SlideShare une entreprise Scribd logo
1  sur  13
BU HASA
                                                  1     2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18
          Phase 1                                 0/1
                                                 -100

1     SYSTEM ANALYSIS
1.1     Analyzing User Needs                    #REF!
1.2     Complete Problem Design                 #REF!
1.3     Presentation of the System Design       #REF!
2     SPECIFICATION AND DESIGN
2.1     Definition of format and type of data   #REF!
2.2     Design of the user screen               #REF!
2.3     Definition of input data                #REF!
2.4     Definition of output data               #REF!
2.5     Definition of the methods to be used    #REF!
3     PROGRAM
3.1     Preparing the documents                 #REF!
3.2     Improving code readibility              #REF!
4     ALPHA TEST
4.1     Testing user needs                      #REF!
4.2     Bug Fixation                            #REF!
5     BETA TEST
5.1     Carry out Beta tests                    #REF!
5.2     Bug Fixation                            #REF!
6
19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36



                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
                                                                                          1   ##   ##
1   ## ##
Follow the steps to enable your online Gannt Chart(To Do List).
1)   Type the name of the project:
                          BU HASA
2)   Enter the planned beginning and ending date of the project:
         Beginning:                                       Ending:                                 Duration:


3)   Select the time unit that you want to display your project progress. There are 36 columns available. Hence if the necessary number o
     your project will be divided into phases (at most 5).


              Days              Weeks          Months               Quarters          Years

     0 page(s) is necessary for displaying your project.
4)   Type the number of main items of the project and the number of sub items of them. Total number of items need not exceed 30.
     Number of Main Items:                 1          2         3        4        5       6


           Main Item Nb.         Number of Sub Items                 Total number of 20 rows.
                1                          3
                2                          5
                3                          2
                4                          2
                5                          2
                6


5)   Type the project item descriptions that you want to keep track of (fill only the white cells):
              Description
     1        System Analysis
     1.1      Analyzing User Needs
     1.2      Complete Problem Design
     1.3      Presentation of the System Design
     2        Specification and Design
     2.1      Definition of format and type of data
     2.2      Design of the user screen
     2.3      Definition of input data
     2.4      Definition of output data
     2.5      Definition of the methods to be used
     3        Program
     3.1      Preparing the documents
     3.2      Improving code readibility
     4        Alpha Test
     4.1      Testing user needs
     4.2      Bug Fixation
     5        Beta Test
     5.1      Carry out Beta tests
     5.2      Bug Fixation
6




>>   Your Gannt Chart (To Do List) is ready to use, further steps are for online use.
6)   Visit the site below:
     http://www.spreadsheetweb.com/getting_started.htm
     You will only need the username and password to create your online Gannt Chart (To Do List).
7)   Visit the site below:
     https://www4.spreadsheetweb.com/SpreadsheetWEB//
     Login to page with your new account information.
8)   Click "Add Web Application" to upload this file. Your online Gannt Chart (To Do List) will be created automatically.
     You can simply use the Gannt Chart (To Do List) from that link or place it on your website.
>>   Your online Gannt Chart (To Do List) will look like:
     http://www1.spreadsheetweb.com/SpreadSheetWEB/Output.aspx?ApplicationId=539ed3b9-a1fe-4ac7-bfd0-bdda9a7eaa20
>>   In order to see more online applications created with PSW you can check the link below:
     http://www.spreadsheetweb.com/demos.htm




     Copyright (c) 2009 Pagos, Inc., http://www.pagos.com/
nce if the necessary number of columns exceeds 36 columns,




tems need not exceed 30.




                 Beginning Date         Ending Date


                   4/4/2009             4/14/2009            Excludes project timeline.
                  4/12/2009             4/17/2009            Excludes project timeline.
                  4/18/2009             4/20/2009            Excludes project timeline.


                  4/22/2009             5/10/2009            Excludes project timeline.
                  4/27/2009              5/9/2009            Excludes project timeline.
                   5/1/2009              5/4/2009            Excludes project timeline.
                   5/5/2009             5/15/2009            Excludes project timeline.
                  5/10/2009             5/17/2009            Excludes project timeline.


                  5/16/2009             6/1/2009             Excludes project timeline.
                  5/27/2009             6/3/2009             Excludes project timeline.


                   6/6/2009             6/10/2009            Excludes project timeline.
                   6/9/2009             6/21/2009            Excludes project timeline.


                  6/23/2009             6/29/2009            Excludes project timeline.
                  6/25/2009              7/7/2009            Excludes project timeline.
7-bfd0-bdda9a7eaa20
1




                                             nb       sheet
               0          36 Days                 0       0                Phase 1   1
             37       252 Weeks                   0       0                Phase 2   2
   2        253      1080 Months                  0       0                Phase 3   3
####       1081      3240 Quarters                0       0                Phase 4   4
           3241 131400 Years                      0       0                Phase 5   5


  6




       1                   1             3                1
       2   FALSE           1             5                5
       3   FALSE           1             2               11
       4   FALSE           1             2               14
       5   FALSE           1             2               17
       6   FALSE           1             0               20


                   Main        Sub           Main Sub         Main


               1    TRUE         FALSE            1       0      1 FALSE
               2 FALSE           TRUE             0       1      1 FALSE
               3 FALSE           TRUE             0       2      1 FALSE
               4 FALSE           TRUE             0       3      1 FALSE
               5    TRUE         FALSE            2       0      2 FALSE
               6 FALSE           TRUE             0       1      2 FALSE
               7 FALSE           TRUE             0       2      2 FALSE
               8 FALSE           TRUE             0       3      2 FALSE
               9 FALSE           TRUE             0       4      2 FALSE
             10 FALSE            TRUE             0       5      2 FALSE
             11     TRUE         FALSE            3       0      3 FALSE
             12 FALSE            TRUE             0       1      3 FALSE
             13 FALSE            TRUE             0       2      3 FALSE
             14     TRUE         FALSE            4       0      4 FALSE
             15 FALSE            TRUE             0       1      4 FALSE
             16 FALSE            TRUE             0       2      4 FALSE
             17     TRUE         FALSE            5       0      5 FALSE
             18 FALSE            TRUE             0       1      5 FALSE
             19 FALSE            TRUE             0       2      5 FALSE
20   TRUE   FALSE   6   0   6 FALSE
21 FALSE    FALSE   0   0   6 TRUE
22 FALSE    FALSE   0   0   6 TRUE
23 FALSE    FALSE   0   0   6 TRUE
24 FALSE    FALSE   0   0   6 TRUE
25 FALSE    FALSE   0   0   6 TRUE
26 FALSE    FALSE   0   0   6 TRUE
27 FALSE    FALSE   0   0   6 TRUE
28 FALSE    FALSE   0   0   6 TRUE
29 FALSE    FALSE   0   0   6 TRUE
30 FALSE    FALSE   0   0   6 TRUE
████

     1     2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17
1 #####
2
3
4
5
18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36

Contenu connexe

En vedette (6)

TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
Gantt Charts
Gantt ChartsGantt Charts
Gantt Charts
 
Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chart
 
Swot analysis
Swot analysisSwot analysis
Swot analysis
 

Similaire à Gannt chart (to do list)

Gannt chart (to do list)
Gannt chart (to do list)Gannt chart (to do list)
Gannt chart (to do list)Confidential
 
Copy of gannt chart (to do list)
Copy of gannt chart (to do list)Copy of gannt chart (to do list)
Copy of gannt chart (to do list)Confidential
 
On the Value of User Preferences in Search-Based Software Engineering:
On the Value of User Preferences in Search-Based Software Engineering: On the Value of User Preferences in Search-Based Software Engineering:
On the Value of User Preferences in Search-Based Software Engineering: CS, NcState
 
كن فعال الكترونيا
كن فعال الكترونياكن فعال الكترونيا
كن فعال الكترونياNahedh Alharbi
 
Antiinflamatoriosesteroideos
AntiinflamatoriosesteroideosAntiinflamatoriosesteroideos
AntiinflamatoriosesteroideosMario Lopez
 
Analytical Social CRM
Analytical Social CRMAnalytical Social CRM
Analytical Social CRMLutz Finger
 
Analytical CRM - Lutz Finger, Fisheye Analytics
Analytical CRM - Lutz Finger, Fisheye AnalyticsAnalytical CRM - Lutz Finger, Fisheye Analytics
Analytical CRM - Lutz Finger, Fisheye AnalyticsOur Social Times
 
Waterfall(cross zero)
Waterfall(cross zero)Waterfall(cross zero)
Waterfall(cross zero)Dick Lam
 
Effective Public Education Programmes for Digital Migration
Effective Public Education Programmes for Digital MigrationEffective Public Education Programmes for Digital Migration
Effective Public Education Programmes for Digital MigrationBSP Media Group
 
Mind powertechniques
Mind powertechniquesMind powertechniques
Mind powertechniquesConfidential
 
A mathematical model and a heuristic memory allocation problem
A mathematical model and a heuristic memory allocation problemA mathematical model and a heuristic memory allocation problem
A mathematical model and a heuristic memory allocation problemDiego Montero
 
Royal Ten Cate: Faster, cheaper and better than the market thinks
Royal Ten Cate: Faster, cheaper and better than the market thinksRoyal Ten Cate: Faster, cheaper and better than the market thinks
Royal Ten Cate: Faster, cheaper and better than the market thinksGert Steens
 
Game on! Designing for a Playful Future
Game on! Designing for a Playful FutureGame on! Designing for a Playful Future
Game on! Designing for a Playful FutureDr. Marigo Raftopoulos
 

Similaire à Gannt chart (to do list) (20)

Gannt chart (to do list)
Gannt chart (to do list)Gannt chart (to do list)
Gannt chart (to do list)
 
Copy of gannt chart (to do list)
Copy of gannt chart (to do list)Copy of gannt chart (to do list)
Copy of gannt chart (to do list)
 
On the Value of User Preferences in Search-Based Software Engineering:
On the Value of User Preferences in Search-Based Software Engineering: On the Value of User Preferences in Search-Based Software Engineering:
On the Value of User Preferences in Search-Based Software Engineering:
 
كن فعال الكترونيا
كن فعال الكترونياكن فعال الكترونيا
كن فعال الكترونيا
 
Politiska Riktlinjer Final
Politiska Riktlinjer FinalPolitiska Riktlinjer Final
Politiska Riktlinjer Final
 
Xirrus Corporate Brochure
Xirrus Corporate BrochureXirrus Corporate Brochure
Xirrus Corporate Brochure
 
Antiinflamatoriosesteroideos
AntiinflamatoriosesteroideosAntiinflamatoriosesteroideos
Antiinflamatoriosesteroideos
 
Analytical Social CRM
Analytical Social CRMAnalytical Social CRM
Analytical Social CRM
 
Analytical CRM - Lutz Finger, Fisheye Analytics
Analytical CRM - Lutz Finger, Fisheye AnalyticsAnalytical CRM - Lutz Finger, Fisheye Analytics
Analytical CRM - Lutz Finger, Fisheye Analytics
 
Waterfall(cross zero)
Waterfall(cross zero)Waterfall(cross zero)
Waterfall(cross zero)
 
Effective Public Education Programmes for Digital Migration
Effective Public Education Programmes for Digital MigrationEffective Public Education Programmes for Digital Migration
Effective Public Education Programmes for Digital Migration
 
Hawaii Pacific GIS Conference 2012: GIS for Environmental, Community and Publ...
Hawaii Pacific GIS Conference 2012: GIS for Environmental, Community and Publ...Hawaii Pacific GIS Conference 2012: GIS for Environmental, Community and Publ...
Hawaii Pacific GIS Conference 2012: GIS for Environmental, Community and Publ...
 
Tgcmlog
TgcmlogTgcmlog
Tgcmlog
 
Mind powertechniques
Mind powertechniquesMind powertechniques
Mind powertechniques
 
A mathematical model and a heuristic memory allocation problem
A mathematical model and a heuristic memory allocation problemA mathematical model and a heuristic memory allocation problem
A mathematical model and a heuristic memory allocation problem
 
Royal Ten Cate: Faster, cheaper and better than the market thinks
Royal Ten Cate: Faster, cheaper and better than the market thinksRoyal Ten Cate: Faster, cheaper and better than the market thinks
Royal Ten Cate: Faster, cheaper and better than the market thinks
 
Muhammed (PBUH) The Greatest
Muhammed (PBUH) The GreatestMuhammed (PBUH) The Greatest
Muhammed (PBUH) The Greatest
 
Game on! Designing for a Playful Future
Game on! Designing for a Playful FutureGame on! Designing for a Playful Future
Game on! Designing for a Playful Future
 
Ipconfig.all
Ipconfig.allIpconfig.all
Ipconfig.all
 
Play claw
Play clawPlay claw
Play claw
 

Plus de Confidential

Wisdom for-managers
Wisdom for-managersWisdom for-managers
Wisdom for-managersConfidential
 
Hossam hussein revised final draft 3
Hossam hussein revised final draft 3Hossam hussein revised final draft 3
Hossam hussein revised final draft 3Confidential
 
I095456 acceptance certificate (1)
I095456 acceptance certificate (1)I095456 acceptance certificate (1)
I095456 acceptance certificate (1)Confidential
 
I095456 acceptance certificate
I095456 acceptance certificate I095456 acceptance certificate
I095456 acceptance certificate Confidential
 
Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Confidential
 
Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Confidential
 
Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Confidential
 
Recession reformation
Recession reformationRecession reformation
Recession reformationConfidential
 
101 powerfulwaystousethelawofattraction (1)
101 powerfulwaystousethelawofattraction (1)101 powerfulwaystousethelawofattraction (1)
101 powerfulwaystousethelawofattraction (1)Confidential
 
4 leadership messages your talent needs to hear forbes
4 leadership messages your talent needs to hear   forbes4 leadership messages your talent needs to hear   forbes
4 leadership messages your talent needs to hear forbesConfidential
 
Job interview mistakes 2
Job interview mistakes  2Job interview mistakes  2
Job interview mistakes 2Confidential
 
Job interview mistakes 1
Job interview mistakes 1Job interview mistakes 1
Job interview mistakes 1Confidential
 
Wisdom for-managers
Wisdom for-managersWisdom for-managers
Wisdom for-managersConfidential
 
Finding jobs through craigslist
Finding jobs through craigslistFinding jobs through craigslist
Finding jobs through craigslistConfidential
 
Acquire power through self development
Acquire power through self developmentAcquire power through self development
Acquire power through self developmentConfidential
 
25 simple-strategies-to-boost-your-creativity (1)
25 simple-strategies-to-boost-your-creativity (1)25 simple-strategies-to-boost-your-creativity (1)
25 simple-strategies-to-boost-your-creativity (1)Confidential
 
Start a local produce business
Start a local produce businessStart a local produce business
Start a local produce businessConfidential
 
How to start a green housecleaning business
How to start a green housecleaning businessHow to start a green housecleaning business
How to start a green housecleaning businessConfidential
 

Plus de Confidential (20)

Wisdom for-managers
Wisdom for-managersWisdom for-managers
Wisdom for-managers
 
Hossam hussein revised final draft 3
Hossam hussein revised final draft 3Hossam hussein revised final draft 3
Hossam hussein revised final draft 3
 
I095456 acceptance certificate (1)
I095456 acceptance certificate (1)I095456 acceptance certificate (1)
I095456 acceptance certificate (1)
 
I095456 acceptance certificate
I095456 acceptance certificate I095456 acceptance certificate
I095456 acceptance certificate
 
Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)
 
Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)
 
Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)Certified NLP Practitioner ( UAE)
Certified NLP Practitioner ( UAE)
 
Recession reformation
Recession reformationRecession reformation
Recession reformation
 
101 powerfulwaystousethelawofattraction (1)
101 powerfulwaystousethelawofattraction (1)101 powerfulwaystousethelawofattraction (1)
101 powerfulwaystousethelawofattraction (1)
 
4 leadership messages your talent needs to hear forbes
4 leadership messages your talent needs to hear   forbes4 leadership messages your talent needs to hear   forbes
4 leadership messages your talent needs to hear forbes
 
Job interview mistakes 2
Job interview mistakes  2Job interview mistakes  2
Job interview mistakes 2
 
Job interview mistakes 1
Job interview mistakes 1Job interview mistakes 1
Job interview mistakes 1
 
Achieving self
Achieving selfAchieving self
Achieving self
 
Skills summary
Skills summarySkills summary
Skills summary
 
Wisdom for-managers
Wisdom for-managersWisdom for-managers
Wisdom for-managers
 
Finding jobs through craigslist
Finding jobs through craigslistFinding jobs through craigslist
Finding jobs through craigslist
 
Acquire power through self development
Acquire power through self developmentAcquire power through self development
Acquire power through self development
 
25 simple-strategies-to-boost-your-creativity (1)
25 simple-strategies-to-boost-your-creativity (1)25 simple-strategies-to-boost-your-creativity (1)
25 simple-strategies-to-boost-your-creativity (1)
 
Start a local produce business
Start a local produce businessStart a local produce business
Start a local produce business
 
How to start a green housecleaning business
How to start a green housecleaning businessHow to start a green housecleaning business
How to start a green housecleaning business
 

Gannt chart (to do list)

  • 1. BU HASA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Phase 1 0/1 -100 1 SYSTEM ANALYSIS 1.1 Analyzing User Needs #REF! 1.2 Complete Problem Design #REF! 1.3 Presentation of the System Design #REF! 2 SPECIFICATION AND DESIGN 2.1 Definition of format and type of data #REF! 2.2 Design of the user screen #REF! 2.3 Definition of input data #REF! 2.4 Definition of output data #REF! 2.5 Definition of the methods to be used #REF! 3 PROGRAM 3.1 Preparing the documents #REF! 3.2 Improving code readibility #REF! 4 ALPHA TEST 4.1 Testing user needs #REF! 4.2 Bug Fixation #REF! 5 BETA TEST 5.1 Carry out Beta tests #REF! 5.2 Bug Fixation #REF! 6
  • 2.
  • 3. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ## 1 ## ##
  • 4. 1 ## ##
  • 5. Follow the steps to enable your online Gannt Chart(To Do List). 1) Type the name of the project: BU HASA 2) Enter the planned beginning and ending date of the project: Beginning: Ending: Duration: 3) Select the time unit that you want to display your project progress. There are 36 columns available. Hence if the necessary number o your project will be divided into phases (at most 5). Days Weeks Months Quarters Years 0 page(s) is necessary for displaying your project. 4) Type the number of main items of the project and the number of sub items of them. Total number of items need not exceed 30. Number of Main Items: 1 2 3 4 5 6 Main Item Nb. Number of Sub Items Total number of 20 rows. 1 3 2 5 3 2 4 2 5 2 6 5) Type the project item descriptions that you want to keep track of (fill only the white cells): Description 1 System Analysis 1.1 Analyzing User Needs 1.2 Complete Problem Design 1.3 Presentation of the System Design 2 Specification and Design 2.1 Definition of format and type of data 2.2 Design of the user screen 2.3 Definition of input data 2.4 Definition of output data 2.5 Definition of the methods to be used 3 Program 3.1 Preparing the documents 3.2 Improving code readibility 4 Alpha Test 4.1 Testing user needs 4.2 Bug Fixation 5 Beta Test 5.1 Carry out Beta tests 5.2 Bug Fixation
  • 6. 6 >> Your Gannt Chart (To Do List) is ready to use, further steps are for online use. 6) Visit the site below: http://www.spreadsheetweb.com/getting_started.htm You will only need the username and password to create your online Gannt Chart (To Do List). 7) Visit the site below: https://www4.spreadsheetweb.com/SpreadsheetWEB// Login to page with your new account information. 8) Click "Add Web Application" to upload this file. Your online Gannt Chart (To Do List) will be created automatically. You can simply use the Gannt Chart (To Do List) from that link or place it on your website. >> Your online Gannt Chart (To Do List) will look like: http://www1.spreadsheetweb.com/SpreadSheetWEB/Output.aspx?ApplicationId=539ed3b9-a1fe-4ac7-bfd0-bdda9a7eaa20 >> In order to see more online applications created with PSW you can check the link below: http://www.spreadsheetweb.com/demos.htm Copyright (c) 2009 Pagos, Inc., http://www.pagos.com/
  • 7. nce if the necessary number of columns exceeds 36 columns, tems need not exceed 30. Beginning Date Ending Date 4/4/2009 4/14/2009 Excludes project timeline. 4/12/2009 4/17/2009 Excludes project timeline. 4/18/2009 4/20/2009 Excludes project timeline. 4/22/2009 5/10/2009 Excludes project timeline. 4/27/2009 5/9/2009 Excludes project timeline. 5/1/2009 5/4/2009 Excludes project timeline. 5/5/2009 5/15/2009 Excludes project timeline. 5/10/2009 5/17/2009 Excludes project timeline. 5/16/2009 6/1/2009 Excludes project timeline. 5/27/2009 6/3/2009 Excludes project timeline. 6/6/2009 6/10/2009 Excludes project timeline. 6/9/2009 6/21/2009 Excludes project timeline. 6/23/2009 6/29/2009 Excludes project timeline. 6/25/2009 7/7/2009 Excludes project timeline.
  • 9. 1 nb sheet 0 36 Days 0 0 Phase 1 1 37 252 Weeks 0 0 Phase 2 2 2 253 1080 Months 0 0 Phase 3 3 #### 1081 3240 Quarters 0 0 Phase 4 4 3241 131400 Years 0 0 Phase 5 5 6 1 1 3 1 2 FALSE 1 5 5 3 FALSE 1 2 11 4 FALSE 1 2 14 5 FALSE 1 2 17 6 FALSE 1 0 20 Main Sub Main Sub Main 1 TRUE FALSE 1 0 1 FALSE 2 FALSE TRUE 0 1 1 FALSE 3 FALSE TRUE 0 2 1 FALSE 4 FALSE TRUE 0 3 1 FALSE 5 TRUE FALSE 2 0 2 FALSE 6 FALSE TRUE 0 1 2 FALSE 7 FALSE TRUE 0 2 2 FALSE 8 FALSE TRUE 0 3 2 FALSE 9 FALSE TRUE 0 4 2 FALSE 10 FALSE TRUE 0 5 2 FALSE 11 TRUE FALSE 3 0 3 FALSE 12 FALSE TRUE 0 1 3 FALSE 13 FALSE TRUE 0 2 3 FALSE 14 TRUE FALSE 4 0 4 FALSE 15 FALSE TRUE 0 1 4 FALSE 16 FALSE TRUE 0 2 4 FALSE 17 TRUE FALSE 5 0 5 FALSE 18 FALSE TRUE 0 1 5 FALSE 19 FALSE TRUE 0 2 5 FALSE
  • 10. 20 TRUE FALSE 6 0 6 FALSE 21 FALSE FALSE 0 0 6 TRUE 22 FALSE FALSE 0 0 6 TRUE 23 FALSE FALSE 0 0 6 TRUE 24 FALSE FALSE 0 0 6 TRUE 25 FALSE FALSE 0 0 6 TRUE 26 FALSE FALSE 0 0 6 TRUE 27 FALSE FALSE 0 0 6 TRUE 28 FALSE FALSE 0 0 6 TRUE 29 FALSE FALSE 0 0 6 TRUE 30 FALSE FALSE 0 0 6 TRUE
  • 11. ████ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 ##### 2 3 4 5
  • 12.
  • 13. 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36