SlideShare une entreprise Scribd logo
1  sur  22
Télécharger pour lire hors ligne
IMO-IMarEST Shipbuilders’ Forum on
       The Ballast Water Management Convention


                      1 November 2010
                         Singapore


Ballast Water Treatment System Installation Issues
               A Class Perspective




                       A. K. Seah
            VP Technology & Business Development
Outline


          Brief review
          Some issues in shipboard installation
            Generation of hazardous gases
            Tanker with low flash point products




                                                   2
BWTS technology




Some 40+ vendors
  Over half use mechanical system as primary means
  Most used disinfectant technology: UV and electrolytic
  chlorination, each has >10 vendors
  >3 systems used combined mechanical, physical and chemical
  processed

                                                               3
Ship size and ballast tank capacity

                                                (m3/hr)




Source: ABS Ballast Water Management Advisory

                                                          4
Implications




               ■ Ships keel-laid after 2012 - must allow for
                 installing BWT system at building stage
               ■ Ships keel laid before 2012 must have system
                 on board by 2017 - this means installing BWT
                 system in special survey drydocking window
                 of 2012-2016

                                                                5
System selection

  Technical feasibility
     Dry cargo ships – any system
     Tankers (flash point ≤ 60°C)
        Ballast system piping in pump room – electrical
        equipment must be explosion-proof or intrinsically safe
        Aft peak ballast tank – a separate ballast system?

  Fitting the system in
     Footprint; Power need; Pressure drop; System supplier
     special needs; Engineering issues
     Side effects: ballast tank coating; accumulation of
     hazardous gases…

  Commercial considerations
     System cost; cost of installation; operating cost;
     maintenance cost

                                                                  6
Some issues on Engineering and
    Shipboard Installation
Hazardous gases

  Electrolytic chlorination process produces
  hydrogen and chlorine
    Hydrogen is flammable
    Chlorine is toxic

  Systems using electrolytic chlorination
  process are now proposed for installation
  Closer look at two systems
    Techcross Electro-CleenTM
    Unitor / Resource ballast Technology BWTS


                                                8
Techcross Electro-CleenTM
  Wholly electrolytic chlorination process
  BW treated at intake; Neutralization at discharge
                              Permissible dosage of active substance as TRO at treatment <10 mg/l
                              Permissible concentration of active
                              substance TRO at discharge < 0.02mg/l


                                                                       (sodium thioslphate)




                                           S

     TRC (Total Residual Chlorine)              Tank
                                                Vent
       TRO (Total Residual Oxidants)                     Source: MEPC 58/2/7

                                                                                                    9
Techcross – Electro-CleenTM

      Received IMO Final Approval, 10 Oct
      2008
      Highest level of gas measured during
      tests (as submitted to IMO):
            H2: 4% [Threshold: LEL 4%]
            Cl2: 0.9ppm [Threshold: 0.5ppm average
            8-h work place exposure]

      IMO approval based on provision of:
            H2 online detection: alarm at 2%;
                                                     System was
            shutdown at 3%
                                                     certified
            Cl2 online detection: alarm at 0.6ppm;   explosion proof
            shutdown at 0.8ppm
Source: MEPC 58/2/7; Techcorss website

                                                                       10
Unitor/Resource Ballast Technology
 Combined cavitation, sterilization, physical
 separation
 BW treatment at intake
 Disinfectant is provided by ozone (< 1.5ppm) and
 by electrolytic chlorination (sodium hypochloride
 < 1.5ppm) in reactor / cavitation chamber




                                                     Source: www.resource-
                                                     technology.com

                                                                       11
Unitor/Resource Ballast Technology

  Received IMO Final Approval 26 Mar 2010
  Highest level of gas measured at simulated tests of
  200m3 ballast tank (as submitted to IMO):
     Ballast water changed once daily for 8 days and twice
     for the last 2 days; tank drained to 1/3 volume then
     refilled to full capacity                 Ozonation

     H2: 0.28%                                         Electrochlorination

     Cl2: 0.25ppm                                               Cavitation

  IMO approval based on
  additional provision of:
     De-aerator & H2 monitor
     TRO monitoring/recording
     at discharge
                                  Source: MEPC 59/2/10, MEPC 60/2/11

                                                                             12
Issue of hazardous gases

  Issue of flammable gases H2
     Oil & gas industry practice: low gas alarm at 20% LEL, high
     gas alarm at 60% LEL & shutdown
     Proposal by Techcross: alarm at 2% (50% LEL) and
     shutdown at 3% (75% LEL)
         Additional shipboard tests showed H2 peaked at 0.03%
     Proposal by Resource Ballast Technology: none; IMO require
     H2 monitor but alarm point and shutdown not specified

  Issue of toxic gas Cl2
     No existing shipboard practice
     Proposal by Techcross accepted by IMO
     None proposed by Resource Ballast
     Technology – acceptable to IMO

  Tank entry; gas-freeing

                                                                   13
Effect of treated BW on corrosion

  In general, appears non-conclusive
     Techcross: tests showed seawater with TRO
     concentrations had less or similar corrosion to natural
     seawater
        Contradicts known and published data that chlorinated
        seawater increased corrosion
     Resource Ballast Technology: tests showed corrosion
     rate for steel in treated seawater about double that for
     equivalent untreated seawater, but within reported
     limits of normal corrosion rate
        No known data on effect of ozone

  IMO recommends:
     Monitoring program to provide long-term effects
     Parallel corrosion tests with tests for type approval
                                        Source: MEPC 58/2/7, MEPC 59/2/10

                                                                            14
Effect of treated BW on corrosion
Techcross
Corrosion Tests


                Coating intact




                 Coating with
             artificial scratch



Source: http://techcross.koreasme.com/

                                         15
Safe spaces / Hazardous spaces

  Tankers carrying cargoes with flash point
  ≤ 60°C
    No connection between piping in safe spaces
    (e.g. engine room) with piping handling liquid
    in hazardous spaces (e.g. pump room; ballast
    tank adjacent to cargo tanks, cargo tanks)
    Some exceptions permitted provided safety
    features are fitted
  BWTS intended for tankers; e.g.:
    Ozone dosing system
    Aft peak tank – can it share BWTS with cargo
    area ballast tanks?

                                                     16
Dosing piping cross connection



                                       Alternative
                        Located as
                        high in pump
                                       arrangement:
                        room as        dosing piping to
                        practicable    enter pump room
                                       from main deck
                                       with vapor seal




  With alarm and shut
  down arrangement


                                                          17
Sampling lines cross connection




                                  18
Aft peak tank
   An acceptable arrangement
                                                              SYS = Ballast Water
                                                              Treatment System




 BWTS would have to be a type that does not require treatment at discharge

                                                                                    19
Aft peak tank

  An unacceptable arrangement




                                20
Summary


 Many new ships have now contracted with
 BWTS….existing ships are largely still
 waiting in the wings
 Some engineering and installation issues are
 being debated and assessed
 Important to examine in detail bases of
 approval reported in MEPC papers in
 installation engineering….and in operations



                                                21
www.eagle.org

Contenu connexe

Tendances

2015 - Senscient Terra Nova - World Oil
2015 - Senscient Terra Nova - World Oil2015 - Senscient Terra Nova - World Oil
2015 - Senscient Terra Nova - World Oil
Rajat Barua
 

Tendances (9)

Analysis of Perchlorate, Chromate, and Inorganic Anions in Drinking Water
Analysis of Perchlorate, Chromate, and Inorganic Anions in Drinking WaterAnalysis of Perchlorate, Chromate, and Inorganic Anions in Drinking Water
Analysis of Perchlorate, Chromate, and Inorganic Anions in Drinking Water
 
Practical Analytical Instrumentation in On-line Applications
Practical Analytical Instrumentation in On-line ApplicationsPractical Analytical Instrumentation in On-line Applications
Practical Analytical Instrumentation in On-line Applications
 
Harsh lab tecnalia windeurope 180927
Harsh lab tecnalia windeurope 180927Harsh lab tecnalia windeurope 180927
Harsh lab tecnalia windeurope 180927
 
Alternatives of chlorine, chlorine di-oxide(ClO2) for water treatment
Alternatives of chlorine, chlorine di-oxide(ClO2) for water treatmentAlternatives of chlorine, chlorine di-oxide(ClO2) for water treatment
Alternatives of chlorine, chlorine di-oxide(ClO2) for water treatment
 
Dr. Abdul Rehman Khan - Rehabilitation of an industrial mercury contaminated ...
Dr. Abdul Rehman Khan - Rehabilitation of an industrial mercury contaminated ...Dr. Abdul Rehman Khan - Rehabilitation of an industrial mercury contaminated ...
Dr. Abdul Rehman Khan - Rehabilitation of an industrial mercury contaminated ...
 
2015 - Senscient Terra Nova - World Oil
2015 - Senscient Terra Nova - World Oil2015 - Senscient Terra Nova - World Oil
2015 - Senscient Terra Nova - World Oil
 
Liquid Fluoride Reactors: A New Beginning for an Old Idea
Liquid Fluoride Reactors: A New Beginning for an Old IdeaLiquid Fluoride Reactors: A New Beginning for an Old Idea
Liquid Fluoride Reactors: A New Beginning for an Old Idea
 
automation
automationautomation
automation
 
Water
WaterWater
Water
 

Similaire à LinkClick.aspx

AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
Global CCS Institute
 
CO2 EOR Pilot Project
CO2 EOR Pilot ProjectCO2 EOR Pilot Project
CO2 EOR Pilot Project
Ahmed Nour
 
Cooling water Treatment presentation
Cooling water Treatment presentationCooling water Treatment presentation
Cooling water Treatment presentation
kamran ul hassan
 
Gas Turbine Fire Suppression Introduction
Gas Turbine Fire Suppression IntroductionGas Turbine Fire Suppression Introduction
Gas Turbine Fire Suppression Introduction
kevta
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
John Grover
 

Similaire à LinkClick.aspx (20)

AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
corrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfcorrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdf
 
Innovative projects in the refrigeration and Air Conditioning sector
Innovative projects in the refrigeration and Air Conditioning sector Innovative projects in the refrigeration and Air Conditioning sector
Innovative projects in the refrigeration and Air Conditioning sector
 
CO2 EOR Pilot Project
CO2 EOR Pilot ProjectCO2 EOR Pilot Project
CO2 EOR Pilot Project
 
Fire System comparison fm ecaro-25 vs novec 1230
Fire System comparison   fm ecaro-25 vs novec 1230Fire System comparison   fm ecaro-25 vs novec 1230
Fire System comparison fm ecaro-25 vs novec 1230
 
Tunnel ventilation ppt tunnel asia 2013
Tunnel ventilation ppt tunnel asia 2013Tunnel ventilation ppt tunnel asia 2013
Tunnel ventilation ppt tunnel asia 2013
 
Cooling water Treatment presentation
Cooling water Treatment presentationCooling water Treatment presentation
Cooling water Treatment presentation
 
Plan B
Plan BPlan B
Plan B
 
Bwm sampling guidelines
Bwm sampling guidelinesBwm sampling guidelines
Bwm sampling guidelines
 
Overview of TCM Mongstad
Overview of TCM MongstadOverview of TCM Mongstad
Overview of TCM Mongstad
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
Chlorine gas alternative
Chlorine gas alternativeChlorine gas alternative
Chlorine gas alternative
 
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
 
Gas Turbine Fire Suppression Introduction
Gas Turbine Fire Suppression IntroductionGas Turbine Fire Suppression Introduction
Gas Turbine Fire Suppression Introduction
 
FuelCellEurope RCS Workshop
FuelCellEurope RCS WorkshopFuelCellEurope RCS Workshop
FuelCellEurope RCS Workshop
 
CCS 120 endress+hauser datasheet-sensor for total chlorine
CCS 120 endress+hauser datasheet-sensor for total chlorineCCS 120 endress+hauser datasheet-sensor for total chlorine
CCS 120 endress+hauser datasheet-sensor for total chlorine
 
Technical calculations for the biological treatment plant
Technical calculations for the biological treatment plantTechnical calculations for the biological treatment plant
Technical calculations for the biological treatment plant
 
State of the art in the pu sub sector-technology options and trends
State of the art in the pu sub sector-technology options and trendsState of the art in the pu sub sector-technology options and trends
State of the art in the pu sub sector-technology options and trends
 
Detritiation of heavy water
Detritiation of heavy waterDetritiation of heavy water
Detritiation of heavy water
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
 

Dernier

Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Dernier (20)

New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 

LinkClick.aspx

  • 1. IMO-IMarEST Shipbuilders’ Forum on The Ballast Water Management Convention 1 November 2010 Singapore Ballast Water Treatment System Installation Issues A Class Perspective A. K. Seah VP Technology & Business Development
  • 2. Outline Brief review Some issues in shipboard installation Generation of hazardous gases Tanker with low flash point products 2
  • 3. BWTS technology Some 40+ vendors Over half use mechanical system as primary means Most used disinfectant technology: UV and electrolytic chlorination, each has >10 vendors >3 systems used combined mechanical, physical and chemical processed 3
  • 4. Ship size and ballast tank capacity (m3/hr) Source: ABS Ballast Water Management Advisory 4
  • 5. Implications ■ Ships keel-laid after 2012 - must allow for installing BWT system at building stage ■ Ships keel laid before 2012 must have system on board by 2017 - this means installing BWT system in special survey drydocking window of 2012-2016 5
  • 6. System selection Technical feasibility Dry cargo ships – any system Tankers (flash point ≤ 60°C) Ballast system piping in pump room – electrical equipment must be explosion-proof or intrinsically safe Aft peak ballast tank – a separate ballast system? Fitting the system in Footprint; Power need; Pressure drop; System supplier special needs; Engineering issues Side effects: ballast tank coating; accumulation of hazardous gases… Commercial considerations System cost; cost of installation; operating cost; maintenance cost 6
  • 7. Some issues on Engineering and Shipboard Installation
  • 8. Hazardous gases Electrolytic chlorination process produces hydrogen and chlorine Hydrogen is flammable Chlorine is toxic Systems using electrolytic chlorination process are now proposed for installation Closer look at two systems Techcross Electro-CleenTM Unitor / Resource ballast Technology BWTS 8
  • 9. Techcross Electro-CleenTM Wholly electrolytic chlorination process BW treated at intake; Neutralization at discharge Permissible dosage of active substance as TRO at treatment <10 mg/l Permissible concentration of active substance TRO at discharge < 0.02mg/l (sodium thioslphate) S TRC (Total Residual Chlorine) Tank Vent TRO (Total Residual Oxidants) Source: MEPC 58/2/7 9
  • 10. Techcross – Electro-CleenTM Received IMO Final Approval, 10 Oct 2008 Highest level of gas measured during tests (as submitted to IMO): H2: 4% [Threshold: LEL 4%] Cl2: 0.9ppm [Threshold: 0.5ppm average 8-h work place exposure] IMO approval based on provision of: H2 online detection: alarm at 2%; System was shutdown at 3% certified Cl2 online detection: alarm at 0.6ppm; explosion proof shutdown at 0.8ppm Source: MEPC 58/2/7; Techcorss website 10
  • 11. Unitor/Resource Ballast Technology Combined cavitation, sterilization, physical separation BW treatment at intake Disinfectant is provided by ozone (< 1.5ppm) and by electrolytic chlorination (sodium hypochloride < 1.5ppm) in reactor / cavitation chamber Source: www.resource- technology.com 11
  • 12. Unitor/Resource Ballast Technology Received IMO Final Approval 26 Mar 2010 Highest level of gas measured at simulated tests of 200m3 ballast tank (as submitted to IMO): Ballast water changed once daily for 8 days and twice for the last 2 days; tank drained to 1/3 volume then refilled to full capacity Ozonation H2: 0.28% Electrochlorination Cl2: 0.25ppm Cavitation IMO approval based on additional provision of: De-aerator & H2 monitor TRO monitoring/recording at discharge Source: MEPC 59/2/10, MEPC 60/2/11 12
  • 13. Issue of hazardous gases Issue of flammable gases H2 Oil & gas industry practice: low gas alarm at 20% LEL, high gas alarm at 60% LEL & shutdown Proposal by Techcross: alarm at 2% (50% LEL) and shutdown at 3% (75% LEL) Additional shipboard tests showed H2 peaked at 0.03% Proposal by Resource Ballast Technology: none; IMO require H2 monitor but alarm point and shutdown not specified Issue of toxic gas Cl2 No existing shipboard practice Proposal by Techcross accepted by IMO None proposed by Resource Ballast Technology – acceptable to IMO Tank entry; gas-freeing 13
  • 14. Effect of treated BW on corrosion In general, appears non-conclusive Techcross: tests showed seawater with TRO concentrations had less or similar corrosion to natural seawater Contradicts known and published data that chlorinated seawater increased corrosion Resource Ballast Technology: tests showed corrosion rate for steel in treated seawater about double that for equivalent untreated seawater, but within reported limits of normal corrosion rate No known data on effect of ozone IMO recommends: Monitoring program to provide long-term effects Parallel corrosion tests with tests for type approval Source: MEPC 58/2/7, MEPC 59/2/10 14
  • 15. Effect of treated BW on corrosion Techcross Corrosion Tests Coating intact Coating with artificial scratch Source: http://techcross.koreasme.com/ 15
  • 16. Safe spaces / Hazardous spaces Tankers carrying cargoes with flash point ≤ 60°C No connection between piping in safe spaces (e.g. engine room) with piping handling liquid in hazardous spaces (e.g. pump room; ballast tank adjacent to cargo tanks, cargo tanks) Some exceptions permitted provided safety features are fitted BWTS intended for tankers; e.g.: Ozone dosing system Aft peak tank – can it share BWTS with cargo area ballast tanks? 16
  • 17. Dosing piping cross connection Alternative Located as high in pump arrangement: room as dosing piping to practicable enter pump room from main deck with vapor seal With alarm and shut down arrangement 17
  • 18. Sampling lines cross connection 18
  • 19. Aft peak tank An acceptable arrangement SYS = Ballast Water Treatment System BWTS would have to be a type that does not require treatment at discharge 19
  • 20. Aft peak tank An unacceptable arrangement 20
  • 21. Summary Many new ships have now contracted with BWTS….existing ships are largely still waiting in the wings Some engineering and installation issues are being debated and assessed Important to examine in detail bases of approval reported in MEPC papers in installation engineering….and in operations 21