SlideShare une entreprise Scribd logo
1  sur  13
Manufacturing Planning
and
Control
ISSUE
“The fundamental problem
of operations management is
balancing capacity and
demand …”
Marketing
Planning
Strategic
Planning
Financial
Planning
Aggregate
Production
Planning
Resource
Planning
Demand
Management
Master Production
Schedule (MPS)
Rough-Cut Capacity
Planning (RCCP)
Material
Requirements
Planning (MRP)
Capacity
Requirements
Planning
Production Activity
Control
Capacity
Control
Manufacturing Planning and Control
Processes in Production Planning
and Control
• DEMAND MANAGEMENT
• AGGREGATE PRODUCTION PLAN
• MASTER PRODUCTION SCHEDULE
• CAPACITY REQUIREMENT PLAN
• MATERIAL REQUIREMENT PLAN
• OPERATIONS SCHEDULING
• SHOP FLOOR CONTROL
• INPUT OUTPUT CONTROL
INTERFACES TO PRODUCTION
PLANNING AND CONTROL
• TO ARRIVE AT MPS WE NEED FIRM ORDERS FROM
CUSTOMERS OR FORECAST OF DEMAND FROM Sales
/CUSTOMERS
• TO ARRIVE AT CAPACITY REQUIREMENT PLANNING WE
NEED TO KNOW THE AVAILABILITY OF THE MACHINE
CAPACITY WITH RESPECT TO THE DEMAND LOAD ON THE
CAPACITY
• TO ARRIVE AT THE MATERIAL REQUIREMENT PLAN WE
NEED THE MPS,ENGG DESIGN CHANGES,BILL OF MATERIAL
AND INVENTORY RECORDS
• MRP OUTPUTS PLANNED ORDER SCHEDULES FOR
INVENTORY AND PRODUCTION CONTROL
MASTER PRODUCTION
SCHEDULE
• MASTER PRODUCTION SCHEDULER
SHOULD:
-INCLUDE ALL DEMANDS FROM PRODUCT
SALES WAREHOUSE REPLENISHMENT
SPARES AND INTER PLANT REQUIREMENT
-KEEP SIGHT OF
AGGREGATE PLAN -KEEP
CUSTOMER ORDER PROMISES IN MIND
-IDENTIFY AND COMMUNICATE ALL
PROBLEMS
CAPACITY PLANNING
• CAPACITY IS A MEASURE OF ABILITY TO
PROVIDE CAPABILITY TO MEET MKT
DEMAND
• CAPACITY DECISIONS USE FOLLOWING
STEPS:
-MEASURE DEMAND
-MEASURE FINITE CAPACITY
-RECONCILE CAPACITY&
DEMAND
-EVALUATE ALTERNATIVES INCLUDING
SUBCONTRACTING
Managing Capacity
• Disaggregate the capacity management problems …
• Example:
– Resource requirements planning -- check the
production plan in aggregate units. Done before
MPS
– Rough cut capacity planning -- check the master
schedule in shop hours and MPS reworked if
required.
– Capacity requirements planning -- check the
materials plan in shop hours By default infinite
capacity is assumed. A separate exercise done on
MATERIAL REQUIREMENT
PLANNING
• MRP DRIVEN BY MPS
• WHAT MATRL TO BE ORDERED FROM
OUTSIDE AND WHAT MATRL TO BE MFG
INHOUSE TAKING INTO ACCOUNT
CURRENT INVENTORY LEVELS
• MRP RUN RESULTS IN CALCULATION OF
NET REQMNT AND RELEASE OF
PURCHASE ORDER OR WORK ORDER
• MRP USES A BILL OF MATERIAL FOR
PRODUCTS TO CALCULATE REQMNTS
OPERATIONS SCHEDULING
• SCHEDULING INVOLVES PREPARATION OF
TIME TABLE FOR WORK THAT NEEDS TO
BE DONE TO MEET CLIENT DATES OR TO
ACHIEVE DESIRED OBJECTIVE
• EFFECTIVE SCHEDULING DONE TO AVOID
BOTTLENECKS AND TO OPTIMIZE
UTILISATION OF SHOP FLOOR RESOURCES
• SHEDULING RULES REQUIRED TO
OPTIMIZE OPERATIONS
SCHEDULING RULES
• FIRST COME FIRST SERVED
• EARLIEST DUE DATE
• SHORTEST PROCESSING TIME
• LONGEST PROCESSING TIME
• LAST ARRIVED FIRST PROCESSED
• LEAST SLACK TIME
• LEAST CHANGEOVER COST
OPERATIONS SCHEDULING
• SCHEDULING SYSTEMS USE EITHER FINITE OR INFINITE LOADING
TECHNIQUES TO DETERMINE HOW MACHINE CAPACITY SHOULD
BE USED
• INFINITE CAPACITY OCCURS WHEN WORK IS ASSIGNED TO A
WORK CENTRE BASED ON WHAT IS NEEDED .IT IS PRESUMED
THAT CAPACITY IS ALWAYS AVAILABLE AND NO
CONSIDERATION IS GIVEN DIRECTLY TO WHETHER THERE IS
SUFFICIENT CAPACITY AT THE RESOURCES REQD TO DO WORK.
IN INFINITE LOADING SYSTEMS LEAD TIME IS ESTIMATED BY
TAKING MULTIPLE OF OPERATING TIME(SETUP +RUN TIME) PLUS
QUEUE DELAY IN MATRL MOVEMENT
• FINITE LOADING SCHEDULES IN DETAIL EACH RESOURCE
USING THE SETUP AND RUNTIME REQD FOR EACH ORDER
.SYSTEM DETERMINES EXACTLY WHAT EACH RESOURCE WILL
DO AT EACH MOMENT OF THE DAY
SCHEDULING AND CONTROL
FUNCTIONS
• ALLOCATING ORDERS TO WORK CENTRES
• DETERMINING SEQUENCE OF ORDER
OPERATIONS
• DISPATCHING OF ORDERS
• SHOP FLOOR CONTROL OF ORDERS
INVOLVING CONTROLLING PROGRESS OF
ORDERS AND EXPEDITING LATE AND
CRITICAL ORDERS

Contenu connexe

Tendances

material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationPankaj Kumar
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Schedulingpilly_leon
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSNEHA GAUTAM
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production scheduleyashbhhardwaj260
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Timesejalgfer
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planningDinesh Nikam
 
Presentation
PresentationPresentation
PresentationUmama S
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)Ravimohan Rajmohan
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRPeasy
 
Material requirement planning case study
Material requirement planning case studyMaterial requirement planning case study
Material requirement planning case studyVaibhav Kadu
 

Tendances (20)

(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Production Planning
Production PlanningProduction Planning
Production Planning
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Production planning hierarchy
Production planning hierarchyProduction planning hierarchy
Production planning hierarchy
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Scheduling
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production schedule
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
Presentation
PresentationPresentation
Presentation
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?
 
Material requirement planning case study
Material requirement planning case studyMaterial requirement planning case study
Material requirement planning case study
 

En vedette

07 Am09 Presentations Hamburger & Lawson
07 Am09 Presentations   Hamburger & Lawson07 Am09 Presentations   Hamburger & Lawson
07 Am09 Presentations Hamburger & LawsonSimon Prince
 
Procurement & sampling of feeding units
Procurement & sampling of feeding unitsProcurement & sampling of feeding units
Procurement & sampling of feeding unitsDr Muhammad Umar Aziz
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and controlNikhil Pandey
 
Audit tools use cases for Genesys platforms
Audit tools  use cases for Genesys platformsAudit tools  use cases for Genesys platforms
Audit tools use cases for Genesys platformsCC Expertise
 
Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]Heddy Hidalgo Rivero
 
Production planning hierarchy
Production planning hierarchy Production planning hierarchy
Production planning hierarchy Cher Dong Theng
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systemshaitham shehata
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planningShankarjyoti Hazarika
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemDesai Vaishali
 
Process Control Power Point
Process Control Power PointProcess Control Power Point
Process Control Power Pointjjhaefner
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOutFahad Ali
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems Nityanand Yadav
 

En vedette (20)

07 Am09 Presentations Hamburger & Lawson
07 Am09 Presentations   Hamburger & Lawson07 Am09 Presentations   Hamburger & Lawson
07 Am09 Presentations Hamburger & Lawson
 
Procurement & sampling of feeding units
Procurement & sampling of feeding unitsProcurement & sampling of feeding units
Procurement & sampling of feeding units
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
Audit tools use cases for Genesys platforms
Audit tools  use cases for Genesys platformsAudit tools  use cases for Genesys platforms
Audit tools use cases for Genesys platforms
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]
 
Production planning hierarchy
Production planning hierarchy Production planning hierarchy
Production planning hierarchy
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systems
 
Supply chain
Supply chainSupply chain
Supply chain
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planning
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
Process Control Power Point
Process Control Power PointProcess Control Power Point
Process Control Power Point
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOut
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
PPAP
PPAPPPAP
PPAP
 

Similaire à Manufacturing plng and control

Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesvideoaakash15
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Production management
Production managementProduction management
Production managementPurnesh Aloni
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesvideoaakash15
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011honeysethi
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.pptsathishkumar776149
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningsabin kafle
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Advanced Planning And Optimization
Advanced Planning And OptimizationAdvanced Planning And Optimization
Advanced Planning And OptimizationHitesh Kumar Markam
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN
4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN
4.DEFINITIONANDMANAGEMENTOFINDICATORS IN ENGeorgeDiamandis11
 
Generalized SCOR Implementation
Generalized SCOR ImplementationGeneralized SCOR Implementation
Generalized SCOR ImplementationJason D Barr
 
Microsoft Dynamics NAV - as ERP Solution for Manufacturing Process
Microsoft Dynamics NAV - as ERP Solution for Manufacturing ProcessMicrosoft Dynamics NAV - as ERP Solution for Manufacturing Process
Microsoft Dynamics NAV - as ERP Solution for Manufacturing ProcessIsra' Abu Rumman
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 

Similaire à Manufacturing plng and control (20)

Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production Planning
Production Planning Production Planning
Production Planning
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
CRP & DRP.pptx
CRP & DRP.pptxCRP & DRP.pptx
CRP & DRP.pptx
 
Production management
Production managementProduction management
Production management
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
 
module 2 OM.pptx
module 2 OM.pptxmodule 2 OM.pptx
module 2 OM.pptx
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
7 -managing_capacity
7  -managing_capacity7  -managing_capacity
7 -managing_capacity
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Advanced Planning And Optimization
Advanced Planning And OptimizationAdvanced Planning And Optimization
Advanced Planning And Optimization
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN
4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN
4.DEFINITIONANDMANAGEMENTOFINDICATORS IN EN
 
Generalized SCOR Implementation
Generalized SCOR ImplementationGeneralized SCOR Implementation
Generalized SCOR Implementation
 
Microsoft Dynamics NAV - as ERP Solution for Manufacturing Process
Microsoft Dynamics NAV - as ERP Solution for Manufacturing ProcessMicrosoft Dynamics NAV - as ERP Solution for Manufacturing Process
Microsoft Dynamics NAV - as ERP Solution for Manufacturing Process
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 

Plus de Karthik Yadav

Plus de Karthik Yadav (20)

Bharti airtel
Bharti airtelBharti airtel
Bharti airtel
 
Arogya parivar
Arogya parivarArogya parivar
Arogya parivar
 
Aircel
AircelAircel
Aircel
 
3 g video telephony
3 g video telephony3 g video telephony
3 g video telephony
 
3 g technology
3 g technology3 g technology
3 g technology
 
Scm (1)
Scm (1)Scm (1)
Scm (1)
 
Chapter 7 cold chain logistics
Chapter 7 cold chain logisticsChapter 7 cold chain logistics
Chapter 7 cold chain logistics
 
With mining and export bans, india turns iron ore importer
With mining and export bans, india turns iron ore importerWith mining and export bans, india turns iron ore importer
With mining and export bans, india turns iron ore importer
 
The german invasion of the indian trucking sector
The german invasion of the indian trucking sectorThe german invasion of the indian trucking sector
The german invasion of the indian trucking sector
 
Strategic management tdy
Strategic management tdyStrategic management tdy
Strategic management tdy
 
Jain irrigation systems
Jain irrigation systemsJain irrigation systems
Jain irrigation systems
 
Hearty mart endearing success of a small-town retailer
Hearty mart   endearing success of a small-town retailerHearty mart   endearing success of a small-town retailer
Hearty mart endearing success of a small-town retailer
 
Cleaning up a german company, india style
Cleaning up a german company, india styleCleaning up a german company, india style
Cleaning up a german company, india style
 
Apple and samsung, 'frenemies' for life
Apple and samsung, 'frenemies' for lifeApple and samsung, 'frenemies' for life
Apple and samsung, 'frenemies' for life
 
10
1010
10
 
9
99
9
 
8
88
8
 
7
77
7
 
6
66
6
 
5
55
5
 

Dernier

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 

Dernier (20)

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 

Manufacturing plng and control

  • 2. ISSUE “The fundamental problem of operations management is balancing capacity and demand …”
  • 3. Marketing Planning Strategic Planning Financial Planning Aggregate Production Planning Resource Planning Demand Management Master Production Schedule (MPS) Rough-Cut Capacity Planning (RCCP) Material Requirements Planning (MRP) Capacity Requirements Planning Production Activity Control Capacity Control Manufacturing Planning and Control
  • 4. Processes in Production Planning and Control • DEMAND MANAGEMENT • AGGREGATE PRODUCTION PLAN • MASTER PRODUCTION SCHEDULE • CAPACITY REQUIREMENT PLAN • MATERIAL REQUIREMENT PLAN • OPERATIONS SCHEDULING • SHOP FLOOR CONTROL • INPUT OUTPUT CONTROL
  • 5. INTERFACES TO PRODUCTION PLANNING AND CONTROL • TO ARRIVE AT MPS WE NEED FIRM ORDERS FROM CUSTOMERS OR FORECAST OF DEMAND FROM Sales /CUSTOMERS • TO ARRIVE AT CAPACITY REQUIREMENT PLANNING WE NEED TO KNOW THE AVAILABILITY OF THE MACHINE CAPACITY WITH RESPECT TO THE DEMAND LOAD ON THE CAPACITY • TO ARRIVE AT THE MATERIAL REQUIREMENT PLAN WE NEED THE MPS,ENGG DESIGN CHANGES,BILL OF MATERIAL AND INVENTORY RECORDS • MRP OUTPUTS PLANNED ORDER SCHEDULES FOR INVENTORY AND PRODUCTION CONTROL
  • 6. MASTER PRODUCTION SCHEDULE • MASTER PRODUCTION SCHEDULER SHOULD: -INCLUDE ALL DEMANDS FROM PRODUCT SALES WAREHOUSE REPLENISHMENT SPARES AND INTER PLANT REQUIREMENT -KEEP SIGHT OF AGGREGATE PLAN -KEEP CUSTOMER ORDER PROMISES IN MIND -IDENTIFY AND COMMUNICATE ALL PROBLEMS
  • 7. CAPACITY PLANNING • CAPACITY IS A MEASURE OF ABILITY TO PROVIDE CAPABILITY TO MEET MKT DEMAND • CAPACITY DECISIONS USE FOLLOWING STEPS: -MEASURE DEMAND -MEASURE FINITE CAPACITY -RECONCILE CAPACITY& DEMAND -EVALUATE ALTERNATIVES INCLUDING SUBCONTRACTING
  • 8. Managing Capacity • Disaggregate the capacity management problems … • Example: – Resource requirements planning -- check the production plan in aggregate units. Done before MPS – Rough cut capacity planning -- check the master schedule in shop hours and MPS reworked if required. – Capacity requirements planning -- check the materials plan in shop hours By default infinite capacity is assumed. A separate exercise done on
  • 9. MATERIAL REQUIREMENT PLANNING • MRP DRIVEN BY MPS • WHAT MATRL TO BE ORDERED FROM OUTSIDE AND WHAT MATRL TO BE MFG INHOUSE TAKING INTO ACCOUNT CURRENT INVENTORY LEVELS • MRP RUN RESULTS IN CALCULATION OF NET REQMNT AND RELEASE OF PURCHASE ORDER OR WORK ORDER • MRP USES A BILL OF MATERIAL FOR PRODUCTS TO CALCULATE REQMNTS
  • 10. OPERATIONS SCHEDULING • SCHEDULING INVOLVES PREPARATION OF TIME TABLE FOR WORK THAT NEEDS TO BE DONE TO MEET CLIENT DATES OR TO ACHIEVE DESIRED OBJECTIVE • EFFECTIVE SCHEDULING DONE TO AVOID BOTTLENECKS AND TO OPTIMIZE UTILISATION OF SHOP FLOOR RESOURCES • SHEDULING RULES REQUIRED TO OPTIMIZE OPERATIONS
  • 11. SCHEDULING RULES • FIRST COME FIRST SERVED • EARLIEST DUE DATE • SHORTEST PROCESSING TIME • LONGEST PROCESSING TIME • LAST ARRIVED FIRST PROCESSED • LEAST SLACK TIME • LEAST CHANGEOVER COST
  • 12. OPERATIONS SCHEDULING • SCHEDULING SYSTEMS USE EITHER FINITE OR INFINITE LOADING TECHNIQUES TO DETERMINE HOW MACHINE CAPACITY SHOULD BE USED • INFINITE CAPACITY OCCURS WHEN WORK IS ASSIGNED TO A WORK CENTRE BASED ON WHAT IS NEEDED .IT IS PRESUMED THAT CAPACITY IS ALWAYS AVAILABLE AND NO CONSIDERATION IS GIVEN DIRECTLY TO WHETHER THERE IS SUFFICIENT CAPACITY AT THE RESOURCES REQD TO DO WORK. IN INFINITE LOADING SYSTEMS LEAD TIME IS ESTIMATED BY TAKING MULTIPLE OF OPERATING TIME(SETUP +RUN TIME) PLUS QUEUE DELAY IN MATRL MOVEMENT • FINITE LOADING SCHEDULES IN DETAIL EACH RESOURCE USING THE SETUP AND RUNTIME REQD FOR EACH ORDER .SYSTEM DETERMINES EXACTLY WHAT EACH RESOURCE WILL DO AT EACH MOMENT OF THE DAY
  • 13. SCHEDULING AND CONTROL FUNCTIONS • ALLOCATING ORDERS TO WORK CENTRES • DETERMINING SEQUENCE OF ORDER OPERATIONS • DISPATCHING OF ORDERS • SHOP FLOOR CONTROL OF ORDERS INVOLVING CONTROLLING PROGRESS OF ORDERS AND EXPEDITING LATE AND CRITICAL ORDERS