal Bwea 08 Presentation
James Beal Bwea 08 Presentation
 
The Valhalla Project
The Valhalla ProjectThe Valhalla Project
The Valhalla Project
 
LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014
 
HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)
HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)
HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)
 
Low carbon SMEs Launch Event e flyer
Low carbon SMEs Launch Event e flyerLow carbon SMEs Launch Event e flyer
Low carbon SMEs Launch Event e flyer
 
CSIRO's Impact Strategies for Energy
CSIRO's Impact Strategies for EnergyCSIRO's Impact Strategies for Energy
CSIRO's Impact Strategies for Energy
 
CCS Financing January 09
CCS Financing January 09CCS Financing January 09
CCS Financing January 09
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 

En vedette

Grayling foreign-investment-think-piece june-2011
Grayling foreign-investment-think-piece june-2011Grayling foreign-investment-think-piece june-2011
Grayling foreign-investment-think-piece june-2011Pavel Melnikov
 
рp.14,15,18 - On tools to search and select GR - PR consultant
рp.14,15,18 - On tools to search and select GR - PR consultantрp.14,15,18 - On tools to search and select GR - PR consultant
рp.14,15,18 - On tools to search and select GR - PR consultantPavel Melnikov
 
Tenth Draft Dr. Cotter
Tenth Draft Dr. CotterTenth Draft Dr. Cotter
Tenth Draft Dr. Cotterfeoropeza
 
Guidea kindvriendelijkheidsboekje
Guidea kindvriendelijkheidsboekjeGuidea kindvriendelijkheidsboekje
Guidea kindvriendelijkheidsboekjeGuidea
 
Presentation
PresentationPresentation
Presentations1170006
 
Black widow present
Black widow presentBlack widow present
Black widow presenttintina
 
стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...
стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...
стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...Pavel Melnikov
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energiaguest8c8206
 
Total Cost of Ownership - TCO in Cooperatives
Total Cost of Ownership - TCO in CooperativesTotal Cost of Ownership - TCO in Cooperatives
Total Cost of Ownership - TCO in Cooperativesropkb
 
Do And Dont To
Do And Dont   ToDo And Dont   To
Do And Dont ToKay Tamon
 
Presentation missouri
Presentation missouriPresentation missouri
Presentation missourifeoropeza
 
Soccer Fields 2
Soccer Fields 2Soccer Fields 2
Soccer Fields 2921631
 
How to Make a Halloween Mobile
How to Make a Halloween MobileHow to Make a Halloween Mobile
How to Make a Halloween Mobilemertxita
 
ICT For Your Council
ICT For Your CouncilICT For Your Council
ICT For Your Councilropkb
 
Sec16 greedy algorithm no2
Sec16 greedy algorithm no2Sec16 greedy algorithm no2
Sec16 greedy algorithm no2Keisuke OTAKI
 

En vedette (20)

Grayling foreign-investment-think-piece june-2011
Grayling foreign-investment-think-piece june-2011Grayling foreign-investment-think-piece june-2011
Grayling foreign-investment-think-piece june-2011
 
рp.14,15,18 - On tools to search and select GR - PR consultant
рp.14,15,18 - On tools to search and select GR - PR consultantрp.14,15,18 - On tools to search and select GR - PR consultant
рp.14,15,18 - On tools to search and select GR - PR consultant
 
Tenth Draft Dr. Cotter
Tenth Draft Dr. CotterTenth Draft Dr. Cotter
Tenth Draft Dr. Cotter
 
Guidea kindvriendelijkheidsboekje
Guidea kindvriendelijkheidsboekjeGuidea kindvriendelijkheidsboekje
Guidea kindvriendelijkheidsboekje
 
Presentation
PresentationPresentation
Presentation
 
Black widow present
Black widow presentBlack widow present
Black widow present
 
ENT Intro Deck
ENT Intro DeckENT Intro Deck
ENT Intro Deck
 
стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...
стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...
стр.10 11. Изменение трендов в коммуникациях за 5 лет - журнал пресс-служба №...
 
Orca
OrcaOrca
Orca
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
 
Total Cost of Ownership - TCO in Cooperatives
Total Cost of Ownership - TCO in CooperativesTotal Cost of Ownership - TCO in Cooperatives
Total Cost of Ownership - TCO in Cooperatives
 
Do And Dont To
Do And Dont   ToDo And Dont   To
Do And Dont To
 
Pingüí
PingüíPingüí
Pingüí
 
Presentation missouri
Presentation missouriPresentation missouri
Presentation missouri
 
Soccer Fields 2
Soccer Fields 2Soccer Fields 2
Soccer Fields 2
 
Audi
AudiAudi
Audi
 
How to Make a Halloween Mobile
How to Make a Halloween MobileHow to Make a Halloween Mobile
How to Make a Halloween Mobile
 
ICT For Your Council
ICT For Your CouncilICT For Your Council
ICT For Your Council
 
Cadec2012
Cadec2012Cadec2012
Cadec2012
 
Sec16 greedy algorithm no2
Sec16 greedy algorithm no2Sec16 greedy algorithm no2
Sec16 greedy algorithm no2
 

Similaire à 01 Anne Hojer Simonsen Agencia Danesa De La Energia

El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)UNDPhr
 
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...Farming Futures
 
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Cluster TWEED
 
VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships Vacon Plc
 
Matthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT GermanyMatthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT GermanyGuidoBacker1
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...OECD Environment
 
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Invest Northern Ireland
 
Wind Energy trends in Denmark - Aisma vitina, ea energy analyses
Wind Energy trends in Denmark - Aisma vitina, ea energy analysesWind Energy trends in Denmark - Aisma vitina, ea energy analyses
Wind Energy trends in Denmark - Aisma vitina, ea energy analysesSustainableEnergyAut
 
Global Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyGlobal Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyPower System Operation
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...TECNALIA Research & Innovation
 
Gino Bawn - Sustainable Severn Forum 2017
Gino Bawn - Sustainable Severn Forum 2017Gino Bawn - Sustainable Severn Forum 2017
Gino Bawn - Sustainable Severn Forum 2017Sustainable Severn
 
1115161Wind Power Now, Tomorrow C.P. (Case) .docx
1115161Wind Power Now, Tomorrow  C.P. (Case) .docx1115161Wind Power Now, Tomorrow  C.P. (Case) .docx
1115161Wind Power Now, Tomorrow C.P. (Case) .docxpaynetawnya
 
Stephen Cook - Renewable Energy
Stephen Cook - Renewable EnergyStephen Cook - Renewable Energy
Stephen Cook - Renewable EnergyPAS_Team
 
Future electricity markets: key pillars with high shares of wind and PV
Future electricity markets: key pillars with high shares of wind and PVFuture electricity markets: key pillars with high shares of wind and PV
Future electricity markets: key pillars with high shares of wind and PVLeonardo ENERGY
 
Future Electricity Markets: key pillars with high shares of wind and PV
Future Electricity Markets: key pillars with high shares of wind and PVFuture Electricity Markets: key pillars with high shares of wind and PV
Future Electricity Markets: key pillars with high shares of wind and PVLeonardo ENERGY
 
Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...
Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...
Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...IEA-ETSAP
 

Similaire à 01 Anne Hojer Simonsen Agencia Danesa De La Energia (20)

El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)
 
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
 
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
 
VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships
 
Matthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT GermanyMatthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT Germany
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
 
Wind Energy trends in Denmark - Aisma vitina, ea energy analyses
Wind Energy trends in Denmark - Aisma vitina, ea energy analysesWind Energy trends in Denmark - Aisma vitina, ea energy analyses
Wind Energy trends in Denmark - Aisma vitina, ea energy analyses
 
Global Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyGlobal Electricity Network Feasibility Study
Global Electricity Network Feasibility Study
 
Sgcp14clark
Sgcp14clarkSgcp14clark
Sgcp14clark
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
 
Contracting Strategy
Contracting StrategyContracting Strategy
Contracting Strategy
 
Gino Bawn - Sustainable Severn Forum 2017
Gino Bawn - Sustainable Severn Forum 2017Gino Bawn - Sustainable Severn Forum 2017
Gino Bawn - Sustainable Severn Forum 2017
 
1115161Wind Power Now, Tomorrow C.P. (Case) .docx
1115161Wind Power Now, Tomorrow  C.P. (Case) .docx1115161Wind Power Now, Tomorrow  C.P. (Case) .docx
1115161Wind Power Now, Tomorrow C.P. (Case) .docx
 
Implementing an energy research strategy for nz
Implementing an energy research strategy for nzImplementing an energy research strategy for nz
Implementing an energy research strategy for nz
 
Stephen Cook - Renewable Energy
Stephen Cook - Renewable EnergyStephen Cook - Renewable Energy
Stephen Cook - Renewable Energy
 
Future electricity markets: key pillars with high shares of wind and PV
Future electricity markets: key pillars with high shares of wind and PVFuture electricity markets: key pillars with high shares of wind and PV
Future electricity markets: key pillars with high shares of wind and PV
 
Future Electricity Markets: key pillars with high shares of wind and PV
Future Electricity Markets: key pillars with high shares of wind and PVFuture Electricity Markets: key pillars with high shares of wind and PV
Future Electricity Markets: key pillars with high shares of wind and PV
 
Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...
Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...
Deep decarbonisation scenarios for New Zealand: perspectives of geothermal en...
 
MAPD 2010 - Strategic energy & climate planning
MAPD 2010 - Strategic energy & climate planningMAPD 2010 - Strategic energy & climate planning
MAPD 2010 - Strategic energy & climate planning
 

01 Anne Hojer Simonsen Agencia Danesa De La Energia

  • 1. Danish Offshore Wind Experience Anne Højer Simonsen Deputy Director General Danish Energy Agency Ministry of Climate and Energy
  • 2. Advantages of Wind Power • Security of supply • Alleviation of energy imports • Environment • climate change mitigation • conservation of biodiversity • Export options • New jobs
  • 3. 16 years of experience offshore • First Danish offshore wind farm 1991 • Strategic mapping 1995 • Capacity now 423 MW. (3100 MW incl. onshore) • Strategic assessment for future location of 5200 MW offshore wind power • 2 x 200 MW being built to go on-line in 2009 and 2011. The projects are on track • 2011 app. 850 MW offshore
  • 4. Wind Power Production National average at normal wind conditions 20% of electricity demand National average 2006 - 17% National average January 2007 - 36% Western Denmark January 2007 - 41%
  • 5. Challenge: To Feed the Grid with Wind Power (Western Denmark as an example)
  • 6. Key Instruments to promote RE Historic perspective Public support to research, development and demonstration of RE-technologies Investment grants for standardized RE-equipment Favourable prices for electricity fed into the public grid A suitable legislative and planning framework - supporting the local initiative Agreements between the Government and the utilities: Wind power programmes and biomass agreement
  • 7. Large scale integration • Denmark has very strong interconnectors to neighbouring countries • Nord Pool is a level playing field • Short gate closure times to allow trades close to real time • Further integration is possible • Storage and demand side management could serve as future options • EU: cross border solutions
  • 8. Decoupling of economic growth and energy consumption 160 140 120 Primary Energy Index GDP Intensity 100 80 60 1980 1983 1986 1989 1992 1995 1998 2001 2004
  • 9. Tendering Aim to bring down financial risk • Screening for site suitability • Tender: Fixed price in 10-12 years • TSO to finance, construct and operate transformer station and sea cable • TSO obliged to connect wind power and strengthen grid if necessary • Security that grid connection is available in due time • Financial compensation if the power produced is curtailed • One stop shop communication
  • 10. Support scheme for offshore • Tender – Cheapest, fastest and most beautiful • Fixed price in 50.000 full load hours • = 10-15 years of production • Low bids: • Horns Rev 2 = € cent 6,7 per kWh • Rødsand 2 = € cent 8,3 per kWh
  • 11. Preparing for the future 2025 • 26 sites of 200 MW identified • 5200 MW • Equivalent to 8 % of total demand or 50% of electricity demand • Consultation answers is taken into account • A sensitivity analysis is too be conducted and used in the decision-making process for the actual site selection
  • 12. Conclusions from the Environmental programme • Public acceptance • Migrating birds avoid collision • Seals behaviour not affected • Harbour porpoises return to the sites • Significant artificial wreck effect observed
  • 14. In conclusion • Large scale integration possible • A doubling of offshore capacity on track for 2009-2011 • Tender procedure combined with TSO-grid financing and one stop shop brings down financial risks • Future locations identified • Environment no problem if sites are planned properly • One-stop-shop approval procedure
  • 15. Thank you for your attention Figures and further information available from www.ens.dk/wind