MAJAOR ASSIGNMENT
ON
JUST IN TIME SYSTEM
SUBMITTED TO
Mr. BHUPENDRA GEHLOT
DEPT.OF (M.E.)
SUBMITTED BY
Deepak Nagar
KID-K10880
B.Tech.(M.E.)
6th Semester
• JIT philosophy means getting the right
quantity of goods at the right place and the
right time.
• JIT exceeds the concept of inventory reduction;
it is an all-encompassing philosophy geared to
eliminate waste, anything that does not add
value.
• A broad JIT view – or lean production/lean
systems - is one that encompasses the entire
organization.
 JIT originated in Japan at Toyota Motor Co,
fueled by a need to survive the devastation
post WWII.
 JIT gained worldwide prominence in the 1970s.
 Often termed “Lean Production” or “Lean
Systems.”
 Broad view that entire organization has the
same goal - to serve customers.
 JIT is built on simplicity - simpler is better.
 Continuous improvement – often using kaizen
blitz.
 Visibility – all waste must be visible to be
identified and eliminated.
 Flexibility - to adapt to changes in
environment.
 JIT manufacturing focuses on production system
to achieve value-added manufacturing.
 TQM is an integrated effort designed to
improve quality performance at every level.
 Respect for people rests on the philosophy that
human resources are an essential part of JIT
philosophy.
 JIT Manufacturing is a philosophy of value-
added manufacturing.
 Achieved by focusing on these elements:
 Inventory reduction - exposes problems.
 Small lots & quick setups.
 Uniform plant loading.
 Flexible resources.
 Efficient facility layouts.
 Moveable, general purpose equipment:
 Portable equipment with plug in power/air
 Drills, lathes, printer-fax-copiers, etc.
 Capable of being setup to do many different things
with minimal setup time.
 Multifunctional workers:
 Workers assume considerable responsibility.
 Cross-trained to perform several different duties.
 Trained to also be problem solvers.
 Integrate quality into all processes
 Focus on continuous improvement.
 Quality at the source - sequential inspection.
 Preventive maintenance – scheduled.
 Work environment - everything in its place, a
place for everything.
The Role of Employees:
 Genuine and meaningful respect for associates.
 Quality circles – small volunteer teams that solve
quality problems.
Lifetime Employment:
– Everyone feels secure/is empowered.
– Everyone is responsible for quality:
understand both internal and external
customer needs.
 Reduction in inventories.
 Improved quality.
 Reduced space requirements.
 Shorter lead times.
 Lower production costs.
 Increased productivity.
 Increased machine utilization.
 Greater flexibility.
Many JIT concepts also apply to Service
companies
 Improved quality such as timeliness, service
consistency, and courtesy
 Uniform facility loading to provide better service
responsiveness
 Use of multifunction workers
 Reduction in cycle time
 Minimizing setup times and parallel processing
 Workplace organization
k10880-deepaknagar(OPC:J.I.T.)

Contenu connexe

Tendances

Benefits of Concurrent Engineering
Benefits of Concurrent EngineeringBenefits of Concurrent Engineering
Benefits of Concurrent EngineeringLanie Lyn Alog
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGProf.Mayur Modi
 
Concurrent engineering
Concurrent engineering Concurrent engineering
Concurrent engineering Amol Chakankar
 
Continuous Process Improvement and Japanese Concepts
Continuous Process Improvement and Japanese ConceptsContinuous Process Improvement and Japanese Concepts
Continuous Process Improvement and Japanese ConceptsNisha Agarwal
 
Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Saiful Alam ✔️
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineeringSHAKTI PRASAD
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringGowsick Subramaniam
 
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSMWhy Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSMKartheek Kein
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent EngineeringBipinKumarJha1
 
Advantages of Lean Production
Advantages of Lean ProductionAdvantages of Lean Production
Advantages of Lean ProductionRebeccah Fearon
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingAnuj Shah
 
5 Things to Know About Lean Manufacturing
5 Things to Know About Lean Manufacturing5 Things to Know About Lean Manufacturing
5 Things to Know About Lean ManufacturingMonarch Metal
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3i4VC
 

Tendances (19)

KAIZEN COSTING NTES
KAIZEN COSTING NTESKAIZEN COSTING NTES
KAIZEN COSTING NTES
 
Benefits of Concurrent Engineering
Benefits of Concurrent EngineeringBenefits of Concurrent Engineering
Benefits of Concurrent Engineering
 
Decision making
Decision makingDecision making
Decision making
 
Lean vs agile manufacturing
Lean vs agile manufacturingLean vs agile manufacturing
Lean vs agile manufacturing
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
Concurrent engineering
Concurrent engineering Concurrent engineering
Concurrent engineering
 
Continuous Process Improvement and Japanese Concepts
Continuous Process Improvement and Japanese ConceptsContinuous Process Improvement and Japanese Concepts
Continuous Process Improvement and Japanese Concepts
 
Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Power point lean
Power point leanPower point lean
Power point lean
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineering
 
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSMWhy Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
lean & agile
lean & agilelean & agile
lean & agile
 
Advantages of Lean Production
Advantages of Lean ProductionAdvantages of Lean Production
Advantages of Lean Production
 
Project Manufacturing
Project ManufacturingProject Manufacturing
Project Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
5 Things to Know About Lean Manufacturing
5 Things to Know About Lean Manufacturing5 Things to Know About Lean Manufacturing
5 Things to Know About Lean Manufacturing
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3
 

En vedette

K10880 deepaknagar vapour absorption technology
K10880 deepaknagar vapour absorption technologyK10880 deepaknagar vapour absorption technology
K10880 deepaknagar vapour absorption technologygurjarajeet
 
How to raise SEED fund
How to raise SEED fundHow to raise SEED fund
How to raise SEED fundEnterslice
 
K10880 deepaknagar vapour absorption technology deepak
K10880 deepaknagar vapour absorption technology deepakK10880 deepaknagar vapour absorption technology deepak
K10880 deepaknagar vapour absorption technology deepakgurjarajeet
 
Store locator extension for magento
Store locator extension for magentoStore locator extension for magento
Store locator extension for magentoalesia_magento
 
K10880 deepaknagar jit ppt deepak
K10880 deepaknagar jit ppt deepakK10880 deepaknagar jit ppt deepak
K10880 deepaknagar jit ppt deepakgurjarajeet
 
K10880 deepaknagar control slide share
K10880 deepaknagar control slide shareK10880 deepaknagar control slide share
K10880 deepaknagar control slide sharegurjarajeet
 
K10880 deepaknagar vehicle accident information deepak
K10880 deepaknagar vehicle accident information deepakK10880 deepaknagar vehicle accident information deepak
K10880 deepaknagar vehicle accident information deepakgurjarajeet
 
business plan for Salon and Spa
business plan for Salon and Spabusiness plan for Salon and Spa
business plan for Salon and SpaEnterslice
 
Business plan fitness center, yoga center
Business plan fitness center, yoga centerBusiness plan fitness center, yoga center
Business plan fitness center, yoga centerEnterslice
 
Business plan for construction and engineering
Business plan for construction and engineeringBusiness plan for construction and engineering
Business plan for construction and engineeringEnterslice
 
business plan for ecommerce startup
business plan for ecommerce startupbusiness plan for ecommerce startup
business plan for ecommerce startupEnterslice
 
Busines plan for bar and night club
Busines plan for bar and night clubBusines plan for bar and night club
Busines plan for bar and night clubEnterslice
 
business plan for fashion eCommerce
business plan for fashion eCommercebusiness plan for fashion eCommerce
business plan for fashion eCommerceEnterslice
 

En vedette (13)

K10880 deepaknagar vapour absorption technology
K10880 deepaknagar vapour absorption technologyK10880 deepaknagar vapour absorption technology
K10880 deepaknagar vapour absorption technology
 
How to raise SEED fund
How to raise SEED fundHow to raise SEED fund
How to raise SEED fund
 
K10880 deepaknagar vapour absorption technology deepak
K10880 deepaknagar vapour absorption technology deepakK10880 deepaknagar vapour absorption technology deepak
K10880 deepaknagar vapour absorption technology deepak
 
Store locator extension for magento
Store locator extension for magentoStore locator extension for magento
Store locator extension for magento
 
K10880 deepaknagar jit ppt deepak
K10880 deepaknagar jit ppt deepakK10880 deepaknagar jit ppt deepak
K10880 deepaknagar jit ppt deepak
 
K10880 deepaknagar control slide share
K10880 deepaknagar control slide shareK10880 deepaknagar control slide share
K10880 deepaknagar control slide share
 
K10880 deepaknagar vehicle accident information deepak
K10880 deepaknagar vehicle accident information deepakK10880 deepaknagar vehicle accident information deepak
K10880 deepaknagar vehicle accident information deepak
 
business plan for Salon and Spa
business plan for Salon and Spabusiness plan for Salon and Spa
business plan for Salon and Spa
 
Business plan fitness center, yoga center
Business plan fitness center, yoga centerBusiness plan fitness center, yoga center
Business plan fitness center, yoga center
 
Business plan for construction and engineering
Business plan for construction and engineeringBusiness plan for construction and engineering
Business plan for construction and engineering
 
business plan for ecommerce startup
business plan for ecommerce startupbusiness plan for ecommerce startup
business plan for ecommerce startup
 
Busines plan for bar and night club
Busines plan for bar and night clubBusines plan for bar and night club
Busines plan for bar and night club
 
business plan for fashion eCommerce
business plan for fashion eCommercebusiness plan for fashion eCommerce
business plan for fashion eCommerce
 

Similaire à k10880-deepaknagar(OPC:J.I.T.)

Similaire à k10880-deepaknagar(OPC:J.I.T.) (20)

Just In Time
Just In TimeJust In Time
Just In Time
 
Lean.ppt
Lean.pptLean.ppt
Lean.ppt
 
ch07.ppt
ch07.pptch07.ppt
ch07.ppt
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
Just in time
Just in timeJust in time
Just in time
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Lean and agile manufacturing system
Lean and agile manufacturing systemLean and agile manufacturing system
Lean and agile manufacturing system
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
Just In Time(JIT)
Just In Time(JIT)Just In Time(JIT)
Just In Time(JIT)
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Just in Time (JIT)
Just in Time (JIT)Just in Time (JIT)
Just in Time (JIT)
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...
 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using lean
 

Dernier

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Dernier (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 

k10880-deepaknagar(OPC:J.I.T.)

  • 1. MAJAOR ASSIGNMENT ON JUST IN TIME SYSTEM SUBMITTED TO Mr. BHUPENDRA GEHLOT DEPT.OF (M.E.) SUBMITTED BY Deepak Nagar KID-K10880 B.Tech.(M.E.) 6th Semester
  • 2. • JIT philosophy means getting the right quantity of goods at the right place and the right time. • JIT exceeds the concept of inventory reduction; it is an all-encompassing philosophy geared to eliminate waste, anything that does not add value. • A broad JIT view – or lean production/lean systems - is one that encompasses the entire organization.
  • 3.  JIT originated in Japan at Toyota Motor Co, fueled by a need to survive the devastation post WWII.  JIT gained worldwide prominence in the 1970s.  Often termed “Lean Production” or “Lean Systems.”  Broad view that entire organization has the same goal - to serve customers.
  • 4.  JIT is built on simplicity - simpler is better.  Continuous improvement – often using kaizen blitz.  Visibility – all waste must be visible to be identified and eliminated.  Flexibility - to adapt to changes in environment.
  • 5.
  • 6.  JIT manufacturing focuses on production system to achieve value-added manufacturing.  TQM is an integrated effort designed to improve quality performance at every level.  Respect for people rests on the philosophy that human resources are an essential part of JIT philosophy.
  • 7.  JIT Manufacturing is a philosophy of value- added manufacturing.  Achieved by focusing on these elements:  Inventory reduction - exposes problems.  Small lots & quick setups.  Uniform plant loading.  Flexible resources.  Efficient facility layouts.
  • 8.  Moveable, general purpose equipment:  Portable equipment with plug in power/air  Drills, lathes, printer-fax-copiers, etc.  Capable of being setup to do many different things with minimal setup time.  Multifunctional workers:  Workers assume considerable responsibility.  Cross-trained to perform several different duties.  Trained to also be problem solvers.
  • 9.  Integrate quality into all processes  Focus on continuous improvement.  Quality at the source - sequential inspection.  Preventive maintenance – scheduled.  Work environment - everything in its place, a place for everything.
  • 10. The Role of Employees:  Genuine and meaningful respect for associates.  Quality circles – small volunteer teams that solve quality problems. Lifetime Employment: – Everyone feels secure/is empowered. – Everyone is responsible for quality: understand both internal and external customer needs.
  • 11.  Reduction in inventories.  Improved quality.  Reduced space requirements.  Shorter lead times.  Lower production costs.  Increased productivity.  Increased machine utilization.  Greater flexibility.
  • 12. Many JIT concepts also apply to Service companies  Improved quality such as timeliness, service consistency, and courtesy  Uniform facility loading to provide better service responsiveness  Use of multifunction workers  Reduction in cycle time  Minimizing setup times and parallel processing  Workplace organization