SlideShare une entreprise Scribd logo
1  sur  4
GOVERNMENT OF KHYBER PAKHTUNKHWA
SPORTS, TOURISM, YOUTH AFFAIRS,
ARCHAEOLOGY & MUSEUMS DEPARTMENT
NOTE FOR CHIEF SECRETARY, KHYBER PAKHTUNKHWA
SUBJECT:PROCESSING OF TECHNICAL SANCTION BY C&W
DEPARTMENT OF THE ENGINEERING WING.
Sports department has its own Engineering Wing for the execution
of its small project created in March 2012 under Annual Development Program
2011-12 bearing computer code 110088 namely Establishment of
Engineering Wing for Sports Culture, Archaeology, Museums, Tourism and
Youth Affairs approved by the PDWP on 18/11/2011. During discussion on
financial and physical progress review by the Hon’able Chief Minister Khyber
Pakhtunkhwa in Khyber Pakhtunkhwa House Islamabad dated 10/10/2014, it
was decided to move a note for Chief Secretary about the pending technical
sanction of Sports Department with C&W Department.
2. During the period March 2012 to March 2014, the following
schemes along with costs have been processed by the Engineering Wing:
S.No
.
ADP.NO Project Name
Approved
cost
Payment
Made to
contractor
Progress in
% Done
Amount of
Technical
Sanction
1
741-
10027
Abdal Hockey stadium 15.48M 13.8 M 100% 17.028 M
2
NON-
ADP
Olympic plaza 45.4M 30.00 M 70% 45.4 M
3
637-
120214
Rehibilitation Of
Kalabat Township
Stadium,DistrictHarripu
re
10M 10.00 M 95% 10.00 M
4
636-
120212
Provision Of Hockey
Turf At Sports
Complex Mardan
50M 50.00M 80% 55.00 M
5
637-
120214
Rehibilitation Of Kohat
Sports Complex, Kohat
20M 17.3 M 86% 20.00 M
6
1047-
120647
Rehabilitation of Rest
House and
Construction of
cottages at Batakundi,
Naran
21.03 M 4.26 M 50% 23.133 M
7
1047-
120647
Construction of Rest
House at NathyaGali
26.017M 00 M 05% 28.618 M
8
1047-
120647
Rehabilitation of Rest
House at Tandyani
6.409 M 1.34 M 30% 7.10 M
9
1047-
120647
Rehabilitation of Rest
House & Children Park
at Bahrain
6.456 M 3.00 M 60% 7.10 M
10
1048-
120890
Day Time facility at
Lake SaifalMaluk
15.28 M 00 M 00% 16.80 M
11
1048-
120890
Tourists facility and
family Cottages at
BattaKundi Narran
50.16 M 23.00 M 40% 55.16 M
12 1048- Rehabilitation of 8.76M 4.3 M 95% 9.6 M
GOVERNMENT OF KHYBER PAKHTUNKHWA
SPORTS, TOURISM, YOUTH AFFAIRS,
ARCHAEOLOGY & MUSEUMS DEPARTMENT
120890 Chitral Rest House at
GaramChasma
13
1026-
110562
Establishment Of
Water Sports
Recreational Facilities
In Sardaryab
50M 18.5 M 30% 55.00 M
14
1025-
100230
Rehabilitation of
Hayatabad Sports
Complex Peshawar
127.9M 61.48 M 40% 164.9 M
15
640-
120096
Youth center at chitral 20M 9.00 M 40% 22.00 M
NEW SCHEMES ADP 2014-15
S.No
.
ADP.NO Project Name
Approved
cost
1
1051-
140036
Establishmentof Picnic spots at suitable
places in Malam Jabba, District swat
50 M
2
1028-
130054
Extension and Rehabilitation of male
and female Hostel at Qayyum Stadium
10 M
3
1053-
140037
Establishmentof Network of Tourist
information Center
50 M
4
1034-
130059
Acquisition of land and creation of play
ground at Chitral and civil work at Tank
50 M
5
1032-
130068
Up gradation of Curtis stadium Harripur
phase -2
20 M
NOTE FOR CHIEF SECRETARY, KHYBER PAKHTUNKHWA
3. This Department since March 2014 has been perusing the
approval of the Chief Engineer concerned for authenticating the technical
sanctions mentioned in Para-2. We also have five schemes that require
technical sanction after the approval of the tender documents.
4. The Communication and Works Department may constitute a
committee to study the issue of sixteen technical sanctions and pin point the
loop holes. Similarly the new tendering process be carried out in consultation
with Communication and works department on board. Lastly the work may be
continued in opinion of the Engineering Wing of this Department as its
stoppage may result in cost over runs.
4. In light of the fore going paragraph’s the C&W Department may be
directed to constitute a committee with the terms of reference to scrutinize
each project and deliberate on the validity of the technical sanctions.
Simultaneously the committee may ensure the transparent tendering of the five
GOVERNMENT OF KHYBER PAKHTUNKHWA
SPORTS, TOURISM, YOUTH AFFAIRS,
ARCHAEOLOGY & MUSEUMS DEPARTMENT
new schemes and its smooth execution in collaboration of the Engineering
Wing of this Department.
6. The above process would justify or otherwise the authentication of
technical sanctions cost claim whereas the progress on the schemes under
implementation are expected to be completed at the earliest possible.
SECRETARY
SPORTS & TOURISM
CHIEF SECRETARY,
KHYBER PAKHTUNKHWA
GOVERNMENT OF KHYBER PAKHTUNKHWA
SPORTS, TOURISM, YOUTH AFFAIRS,
ARCHAEOLOGY & MUSEUMS DEPARTMENT
NOTE FOR CHIEF SECRETARY, KHYBER PAKHTUNKHWA

Contenu connexe

En vedette

LeanLaunchpad_finaldemo_ContactTree
LeanLaunchpad_finaldemo_ContactTreeLeanLaunchpad_finaldemo_ContactTree
LeanLaunchpad_finaldemo_ContactTreeAna
 
To rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects newTo rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects newhayat alishah
 
From Bad to Worse: How to Stay Protected from a Mega Data Breach
From Bad to Worse: How to Stay Protected from a Mega Data BreachFrom Bad to Worse: How to Stay Protected from a Mega Data Breach
From Bad to Worse: How to Stay Protected from a Mega Data BreachPaymetric, Inc.
 
Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...
Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...
Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...hayat alishah
 
Cloud Computing and VCE
Cloud Computing and VCECloud Computing and VCE
Cloud Computing and VCECenk Ersoy
 
A manual of english stylistics
A manual of english stylisticsA manual of english stylistics
A manual of english stylisticsstiffy12345
 
To rs & new advertisment consultancy environment tourism projects
To rs & new advertisment consultancy environment tourism projectsTo rs & new advertisment consultancy environment tourism projects
To rs & new advertisment consultancy environment tourism projectshayat alishah
 
Global financial crisis
Global financial crisisGlobal financial crisis
Global financial crisiskashishroxx
 

En vedette (14)

LeanLaunchpad_finaldemo_ContactTree
LeanLaunchpad_finaldemo_ContactTreeLeanLaunchpad_finaldemo_ContactTree
LeanLaunchpad_finaldemo_ContactTree
 
Project profile new
Project profile newProject profile new
Project profile new
 
To rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects newTo rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects new
 
From Bad to Worse: How to Stay Protected from a Mega Data Breach
From Bad to Worse: How to Stay Protected from a Mega Data BreachFrom Bad to Worse: How to Stay Protected from a Mega Data Breach
From Bad to Worse: How to Stay Protected from a Mega Data Breach
 
Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...
Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...
Kp tourism vision document & impl plan meeting at 11 am tckp conference room ...
 
Cloud Computing and VCE
Cloud Computing and VCECloud Computing and VCE
Cloud Computing and VCE
 
Padang Lamun
Padang LamunPadang Lamun
Padang Lamun
 
A manual of english stylistics
A manual of english stylisticsA manual of english stylistics
A manual of english stylistics
 
Mala dfr.mak
Mala dfr.makMala dfr.mak
Mala dfr.mak
 
Information
InformationInformation
Information
 
Seahenge
SeahengeSeahenge
Seahenge
 
To rs & new advertisment consultancy environment tourism projects
To rs & new advertisment consultancy environment tourism projectsTo rs & new advertisment consultancy environment tourism projects
To rs & new advertisment consultancy environment tourism projects
 
Project by Koushik
Project by KoushikProject by Koushik
Project by Koushik
 
Global financial crisis
Global financial crisisGlobal financial crisis
Global financial crisis
 

Similaire à Engineering wing cs notes 9 12-14

Ddwp minutes 27 10-2014
Ddwp minutes 27 10-2014Ddwp minutes 27 10-2014
Ddwp minutes 27 10-2014hayat alishah
 
Meeting minutes ddwp on 26 11-14
Meeting minutes ddwp on 26 11-14Meeting minutes ddwp on 26 11-14
Meeting minutes ddwp on 26 11-14hayat alishah
 
New programme (corrected)
New programme (corrected)New programme (corrected)
New programme (corrected)hayat alishah
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportshayat alishah
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportshayat alishah
 
Presentation muhammadalishahzada110620141930hours
Presentation muhammadalishahzada110620141930hoursPresentation muhammadalishahzada110620141930hours
Presentation muhammadalishahzada110620141930hourshayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Working paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanWorking paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanhayat alishah
 

Similaire à Engineering wing cs notes 9 12-14 (9)

Ddwp minutes 27 10-2014
Ddwp minutes 27 10-2014Ddwp minutes 27 10-2014
Ddwp minutes 27 10-2014
 
Meeting minutes ddwp on 26 11-14
Meeting minutes ddwp on 26 11-14Meeting minutes ddwp on 26 11-14
Meeting minutes ddwp on 26 11-14
 
New programme (corrected)
New programme (corrected)New programme (corrected)
New programme (corrected)
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sports
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sports
 
Presentation muhammadalishahzada110620141930hours
Presentation muhammadalishahzada110620141930hoursPresentation muhammadalishahzada110620141930hours
Presentation muhammadalishahzada110620141930hours
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
RDP Chapter 19
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Working paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanWorking paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatan
 

Plus de hayat alishah

1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copyhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updatedhayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucathayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreporthayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism departmenthayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdfhayat alishah
 

Plus de hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 
Cv umair
Cv umairCv umair
Cv umair
 

Engineering wing cs notes 9 12-14

  • 1. GOVERNMENT OF KHYBER PAKHTUNKHWA SPORTS, TOURISM, YOUTH AFFAIRS, ARCHAEOLOGY & MUSEUMS DEPARTMENT NOTE FOR CHIEF SECRETARY, KHYBER PAKHTUNKHWA SUBJECT:PROCESSING OF TECHNICAL SANCTION BY C&W DEPARTMENT OF THE ENGINEERING WING. Sports department has its own Engineering Wing for the execution of its small project created in March 2012 under Annual Development Program 2011-12 bearing computer code 110088 namely Establishment of Engineering Wing for Sports Culture, Archaeology, Museums, Tourism and Youth Affairs approved by the PDWP on 18/11/2011. During discussion on financial and physical progress review by the Hon’able Chief Minister Khyber Pakhtunkhwa in Khyber Pakhtunkhwa House Islamabad dated 10/10/2014, it was decided to move a note for Chief Secretary about the pending technical sanction of Sports Department with C&W Department. 2. During the period March 2012 to March 2014, the following schemes along with costs have been processed by the Engineering Wing: S.No . ADP.NO Project Name Approved cost Payment Made to contractor Progress in % Done Amount of Technical Sanction 1 741- 10027 Abdal Hockey stadium 15.48M 13.8 M 100% 17.028 M 2 NON- ADP Olympic plaza 45.4M 30.00 M 70% 45.4 M 3 637- 120214 Rehibilitation Of Kalabat Township Stadium,DistrictHarripu re 10M 10.00 M 95% 10.00 M 4 636- 120212 Provision Of Hockey Turf At Sports Complex Mardan 50M 50.00M 80% 55.00 M 5 637- 120214 Rehibilitation Of Kohat Sports Complex, Kohat 20M 17.3 M 86% 20.00 M 6 1047- 120647 Rehabilitation of Rest House and Construction of cottages at Batakundi, Naran 21.03 M 4.26 M 50% 23.133 M 7 1047- 120647 Construction of Rest House at NathyaGali 26.017M 00 M 05% 28.618 M 8 1047- 120647 Rehabilitation of Rest House at Tandyani 6.409 M 1.34 M 30% 7.10 M 9 1047- 120647 Rehabilitation of Rest House & Children Park at Bahrain 6.456 M 3.00 M 60% 7.10 M 10 1048- 120890 Day Time facility at Lake SaifalMaluk 15.28 M 00 M 00% 16.80 M 11 1048- 120890 Tourists facility and family Cottages at BattaKundi Narran 50.16 M 23.00 M 40% 55.16 M 12 1048- Rehabilitation of 8.76M 4.3 M 95% 9.6 M
  • 2. GOVERNMENT OF KHYBER PAKHTUNKHWA SPORTS, TOURISM, YOUTH AFFAIRS, ARCHAEOLOGY & MUSEUMS DEPARTMENT 120890 Chitral Rest House at GaramChasma 13 1026- 110562 Establishment Of Water Sports Recreational Facilities In Sardaryab 50M 18.5 M 30% 55.00 M 14 1025- 100230 Rehabilitation of Hayatabad Sports Complex Peshawar 127.9M 61.48 M 40% 164.9 M 15 640- 120096 Youth center at chitral 20M 9.00 M 40% 22.00 M NEW SCHEMES ADP 2014-15 S.No . ADP.NO Project Name Approved cost 1 1051- 140036 Establishmentof Picnic spots at suitable places in Malam Jabba, District swat 50 M 2 1028- 130054 Extension and Rehabilitation of male and female Hostel at Qayyum Stadium 10 M 3 1053- 140037 Establishmentof Network of Tourist information Center 50 M 4 1034- 130059 Acquisition of land and creation of play ground at Chitral and civil work at Tank 50 M 5 1032- 130068 Up gradation of Curtis stadium Harripur phase -2 20 M NOTE FOR CHIEF SECRETARY, KHYBER PAKHTUNKHWA 3. This Department since March 2014 has been perusing the approval of the Chief Engineer concerned for authenticating the technical sanctions mentioned in Para-2. We also have five schemes that require technical sanction after the approval of the tender documents. 4. The Communication and Works Department may constitute a committee to study the issue of sixteen technical sanctions and pin point the loop holes. Similarly the new tendering process be carried out in consultation with Communication and works department on board. Lastly the work may be continued in opinion of the Engineering Wing of this Department as its stoppage may result in cost over runs. 4. In light of the fore going paragraph’s the C&W Department may be directed to constitute a committee with the terms of reference to scrutinize each project and deliberate on the validity of the technical sanctions. Simultaneously the committee may ensure the transparent tendering of the five
  • 3. GOVERNMENT OF KHYBER PAKHTUNKHWA SPORTS, TOURISM, YOUTH AFFAIRS, ARCHAEOLOGY & MUSEUMS DEPARTMENT new schemes and its smooth execution in collaboration of the Engineering Wing of this Department. 6. The above process would justify or otherwise the authentication of technical sanctions cost claim whereas the progress on the schemes under implementation are expected to be completed at the earliest possible. SECRETARY SPORTS & TOURISM CHIEF SECRETARY, KHYBER PAKHTUNKHWA
  • 4. GOVERNMENT OF KHYBER PAKHTUNKHWA SPORTS, TOURISM, YOUTH AFFAIRS, ARCHAEOLOGY & MUSEUMS DEPARTMENT NOTE FOR CHIEF SECRETARY, KHYBER PAKHTUNKHWA