Presentation School of Science & Engineering MSc Applied Instrumentation & Control MSc I&C, GCAL
FPSO * Turret Equipment Room Emergency Shutdown (TER ESD) System Upgrade ( A project for Oil & Gas Platform at North Sea) * Floating Production, Storage and Offloading Presented By Syed Naqvi
Agenda ,[object Object],[object Object],MSc I&C, GCAL
ESD Definition ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL
Turret Equipment Room Emergency Shutdown System (TER ESD) ,[object Object],[object Object],[object Object],MSc I&C, GCAL
The Problem MSc I&C, GCAL
TER ESD Spare Capacity and Modifications ,[object Object],[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL
Spare Capacity Requirements ,[object Object],[object Object],MSc I&C, GCAL
Techniques to Enhance Spare Capacity ,[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL
Expansion of Existing System (1) ,[object Object],MSc I&C, GCAL
Partial Expansion MSc I&C, GCAL
Partial Expansion (1) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL ESD 50% Spare Capacity 20% Spare Capacity   Program Modules Program racks 2oo3  Voting Units Output racks Program  Modules Program  Racks 2oo3  Voting  Units Output  Racks TER 12 2 18 5 6 1 8 2
Redesign 2oo3 Voter Unit (1) ,[object Object],[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL
TER ESD Replacement/Upgrade (1) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL
TER ESD Replacement/Upgrade (2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Built in  Redundancy Externally Redundant MSc I&C, GCAL
TER ESD Replacement/Upgrade (3) Installation Space Required MSc I&C, GCAL
TER ESD Replacement/Upgrade (4) ,[object Object],Technical Criteria & System Ratings MSc I&C, GCAL
MSc I&C, GCAL Systems Results Trusted Trusted would be most suitable system in terms of space requirements, obsolescence, fault tolerant and availability.  Tricon Tricon can be suitable in terms of installation space but its size would be 2 times larger than Trusted and is less Fault tolerant.  PROSAFE- RS Prosafe-RS can be suitable in terms of installation space but its size would be 2 times larger than Trusted. Although it is SIL3 rated and 99.999% availability but  have double redundant architecture rather than  TMR architecture  Aadvance For 50 % capacity Aadvance will occupy than two system bays i.e. requires very large installation space.  GMR GMR would occupy around three system bays and it can't be install in TER for 50% capacity.*1 For 20% still the space requirements are huge.
Summary ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MSc I&C, GCAL
Conclusion MSc I&C, GCAL Techniques Recommendations ESD Replacement  First choice Partial Expansion Not Recommend Redesign 2oo3 Relay voter logic Not Recommend TER ESD Expansion Not Recommend Safety Systems Recommendations Trusted  First Choice Triconex Second Choice Prosafe-RS Third Choice Aadvance Not Recommend GMR Not Recommend
[object Object],MSc I&C, GCAL

Contenu connexe

Tendances

Advances in EM Simulations
Advances in EM SimulationsAdvances in EM Simulations
Advances in EM Simulations
Altair
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM R & D Pvt. Ltd.
 
RT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RT
RT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RTRT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RT
RT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RT
OPAL-RT TECHNOLOGIES
 

Tendances (20)

Advances in EM Simulations
Advances in EM SimulationsAdvances in EM Simulations
Advances in EM Simulations
 
OPAL-RT Seminar on HYPERSIM
OPAL-RT Seminar on HYPERSIMOPAL-RT Seminar on HYPERSIM
OPAL-RT Seminar on HYPERSIM
 
FEKO now part of HyperWorks for Electromagnetic Simulations
FEKO now part of HyperWorks for Electromagnetic SimulationsFEKO now part of HyperWorks for Electromagnetic Simulations
FEKO now part of HyperWorks for Electromagnetic Simulations
 
2017 Atlanta Regional User Seminar - Using OPAL-RT Real-Time Simulation and H...
2017 Atlanta Regional User Seminar - Using OPAL-RT Real-Time Simulation and H...2017 Atlanta Regional User Seminar - Using OPAL-RT Real-Time Simulation and H...
2017 Atlanta Regional User Seminar - Using OPAL-RT Real-Time Simulation and H...
 
pramod
pramodpramod
pramod
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
 
RT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RT
RT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RTRT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RT
RT15 Berkeley | Real-time simulation as a prime tool for Cybersecurity - OPAL-RT
 
RT15 Berkeley | ARTEMiS-SSN Features for Micro-grid / Renewable Energy Sourc...
RT15 Berkeley |  ARTEMiS-SSN Features for Micro-grid / Renewable Energy Sourc...RT15 Berkeley |  ARTEMiS-SSN Features for Micro-grid / Renewable Energy Sourc...
RT15 Berkeley | ARTEMiS-SSN Features for Micro-grid / Renewable Energy Sourc...
 
High Accuracy Distance Measurement for Bluetooth Based on Phase Ranging
High Accuracy Distance Measurement for Bluetooth Based on Phase RangingHigh Accuracy Distance Measurement for Bluetooth Based on Phase Ranging
High Accuracy Distance Measurement for Bluetooth Based on Phase Ranging
 
RT15 Berkeley | Power Grid Simulation and Beyond at PNNL
RT15 Berkeley | Power Grid Simulation and Beyond at PNNLRT15 Berkeley | Power Grid Simulation and Beyond at PNNL
RT15 Berkeley | Power Grid Simulation and Beyond at PNNL
 
Pro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualificationPro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualification
 
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia LaboratoryRT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar
 
Mr. Ahmed ElSewassy
Mr. Ahmed ElSewassyMr. Ahmed ElSewassy
Mr. Ahmed ElSewassy
 
OPAL-RT | Setup and Performance of a Combined Hardware-in-loop and Software-i...
OPAL-RT | Setup and Performance of a Combined Hardware-in-loop and Software-i...OPAL-RT | Setup and Performance of a Combined Hardware-in-loop and Software-i...
OPAL-RT | Setup and Performance of a Combined Hardware-in-loop and Software-i...
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
2017 Atlanta Regional User Seminar - Real-Time Volt/Var Optimization Scheme f...
2017 Atlanta Regional User Seminar - Real-Time Volt/Var Optimization Scheme f...2017 Atlanta Regional User Seminar - Real-Time Volt/Var Optimization Scheme f...
2017 Atlanta Regional User Seminar - Real-Time Volt/Var Optimization Scheme f...
 
OPAL-RT and RTDS Technologies Co-Simulation
OPAL-RT and RTDS Technologies Co-SimulationOPAL-RT and RTDS Technologies Co-Simulation
OPAL-RT and RTDS Technologies Co-Simulation
 
Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
 Ph.D. Defence on "High power medium voltage dc/dc converter technology for D... Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
Ph.D. Defence on "High power medium voltage dc/dc converter technology for D...
 
OPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim WebinarOPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim Webinar
 

Similaire à ESD System upgrade

John Chu Resume Pmt 10 2 Pg[1]
John Chu Resume Pmt 10 2 Pg[1]John Chu Resume Pmt 10 2 Pg[1]
John Chu Resume Pmt 10 2 Pg[1]
chujohn
 
10 Steps in Telecom Thermal Management
10 Steps in Telecom Thermal Management  10 Steps in Telecom Thermal Management
10 Steps in Telecom Thermal Management
Kamal Karimanal
 
Genesys System - 8dec2010
Genesys System - 8dec2010Genesys System - 8dec2010
Genesys System - 8dec2010
Agora Group
 
A04310104
A04310104A04310104
A04310104
theijes
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
Raja Ratnam
 
PRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAEPRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAE
Prabhakaran K
 

Similaire à ESD System upgrade (20)

John Chu Resume Pmt 10 2 Pg[1]
John Chu Resume Pmt 10 2 Pg[1]John Chu Resume Pmt 10 2 Pg[1]
John Chu Resume Pmt 10 2 Pg[1]
 
10 Steps in Telecom Thermal Management
10 Steps in Telecom Thermal Management  10 Steps in Telecom Thermal Management
10 Steps in Telecom Thermal Management
 
Uav Stability Augmentation System Usas
Uav Stability Augmentation System   UsasUav Stability Augmentation System   Usas
Uav Stability Augmentation System Usas
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Genesys System - 8dec2010
Genesys System - 8dec2010Genesys System - 8dec2010
Genesys System - 8dec2010
 
Future Onshore Wind Energy Technology
Future Onshore Wind Energy TechnologyFuture Onshore Wind Energy Technology
Future Onshore Wind Energy Technology
 
Cellular LPWA and LTE-M
Cellular LPWA and LTE-MCellular LPWA and LTE-M
Cellular LPWA and LTE-M
 
Lte-m Sierra Wireless V1
Lte-m Sierra Wireless V1Lte-m Sierra Wireless V1
Lte-m Sierra Wireless V1
 
FPGA-based implementation of sensorless AC drive controllers for embedded Ele...
FPGA-based implementation of sensorless AC drive controllers for embedded Ele...FPGA-based implementation of sensorless AC drive controllers for embedded Ele...
FPGA-based implementation of sensorless AC drive controllers for embedded Ele...
 
A04310104
A04310104A04310104
A04310104
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdf
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
 
Daniel Hall - How to mitigate flash hazards in a main switchroom
Daniel Hall - How to mitigate flash hazards in a main switchroomDaniel Hall - How to mitigate flash hazards in a main switchroom
Daniel Hall - How to mitigate flash hazards in a main switchroom
 
Development of a 300 kWe Integrated Axial Turbine and Generator for ORC Appli...
Development of a 300 kWe Integrated Axial Turbine and Generator for ORC Appli...Development of a 300 kWe Integrated Axial Turbine and Generator for ORC Appli...
Development of a 300 kWe Integrated Axial Turbine and Generator for ORC Appli...
 
Resume
ResumeResume
Resume
 
PRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAEPRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAE
 
PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...
PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...
PES Wind Magazine - New-generation DFIG power converters for 6-8 MW wind turb...
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 

Plus de Hasnain Ali

Plus de Hasnain Ali (6)

Case Study: Weighing System
Case Study: Weighing SystemCase Study: Weighing System
Case Study: Weighing System
 
Measuring the cutoff frequency of a low pass filter
Measuring the cutoff frequency of a low pass filterMeasuring the cutoff frequency of a low pass filter
Measuring the cutoff frequency of a low pass filter
 
Case Study: Cyclic Voltametric Measurement
Case Study: Cyclic Voltametric MeasurementCase Study: Cyclic Voltametric Measurement
Case Study: Cyclic Voltametric Measurement
 
Tomography_Resistivity Measurement System using Four Point Probe
Tomography_Resistivity Measurement System using Four Point ProbeTomography_Resistivity Measurement System using Four Point Probe
Tomography_Resistivity Measurement System using Four Point Probe
 
Design & Simulation of Cargo Stabilization System
Design & Simulation of Cargo Stabilization SystemDesign & Simulation of Cargo Stabilization System
Design & Simulation of Cargo Stabilization System
 
Safety & Safety Management
Safety & Safety ManagementSafety & Safety Management
Safety & Safety Management
 

ESD System upgrade

  • 1. Presentation School of Science & Engineering MSc Applied Instrumentation & Control MSc I&C, GCAL
  • 2. FPSO * Turret Equipment Room Emergency Shutdown (TER ESD) System Upgrade ( A project for Oil & Gas Platform at North Sea) * Floating Production, Storage and Offloading Presented By Syed Naqvi
  • 3.
  • 4.
  • 5.
  • 6. The Problem MSc I&C, GCAL
  • 7.
  • 8.
  • 9.
  • 10.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. TER ESD Replacement/Upgrade (3) Installation Space Required MSc I&C, GCAL
  • 17.
  • 18. MSc I&C, GCAL Systems Results Trusted Trusted would be most suitable system in terms of space requirements, obsolescence, fault tolerant and availability. Tricon Tricon can be suitable in terms of installation space but its size would be 2 times larger than Trusted and is less Fault tolerant. PROSAFE- RS Prosafe-RS can be suitable in terms of installation space but its size would be 2 times larger than Trusted. Although it is SIL3 rated and 99.999% availability but have double redundant architecture rather than TMR architecture Aadvance For 50 % capacity Aadvance will occupy than two system bays i.e. requires very large installation space. GMR GMR would occupy around three system bays and it can't be install in TER for 50% capacity.*1 For 20% still the space requirements are huge.
  • 19.
  • 20. Conclusion MSc I&C, GCAL Techniques Recommendations ESD Replacement First choice Partial Expansion Not Recommend Redesign 2oo3 Relay voter logic Not Recommend TER ESD Expansion Not Recommend Safety Systems Recommendations Trusted First Choice Triconex Second Choice Prosafe-RS Third Choice Aadvance Not Recommend GMR Not Recommend
  • 21.