SlideShare une entreprise Scribd logo
1  sur  4
Husam Ibrahim, P.Eng, PMP.                                                11821, 167B Ave.
Bsc. Electrical Engineering                                         Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565                                           hkaibrahim@gmail.com


HIGHLIGHTS OF QUALIFICATIONS:

      Over 15 years of electrical engineering design, construction procurement and project
       management experience in oil & gas, industrial, commercial, high rise, housing, LV & HV
       power and utility projects
      Have attained ability to lead and work well with others as part of a team
      Good oral and written communication skills
      Managed and lead electrical design team over 5 years
      Prepared electrical specifications for electrical designs and equipment
      Volunteered in mentoring of new electrical engineering graduates

PROFESSIONAL EXPERIENCE:

ATCO Electric Ltd. - Canada                                               Oct 2009- Present
PMO Process Team Lead
Responsibilities
    Lead the Project Management Office (PMO) team to achieve deadlines and scope
      deliverables
    Participated in the management of the development of Project management process,
      procedures and templates of HV Transmission and Distribution Projects
    Managed the Implementation of a new collaboration tool (Microsoft Office Project Server)
      to be used as a standard Program and Project Management System in all Electrical HV
      Projects of ATCO Electric
    Prepared Project Management plan including, Microsoft Project Schedule, of the PMO
    Prepared new templates and modified existing ones following PMI standards
    Communicated with all groups of ATCO Electric and gathered information and feedback
    Reviewed and modified the new ATCO Electric Work Breakdown Structure (WBS)

Sinai Engineering Corporation - Canada                               May 2007- May 2009
Procurement Lead Engineer
Responsibilities
    Managed procurement for the 260KV facilities of Suncor Voyageur Upgrader Project and
       North Steepbank Extension Project at Fort McMurray
    Managed team members to achieve deadlines and scope deliverables
    Managed the approval process of manufacturing design drawings
    Prepared and issued bid documents ( RFQ ) for electrical HV 260 KV equipment like
       CT’s, CVT’s, CB’s, Disconnect Switches and Transmission Lines
    Communicated with vendors and bidders, clarified and answered their (RFI’s)
    Managed and coordinated Pre-Bid meetings for different Bids.
    Coordinated technical and commercial documents with project schedule activities
    Managed evaluation of proposals process and issued award recommendations
    Prepared and issued purchase orders for 260 KV and other HV equipment
    Prepared and issued construction contracts of Substations 29EDD1 (Millennium),
       29EDD94 (Voyageur), 29EDD34 and 260 KV Transmission Lines 29PL 9-16/17
    Managed Kick Off meetings
    Issued weekly, bi-weekly and monthly progress reports
    Managed production of Sinai Procurement Procedures & Standards
PCL Intracon Power Inc. - Canada                                         Oct 2006- May 2007
Electrical Estimator/ Coordinator

                                         Page 1 of 4
Husam Ibrahim, P.Eng, PMP.                                                    11821, 167B Ave.
Bsc. Electrical Engineering                                             Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565                                               hkaibrahim@gmail.com

Responsibilities
   Reviewed and coordinated the EHT As-Built drawings for the CNRL Heat Integration
      Modules
   Estimated Electrical bids for different projects using the Accubid software:
       Praxair, H2 Storage Salt Cavern
       CNRL Secondary Upgrading
Association of Professional Engineers, Geologists, Geophysicists         Dec 2003 - Oct 2006
of Alberta (APEGGA) - Canada
Qualified my degree and experience through the Association of Professional Engineers of Alberta
which was a long process that included technical assessment and process and finally the
Engineering National Exam which I passed and accordingly awarded the Diploma of Professional
Engineering

Gulf Engineering Company - Kuwait                                           July 2002- Dec 2003
Senior Electrical Engineer
Responsibilities
    Managed and supervised electrical construction of west central plant MEP project in the
        new campus of the Public Authority for applied Education and Training in Kuwait. This
        plant includes 9 numbers cooling towers and 9 numbers of 1000 cooling tons chillers;
        these chillers were powered by 11KV/0.415KV of 9 numbers 1000 KVA transformers.
    Reviewed electrical drawings, coordinated workshop drawings with other trades drawings
        and activities
    Supervised site electrical activities and directed electrical crews on a daily basis schedule
    Conducted out-of-country short circuit test for a switchgear panel at the British Short
        Circuit Testing Station Limited (BSTS) certified by ASTA in the UK.
    Conducted out-of-country technical inspections and tests for two 1250KVA emergency
        diesel generators manufactured for the project at Cummins Diesel Generators Factory in
        the UK.
    Participated in out-of-country presentation about Automation Systems Technology’s
        latest update in the UK
    Conducted out-of-country technical inspection for the Gent Fire Alarm factory, the fire
        alarm system provider in the UK.
    Commissioned and handed over electrical systems to the consultant and the client.
Accomplishments
    Completed electrical construction and power supply to the project 30 days ahead of
        scheduled time
    Reduced material cost by 15% and manpower cost by 25%
AL-Sager General Trading & Cont. Company - Kuwait                      Jan 1997- July 2002
Senior Electrical Engineer
Responsibilities
    Managed new electrical design and construction division
    Reviewed and quoted government and private tenders including design drawings,
        technical specifications and bill of quantities
    Communicated with electrical material suppliers and equipment manufacturers
    Negotiated subcontract agreements and purchase orders for electrical materials
Accomplishments
    Established, organized and managed new electrical construction division of 2 electrical
        engineers, 4 supervisors and 30 electricians
    Reduced cost of procurement of electrical materials by 20%
    Saved 15% of the cost of electrical systems

                                           Page 2 of 4
Husam Ibrahim, P.Eng, PMP.                                                   11821, 167B Ave.
Bsc. Electrical Engineering                                            Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565                                              hkaibrahim@gmail.com


ALNuhoodh Establishment. - Kuwait                                         Oct 1988- Dec 1996
Senior Electrical Engineer
Responsibilities
    Designed electrical drawings for oil & gas, industrial, commercial and residential projects:
         Al-Shuaiba petrochemical refinery expansion
         Petrochemical Industry Complex integration
         Construction of 10 numbers petrol stations at Mina-Abdulla oil industrial area
         Americana meat processing factory expansion
         Ebomac, switchgear manufacturer extension
         The power distribution of new warehouses in Sabhan industrial area
         Chemical detergents and cleaning products factory
         Shamia and Shuwaikh Co-op Society new supermarket
         Commercial high rise building at Kuwait city
    Managed construction and procurement of electrical works for a variety of projects
    Coordinated workshop electrical drawings with other construction trades
    Inspected and approved diverse range of projects by signing the MEW (ministry of
        electricity & water) inspection report as per the MEW standards:
         Rawda & Hawalli cooperation society supermarket
         Kuwait Hilton Resort Hotel at Mangaf area
         East Hadia area major sewage stations power distribution system
         Kuwait Coast Guard Headquarters at Salmia area
    Conducted electrical insulation, short circuit and earthing conductivity tests

       Consulted for different engineering firms, as a certified MEW electrical engineer for
        different projects:
         The new shrimp factory and cold stores at Shuwaikh
         Shamia and Shuwaikh Co-op Society new supermarket
         Power distribution of Hadia housing infrastructure
         Americana meat processing factory expansion
A.H.AL-Sagar &Bros. - Kuwait                                               Aug 1985- Sept 1988
Electrical Project Engineer
Responsibilities
                Managed the construction of the power distribution network of the new 300 KV,
         132 KV and 33 KV substations of new developed housing project including over-head
         transmission lines and high-voltage underground cables
     Surveyed the new overhead-transmission lines and underground cable routes and
         coordinated them with the other services routes to avoid any overlap of services
                Coordinated the design drawings with international suppliers of switch-gear,
         cables and overhead-transmission lines like Hitachi, Alsthome, Siemens, Mitsubishi,
         ABB, NKF, Fujicura…, and modified the design drawings as per MEW standards
                Commissioned, energized and tested the power distribution network and handed
         over the network to the client.
Accomplishments
                Completed and handed over my first contract # MEW 1379/83-84 on time on
         budget
     Saved 25 days of my second contract # MEW 1501/84 and managed to save the man-
         hours cost by approximately10% after modifying the work breakdown structure

Fawaz Refr. & A/C CO. - Kuwait                                        Sept 1984- Aug 1985
Trainee Electrical Engineer
Responsibilities

                                           Page 3 of 4
Husam Ibrahim, P.Eng, PMP.                                                  11821, 167B Ave.
Bsc. Electrical Engineering                                           Edmonton, AB, T5X 0B3
Mobile No. (780) 906-0565                                             hkaibrahim@gmail.com

              Reviewed the design drawings of a high rise building of two towers (Fintas
       Towers MEP project) each of which powered by 11KV/0.415KV substation of 7numbers
       750 KVA transformers
              Prepared the As-Built drawings and followed up with the Ministry of Electricity
       &Water (MEW) for final approval and inspection
              Conducted the MEW inspection of the electrical installations to permit energizing
       the two substations
      Commissioned the electrical substations, switch-gears, bus-duct and all electrical
       systems

PROFESSIONAL AFFILIATIONS

      Association of Professional Engineers, Geologists and Geophysicists of Alberta
       (APEGGA), Canada, P.Eng # M 94835
      Project Management Professional – PMP NO. 1325785
      Ministry of Electricity & Water ( Kuwait) License of Certified Electrical Engineer
      Kuwait Society of Engineers
      Jordan Syndicate of Engineers

EDUCATION

Bachelor of Electrical Engineering
      Kuwait University                                                            1984




                                          Page 4 of 4

Contenu connexe

En vedette

Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)Mohd Hanif Abd Hadi
 
Jahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RJahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RIan Jahn
 
Dean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent finalDean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent finalDean Boyle
 
Combine cover letter and resume
Combine cover letter and resumeCombine cover letter and resume
Combine cover letter and resumeRich St.Cyr
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Rahul Sarve - Resume- Project Manager
Rahul Sarve - Resume- Project ManagerRahul Sarve - Resume- Project Manager
Rahul Sarve - Resume- Project ManagerRahul Sarve
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultzKenneth Michael Shultz
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 

En vedette (14)

Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
Jahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RJahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - R
 
Dean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent finalDean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent final
 
Resume
ResumeResume
Resume
 
Combine cover letter and resume
Combine cover letter and resumeCombine cover letter and resume
Combine cover letter and resume
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Rahul Sarve - Resume- Project Manager
Rahul Sarve - Resume- Project ManagerRahul Sarve - Resume- Project Manager
Rahul Sarve - Resume- Project Manager
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultz
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
YANNIS D.MERTIKAS CV
YANNIS D.MERTIKAS CVYANNIS D.MERTIKAS CV
YANNIS D.MERTIKAS CV
 
CV_SR_IND1
CV_SR_IND1CV_SR_IND1
CV_SR_IND1
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 

Husam Ibrahim Detailed Resume 05012010

  • 1. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave. Bsc. Electrical Engineering Edmonton, AB, T5X 0B3 Mobile No. (780) 906-0565 hkaibrahim@gmail.com HIGHLIGHTS OF QUALIFICATIONS:  Over 15 years of electrical engineering design, construction procurement and project management experience in oil & gas, industrial, commercial, high rise, housing, LV & HV power and utility projects  Have attained ability to lead and work well with others as part of a team  Good oral and written communication skills  Managed and lead electrical design team over 5 years  Prepared electrical specifications for electrical designs and equipment  Volunteered in mentoring of new electrical engineering graduates PROFESSIONAL EXPERIENCE: ATCO Electric Ltd. - Canada Oct 2009- Present PMO Process Team Lead Responsibilities  Lead the Project Management Office (PMO) team to achieve deadlines and scope deliverables  Participated in the management of the development of Project management process, procedures and templates of HV Transmission and Distribution Projects  Managed the Implementation of a new collaboration tool (Microsoft Office Project Server) to be used as a standard Program and Project Management System in all Electrical HV Projects of ATCO Electric  Prepared Project Management plan including, Microsoft Project Schedule, of the PMO  Prepared new templates and modified existing ones following PMI standards  Communicated with all groups of ATCO Electric and gathered information and feedback  Reviewed and modified the new ATCO Electric Work Breakdown Structure (WBS) Sinai Engineering Corporation - Canada May 2007- May 2009 Procurement Lead Engineer Responsibilities  Managed procurement for the 260KV facilities of Suncor Voyageur Upgrader Project and North Steepbank Extension Project at Fort McMurray  Managed team members to achieve deadlines and scope deliverables  Managed the approval process of manufacturing design drawings  Prepared and issued bid documents ( RFQ ) for electrical HV 260 KV equipment like CT’s, CVT’s, CB’s, Disconnect Switches and Transmission Lines  Communicated with vendors and bidders, clarified and answered their (RFI’s)  Managed and coordinated Pre-Bid meetings for different Bids.  Coordinated technical and commercial documents with project schedule activities  Managed evaluation of proposals process and issued award recommendations  Prepared and issued purchase orders for 260 KV and other HV equipment  Prepared and issued construction contracts of Substations 29EDD1 (Millennium), 29EDD94 (Voyageur), 29EDD34 and 260 KV Transmission Lines 29PL 9-16/17  Managed Kick Off meetings  Issued weekly, bi-weekly and monthly progress reports  Managed production of Sinai Procurement Procedures & Standards PCL Intracon Power Inc. - Canada Oct 2006- May 2007 Electrical Estimator/ Coordinator Page 1 of 4
  • 2. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave. Bsc. Electrical Engineering Edmonton, AB, T5X 0B3 Mobile No. (780) 906-0565 hkaibrahim@gmail.com Responsibilities  Reviewed and coordinated the EHT As-Built drawings for the CNRL Heat Integration Modules  Estimated Electrical bids for different projects using the Accubid software:  Praxair, H2 Storage Salt Cavern  CNRL Secondary Upgrading Association of Professional Engineers, Geologists, Geophysicists Dec 2003 - Oct 2006 of Alberta (APEGGA) - Canada Qualified my degree and experience through the Association of Professional Engineers of Alberta which was a long process that included technical assessment and process and finally the Engineering National Exam which I passed and accordingly awarded the Diploma of Professional Engineering Gulf Engineering Company - Kuwait July 2002- Dec 2003 Senior Electrical Engineer Responsibilities  Managed and supervised electrical construction of west central plant MEP project in the new campus of the Public Authority for applied Education and Training in Kuwait. This plant includes 9 numbers cooling towers and 9 numbers of 1000 cooling tons chillers; these chillers were powered by 11KV/0.415KV of 9 numbers 1000 KVA transformers.  Reviewed electrical drawings, coordinated workshop drawings with other trades drawings and activities  Supervised site electrical activities and directed electrical crews on a daily basis schedule  Conducted out-of-country short circuit test for a switchgear panel at the British Short Circuit Testing Station Limited (BSTS) certified by ASTA in the UK.  Conducted out-of-country technical inspections and tests for two 1250KVA emergency diesel generators manufactured for the project at Cummins Diesel Generators Factory in the UK.  Participated in out-of-country presentation about Automation Systems Technology’s latest update in the UK  Conducted out-of-country technical inspection for the Gent Fire Alarm factory, the fire alarm system provider in the UK.  Commissioned and handed over electrical systems to the consultant and the client. Accomplishments  Completed electrical construction and power supply to the project 30 days ahead of scheduled time  Reduced material cost by 15% and manpower cost by 25% AL-Sager General Trading & Cont. Company - Kuwait Jan 1997- July 2002 Senior Electrical Engineer Responsibilities  Managed new electrical design and construction division  Reviewed and quoted government and private tenders including design drawings, technical specifications and bill of quantities  Communicated with electrical material suppliers and equipment manufacturers  Negotiated subcontract agreements and purchase orders for electrical materials Accomplishments  Established, organized and managed new electrical construction division of 2 electrical engineers, 4 supervisors and 30 electricians  Reduced cost of procurement of electrical materials by 20%  Saved 15% of the cost of electrical systems Page 2 of 4
  • 3. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave. Bsc. Electrical Engineering Edmonton, AB, T5X 0B3 Mobile No. (780) 906-0565 hkaibrahim@gmail.com ALNuhoodh Establishment. - Kuwait Oct 1988- Dec 1996 Senior Electrical Engineer Responsibilities  Designed electrical drawings for oil & gas, industrial, commercial and residential projects:  Al-Shuaiba petrochemical refinery expansion  Petrochemical Industry Complex integration  Construction of 10 numbers petrol stations at Mina-Abdulla oil industrial area  Americana meat processing factory expansion  Ebomac, switchgear manufacturer extension  The power distribution of new warehouses in Sabhan industrial area  Chemical detergents and cleaning products factory  Shamia and Shuwaikh Co-op Society new supermarket  Commercial high rise building at Kuwait city  Managed construction and procurement of electrical works for a variety of projects  Coordinated workshop electrical drawings with other construction trades  Inspected and approved diverse range of projects by signing the MEW (ministry of electricity & water) inspection report as per the MEW standards:  Rawda & Hawalli cooperation society supermarket  Kuwait Hilton Resort Hotel at Mangaf area  East Hadia area major sewage stations power distribution system  Kuwait Coast Guard Headquarters at Salmia area  Conducted electrical insulation, short circuit and earthing conductivity tests  Consulted for different engineering firms, as a certified MEW electrical engineer for different projects:  The new shrimp factory and cold stores at Shuwaikh  Shamia and Shuwaikh Co-op Society new supermarket  Power distribution of Hadia housing infrastructure  Americana meat processing factory expansion A.H.AL-Sagar &Bros. - Kuwait Aug 1985- Sept 1988 Electrical Project Engineer Responsibilities  Managed the construction of the power distribution network of the new 300 KV, 132 KV and 33 KV substations of new developed housing project including over-head transmission lines and high-voltage underground cables  Surveyed the new overhead-transmission lines and underground cable routes and coordinated them with the other services routes to avoid any overlap of services  Coordinated the design drawings with international suppliers of switch-gear, cables and overhead-transmission lines like Hitachi, Alsthome, Siemens, Mitsubishi, ABB, NKF, Fujicura…, and modified the design drawings as per MEW standards  Commissioned, energized and tested the power distribution network and handed over the network to the client. Accomplishments  Completed and handed over my first contract # MEW 1379/83-84 on time on budget  Saved 25 days of my second contract # MEW 1501/84 and managed to save the man- hours cost by approximately10% after modifying the work breakdown structure Fawaz Refr. & A/C CO. - Kuwait Sept 1984- Aug 1985 Trainee Electrical Engineer Responsibilities Page 3 of 4
  • 4. Husam Ibrahim, P.Eng, PMP. 11821, 167B Ave. Bsc. Electrical Engineering Edmonton, AB, T5X 0B3 Mobile No. (780) 906-0565 hkaibrahim@gmail.com  Reviewed the design drawings of a high rise building of two towers (Fintas Towers MEP project) each of which powered by 11KV/0.415KV substation of 7numbers 750 KVA transformers  Prepared the As-Built drawings and followed up with the Ministry of Electricity &Water (MEW) for final approval and inspection  Conducted the MEW inspection of the electrical installations to permit energizing the two substations  Commissioned the electrical substations, switch-gears, bus-duct and all electrical systems PROFESSIONAL AFFILIATIONS  Association of Professional Engineers, Geologists and Geophysicists of Alberta (APEGGA), Canada, P.Eng # M 94835  Project Management Professional – PMP NO. 1325785  Ministry of Electricity & Water ( Kuwait) License of Certified Electrical Engineer  Kuwait Society of Engineers  Jordan Syndicate of Engineers EDUCATION Bachelor of Electrical Engineering Kuwait University 1984 Page 4 of 4