CONCEPT, DESIGN & CONSTRUCTION
PRE ENGINEERED STEEL
BUILDINGS
PRE ENGINEERED BUILDINGSPRE ENGINEERED BUILDINGS
 The buildings are design as per
client’s requirement & actual
design calculations using tapered
sections.
 A combination of built up section,
hot rolled section, cold formed
elements and profiled sheets
 Designing and casting is done in
factory
 Building components are brought
to site
 Then fixed/jointed at the site
 All connections are bolted.
 Steel was very expensive item in USA
 The concept of PEB originate from here.
 The idea was that section should be provided as per B.M.D.
 This lead to the saving in steel and development of PEB
concept.
BRIEF HISTORYBRIEF HISTORY
APPLICATIONS
 Industrial Buildings
 Warehouses
 Commercial Complexes
 Showrooms
 Offices
 Schools
 Indoor Stadiums
 Outdoor Stadiums with canopies
 Gas Stations
 Metro Stations, Bus Terminals, Parking Lots
 Primary Health Centers, Angan wadi’s
 And many more…
Industrial Building
Parking lotsParking lots
Indoor StadiumsIndoor Stadiums
Railway StationRailway Station
Aircraft Hangars Metro StationMetro Station
Wear HouseWear House High Rise BuildingHigh Rise Building
ADVANTAGES
 Aesthetic Appeal
 Faster Completion
 Economical
 Seismic Resistance
 Ease of Expansion
 Maintenance Free
 Large Clear Spans
 Controlled Quality
 Hassle Free
 Self weight
 30% lighter
 Primary Member is tapered
section
 Secondary members are light
weight rolled framed “Z”
and “C” section
 Self weight
 More heavy
 Primary members are Hot
rolled “I” section
 Secondary members are “I”
or “C” section which are
heavy in weight.
 Delivery – average 6 to 8
weeks
 Foundation-simple design,
easy to construct & light wt.
 Erection cost and time-
accurately known
 Erection process is easy, fast,
step by step
 Delivery- average 20 to 26
weeks
 Foundation- expensive,
heavy foundation required.
 Erection cost and time- 20%
more than PEB
 Erection process is slow and
extensive field labor is
required.
 Seismic Resistance- low
weight flexible frames offer
higher resistance to seismic
forces
 Overall price -30%lower
 architecture-achieved at low
cast
 Seismic Resistance- rigid
heavy weight structures do
not perform well in seismic
zones
 Overall price - Higher Price
per square meter.
 Architecture- achieved at
higher cost
COMPONENTS
 MAIN FRAME
 PRIMARY MEMBERS (Main Frame)
Columns
Rafters
 SECONDARY MEMBERS
Purlins
Girts
 SHEETINGSHEETING
 RoofRoof
 WallWall
 Fascias etcFascias etc
 AccessoriesAccessories
 VentilatorsVentilators
 Sky LightsSky Lights
 Misc.Misc.
OTHER MAJOR COMPONENTS OF
PEB
CRANE BRACKETS &
BEAMS
MEZZANINE FLOORS
STRUCTURAL
PARTIONS
FASCIAS CANOPIES
Load 1
X
Y
Z
PRE-ENGINEERED BUILDINGS NOMENCLATURE –
STANDARD FRAMING SYSTEMS
TCCS = TAPERED COLUMN CLEAR SPAN
Load 1
X
Y
Z
TCMS-1 TAPERED COLUMN MULTI-SPAN WITH 1 INTERMEDIATE COLUMN.
Load 1
SSCS = SINGLE SLOPE CLEAR SPAN.
Load 1
X
Y
Z
SSMS-1= SINGLE SLOPE MULTI-SPAN WITH 1 INTERMEDIATE COLUMN
GUIDELINES FOR PEB DESIGN AT
PROPOSAL STAGE
 All Designs Shall Be As Per MBMA [Metal Building
Manufacturer Association] &Client Specifies As Per Is
Code.
 Live load as Per American Code = 0.57 KN/M2
and as
Per IS Code = 0.75 KN/M2
. (Reduction in live load to be
incorporated for buildings having higher slopes)
 As Per American Code :Horizontal Deflection = L/180 &
Vertical Deflection = eh/100 For Main Frames.
 Wind terrain category 3 is to be selected unless more data
is available.
 In American Design , Wind Coefficients To Be Followed As
Given In MBMA.
 In Is Design, Internal & External Building Wind Coefficients
As Per Is -875 (Part-3).
 Generally Buildings Are To Be Designed As Pinned Except
For Building Span >30m Or Crane Capacity Of More Than 5
Tons Or Height Greater Than 9 M
 Standard Purlin Laps Should Be 385 mm
design codes generally used:
AISC : American institute of steel construction manual
AISI : American iron and steel institute specifications
MBMA : Metal building manufacturer’s code
ANSI : American national standards institute
specifications
ASCE : American society of civil engineers
UBC : Uniform building code
IS: Indian standards
Equivalent to Indian standard
IS 800: For design of structural steel
IS 800-2007: For design of structural steel by LSM
IS 801: For design of cold formed section
IS 875: For calculation of load
STRUCTURAL DESIGN PROCESS
LOOP
OPTIMAL STRUCTURAL DESIGN
ANALYSIS :-
1.Dead load calculations
2.Live load calculations
3.Wind load calculations
LOAD COMBINATIONS :-
A. 1.5(DL + LL)
B. 1.5(DL + WL)
PLOT THE MAXIMUM SFD AND BMD OF THE MEMBERS :-
DESIGNING :-
1.Design of the primary members
2.Design of connection plate
3.Purline Design
4.Girt Design
5.Base Plate
6.Anchor Bolt design for Moment Condition
7.Anchor Bolt design for Shear Condition
8.Cranes Design
DESIGN STEPS
Optimisation of frame
 Basic Frame
• Width of the frame = 16 M
• Height of the frame = 8 M
• Length of the frame = 35 M
• Wind speed V = 43 M/S
• Bay spacing L = 7 M
• Slop of roof I= 1:10
• Seismic zone = 4
LOAD COMBINATION:- 1.5(DL + LL)
LOAD COMBINATION:- 1.5(DL + LL)
1 2
3 4
LOAD COMBINATION:- 1.5(DL + WL)
LOAD COMBINATION:- 1.5(DL + WL)
1
22
2
43
DESIGN RESULT : BY LIMIT STATE
METHOD
DESIGN RESULT: BY WORKING STATE
METHOD
•USING SAME SECTION THAT USED IN LIMIT STATE
METHOD
DESIGN RESULT : BY WORKING STATE
METHOD
ERECTION SYSTEM
 Understanding The Engineering Documents.
1. Anchor Bolt Setting Plan
2. Cross section
3. Roof framing plan
4. Roof sheeting & framing
5. Sidewall sheeting & framing
6. Other drawings
7. Bill of materials
 Preparation for Erection
1. Pre Erection checks
2. Receiving Materials at site
3. Unloading Containers
 Erection of the Framing
1. Preparation of the First Bay
2. Main frames
3. Mezzanine floors
4. Crane Beams
Sheeting & Trimming
 Sheeting preparation
 Sheeting the walls
 Sheeting the roofs
 Miscellaneous trimmings
 Fascia
Peb structures (1)
Peb structures (1)

Contenu connexe

Tendances

DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PROAli Meer
 
Industrial building
Industrial buildingIndustrial building
Industrial buildingtausif_k
 
My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)Abhilash Chandra Dey
 
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)Suman Sau
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildingsYamini K
 
Design and analysis of reinforced concrete multistory commercial building usi...
Design and analysis of reinforced concrete multistory commercial building usi...Design and analysis of reinforced concrete multistory commercial building usi...
Design and analysis of reinforced concrete multistory commercial building usi...Estisharaat Company
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
Design basis report on-14.11.2016
Design basis report  on-14.11.2016Design basis report  on-14.11.2016
Design basis report on-14.11.2016bhavesh raysoni
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Pratik R. Atwal
 
Analysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.ProAnalysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.Progsharda123
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs Godfrey James
 
Types of Gravitational Loads And Forces
Types of Gravitational Loads And ForcesTypes of Gravitational Loads And Forces
Types of Gravitational Loads And ForcesManvinder Kingra
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab designSatish Narayan
 

Tendances (20)

DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
Industrial building
Industrial buildingIndustrial building
Industrial building
 
My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)
 
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Etabs tutorial
Etabs tutorialEtabs tutorial
Etabs tutorial
 
Design and analysis of reinforced concrete multistory commercial building usi...
Design and analysis of reinforced concrete multistory commercial building usi...Design and analysis of reinforced concrete multistory commercial building usi...
Design and analysis of reinforced concrete multistory commercial building usi...
 
Footing design
Footing designFooting design
Footing design
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Design basis report on-14.11.2016
Design basis report  on-14.11.2016Design basis report  on-14.11.2016
Design basis report on-14.11.2016
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...
 
Analysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.ProAnalysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.Pro
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Types of Gravitational Loads And Forces
Types of Gravitational Loads And ForcesTypes of Gravitational Loads And Forces
Types of Gravitational Loads And Forces
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Design of steel beams
Design of steel beamsDesign of steel beams
Design of steel beams
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
 
Peb
PebPeb
Peb
 

Similaire à Peb structures (1)

115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structureArpan Dixit
 
DSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdfDSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdfSwaraj636170
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...SEO Tech Solution
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...IRJET Journal
 
Harlem Park Building Design Project
Harlem Park Building Design ProjectHarlem Park Building Design Project
Harlem Park Building Design ProjectEd Guerra, P.E.
 
design philosophy in structure design in civil engineering
design philosophy in structure design in civil engineeringdesign philosophy in structure design in civil engineering
design philosophy in structure design in civil engineeringNagma Modi
 
Comparative Study of Conventional Steel Structure and Tubular Steel Structure
Comparative Study of Conventional Steel Structure and Tubular Steel StructureComparative Study of Conventional Steel Structure and Tubular Steel Structure
Comparative Study of Conventional Steel Structure and Tubular Steel StructureIRJET Journal
 
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel StructuresComparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel StructuresIRJET Journal
 
Project 1 - Industrialised Building System
Project 1 - Industrialised Building SystemProject 1 - Industrialised Building System
Project 1 - Industrialised Building Systemhilmanaqil1
 

Similaire à Peb structures (1) (20)

peb ppt.ppt
peb ppt.pptpeb ppt.ppt
peb ppt.ppt
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structure
 
Brochure eb 2017
Brochure eb 2017Brochure eb 2017
Brochure eb 2017
 
DSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdfDSS UNIT 1 Introduction.pdf
DSS UNIT 1 Introduction.pdf
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
 
Lecture 1.pdf steel structure
Lecture 1.pdf steel structureLecture 1.pdf steel structure
Lecture 1.pdf steel structure
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
 
Harlem Park Building Design Project
Harlem Park Building Design ProjectHarlem Park Building Design Project
Harlem Park Building Design Project
 
design philosophy in structure design in civil engineering
design philosophy in structure design in civil engineeringdesign philosophy in structure design in civil engineering
design philosophy in structure design in civil engineering
 
Comparative Study of Conventional Steel Structure and Tubular Steel Structure
Comparative Study of Conventional Steel Structure and Tubular Steel StructureComparative Study of Conventional Steel Structure and Tubular Steel Structure
Comparative Study of Conventional Steel Structure and Tubular Steel Structure
 
Lect1
Lect1Lect1
Lect1
 
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel StructuresComparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
 
Wilshire Grand Redevelopment Project
Wilshire Grand Redevelopment ProjectWilshire Grand Redevelopment Project
Wilshire Grand Redevelopment Project
 
Dbr kashmiri gate
Dbr kashmiri gateDbr kashmiri gate
Dbr kashmiri gate
 
Project
ProjectProject
Project
 
Project 1 - Industrialised Building System
Project 1 - Industrialised Building SystemProject 1 - Industrialised Building System
Project 1 - Industrialised Building System
 

Plus de hlksd

Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a dayhlksd
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayhlksd
 
Reasonskills
ReasonskillsReasonskills
Reasonskillshlksd
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillshlksd
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayhlksd
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skillshlksd
 
Tuladhar
TuladharTuladhar
Tuladharhlksd
 
Standard specifications
Standard specificationsStandard specifications
Standard specificationshlksd
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comhlksd
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62hlksd
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildingshlksd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building constructionhlksd
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteelhlksd
 
As22267272
As22267272As22267272
As22267272hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildingshlksd
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-buildinghlksd
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-buildinghlksd
 

Plus de hlksd (20)

Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a day
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a day
 
Reasonskills
ReasonskillsReasonskills
Reasonskills
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskills
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a day
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skills
 
Tuladhar
TuladharTuladhar
Tuladhar
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.com
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildings
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
 
Peb
PebPeb
Peb
 
As22267272
As22267272As22267272
As22267272
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildings
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 

Peb structures (1)

  • 1. PRE ENGINEERED STEEL BUILDINGS BY manohar reddy sreenivasa rao Narendra kumar Kiran babu Phanindra Rajeev and soundarya amara institute of engg and tech
  • 2. CONCEPT, DESIGN & CONSTRUCTION PRE ENGINEERED STEEL BUILDINGS
  • 3. PRE ENGINEERED BUILDINGSPRE ENGINEERED BUILDINGS  The buildings are design as per client’s requirement & actual design calculations using tapered sections.  A combination of built up section, hot rolled section, cold formed elements and profiled sheets  Designing and casting is done in factory  Building components are brought to site  Then fixed/jointed at the site  All connections are bolted.
  • 4.  Steel was very expensive item in USA  The concept of PEB originate from here.  The idea was that section should be provided as per B.M.D.  This lead to the saving in steel and development of PEB concept. BRIEF HISTORYBRIEF HISTORY
  • 5. APPLICATIONS  Industrial Buildings  Warehouses  Commercial Complexes  Showrooms  Offices  Schools  Indoor Stadiums  Outdoor Stadiums with canopies  Gas Stations  Metro Stations, Bus Terminals, Parking Lots  Primary Health Centers, Angan wadi’s  And many more…
  • 6. Industrial Building Parking lotsParking lots Indoor StadiumsIndoor Stadiums Railway StationRailway Station
  • 7. Aircraft Hangars Metro StationMetro Station Wear HouseWear House High Rise BuildingHigh Rise Building
  • 8. ADVANTAGES  Aesthetic Appeal  Faster Completion  Economical  Seismic Resistance  Ease of Expansion  Maintenance Free  Large Clear Spans  Controlled Quality  Hassle Free
  • 9.  Self weight  30% lighter  Primary Member is tapered section  Secondary members are light weight rolled framed “Z” and “C” section  Self weight  More heavy  Primary members are Hot rolled “I” section  Secondary members are “I” or “C” section which are heavy in weight.
  • 10.  Delivery – average 6 to 8 weeks  Foundation-simple design, easy to construct & light wt.  Erection cost and time- accurately known  Erection process is easy, fast, step by step  Delivery- average 20 to 26 weeks  Foundation- expensive, heavy foundation required.  Erection cost and time- 20% more than PEB  Erection process is slow and extensive field labor is required.
  • 11.  Seismic Resistance- low weight flexible frames offer higher resistance to seismic forces  Overall price -30%lower  architecture-achieved at low cast  Seismic Resistance- rigid heavy weight structures do not perform well in seismic zones  Overall price - Higher Price per square meter.  Architecture- achieved at higher cost
  • 12. COMPONENTS  MAIN FRAME  PRIMARY MEMBERS (Main Frame) Columns Rafters  SECONDARY MEMBERS Purlins Girts  SHEETINGSHEETING  RoofRoof  WallWall  Fascias etcFascias etc  AccessoriesAccessories  VentilatorsVentilators  Sky LightsSky Lights  Misc.Misc.
  • 13.
  • 14. OTHER MAJOR COMPONENTS OF PEB CRANE BRACKETS & BEAMS MEZZANINE FLOORS STRUCTURAL PARTIONS FASCIAS CANOPIES
  • 15. Load 1 X Y Z PRE-ENGINEERED BUILDINGS NOMENCLATURE – STANDARD FRAMING SYSTEMS TCCS = TAPERED COLUMN CLEAR SPAN Load 1 X Y Z TCMS-1 TAPERED COLUMN MULTI-SPAN WITH 1 INTERMEDIATE COLUMN.
  • 16. Load 1 SSCS = SINGLE SLOPE CLEAR SPAN. Load 1 X Y Z SSMS-1= SINGLE SLOPE MULTI-SPAN WITH 1 INTERMEDIATE COLUMN
  • 17. GUIDELINES FOR PEB DESIGN AT PROPOSAL STAGE  All Designs Shall Be As Per MBMA [Metal Building Manufacturer Association] &Client Specifies As Per Is Code.  Live load as Per American Code = 0.57 KN/M2 and as Per IS Code = 0.75 KN/M2 . (Reduction in live load to be incorporated for buildings having higher slopes)  As Per American Code :Horizontal Deflection = L/180 & Vertical Deflection = eh/100 For Main Frames.  Wind terrain category 3 is to be selected unless more data is available.
  • 18.  In American Design , Wind Coefficients To Be Followed As Given In MBMA.  In Is Design, Internal & External Building Wind Coefficients As Per Is -875 (Part-3).  Generally Buildings Are To Be Designed As Pinned Except For Building Span >30m Or Crane Capacity Of More Than 5 Tons Or Height Greater Than 9 M  Standard Purlin Laps Should Be 385 mm
  • 19. design codes generally used: AISC : American institute of steel construction manual AISI : American iron and steel institute specifications MBMA : Metal building manufacturer’s code ANSI : American national standards institute specifications ASCE : American society of civil engineers UBC : Uniform building code IS: Indian standards
  • 20. Equivalent to Indian standard IS 800: For design of structural steel IS 800-2007: For design of structural steel by LSM IS 801: For design of cold formed section IS 875: For calculation of load
  • 23. ANALYSIS :- 1.Dead load calculations 2.Live load calculations 3.Wind load calculations LOAD COMBINATIONS :- A. 1.5(DL + LL) B. 1.5(DL + WL) PLOT THE MAXIMUM SFD AND BMD OF THE MEMBERS :- DESIGNING :- 1.Design of the primary members 2.Design of connection plate 3.Purline Design 4.Girt Design 5.Base Plate 6.Anchor Bolt design for Moment Condition 7.Anchor Bolt design for Shear Condition 8.Cranes Design DESIGN STEPS
  • 24. Optimisation of frame  Basic Frame • Width of the frame = 16 M • Height of the frame = 8 M • Length of the frame = 35 M • Wind speed V = 43 M/S • Bay spacing L = 7 M • Slop of roof I= 1:10 • Seismic zone = 4
  • 26. LOAD COMBINATION:- 1.5(DL + LL) 1 2 3 4
  • 28. LOAD COMBINATION:- 1.5(DL + WL) 1 22 2 43
  • 29. DESIGN RESULT : BY LIMIT STATE METHOD
  • 30. DESIGN RESULT: BY WORKING STATE METHOD •USING SAME SECTION THAT USED IN LIMIT STATE METHOD
  • 31. DESIGN RESULT : BY WORKING STATE METHOD
  • 32. ERECTION SYSTEM  Understanding The Engineering Documents. 1. Anchor Bolt Setting Plan 2. Cross section 3. Roof framing plan 4. Roof sheeting & framing 5. Sidewall sheeting & framing 6. Other drawings 7. Bill of materials
  • 33.  Preparation for Erection 1. Pre Erection checks 2. Receiving Materials at site 3. Unloading Containers  Erection of the Framing 1. Preparation of the First Bay 2. Main frames 3. Mezzanine floors 4. Crane Beams
  • 34. Sheeting & Trimming  Sheeting preparation  Sheeting the walls  Sheeting the roofs  Miscellaneous trimmings  Fascia