Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
1
[G TOWER]
a sustainable tower
Architect:
BEP Akitek Sdn Bhd
The Architectural Network
Project:
GTower
Location:
199 Jalan Tun Razak, 50400
Kuala Lumpur, Wilayah
Persekutuan Kuala Lumpur,
Malaysia
Client:
Goldis Tower Sdn Bhd
PropertyType:
Office & Hotel
Date Completed:
June 2006
ContentPage
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
2
No. Topic Pages
1 Introduction 3 - 5
2 Concept & Ideas 6
3 Sustainable Design 7 - 14
4 Temperature & Climate Data 15 - 17
5 Wind Direction Analysis 18 - 19
6 Sun Path Analysis 20 - 21
7 Passive Design – Building Orientation 22 - 26
8 Passive Design – Double Glazing Glass 27 - 29
9 Conclusion 30
10 Reference 31
Introduction
The G Tower, is a new working concept incorporating an office space, a members-only
private club and a hotel called aptly, The G City Club Hotel, is the first fully certified green
building. Given the Green Mark Gold Rating by standards of the Singapore’s Building and
Construction Authority(BCA).
Being strategically located at the crossroads of Jalan Tun Razak and Jalan Ampang in Kuala
Lumpur, this 30-storey building with a total land area of 2000m² encompasses a 180-room
5 star hotel, 112 CEO duplex office suites and a club was designed by BEP Akitek under
Goldis Tower and was completed in June 2009.
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
3
Diagram 1.1 : G Tower Site Plan
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
4
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
5
Diagram 1.2 : Lobby Green Feature Wall Diagram 1.3 : Entrance to Lower Ground
Concept&Ideas
G Tower is Malaysia’s first green and smart building which implemented the idea of
environment sustainability, RETHINK, REDUCE, REUSE and RECYCLE.
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
6
Concepts Application
Rethink Not restricted in the building only. Site orientation is considered
to reduce usage of energy.
Sustainable green building technologies and systems are added.
Reduce Reduce energy consumption:
-Usage of double glazed low-emission glass. (Allow maximum
light, minimum heat transmission)
Chilled water centralised air-conditioning chillers are used.
Low energy LED lighting which will reduce energy consumption
by 80-90%
Cleaning agents that are eco-friendly are used in the hotel.
Eco-friendly infinity pool on the rooftop is conditioned by salt
instead of chlorine. The pool is also heated by the heat waste
from the air-con units.
Reuse Harvest of rainwater in the water catchment areas to provide
enough water for the green roof and the vertical green walls.
Crawling plants on the façade wall and in the interior walls
helps purified air in a natural way.
Heat waste from air-con is also reuse for heating the water in
bathrooms.
Recycle The staffs in the hotel learned to separate recyclable waste.
The furnishing of the interior of hotel are made of recycled
materials.
Even the paint that is used is made of organic compound.
Table 1.1 : G Tower Concept
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
7
SustainableDesign
The building has been certified by the Singapore Government’s Building and Construction
Authority with the GREEN MARK GOLD certification which acknowledges that G Tower has
incorporated the following Green Building Technologies (GBTs) to improve:
 Energy efficiency
 Water efficiency
 Indoor environmental quality and environmental management
 Green planting throughout the building to improve air quality
 Energy efficient chilled water air-con centralized air conditioning
 Low e-glass for lower heat transmission
 Environmentally- friendly materials used throughout the building
Diagram 2.1 : Sustainability Process
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
8
Energy Efficiency
To increase the overall energy efficiency, the air conditioning which consumes the largest
amount of energy has been replaced to operate at low system efficiency.
Motion and photo sensors have also been added which promote a reduction in energy
consumption from lighting in various facilities when not in use.
The use of greenery in landscaping, green roof can assist in alleviating urban heat islands
through shading and evaporative cooling.
Diagram 3.1 : Motion Sensors Process
Diagram 3.2 : G Tower Green Roof
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
9
Water Efficiency
As an initiative to reduce water consumption, water efficient fittings were installed so that
facility staff can monitor daily water usage and detect any leakage occurring in the building.
Rain water harvesting system has also been implemented for irrigating the landscape and
vertical greening areas.
Piping of irrigation system runs along side the green walls and plantation in the building.
G-TOWER
USAGE
Diagram 3.3 : Rainwater Harvesting Process
Diagram 3.4 : Vertical Greenery Irrigation Diagram 3.5 : Plantation Irrigation
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
10
Project Management
An estimate of more than 30% of construction materials such as carpets, landscape draining
cells, external wood decking, and kitchen cabinets are of recycled contents as an
environmentally friendly approach.
Carpet with recycled contents
Landscape draining cells
External wood decking
Kitchen cabinets with recycled content
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
11
The Bridge Bar is the crucial part of the building’s commitment to being green. The management
of G Tower wanted to show that even a carefree drinking joint could also echo green themes by
using materials with recycled contents to decorate the interior and atmosphere of the bar.
1. Wine bottles that are built-in into the bar as
decoration.
2. Abundantly use of cengal wood.
3. Refurbished furniture. 4. Usage of eco woods fabricated with rice
husk for outdoor decking.
5. Recyclable carpets. 6. LED lights.
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
12
Provisions for Carbon Monoxide (CO) and Carbon Dioxide (CO²) monitoring systems which
BMS to circulate air inside the building to provide better indoor air quality. The use of low
VOC paint helps prevents from getting exposed to chemical particles.
Indoor Environment Quality Implementation:
1. Providing Carbon Monoxide monitoring systems at basement car parks.
• To ensure toxic fumes are removed regularly
2. Carbon Dioxide sensors are available at all AHUs
3. Fluorescent luminaries’ c/w high frequency ballast
4. Use of VOC paint and wallpaper
5. Provision for Refrigerant leak detection system
Indoor Environmental Quality & Protection
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
13
The Bridge Bar
The Element Gym
 An eco-friendly gym which incorporate the principles of green-living in its fitness regime.
Ensconced in the 28th Floor of G Tower Building the
feeling of a private home pervades the stylishly
décor of a Bridge Bar. The outlet showcases and
profile something as frivolous as a drinking outlet
could echo a commitment to ‘going green’ both in
theme and décor.
 Heated infinity pool with salted water
 Slat chlorinators are used in this swimming pool
to minimize the usage of chemicals
 Thus, this will improve the water quality and
good environmental impact
Eco- Friendly Infinity Pool
Sustainable Design Features
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
14
DOUBLE GLAZING TO REDUCE
HEAT TRANSFER
SustainableDesignSystem
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
15
Malaysia is located in the equatorial region and has a tropical rainforest climate which is
causes it to remain hot and humid throughout the year. It experiences two types of climates
which are rainy season (mid- November to March) and dry season (May to September).
However, the temperature in Malaysia varies a little from season to season since it is close to
the equator.
The average annual temperature of Malaysia ranges between 24°C to 33°C. During the rainy
season, the average rainfall throughout the year is 217.5mm and November is the highest
rainfall month. The humidity in Malaysia is very high. The relative humidity varies from a low
80% in January to a high of 85% in October. For the average daily sunshine hours in Malaysia,
the daily sunshine hours is about eight hours in the dry season and range from six to seven
hours throughout the rainy season.
Temperature&ClimateData
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
16
0
10
20
30
40
50
60
70
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average High Temperature
(°C)
Average Low Temperature
(°C)
Average Temperature (°C) - Kuala Lumpur
77
78
79
80
81
82
83
84
85
86
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average Humidity (%)
Average Humidity (%) - Kuala Lumpur
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
17
0
1
2
3
4
5
6
7
8
9
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average Daily Sunshine
Hours
Average Daily Sunshine Hours - Kuala Lumpur
0
50
100
150
200
250
300
350
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average Rainfall (mm)
Average Rain Days
Average Rainfall (mm) - Kuala Lumpur
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
18
WindDirectionAnalysis
NortheastMonsoon(November–March)
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
19
SouthwestMonsoon(May–September)
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
20
SunPathAnalysis
Diagram 4.1 : 9am
Diagram 4.2 12pm
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
21
Diagram 4.3 : 4pm
Diagram 4.4 : 6pm
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
22
PassiveDesign
The orientation of the building is important to maintain the buildings indoor temperature
within the thermal comfort range. According to ASHRAE Standard, the thermal comfort range
Is set at around 24 to 26 Degree Celsius. In order to achieve thermal comfort, there are
several criteria that should be noted.
The orientation of building plays important role in manipulating indoor temperature. The
front façade of G Tower is defined by the site and main road access. According to the map
above, the main entrance of G-Tower is supposed to face to south-east direction. However,
the building orientation has been adjusted to east of northeast by adding a path to allow the
car access.
Diagram 5.1 : Building Orientation on
Site
N
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
23
The front façade of G Tower is subtracted as shown in diagram below to minimize the
total amount of morning sunlight penetrate into the building. While simultaneously it
also provides shadings to the users and achieve thermal comfort.
The front façade has replaced with
vertical garden. Vertical garden has similar
function as green roof. It undergoes
photosynthesis, which required sunlight,
and releases oxygen to cooler the
surrounding temperature. Hence, the
heat energy does not transfer into the
interior spaces of G Tower.
Diagram 5.3 : Vertical Greenery on Front Facade
Diagram 5.2 : Geometry Subtraction
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
24
The front façade of G Tower has a
reduced surface area compare to other
elevations. As the higher the surface
area of an elevation, the more sunlight
is allow to penetrate into the building,
causing indoor temperature to rise. As
the G Tower is located in the city, only
limited area can be used for plantation
as sun shading and to reduce the
temperature. Hence, the subtracted
design of the façade.
Diagram 5.5 : Front View of
Facade
Diagram 5.4 : Sun Ray on North-East
Facade
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
25
Sunlightradiation ismostreceivedon NorthEastFaçadefrom10am
to1pm
Differentialinpressureofcloudscausesclearskiesbylateevening
after2pmonwards
According to the ecotect diagram, the most sun radiation received is from 10 a.m. to 1 p.m. In
order to avoid the raise of temperature in the building, several design moderation were taken
to reduce the amount of sun radiation being received.
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
26
 To ensure the glass would not result in too much heat transfer, the building was oriented so
the greater expanses of glass are to the north and south, and are less affected by solar
radiation than the east and west elevations.
 The east facade, which receives the most direct sunlight, has a reduced of glass surface area,
but the stepped design of the building ensures indirect sunlight can still penetrate the
interior.
 In addition, the entire building is double glazed.
 The use of energy-efficient lighting is a key factor which is related to the building’s
orientation.
 The building is equipped with motion sensors, so lighting is only used where needed. So,
there are photo sensors that take into account the amount of natural light coming into the
space
 The lighting levels are automatically adjusted due to the natural sunlight received to ensure
no energy is wasted.
 Hence, this building was designed to provide estimated annual energy savings of 5.2 million
kilowatts.
More openings at North and South
direction
Glass reduced at the East and West
direction
OrientationSummary
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
27
Heat flow occurs when there is a difference in temperature between the interior and exterior of
G Tower. The greater the difference between the outside and inside temperature, the greater
the heat flow, especially through windows using ordinary single glazing. In Malaysia, which
usually has a hot weather needs to consider glazing technologies that dramatically improve the
insulation performance of the window and improve its energy efficiency performance. Low E
glass and Insulated Glazing referred to double glazing that can be used individually or combined
to provide outstanding insulation performance.
Source: http://www.trulyconservatoryrepairs.com/conservatory-upgrades/roof-frame-glass/
In G Tower, double glazed glass is where it assists in keeping air conditioned spaces cooler for
longer time, cutting down on energy bills and improving comfort.
Double glazed glass consists of two panes of glass with a gap in the middle which enable
sunlight to be reflected back to the surroundings. The two pieces of glass and an insulated
frame are sealed together as one unit. The gap in the middle is usually a vacuum and sealed
tight.
Diagram 6.1 : Double Glazing Cross-Section
Insulated Glazing
(reduce heat transfer)
Cool Air
(long wave radiation
reflected the cold air back
into the interior)
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
28
The main facades of the G Tower consist of glass, there is a large area of the exterior will be
shined with direct sunlight. The cons to this is that glazed façade allows solar radiation to go
through the glass facades into the building and then trap the heat energy indoor causing the
interior to be heated up.
G Tower uses low-e glasses for the glass facades because the solar rays passes through the
glasses as short wave (radiation) and goes through the glass to be absorbed by the interior of
the building. Most of the longer wave heat energy is reflected back into the surrounding by the
low-e glass filtering out most of the heat wave and reduce the increased of heat indoors.
The combination of both of low-e glass and insulated glazing can ensure a better heat insulation
for the building improving the thermal comfort of G Tower. The glass can reduce heat loss up to
50% of the heat radiation that passes through the double glazed glass. The double layers of glass
helps to reduce noises from the external too. This type of glass increases security and protection
for building because there are double layers which means double protection.
Nowadays a certain amount of Argon gas, which is a naturally occurring inert gas, is inserted
between the panes of glass. Argon gas has a density higher than the surrounding air and this
reduce heat energy to be transmitted into the interior spaces. The gas acts as a barrier
reducing heat loss as well as heat absorption in the building.
Diagram 6.2 : Double Glazing Process
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
29
Advantages of Energy Efficient Glass
 Energy Saving ,decreasing air-conditioning cost
Improve the energy efficiency of G Tower, reduce monthly bills and decrease the size of carbon
footprint while G Tower can reduce the usage of air conditioners.
 Interior Comfort
Low-e glass is essential for rooms or buildings with a high proportion of windows or glass doors,
such as the office block of G-Tower which require lots of natural lighting especially for the office
block. The use of low-e glazing helps to retain the interior temperature which is much lower
than the exterior, allowing users to comfortably use the space daily.
 Sound Reduction
Double glazing reduces sound transmission and can help reduce unwanted noise. 75% ambient
noise reduction compared to single pane windows. This is important for G Tower is an office-
hotel which requires a quiet space for workers and customers.
 Draught-proof
Draught-proofing is one of the most cost effective and least intrusive ways of improving the
comfort of occupants and reducing energy used for cooling with little or no change to a
building’s appearance. It has the added benefit of helping to reduce noise and keeping out dust.
It can also reduce air leakage in windows by between 33% and 50% significantly reducing the
energy requirement needed for cooling the room. This will ensure the interior space of G Tower
will maintain at the same temperature.
 60% better heat insulation compared to single pane windows
G-Tower used the most energy-efficient glass for double glazing which is the low emissivity glass.
It often has an unnoticeable coating of metal oxide, normally on one of the internal panes next
to the gap. This lets in light and heat but cuts the amount of heat that can get out. There is gas
between the gaps for heat insulation. The whole window is assessed on its efficiency at retaining
heat.
Conclusion
Being the first green building to receive Gold class on the BCA Green Mark in Malaysia,
the G Tower certainly deserves its title and upholds it as well with its multiple green
features aiming towards a more eco friendly building in the center of the concrete jungle.
As a green buildings looks to ways for innovatively reduce the carbon footprint and
minimize the impact on the planet. G Tower was designed for environmental efficiency.
With advance motion sensor, energy efficient, water usage monitoring system, and a
rainwater harvesting technology, the G Tower stands as a highly intelligent yet eco-
friendly building that simultaneously provides the comfort and security that is demanded
from an A++ hotel.
The G Tower was designed and position purposely with site specific specifications. The
front façade being composed mostly of double glazed glass to maintain the cool
temperature and keeping the heat out of the interior while still allowing sunlight to
brighten the interior.
The building has also been orientated with its front façade facing east by north-east.
Fitted with vertical greenery and a subtracted surface area elevation, the G Tower aims to
minimize the sun radiation received in the early morning since its north and south
surfaces are less affected by the solar radiation has maintained its full elevation.
The G Tower is truly outstanding example of a modern day sustainable building that has
its focus set on the five essential pillars of green construction : energy, efficiency, water
efficiency, environmental protection, indoor environmental quality and innovation in
green features.
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
30
Building Science 1(ARC2413) | Case Study :
Identifying Innovative Passive Design
Strategies
31
Reference
 http://www.goldis.com/media/doc/Architecture%20Malaysia%20G%20Tower%20a%20S
ustainable%20Tower.pdf
 http://gtowerhotel.com/green.php?content=green
 http://www.metroglasstech.co.nz/products/double-glazing/thermal-insulation.aspx
 http://studentsrepo.um.edu.my/3701/5/2._chap_1_-_6.pdf
 http://www.climatechangeandyourhome.org.uk/live/content_pdfs/890.pdf
 http://gtower.com.my/pdf/archieve/Trends%20Magazine.pdf
 http://www.rebeccasaw.com/gtower-hotel-kl-its-green-its-a-grade-a-office-building-its-
has-msc-status/
 http://3.bp.blogspot.com/-aLVkCMVXMKI/UILP9bqY8BI/AAAAAAAABAU/2-
vVckHpCwQ/s1600/2.JPG
 http://www.flickr.com/photos/38887489@N07/5104545212/
 http://www.flickr.com/photos/38887489@N07/5103951569/
 http://www.flickr.com/photos/38887489@N07/5104545786/

Contenu connexe

Tendances

Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Adila Zaas
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Jeanne Hoo
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...AdnanSwat1
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)AlexSiv03
 
NATURAL VENTILATION CASE STUDY
NATURAL VENTILATION CASE STUDYNATURAL VENTILATION CASE STUDY
NATURAL VENTILATION CASE STUDYRohit Saxena
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office BuildingsRohan Narvekar
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent buildingMohd. Ikhwan
 
The Edge Building
The Edge BuildingThe Edge Building
The Edge BuildingRobDaniela
 
Mechanical ventilation case study
Mechanical ventilation case studyMechanical ventilation case study
Mechanical ventilation case studyRohit Saxena
 
B.services case-study
B.services case-studyB.services case-study
B.services case-studyClement Seong
 
Chapter 4 case studies characteristics
Chapter 4   case studies characteristicsChapter 4   case studies characteristics
Chapter 4 case studies characteristicsLokman Hakim Ismail
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara MaybankSheau Hui Tan
 
Building Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallBuilding Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallAh Jun
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1Izam Lukman
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...
THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...
THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...Lakshmi Ravi Chandu Kolusu
 
PAM centre (building services)
PAM centre (building services)PAM centre (building services)
PAM centre (building services)Cryslyn Tan
 

Tendances (20)

Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
 
Telekom Tower
Telekom TowerTelekom Tower
Telekom Tower
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)
 
NATURAL VENTILATION CASE STUDY
NATURAL VENTILATION CASE STUDYNATURAL VENTILATION CASE STUDY
NATURAL VENTILATION CASE STUDY
 
Gtower report
Gtower reportGtower report
Gtower report
 
Silent valley resort
Silent valley resortSilent valley resort
Silent valley resort
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office Buildings
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
The Edge Building
The Edge BuildingThe Edge Building
The Edge Building
 
Mechanical ventilation case study
Mechanical ventilation case studyMechanical ventilation case study
Mechanical ventilation case study
 
B.services case-study
B.services case-studyB.services case-study
B.services case-study
 
Chapter 4 case studies characteristics
Chapter 4   case studies characteristicsChapter 4   case studies characteristics
Chapter 4 case studies characteristics
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Building Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallBuilding Services Project 1 - Summit Mall
Building Services Project 1 - Summit Mall
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1
 
Building services report
Building services report Building services report
Building services report
 
THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...
THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...
THE CRYSTAL, LONDON: A SUSTAINABLE INTELLIGENT BUILDING CASESTUDY BY LAKSHMI ...
 
PAM centre (building services)
PAM centre (building services)PAM centre (building services)
PAM centre (building services)
 

Similaire à Building Science 1: Project 1 G- Tower

Boris Shapiro Sustainability Program in NJIT
Boris Shapiro Sustainability Program in NJITBoris Shapiro Sustainability Program in NJIT
Boris Shapiro Sustainability Program in NJITBoris Shapiro PE
 
Elements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design ParametersElements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design ParametersAjit Sabnis
 
Report passive cooling natural lighting
Report  passive cooling natural lightingReport  passive cooling natural lighting
Report passive cooling natural lightingCindy Lim
 
Planning and Analysis of Energy Efficient Building
Planning and Analysis of Energy Efficient BuildingPlanning and Analysis of Energy Efficient Building
Planning and Analysis of Energy Efficient BuildingIRJET Journal
 
Retrofitting of Academic Building by Energy Efficient Techniques
Retrofitting of Academic Building by Energy Efficient TechniquesRetrofitting of Academic Building by Energy Efficient Techniques
Retrofitting of Academic Building by Energy Efficient TechniquesIRJET Journal
 
Comparative Analysis of Conventional and Energy Efficient Materials for Resid...
Comparative Analysis of Conventional and Energy Efficient Materials for Resid...Comparative Analysis of Conventional and Energy Efficient Materials for Resid...
Comparative Analysis of Conventional and Energy Efficient Materials for Resid...IRJET Journal
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5RevistaBiz
 
Building Services.pptx
Building Services.pptxBuilding Services.pptx
Building Services.pptxarobindo gupta
 
Applying sustainable concept on building
Applying sustainable concept on buildingApplying sustainable concept on building
Applying sustainable concept on buildingRidzuan Ewan
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleKomal Arora
 
Enviroment and sustainablity of buildings
Enviroment and sustainablity of buildingsEnviroment and sustainablity of buildings
Enviroment and sustainablity of buildingstahia130136
 
Papyrus Summer 2002
Papyrus Summer 2002Papyrus Summer 2002
Papyrus Summer 2002IAMFA
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
Lecture 10 energy efficient design
Lecture 10 energy efficient designLecture 10 energy efficient design
Lecture 10 energy efficient designNedhal Al-Tamimi
 

Similaire à Building Science 1: Project 1 G- Tower (20)

Boris Shapiro Sustainability Program in NJIT
Boris Shapiro Sustainability Program in NJITBoris Shapiro Sustainability Program in NJIT
Boris Shapiro Sustainability Program in NJIT
 
perfect project report (1)
perfect project report (1)perfect project report (1)
perfect project report (1)
 
Green building
Green buildingGreen building
Green building
 
Elements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design ParametersElements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design Parameters
 
Report passive cooling natural lighting
Report  passive cooling natural lightingReport  passive cooling natural lighting
Report passive cooling natural lighting
 
Kala Bansal.ppt
Kala Bansal.pptKala Bansal.ppt
Kala Bansal.ppt
 
Case study
Case studyCase study
Case study
 
Planning and Analysis of Energy Efficient Building
Planning and Analysis of Energy Efficient BuildingPlanning and Analysis of Energy Efficient Building
Planning and Analysis of Energy Efficient Building
 
Retrofitting of Academic Building by Energy Efficient Techniques
Retrofitting of Academic Building by Energy Efficient TechniquesRetrofitting of Academic Building by Energy Efficient Techniques
Retrofitting of Academic Building by Energy Efficient Techniques
 
Comparative Analysis of Conventional and Energy Efficient Materials for Resid...
Comparative Analysis of Conventional and Energy Efficient Materials for Resid...Comparative Analysis of Conventional and Energy Efficient Materials for Resid...
Comparative Analysis of Conventional and Energy Efficient Materials for Resid...
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5
 
Building Services.pptx
Building Services.pptxBuilding Services.pptx
Building Services.pptx
 
Green building
Green buildingGreen building
Green building
 
Applying sustainable concept on building
Applying sustainable concept on buildingApplying sustainable concept on building
Applying sustainable concept on building
 
Green Presentation
Green PresentationGreen Presentation
Green Presentation
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scale
 
Enviroment and sustainablity of buildings
Enviroment and sustainablity of buildingsEnviroment and sustainablity of buildings
Enviroment and sustainablity of buildings
 
Papyrus Summer 2002
Papyrus Summer 2002Papyrus Summer 2002
Papyrus Summer 2002
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
Lecture 10 energy efficient design
Lecture 10 energy efficient designLecture 10 energy efficient design
Lecture 10 energy efficient design
 

Plus de hiewyennee

3 factors board a3
3 factors board a33 factors board a3
3 factors board a3hiewyennee
 
Contradictory levels
Contradictory levelsContradictory levels
Contradictory levelshiewyennee
 
Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang hiewyennee
 
Building Construction 2: Project 2 Fuksas booklet
Building Construction 2: Project 2 Fuksas bookletBuilding Construction 2: Project 2 Fuksas booklet
Building Construction 2: Project 2 Fuksas booklethiewyennee
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Reporthiewyennee
 

Plus de hiewyennee (7)

3 factors board a3
3 factors board a33 factors board a3
3 factors board a3
 
3 factors
3 factors3 factors
3 factors
 
Theory paper
Theory paperTheory paper
Theory paper
 
Contradictory levels
Contradictory levelsContradictory levels
Contradictory levels
 
Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang
 
Building Construction 2: Project 2 Fuksas booklet
Building Construction 2: Project 2 Fuksas bookletBuilding Construction 2: Project 2 Fuksas booklet
Building Construction 2: Project 2 Fuksas booklet
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 

Dernier

Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceSapana Sha
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...Florian Roscheck
 
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSINGmarianagonzalez07
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home ServiceSapana Sha
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一F sss
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queensdataanalyticsqueen03
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanMYRABACSAFRA2
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsVICTOR MAESTRE RAMIREZ
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectBoston Institute of Analytics
 

Dernier (20)

Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts Service
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
 
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queens
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population Mean
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business Professionals
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis Project
 

Building Science 1: Project 1 G- Tower

  • 1. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 1 [G TOWER] a sustainable tower Architect: BEP Akitek Sdn Bhd The Architectural Network Project: GTower Location: 199 Jalan Tun Razak, 50400 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia Client: Goldis Tower Sdn Bhd PropertyType: Office & Hotel Date Completed: June 2006
  • 2. ContentPage Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 2 No. Topic Pages 1 Introduction 3 - 5 2 Concept & Ideas 6 3 Sustainable Design 7 - 14 4 Temperature & Climate Data 15 - 17 5 Wind Direction Analysis 18 - 19 6 Sun Path Analysis 20 - 21 7 Passive Design – Building Orientation 22 - 26 8 Passive Design – Double Glazing Glass 27 - 29 9 Conclusion 30 10 Reference 31
  • 3. Introduction The G Tower, is a new working concept incorporating an office space, a members-only private club and a hotel called aptly, The G City Club Hotel, is the first fully certified green building. Given the Green Mark Gold Rating by standards of the Singapore’s Building and Construction Authority(BCA). Being strategically located at the crossroads of Jalan Tun Razak and Jalan Ampang in Kuala Lumpur, this 30-storey building with a total land area of 2000m² encompasses a 180-room 5 star hotel, 112 CEO duplex office suites and a club was designed by BEP Akitek under Goldis Tower and was completed in June 2009. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 3 Diagram 1.1 : G Tower Site Plan
  • 4. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 4
  • 5. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 5 Diagram 1.2 : Lobby Green Feature Wall Diagram 1.3 : Entrance to Lower Ground
  • 6. Concept&Ideas G Tower is Malaysia’s first green and smart building which implemented the idea of environment sustainability, RETHINK, REDUCE, REUSE and RECYCLE. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 6 Concepts Application Rethink Not restricted in the building only. Site orientation is considered to reduce usage of energy. Sustainable green building technologies and systems are added. Reduce Reduce energy consumption: -Usage of double glazed low-emission glass. (Allow maximum light, minimum heat transmission) Chilled water centralised air-conditioning chillers are used. Low energy LED lighting which will reduce energy consumption by 80-90% Cleaning agents that are eco-friendly are used in the hotel. Eco-friendly infinity pool on the rooftop is conditioned by salt instead of chlorine. The pool is also heated by the heat waste from the air-con units. Reuse Harvest of rainwater in the water catchment areas to provide enough water for the green roof and the vertical green walls. Crawling plants on the façade wall and in the interior walls helps purified air in a natural way. Heat waste from air-con is also reuse for heating the water in bathrooms. Recycle The staffs in the hotel learned to separate recyclable waste. The furnishing of the interior of hotel are made of recycled materials. Even the paint that is used is made of organic compound. Table 1.1 : G Tower Concept
  • 7. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 7 SustainableDesign The building has been certified by the Singapore Government’s Building and Construction Authority with the GREEN MARK GOLD certification which acknowledges that G Tower has incorporated the following Green Building Technologies (GBTs) to improve:  Energy efficiency  Water efficiency  Indoor environmental quality and environmental management  Green planting throughout the building to improve air quality  Energy efficient chilled water air-con centralized air conditioning  Low e-glass for lower heat transmission  Environmentally- friendly materials used throughout the building Diagram 2.1 : Sustainability Process
  • 8. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 8 Energy Efficiency To increase the overall energy efficiency, the air conditioning which consumes the largest amount of energy has been replaced to operate at low system efficiency. Motion and photo sensors have also been added which promote a reduction in energy consumption from lighting in various facilities when not in use. The use of greenery in landscaping, green roof can assist in alleviating urban heat islands through shading and evaporative cooling. Diagram 3.1 : Motion Sensors Process Diagram 3.2 : G Tower Green Roof
  • 9. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 9 Water Efficiency As an initiative to reduce water consumption, water efficient fittings were installed so that facility staff can monitor daily water usage and detect any leakage occurring in the building. Rain water harvesting system has also been implemented for irrigating the landscape and vertical greening areas. Piping of irrigation system runs along side the green walls and plantation in the building. G-TOWER USAGE Diagram 3.3 : Rainwater Harvesting Process Diagram 3.4 : Vertical Greenery Irrigation Diagram 3.5 : Plantation Irrigation
  • 10. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 10 Project Management An estimate of more than 30% of construction materials such as carpets, landscape draining cells, external wood decking, and kitchen cabinets are of recycled contents as an environmentally friendly approach. Carpet with recycled contents Landscape draining cells External wood decking Kitchen cabinets with recycled content
  • 11. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 11 The Bridge Bar is the crucial part of the building’s commitment to being green. The management of G Tower wanted to show that even a carefree drinking joint could also echo green themes by using materials with recycled contents to decorate the interior and atmosphere of the bar. 1. Wine bottles that are built-in into the bar as decoration. 2. Abundantly use of cengal wood. 3. Refurbished furniture. 4. Usage of eco woods fabricated with rice husk for outdoor decking. 5. Recyclable carpets. 6. LED lights.
  • 12. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 12 Provisions for Carbon Monoxide (CO) and Carbon Dioxide (CO²) monitoring systems which BMS to circulate air inside the building to provide better indoor air quality. The use of low VOC paint helps prevents from getting exposed to chemical particles. Indoor Environment Quality Implementation: 1. Providing Carbon Monoxide monitoring systems at basement car parks. • To ensure toxic fumes are removed regularly 2. Carbon Dioxide sensors are available at all AHUs 3. Fluorescent luminaries’ c/w high frequency ballast 4. Use of VOC paint and wallpaper 5. Provision for Refrigerant leak detection system Indoor Environmental Quality & Protection
  • 13. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 13 The Bridge Bar The Element Gym  An eco-friendly gym which incorporate the principles of green-living in its fitness regime. Ensconced in the 28th Floor of G Tower Building the feeling of a private home pervades the stylishly décor of a Bridge Bar. The outlet showcases and profile something as frivolous as a drinking outlet could echo a commitment to ‘going green’ both in theme and décor.  Heated infinity pool with salted water  Slat chlorinators are used in this swimming pool to minimize the usage of chemicals  Thus, this will improve the water quality and good environmental impact Eco- Friendly Infinity Pool Sustainable Design Features
  • 14. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 14 DOUBLE GLAZING TO REDUCE HEAT TRANSFER SustainableDesignSystem
  • 15. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 15 Malaysia is located in the equatorial region and has a tropical rainforest climate which is causes it to remain hot and humid throughout the year. It experiences two types of climates which are rainy season (mid- November to March) and dry season (May to September). However, the temperature in Malaysia varies a little from season to season since it is close to the equator. The average annual temperature of Malaysia ranges between 24°C to 33°C. During the rainy season, the average rainfall throughout the year is 217.5mm and November is the highest rainfall month. The humidity in Malaysia is very high. The relative humidity varies from a low 80% in January to a high of 85% in October. For the average daily sunshine hours in Malaysia, the daily sunshine hours is about eight hours in the dry season and range from six to seven hours throughout the rainy season. Temperature&ClimateData
  • 16. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 16 0 10 20 30 40 50 60 70 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average High Temperature (°C) Average Low Temperature (°C) Average Temperature (°C) - Kuala Lumpur 77 78 79 80 81 82 83 84 85 86 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average Humidity (%) Average Humidity (%) - Kuala Lumpur
  • 17. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 17 0 1 2 3 4 5 6 7 8 9 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average Daily Sunshine Hours Average Daily Sunshine Hours - Kuala Lumpur 0 50 100 150 200 250 300 350 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average Rainfall (mm) Average Rain Days Average Rainfall (mm) - Kuala Lumpur
  • 18. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 18 WindDirectionAnalysis NortheastMonsoon(November–March)
  • 19. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 19 SouthwestMonsoon(May–September)
  • 20. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 20 SunPathAnalysis Diagram 4.1 : 9am Diagram 4.2 12pm
  • 21. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 21 Diagram 4.3 : 4pm Diagram 4.4 : 6pm
  • 22. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 22 PassiveDesign The orientation of the building is important to maintain the buildings indoor temperature within the thermal comfort range. According to ASHRAE Standard, the thermal comfort range Is set at around 24 to 26 Degree Celsius. In order to achieve thermal comfort, there are several criteria that should be noted. The orientation of building plays important role in manipulating indoor temperature. The front façade of G Tower is defined by the site and main road access. According to the map above, the main entrance of G-Tower is supposed to face to south-east direction. However, the building orientation has been adjusted to east of northeast by adding a path to allow the car access. Diagram 5.1 : Building Orientation on Site N
  • 23. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 23 The front façade of G Tower is subtracted as shown in diagram below to minimize the total amount of morning sunlight penetrate into the building. While simultaneously it also provides shadings to the users and achieve thermal comfort. The front façade has replaced with vertical garden. Vertical garden has similar function as green roof. It undergoes photosynthesis, which required sunlight, and releases oxygen to cooler the surrounding temperature. Hence, the heat energy does not transfer into the interior spaces of G Tower. Diagram 5.3 : Vertical Greenery on Front Facade Diagram 5.2 : Geometry Subtraction
  • 24. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 24 The front façade of G Tower has a reduced surface area compare to other elevations. As the higher the surface area of an elevation, the more sunlight is allow to penetrate into the building, causing indoor temperature to rise. As the G Tower is located in the city, only limited area can be used for plantation as sun shading and to reduce the temperature. Hence, the subtracted design of the façade. Diagram 5.5 : Front View of Facade Diagram 5.4 : Sun Ray on North-East Facade
  • 25. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 25 Sunlightradiation ismostreceivedon NorthEastFaçadefrom10am to1pm Differentialinpressureofcloudscausesclearskiesbylateevening after2pmonwards According to the ecotect diagram, the most sun radiation received is from 10 a.m. to 1 p.m. In order to avoid the raise of temperature in the building, several design moderation were taken to reduce the amount of sun radiation being received.
  • 26. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 26  To ensure the glass would not result in too much heat transfer, the building was oriented so the greater expanses of glass are to the north and south, and are less affected by solar radiation than the east and west elevations.  The east facade, which receives the most direct sunlight, has a reduced of glass surface area, but the stepped design of the building ensures indirect sunlight can still penetrate the interior.  In addition, the entire building is double glazed.  The use of energy-efficient lighting is a key factor which is related to the building’s orientation.  The building is equipped with motion sensors, so lighting is only used where needed. So, there are photo sensors that take into account the amount of natural light coming into the space  The lighting levels are automatically adjusted due to the natural sunlight received to ensure no energy is wasted.  Hence, this building was designed to provide estimated annual energy savings of 5.2 million kilowatts. More openings at North and South direction Glass reduced at the East and West direction OrientationSummary
  • 27. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 27 Heat flow occurs when there is a difference in temperature between the interior and exterior of G Tower. The greater the difference between the outside and inside temperature, the greater the heat flow, especially through windows using ordinary single glazing. In Malaysia, which usually has a hot weather needs to consider glazing technologies that dramatically improve the insulation performance of the window and improve its energy efficiency performance. Low E glass and Insulated Glazing referred to double glazing that can be used individually or combined to provide outstanding insulation performance. Source: http://www.trulyconservatoryrepairs.com/conservatory-upgrades/roof-frame-glass/ In G Tower, double glazed glass is where it assists in keeping air conditioned spaces cooler for longer time, cutting down on energy bills and improving comfort. Double glazed glass consists of two panes of glass with a gap in the middle which enable sunlight to be reflected back to the surroundings. The two pieces of glass and an insulated frame are sealed together as one unit. The gap in the middle is usually a vacuum and sealed tight. Diagram 6.1 : Double Glazing Cross-Section Insulated Glazing (reduce heat transfer) Cool Air (long wave radiation reflected the cold air back into the interior)
  • 28. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 28 The main facades of the G Tower consist of glass, there is a large area of the exterior will be shined with direct sunlight. The cons to this is that glazed façade allows solar radiation to go through the glass facades into the building and then trap the heat energy indoor causing the interior to be heated up. G Tower uses low-e glasses for the glass facades because the solar rays passes through the glasses as short wave (radiation) and goes through the glass to be absorbed by the interior of the building. Most of the longer wave heat energy is reflected back into the surrounding by the low-e glass filtering out most of the heat wave and reduce the increased of heat indoors. The combination of both of low-e glass and insulated glazing can ensure a better heat insulation for the building improving the thermal comfort of G Tower. The glass can reduce heat loss up to 50% of the heat radiation that passes through the double glazed glass. The double layers of glass helps to reduce noises from the external too. This type of glass increases security and protection for building because there are double layers which means double protection. Nowadays a certain amount of Argon gas, which is a naturally occurring inert gas, is inserted between the panes of glass. Argon gas has a density higher than the surrounding air and this reduce heat energy to be transmitted into the interior spaces. The gas acts as a barrier reducing heat loss as well as heat absorption in the building. Diagram 6.2 : Double Glazing Process
  • 29. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 29 Advantages of Energy Efficient Glass  Energy Saving ,decreasing air-conditioning cost Improve the energy efficiency of G Tower, reduce monthly bills and decrease the size of carbon footprint while G Tower can reduce the usage of air conditioners.  Interior Comfort Low-e glass is essential for rooms or buildings with a high proportion of windows or glass doors, such as the office block of G-Tower which require lots of natural lighting especially for the office block. The use of low-e glazing helps to retain the interior temperature which is much lower than the exterior, allowing users to comfortably use the space daily.  Sound Reduction Double glazing reduces sound transmission and can help reduce unwanted noise. 75% ambient noise reduction compared to single pane windows. This is important for G Tower is an office- hotel which requires a quiet space for workers and customers.  Draught-proof Draught-proofing is one of the most cost effective and least intrusive ways of improving the comfort of occupants and reducing energy used for cooling with little or no change to a building’s appearance. It has the added benefit of helping to reduce noise and keeping out dust. It can also reduce air leakage in windows by between 33% and 50% significantly reducing the energy requirement needed for cooling the room. This will ensure the interior space of G Tower will maintain at the same temperature.  60% better heat insulation compared to single pane windows G-Tower used the most energy-efficient glass for double glazing which is the low emissivity glass. It often has an unnoticeable coating of metal oxide, normally on one of the internal panes next to the gap. This lets in light and heat but cuts the amount of heat that can get out. There is gas between the gaps for heat insulation. The whole window is assessed on its efficiency at retaining heat.
  • 30. Conclusion Being the first green building to receive Gold class on the BCA Green Mark in Malaysia, the G Tower certainly deserves its title and upholds it as well with its multiple green features aiming towards a more eco friendly building in the center of the concrete jungle. As a green buildings looks to ways for innovatively reduce the carbon footprint and minimize the impact on the planet. G Tower was designed for environmental efficiency. With advance motion sensor, energy efficient, water usage monitoring system, and a rainwater harvesting technology, the G Tower stands as a highly intelligent yet eco- friendly building that simultaneously provides the comfort and security that is demanded from an A++ hotel. The G Tower was designed and position purposely with site specific specifications. The front façade being composed mostly of double glazed glass to maintain the cool temperature and keeping the heat out of the interior while still allowing sunlight to brighten the interior. The building has also been orientated with its front façade facing east by north-east. Fitted with vertical greenery and a subtracted surface area elevation, the G Tower aims to minimize the sun radiation received in the early morning since its north and south surfaces are less affected by the solar radiation has maintained its full elevation. The G Tower is truly outstanding example of a modern day sustainable building that has its focus set on the five essential pillars of green construction : energy, efficiency, water efficiency, environmental protection, indoor environmental quality and innovation in green features. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 30
  • 31. Building Science 1(ARC2413) | Case Study : Identifying Innovative Passive Design Strategies 31 Reference  http://www.goldis.com/media/doc/Architecture%20Malaysia%20G%20Tower%20a%20S ustainable%20Tower.pdf  http://gtowerhotel.com/green.php?content=green  http://www.metroglasstech.co.nz/products/double-glazing/thermal-insulation.aspx  http://studentsrepo.um.edu.my/3701/5/2._chap_1_-_6.pdf  http://www.climatechangeandyourhome.org.uk/live/content_pdfs/890.pdf  http://gtower.com.my/pdf/archieve/Trends%20Magazine.pdf  http://www.rebeccasaw.com/gtower-hotel-kl-its-green-its-a-grade-a-office-building-its- has-msc-status/  http://3.bp.blogspot.com/-aLVkCMVXMKI/UILP9bqY8BI/AAAAAAAABAU/2- vVckHpCwQ/s1600/2.JPG  http://www.flickr.com/photos/38887489@N07/5104545212/  http://www.flickr.com/photos/38887489@N07/5103951569/  http://www.flickr.com/photos/38887489@N07/5104545786/