switchgear
“ Establish maintenance practices and provide general guidelines for switch
gear maintenance”
PM - practices
 Establish maintenance practice
 from continuous online monitoring to “run-to-failure”
 Predictive and preventive maintenance programs—including most of
the NFPA and InterNational Electrical Testing Association (NETA)
recommendations—fall in the middle of this range.
 Most real-world maintenance programs are a combination of these
approaches. Eg replace indicating lamp when fail, but do predictive
for breaker.
 Decide maintenance frequency
 Finalize preventive & diagnostic maintenance practices & schedule
Maintenance check points
Panel / Feeder
– Inspection of components, terminations, hardware for any
abnormality
– Ensure Panel vermin proofing
– Site specific checklist
Support Insulators
– Inspection for tracking, condensation
– Inspection for damages caused by overheating
Breaker
– PM & overhauling as per standard practice and
manufacturer guidelines
Maintenance check points
Protection relay and protection schemes
 Cleaning / Functional test of individual relay
 Follow specific instructions from OEM
 Protection scheme check after PM
Bus maintenance
 Cleaning / tightness / Insulation test
Condition monitoring
 Load monitoring
 Thermography
ELECTRICAL PARAMETERS TO CHECK
a) Insulation resistance to be measured
b) If facility is available then measure opening and closing time of
breaker .This shall be once in a year even through outside agency .
c) Measurement of contact resistance .
d) Checking of control circuit
e) Taking trial in test position for closing
and tripping .
f) Checking of indicating devices .
g) Checking of closing and tripping coils .
h) Checking of contacts
i) Checking of operating mechanism
j) Checking of auxiliary switches
k)) Checking of tightness of bolts and nuts
During Periodic Maintenance
Simple maintenance tips that work
Few key considerations:
Visually inspect the external condition of the switchboard on a
regular basis for foreign matter, dust and hot spots, and when
planned the inside of the cable termination chambers and other
sections within the switchboard
Annually check using infrared detection for internal electrical hot
spots
Examine the main/arcing contacts for excessive burning/damage
and recondition or renew as requirede
Check and adjust the spring contact force and contact alignment
as required
Remove, examine and clean the arc chutes and renew if damaged
Inspect, adjust and lubricate mechanisms
Simple maintenance tips that work
On withdrawable equipment examine the primary isolating
contacts for damage, burning, corrosion and clean and refurb
where necessary.
Check the lubrication of the circuit-breaker isolating mechanism
Check that the position indicators and interlocks work properly
Examine and check the voltage transformer if applicable
Plan for frequent trip-testing of the circuit-breakers via the
protection relay system
Never work on live equipment. Or when absolutely necessary,
use properly insulated tools to prevent risk of flashover
Check operation of interlocks and safety shutters
Carry out ductor, megger and secondary injection tests and
Maintenance and CM schedule
SN Activity Frequency
1 Monitor and record load current and voltage Daily
2 Thermography survey 6 months
Maintenance
Condition monitoring / Diagnostic
1 PM of breaker and feeder 6 months
2 Overhauling of breaker 3 to 4 years / OEM
recommendation
3 PM of bus bars Opportunity
4 Relay testing As per criticality of service
1 year to 4 years
5 Functional testing of protection scheme After carrying out PM / relay
testing
reliability concerns
Reliability concerns to not only insulation but also to the
correct functioning of the operating mechanism, protective
devices, and control that are integral to the breaker.
switchgear breakers are active elements that can fail by acting
spuriously or by not functioning upon command
Failure modes for medium-voltage
circuit breakers
• Failure to close
• Failure to open
• Spurious opening
• Spurious closure
• Failure to operate as required
• Failure to recharge closing spring
• Slow operation
• Short circuit to ground
• Out of calibration
• Intermittent operation
failure symptom categories
The following failure symptom categories were identified as being
important:
• Movement of the breaker mechanism is impeded by insuffi cient or
inadequate lubrication
• Movement of the breaker mechanism is impeded by broken, bent,
or loose parts, friction, binding, resulting from excessive stress,
wear, or faulty installation
• Operation of the breaker is impeded by incorrect adjustment of set
points/limit switches
• Various electrical problems caused, e.g., by defective coils,
defective command circuits, wiring faults, loose wires, poor
contacts, and blown fuses
• Others (e.g., dirt, pollution, and corrosion)
MAINTENANCE OF POWER TRANSFORMER
 General maintenance of transformer requires …..
 HALF YEARLY CHECKS:
 Check & clean bushings.
 Check OLTC mechanism for smooth operation. Check
motor & its control.
 Check dielectric strength of oil.
 Check cooling system i.e. cooling fan working and its
operating controls.
 Service fans and replace if not working.
 Check earthing of transformer.
MAINTENANCE OF POWER TRANSFORMER
 General maintenance of transformer requires …..
 YEARLY CHECKS:
 Check & clean bushings.
 Check OLTC mechanism for smooth operation.
 Check OLTC motor & its control.
 Check dielectric strength of oil.
 Check water content in oil.
 Check earthing of transformer.
 Check control & protection system and Tighten all
connections.
 Take routine test on transformer.
 General maintenance of Distribution transformer
 HALF YEARLY CHECKS:
 Check proper size of DO fuse.
 Check colour of silica gel.
 Tight all incoming / out going connections.
 Check earthing of transformer.
 Check oil leakage & attend if any.
 Clean main tank, radiator & bushings.
 YEARLY CHECKS:
 Measure IR value.
 Measure dielectric strength of oil.
• AFTER SERVICE OF 5 – 7 YEARS:
 Preferably, the manufacturer’s engineer may
be called at site.
 Replace all ageing gaskets.
 The existing oil in the transformer should be
filtered continuously to attain dielectric
strength of 60 kV for 1 min. or more with
improvement in the IR value.
 The procedure could also be as per the
manufacturer’s manual.
• AFTER SERVICE OF 5 – 7 YEARS:
 Filtration would remove sludge, dirt, moisture,
etc. from the oil.
 If condition of existing oil is found extremely
deteriorated upon testing prior to
maintenance, fresh oil should be filled in the
transformer under vacuum.
 The values of IR and PI should be taken
again to ensure the healthiness of
transformer.
■ Transformer Body
 Main Tank
 Conservator tank
 Load Tap Changer
 Bushings
 Core
 Winding
■ Cooling Media / system
 Oil
 Radiator
 Radiator Fans
 Oil Pumps
Accessories
 Breather
 Buchholtz relay
 Oil and Winding Temp. indicator
 Explosion vent
 Pressure release valve
 MOG
 OSR
 Marshaling box
SD.pptx
SD.pptx

Contenu connexe

Similaire à SD.pptx

HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
Shankar Singh
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
nestor alega
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
hiiarindam
 

Similaire à SD.pptx (20)

Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Standards
StandardsStandards
Standards
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Fusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity CircuitsFusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity Circuits
 
Transformer
TransformerTransformer
Transformer
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
Hướng dẫn sử dụng Testo 760-1
Hướng dẫn sử dụng Testo 760-1Hướng dẫn sử dụng Testo 760-1
Hướng dẫn sử dụng Testo 760-1
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Fluke 101 Basic Digital Multimeter User Manual
Fluke 101 Basic Digital Multimeter User ManualFluke 101 Basic Digital Multimeter User Manual
Fluke 101 Basic Digital Multimeter User Manual
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
MSC SOW
MSC SOWMSC SOW
MSC SOW
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset management
 
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect BillingSite Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
 

Dernier

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Dernier (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 

SD.pptx

  • 2. “ Establish maintenance practices and provide general guidelines for switch gear maintenance” PM - practices  Establish maintenance practice  from continuous online monitoring to “run-to-failure”  Predictive and preventive maintenance programs—including most of the NFPA and InterNational Electrical Testing Association (NETA) recommendations—fall in the middle of this range.  Most real-world maintenance programs are a combination of these approaches. Eg replace indicating lamp when fail, but do predictive for breaker.  Decide maintenance frequency  Finalize preventive & diagnostic maintenance practices & schedule
  • 3. Maintenance check points Panel / Feeder – Inspection of components, terminations, hardware for any abnormality – Ensure Panel vermin proofing – Site specific checklist Support Insulators – Inspection for tracking, condensation – Inspection for damages caused by overheating Breaker – PM & overhauling as per standard practice and manufacturer guidelines
  • 4. Maintenance check points Protection relay and protection schemes  Cleaning / Functional test of individual relay  Follow specific instructions from OEM  Protection scheme check after PM Bus maintenance  Cleaning / tightness / Insulation test Condition monitoring  Load monitoring  Thermography
  • 5. ELECTRICAL PARAMETERS TO CHECK a) Insulation resistance to be measured b) If facility is available then measure opening and closing time of breaker .This shall be once in a year even through outside agency . c) Measurement of contact resistance . d) Checking of control circuit e) Taking trial in test position for closing and tripping . f) Checking of indicating devices . g) Checking of closing and tripping coils . h) Checking of contacts i) Checking of operating mechanism j) Checking of auxiliary switches k)) Checking of tightness of bolts and nuts During Periodic Maintenance
  • 6. Simple maintenance tips that work Few key considerations: Visually inspect the external condition of the switchboard on a regular basis for foreign matter, dust and hot spots, and when planned the inside of the cable termination chambers and other sections within the switchboard Annually check using infrared detection for internal electrical hot spots Examine the main/arcing contacts for excessive burning/damage and recondition or renew as requirede Check and adjust the spring contact force and contact alignment as required Remove, examine and clean the arc chutes and renew if damaged Inspect, adjust and lubricate mechanisms
  • 7. Simple maintenance tips that work On withdrawable equipment examine the primary isolating contacts for damage, burning, corrosion and clean and refurb where necessary. Check the lubrication of the circuit-breaker isolating mechanism Check that the position indicators and interlocks work properly Examine and check the voltage transformer if applicable Plan for frequent trip-testing of the circuit-breakers via the protection relay system Never work on live equipment. Or when absolutely necessary, use properly insulated tools to prevent risk of flashover Check operation of interlocks and safety shutters Carry out ductor, megger and secondary injection tests and
  • 8. Maintenance and CM schedule SN Activity Frequency 1 Monitor and record load current and voltage Daily 2 Thermography survey 6 months Maintenance Condition monitoring / Diagnostic 1 PM of breaker and feeder 6 months 2 Overhauling of breaker 3 to 4 years / OEM recommendation 3 PM of bus bars Opportunity 4 Relay testing As per criticality of service 1 year to 4 years 5 Functional testing of protection scheme After carrying out PM / relay testing
  • 9. reliability concerns Reliability concerns to not only insulation but also to the correct functioning of the operating mechanism, protective devices, and control that are integral to the breaker. switchgear breakers are active elements that can fail by acting spuriously or by not functioning upon command
  • 10. Failure modes for medium-voltage circuit breakers • Failure to close • Failure to open • Spurious opening • Spurious closure • Failure to operate as required • Failure to recharge closing spring • Slow operation • Short circuit to ground • Out of calibration • Intermittent operation
  • 11. failure symptom categories The following failure symptom categories were identified as being important: • Movement of the breaker mechanism is impeded by insuffi cient or inadequate lubrication • Movement of the breaker mechanism is impeded by broken, bent, or loose parts, friction, binding, resulting from excessive stress, wear, or faulty installation • Operation of the breaker is impeded by incorrect adjustment of set points/limit switches • Various electrical problems caused, e.g., by defective coils, defective command circuits, wiring faults, loose wires, poor contacts, and blown fuses • Others (e.g., dirt, pollution, and corrosion)
  • 12.
  • 13. MAINTENANCE OF POWER TRANSFORMER  General maintenance of transformer requires …..  HALF YEARLY CHECKS:  Check & clean bushings.  Check OLTC mechanism for smooth operation. Check motor & its control.  Check dielectric strength of oil.  Check cooling system i.e. cooling fan working and its operating controls.  Service fans and replace if not working.  Check earthing of transformer.
  • 14. MAINTENANCE OF POWER TRANSFORMER  General maintenance of transformer requires …..  YEARLY CHECKS:  Check & clean bushings.  Check OLTC mechanism for smooth operation.  Check OLTC motor & its control.  Check dielectric strength of oil.  Check water content in oil.  Check earthing of transformer.  Check control & protection system and Tighten all connections.  Take routine test on transformer.
  • 15.  General maintenance of Distribution transformer  HALF YEARLY CHECKS:  Check proper size of DO fuse.  Check colour of silica gel.  Tight all incoming / out going connections.  Check earthing of transformer.  Check oil leakage & attend if any.  Clean main tank, radiator & bushings.  YEARLY CHECKS:  Measure IR value.  Measure dielectric strength of oil.
  • 16. • AFTER SERVICE OF 5 – 7 YEARS:  Preferably, the manufacturer’s engineer may be called at site.  Replace all ageing gaskets.  The existing oil in the transformer should be filtered continuously to attain dielectric strength of 60 kV for 1 min. or more with improvement in the IR value.  The procedure could also be as per the manufacturer’s manual.
  • 17. • AFTER SERVICE OF 5 – 7 YEARS:  Filtration would remove sludge, dirt, moisture, etc. from the oil.  If condition of existing oil is found extremely deteriorated upon testing prior to maintenance, fresh oil should be filled in the transformer under vacuum.  The values of IR and PI should be taken again to ensure the healthiness of transformer.
  • 18. ■ Transformer Body  Main Tank  Conservator tank  Load Tap Changer  Bushings  Core  Winding ■ Cooling Media / system  Oil  Radiator  Radiator Fans  Oil Pumps Accessories  Breather  Buchholtz relay  Oil and Winding Temp. indicator  Explosion vent  Pressure release valve  MOG  OSR  Marshaling box

Notes de l'éditeur

  1. Develop a maintenance program. The many approaches to switchgear maintenance range from continuous online monitoring to “do nothing” (also called “run-to-failure”). Predictive and preventive maintenance programs—including most of the National Fire Protection Association (NFPA) and InterNational Electrical Testing Association (NETA) recommendations—fall in the middle of this range. Most real-world maintenance programs are a combination of these approaches. For instance, replacing indication lights only when they’ve failed is an example of run-to-failure maintenance. On the other hand, maintaining disconnect switches on a periodic basis— cleaning, lubricating, and exercising them—is an example of preventive maintenance. Annual visual and thermographic inspections on bus connections and breakers are examples of predictive maintenance.
  2. reliability concerns to not only insulation but also to the correct functioning of the operating mechanism, protective devices, and control that are integral to the breaker. Unlike transformers that are a quiescent element, switchgear breakers are active elements that can fail by acting spuriously or by not functioning (either to open or close) upon command. These incorrect functions can create problems in the connected circuits that are quite different from those that result directly from any fire, explosion, or spread of possibly toxic insulating fluids. If a breaker fails to clear upon signal or becomes overloaded for any reason, then the circuit will be subjected to further damage until an upstream breaker (usually larger and set at a higher current rating) can sense and clear the overload.