CONSTRUCTIVE COST MODEL TOOLS
Dr/ Mohamed Shams
Hossam El_Din Mohamed Nabih Abd El_Gawad
What COCOMO Model?
-It is short for CONSTRUCTIVE COST
MODEL
-technique that use to estimate the cost
of projects
-part of algorithmic cost model
-Depends on size of our project
COCOMO MODELS
Advanced
Intermedi
ate
Basic
Basic
Smaller projects
Team size is small
Cost drivers upon to
project size
Intermediate
medium sized
projects
Cost drivers depend
upon product
reliability, database
size, execution and
storage
Team size is medium
Advanced
large sized projects
cost drivers depend
upon requirements,
analysis, design,
testing and
maintenance
Team size is large
More about Basic COCOMO
Effort
E = a *
(KDSI) b
* EAF
schedule
S= c * (E) d
*KDSI is number of thousands of delivered source instructions a and b
are constants, may vary depending on size of the project
*E is the Effort and c, d are constants.
EAF is called Effort Adjustment Factor which is 1 for basic cocomo ,
this value may vary from 1 to 15
COCOMO LIMTATION (Disadvantages)
not suitable for non-sequential ,rapid development,
reengineering ,reuse cases models
any changes in the requirements are not accommodated for
calculation of cost of the project
is not a perfect realistic model
COCOMO II (what and why )
-It could overcome the limitations of calculating the costs
for non-sequential, rapid development, reengineering
and reuse models of software.
-It has 3 modules
-Application composition: - good for projects with GUI
interface for rapid development of project.
-Early design: - Prepare a rough picture of what is to be
designed. Done before the architecture is designed.
-Post architecture: - Prepared after the architecture has
been designed.
Calculation COCOMO II
 In COCOMO II the constant value b is
replaced by 5 scale factors.
 Effort (E) is calculated as follows
E = a * (KDSI) sf * π (EM)
 Where a is constant, sf is scaling
factor, EM is Effort Multiplier
(7 for Early
design, 17 for Post architecture).
Using COCOMO II
Establishes the cost and
schedule of the project under
development, this provides a
plan for the project
Provides a more reliable
cost and schedule, hence
the risk mitigation is easy to
accomplish
It overcomes the problem of
reengineering and reuse of
software modules
Develops a process at each
level . Hence takes care of
the capability maturity
model.
Advantages
Tools examples
The tools we use in most are
depend on these models
COCOMO II and COCOMO models
We can try
- SystemStar is a systems engineering
estimation tool based on the
Constructive Systems Engineering Cost
Model (COSYSMO) developed by
Dr. Ricardo Valerdi
- COCOMO II version 2000.3 : This
software was developed by the Center for
Software Engineering at the
University of Southern California (USC).
-there are many other tools

Contenu connexe

Tendances

COCOMO Model in software project management
COCOMO Model in software project managementCOCOMO Model in software project management
COCOMO Model in software project managementSyed Hassan Ali
 
Cost estimation using cocomo model
Cost estimation using cocomo modelCost estimation using cocomo model
Cost estimation using cocomo modelNitesh Bichwani
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)MuskanSony
 
software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo modelREHMAT ULLAH
 
COCOMO model | How to calculate effort, staffing and Duration of Project
COCOMO model | How to calculate effort, staffing and Duration of ProjectCOCOMO model | How to calculate effort, staffing and Duration of Project
COCOMO model | How to calculate effort, staffing and Duration of ProjectNavjyotsinh Jadeja
 
Software estimation
Software estimationSoftware estimation
Software estimationMd Shakir
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)AmanSharma1172
 
Effort estimation( software Engineering)
Effort estimation( software Engineering)Effort estimation( software Engineering)
Effort estimation( software Engineering)kiran Patel
 

Tendances (20)

COCOMO Model in software project management
COCOMO Model in software project managementCOCOMO Model in software project management
COCOMO Model in software project management
 
COCOMO MODEL 1 And 2
COCOMO MODEL 1 And 2COCOMO MODEL 1 And 2
COCOMO MODEL 1 And 2
 
Cost estimation using cocomo model
Cost estimation using cocomo modelCost estimation using cocomo model
Cost estimation using cocomo model
 
Cocomo models
Cocomo modelsCocomo models
Cocomo models
 
COCOMO model
COCOMO modelCOCOMO model
COCOMO model
 
COCOMO Model By Dr. B. J. Mohite
COCOMO Model By Dr. B. J. MohiteCOCOMO Model By Dr. B. J. Mohite
COCOMO Model By Dr. B. J. Mohite
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)
 
Cocomo
CocomoCocomo
Cocomo
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo model
 
COCOMO model | How to calculate effort, staffing and Duration of Project
COCOMO model | How to calculate effort, staffing and Duration of ProjectCOCOMO model | How to calculate effort, staffing and Duration of Project
COCOMO model | How to calculate effort, staffing and Duration of Project
 
Cocomo
CocomoCocomo
Cocomo
 
COCOMO MODEL
COCOMO MODELCOCOMO MODEL
COCOMO MODEL
 
Cocomomodel
CocomomodelCocomomodel
Cocomomodel
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)
 
Effort estimation( software Engineering)
Effort estimation( software Engineering)Effort estimation( software Engineering)
Effort estimation( software Engineering)
 
Aa03101540158
Aa03101540158Aa03101540158
Aa03101540158
 

En vedette

งานคอมจ้า1111111112222946427943497
งานคอมจ้า1111111112222946427943497งานคอมจ้า1111111112222946427943497
งานคอมจ้า1111111112222946427943497Iceeci Flatron
 
งานคู่ 13 16
งานคู่ 13 16งานคู่ 13 16
งานคู่ 13 16'Fixation Tar
 
Sistem pemerintahan beraja mutlak di perancis_penggal 1 STPM
Sistem pemerintahan beraja mutlak di perancis_penggal 1 STPMSistem pemerintahan beraja mutlak di perancis_penggal 1 STPM
Sistem pemerintahan beraja mutlak di perancis_penggal 1 STPMCatherine Inggai
 
AW 学び続ける力 スライド
AW 学び続ける力 スライドAW 学び続ける力 スライド
AW 学び続ける力 スライド聡 中川
 
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์แบบเสนอโครงร่างโครงงานคอมพิวเตอร์
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์'Fixation Tar
 
Desfile enscoop 2011
Desfile enscoop 2011Desfile enscoop 2011
Desfile enscoop 2011AgostinaBerni
 
先端技術 データサイエンティスト
先端技術 データサイエンティスト先端技術 データサイエンティスト
先端技術 データサイエンティスト聡 中川
 
ประว ต ส_วนต_ว (1)
ประว ต ส_วนต_ว (1)ประว ต ส_วนต_ว (1)
ประว ต ส_วนต_ว (1)'Fixation Tar
 

En vedette (20)

Nataly jarrin
Nataly jarrinNataly jarrin
Nataly jarrin
 
Test 1
Test 1Test 1
Test 1
 
Gat2
Gat2Gat2
Gat2
 
งานคอมจ้า1111111112222946427943497
งานคอมจ้า1111111112222946427943497งานคอมจ้า1111111112222946427943497
งานคอมจ้า1111111112222946427943497
 
великая эпоха читателю
великая эпоха   читателювеликая эпоха   читателю
великая эпоха читателю
 
Desfile
DesfileDesfile
Desfile
 
งานคู่ 13 16
งานคู่ 13 16งานคู่ 13 16
งานคู่ 13 16
 
Nataly jarrin
Nataly jarrinNataly jarrin
Nataly jarrin
 
Sistem pemerintahan beraja mutlak di perancis_penggal 1 STPM
Sistem pemerintahan beraja mutlak di perancis_penggal 1 STPMSistem pemerintahan beraja mutlak di perancis_penggal 1 STPM
Sistem pemerintahan beraja mutlak di perancis_penggal 1 STPM
 
Engels cricket
Engels cricketEngels cricket
Engels cricket
 
A conversation
A conversationA conversation
A conversation
 
AW 学び続ける力 スライド
AW 学び続ける力 スライドAW 学び続ける力 スライド
AW 学び続ける力 スライド
 
Quotes
QuotesQuotes
Quotes
 
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์แบบเสนอโครงร่างโครงงานคอมพิวเตอร์
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์
 
Desfile enscoop 2011
Desfile enscoop 2011Desfile enscoop 2011
Desfile enscoop 2011
 
Android part1
Android part1Android part1
Android part1
 
ปี2552
ปี2552ปี2552
ปี2552
 
先端技術 データサイエンティスト
先端技術 データサイエンティスト先端技術 データサイエンティスト
先端技術 データサイエンティスト
 
Brillen en lenzen
Brillen en lenzenBrillen en lenzen
Brillen en lenzen
 
ประว ต ส_วนต_ว (1)
ประว ต ส_วนต_ว (1)ประว ต ส_วนต_ว (1)
ประว ต ส_วนต_ว (1)
 

Similaire à CONSTRUCTIVE COST MODEL TOOLS

COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimationPramod Parajuli
 
Algorithmic Software Cost Estimation V2(1) (1).pptx
Algorithmic Software Cost Estimation V2(1) (1).pptxAlgorithmic Software Cost Estimation V2(1) (1).pptx
Algorithmic Software Cost Estimation V2(1) (1).pptxsadeepaJayatissa1
 
Cocomo ( cot constrictive model) and capability maturity model
Cocomo ( cot constrictive model) and capability maturity modelCocomo ( cot constrictive model) and capability maturity model
Cocomo ( cot constrictive model) and capability maturity modelPrakash Poudel
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5SIMONTHOMAS S
 
Estimation techniques and risk management
Estimation techniques and risk managementEstimation techniques and risk management
Estimation techniques and risk managementPurushottam Basnet
 
Software Project Planning 1
Software Project Planning 1Software Project Planning 1
Software Project Planning 1Gagan Deep
 
Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxYagnaGummadi
 
cocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdfcocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdfssuser2d043c
 
2.6 Empirical estimation models & The make-buy decision.ppt
2.6 Empirical estimation models & The make-buy decision.ppt2.6 Empirical estimation models & The make-buy decision.ppt
2.6 Empirical estimation models & The make-buy decision.pptTHARUNS44
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewCisco
 

Similaire à CONSTRUCTIVE COST MODEL TOOLS (20)

COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimation
 
1sqa25.pptx
1sqa25.pptx1sqa25.pptx
1sqa25.pptx
 
cocomo.pptx
cocomo.pptxcocomo.pptx
cocomo.pptx
 
Algorithmic Software Cost Estimation V2(1) (1).pptx
Algorithmic Software Cost Estimation V2(1) (1).pptxAlgorithmic Software Cost Estimation V2(1) (1).pptx
Algorithmic Software Cost Estimation V2(1) (1).pptx
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
Cocomo ( cot constrictive model) and capability maturity model
Cocomo ( cot constrictive model) and capability maturity modelCocomo ( cot constrictive model) and capability maturity model
Cocomo ( cot constrictive model) and capability maturity model
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5
 
Case study(i)
Case study(i)Case study(i)
Case study(i)
 
Cost estamition
Cost estamitionCost estamition
Cost estamition
 
Cocomo pooja jadhav
Cocomo pooja jadhavCocomo pooja jadhav
Cocomo pooja jadhav
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
cocomo.pdf
cocomo.pdfcocomo.pdf
cocomo.pdf
 
Estimation techniques and risk management
Estimation techniques and risk managementEstimation techniques and risk management
Estimation techniques and risk management
 
Software Project Planning 1
Software Project Planning 1Software Project Planning 1
Software Project Planning 1
 
Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptx
 
COCOMO (Software Engineering)
COCOMO (Software Engineering)COCOMO (Software Engineering)
COCOMO (Software Engineering)
 
cocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdfcocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdf
 
cost-estimation-tutorial
cost-estimation-tutorialcost-estimation-tutorial
cost-estimation-tutorial
 
2.6 Empirical estimation models & The make-buy decision.ppt
2.6 Empirical estimation models & The make-buy decision.ppt2.6 Empirical estimation models & The make-buy decision.ppt
2.6 Empirical estimation models & The make-buy decision.ppt
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product Overview
 

Dernier

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Dernier (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

CONSTRUCTIVE COST MODEL TOOLS

  • 1. CONSTRUCTIVE COST MODEL TOOLS Dr/ Mohamed Shams Hossam El_Din Mohamed Nabih Abd El_Gawad
  • 2. What COCOMO Model? -It is short for CONSTRUCTIVE COST MODEL -technique that use to estimate the cost of projects -part of algorithmic cost model -Depends on size of our project
  • 4. Basic Smaller projects Team size is small Cost drivers upon to project size Intermediate medium sized projects Cost drivers depend upon product reliability, database size, execution and storage Team size is medium Advanced large sized projects cost drivers depend upon requirements, analysis, design, testing and maintenance Team size is large
  • 5. More about Basic COCOMO Effort E = a * (KDSI) b * EAF schedule S= c * (E) d *KDSI is number of thousands of delivered source instructions a and b are constants, may vary depending on size of the project *E is the Effort and c, d are constants. EAF is called Effort Adjustment Factor which is 1 for basic cocomo , this value may vary from 1 to 15
  • 6. COCOMO LIMTATION (Disadvantages) not suitable for non-sequential ,rapid development, reengineering ,reuse cases models any changes in the requirements are not accommodated for calculation of cost of the project is not a perfect realistic model
  • 7. COCOMO II (what and why ) -It could overcome the limitations of calculating the costs for non-sequential, rapid development, reengineering and reuse models of software. -It has 3 modules -Application composition: - good for projects with GUI interface for rapid development of project. -Early design: - Prepare a rough picture of what is to be designed. Done before the architecture is designed. -Post architecture: - Prepared after the architecture has been designed.
  • 8. Calculation COCOMO II  In COCOMO II the constant value b is replaced by 5 scale factors.  Effort (E) is calculated as follows E = a * (KDSI) sf * π (EM)  Where a is constant, sf is scaling factor, EM is Effort Multiplier (7 for Early design, 17 for Post architecture).
  • 9. Using COCOMO II Establishes the cost and schedule of the project under development, this provides a plan for the project Provides a more reliable cost and schedule, hence the risk mitigation is easy to accomplish It overcomes the problem of reengineering and reuse of software modules Develops a process at each level . Hence takes care of the capability maturity model. Advantages
  • 10. Tools examples The tools we use in most are depend on these models COCOMO II and COCOMO models We can try - SystemStar is a systems engineering estimation tool based on the Constructive Systems Engineering Cost Model (COSYSMO) developed by Dr. Ricardo Valerdi - COCOMO II version 2000.3 : This software was developed by the Center for Software Engineering at the University of Southern California (USC). -there are many other tools