12/01/2015 | Thomas W. Overton, JD
With low gas prices and renewable generation boosting demand and capacity
factors for combined cycle plants, plant operators are being called upon to
squeeze out every last megawatt from their systems. Fortunately, there have
never been more ways to do it. Here are some you may not have thought of.
Gas-fired power is booming—even more than expected. For only the second
time ever, but also the second time this year, gas generated more electricity in a
month in the U.S. than coal. According to statistics from the Energy
Information Administration (EIA), in July 2015 coal generated 139 TWh, while
natural gas generated 140 TWh. Those statistics are a stark break from 2014,
when coal produced 150 TWh and gas was responsible for only 114 TWh.
While coal remained in the lead with a 34.5%-to-31.1% advantage in the power
mix through July, those numbers represent a fairly substantial departure from
EIA predictions. In its Annual Energy Outlook this year, the EIA predicted gas
would reach a 31% share—in 2040.
With gas-fired plants being called upon to shoulder an ever-growing share of
the power mix, plant owners are looking for more and better ways to squeeze
extra performance out of their equipment, without breaking the bank.
While gas turbine manufacturers such as GE, Siemens, and Mitsubishi-Hitachi
Power Systems offer a selection of upgrade packages to improve performance,
these kinds of choices are both expensive and require significant down time.
For plants that are not in the position to undertake costly outages and upgrades,
and those newer plants already operating state-of-the-art equipment, there are
still some ways to tweak out a few extra kilowatts.
Clean-Up Time
Jeff Fassett of IEM Energy Consultants, who spoke to POWER in October,
recommended that plant operators think first about cleanliness.
Fassett pointed out that a substantial portion of a turbine’s energy is used by the
compressor, which means dirty compressor blades can have a serious effect on
efficiency. “When the blades are dirty, the airflow is more turbulent, and that
will degrade performance.”
Of course, the importance of maintaining inlet filters and keeping intake air
clean isn’t a novel idea. Poor-quality inlet air can also lead to blade erosion and
corrosion of turbine components, both of which will hurt efficiency. One
problem is that the effects of poor-quality air are cumulative: Though cleaning
can address blade fouling to some extent, restoring original turbine
performance is typically not possible—and erosion can only be addressed by
replacement. Thus, it behooves turbine operators to keep air quality as high as
possible from initial startup.
But Fassett said the solution he recommends isn’t one operators often take:
Swapping out standard ASHRAE filters for HEPA-rated filters.
“The common approach is just changing the filters more often,” he said, “but
this doesn’t get to the root problem,” which is that lower-rated filters allow
more particulate matter into the turbine and that everything getting into the
compressor that doesn’t belong there degrades both short-term and long-term
performance.
Fassett has worked with plant managers to upgrade their turbine filters, which
usually involves a retrofit, depending on the configuration of the filter house.
A number of companies currently market gas turbine HEPA filters. Louisville,
Ky.–based AAF, which has supplied HEPA filters for more than 50 F-class
turbines worldwide, estimates that using these filters can recover 6% of the
power output normally lost to engine fouling. With HEPA filters, time between
turbine cleaning cycles can be at least 8,000 hours (Figure 1). Though the use
of HEPA filters results in a larger pressure differential, the initial power loss is
more than compensated for by substantially increased cleanliness and reduced
downtime.
1. Clean sweep. The differences in turbine blade fouling from operating with
different filters can be dramatic. The left photo shows turbine blades after 8,000
hours with a HEPA filter; the right photo, after 2,000 hours with a standard
filter. Courtesy: AAF International
Bill Lovejoy, chief engineer for engineering services firm NAES, concurred on
the importance of maintaining cleanliness, not just because of impact on the
turbine blades but also because of the effects dirty filters will have on
performance.
“It can catch up to you over time, and you are really hurting yourself. You pay
for that pressure drop in your overall efficiency.”
Operational Adjustments
Another performance element Fassett recommends that operators think about is
the low-load setpoints on their gas turbines—not just because of effects on the
gas turbine but also the downstream effects on the steam turbine.
“When the steam turbine is operating at low loads, you can exhaust the thermal
energy before the steam reaches the final stages and get condensation. That can
cause erosion of the turbine blades.”
Fassett said low-load setpoints for the gas turbines need to consider effects not
just on the turbines themselves but also on the rest of the plant.
Other efficiency losses can be found and eliminated by thinking about ways
energy may be escaping the system.
“One site we worked with has an auxiliary boiler and is using it to keep vacuum
on the steam turbine generator,” Fassett said. “All excess steam is being piped
to the heat-recovery steam generator (HRSG) to keep the boilers warm, so hot
restarts are minimized.” Another relatively simple tweak is installing heat
blankets to insulate the steam turbine, which cuts down on cold restarts, he said.
Aftermarket Add-Ons
In addition to relatively simple tweaks, there are more sophisticated aftermarket
tuning solutions that can be added to existing plants.
EthosEnergy has marketed its ECOMAX automated combustion tuning system
for several years. ECOMAX is designed to address performance instabilities
that can result from manual tuning to maintain emissions compliance,
particularly for NOx. Operating with lean premixed flames in the combustor
keeps NOx low but can cause instability in combustion dynamics, which can
damage turbine components over time. These instabilities are exacerbated by
large ambient temperature swings—common in many areas where gas is a
major element of the power mix, such as the U.S. Southwest and West Coast—
as well as by fuel quality and instrument drift. When the operating envelope
strays outside the optimized range, performance will suffer and emissions can
fall out of compliance.
Using real-time monitoring of combustion and emissions, the ECOMAX
system automatically tunes combustion to keep the turbine within the optimized
operational envelope (Figure 2). ECOMAX can communicate directly with the
turbine or integrate with the plant’s digital control system.
2. Autopilot. The ECOMAX automated combustion tuning system is capable
of monitoring a range of key turbine operating parameters and keeping output
within a specified range to avoid emissions problems and to maintain peak
performance. Courtesy: EthosEnergy
ECOMAX can also be used to boost performance, as necessary, with the
addition of the Tru-Curve option, which raises the baseload fuel-air ratio while
still controlling emissions and combustion dynamics. Tru-Curve can be turned
on and off as desired.
EthosEnergy says the ECOMAX Tru-Curve package can improve heat rate by
0.20% to 0.25% and boost power output by up to 11 MW, depending on the
size of the plant.
Another, more outside-the-box upgrade is the Turbophase compressed air
peaking power system. Offered by Jupiter, Fla.–based Powerphase, the
Turbophase unit uses a separate reciprocating engine to add additional
compression to the turbine air inlet, without the use of steam or water injection,
which can cause operational issues. Powerphase says this system allows faster
peaking response than existing options, allowing 10% to 20% additional
peaking power capability and up to 7% heat rate improvement, depending on
the model of turbine.
Low-Load Combined Cycle Operation
Combined cycle plants often do not operate in combined cycle mode at low
loads because the system is optimized for baseload operation, and improper
optimization can result in damage to the heat recovery steam generator, as well
as emissions violations. However, giving up the ability to operate at low loads
can mean lost revenue.
Many of the newest models of combined cycle plants are designed for load
following and low-load operation, but with the right approach, some older
plants can optimize their operations for low-load generation as well. The
Electric Power Research Institute (EPRI) recently conducted a proprietary
study determining the best ways to optimize combined cycle operation at a
plant using GE 7FA turbines. Though proper optimization procedures will vary
from plant to plant and depend on operational profiles, the EPRI study found
that a tradeoff between lower exhaust gas temperature and higher exhaust flow
would allow lower-load operation without damage to the HRSG and without
causing NOx emissions to spike.
Making it work requires careful monitoring of NOx and CO emission levels,
combustion dynamics, attemperator performance, main steam-line superheater
level, and inlet-guide vane position, in order to determine the minimum
generation load at the lowest possible turbi0ne-exhaust temperature.
Though there are trade-offs with nearly any performance enhancement, plant
operators have more options these days than ever.
— Thomas W. Overton, JD is a POWER associate editor.
Quickly Boost Your Combustion Turbine
Response
10/01/2014 | Dr. Robert Peltier, PE
Morris Cogeneration, a combined cycle cogeneration plant near Chicago, has
installed TurboPHASE, a fast-responding, modular “turbocharger” installed to
boost capacity and PJM regulation revenue. How does it perform?
Twice this year, PJM flirted with blackouts when brutal winter storms (dubbed
a polar vortex) struck the Eastern U.S. in January. The cold weather set a new
winter peak demand record of 141,500 MW on Jan. 7, busting the record set in
February 2007 by nearly 5,000 MW. In fact, the five biggest demands ever
placed on the PJM grid, and eight of the 10 largest, occurred between Jan. 7 and
Jan. 30. PJM reported that at one point, 36,000 MW was out of service due to
forced outages, which amounts to 20% of its installed capacity. Adam Keech,
director of wholesale market operations, is reported by RTO Insider as saying—
the morning after setting the winter peak record—“We really exhausted every
megawatt we had on the system.” Peaking capacity and fast unit response is a
necessity during summer and winter peaks, and many regional transmission
organizations (RTOs) are willing to pay well for the service.
A solid majority of new plant construction in PJM is gas fired, led by simple or
combined cycle plants. Simple cycle combustion turbine (CT) plants are less
efficient than combined cycle plants but are able to start more rapidly and add
valuable power to the grid in minutes, which is extremely valuable to a system
like PJM as synchronized reserve, fast grid regulation, or black start service. In
fact, ancillary service payments often justify the cost of constructing a simple
cycle peaking plant.
A New Option
Jupiter, Florida–based PowerPhase LLC has successfully demonstrated a new
technology called TurboPHASE that may allow an existing simple cycle CT or
combined cycle plant to add as much as 10% to 20% more power to the grid in
seconds, depending on plant configuration, addressing the quick-start and fast-
response needs of the modern grid.
The TurboPHASE system consists of a multistage intercooled centrifugal
compressor that delivers hot compressed air to the CT’s compressor discharge
section, thereby allowing the CT to operate at its rated capacity irrespective of
the ambient conditions (5C to 50C) or altitude (Figure 1). The system takes
advantage of the CT operating below its limits during hot weather much like an
inlet chiller or evaporative cooling system, although TurboPHASE can also
operate in conjunction with either of those inlet cooling options.
1. Turbocharging combustion turbines. TurboPHASE consists of four main components:
engine, gearbox, compressor, and recuperator. A gas-fired engine-compressor set
produces compressed air that is added to the combustion turbine’s compressor discharge
section to negate the effect of a high ambient temperature performance derate.
Courtesy: PowerPhase LLC
A separately fueled reciprocating engine direct drives the compressor. The heat
from the exhaust of the engine is used to heat the compressed air in the
recuperator before entering the CT compressor section. On an operating CT,
TurboPHASE is said to be able to ramp to full load in 60 seconds or less and
from part load to full load in 10 seconds or less. This design feature is sure to
be of interest to grid dispatchers anxious to have the ability to quickly backfill
lost capacity during a system emergency or to quickly respond to the
intermittency of renewable resources.
Field Tests Completed
Two prototype TurboPHASE modules (TPMs) were tested in August, and the
data and test results were provided to POWER on an exclusive basis. The tests
were conducted at Atlantic Power Corp.’s Morris Cogeneration Plant (Morris),
located just outside Chicago (Figure 2). The gas-fired 177-MW combined cycle
facility is located within the Equistar Chemicals petrochemical plant in Morris,
Ill. All of the steam (after passing through a steam turbine) and a portion of the
electricity produced by the plant is sold to Equistar, and the remainder of the
power is sold into the PJM West market. Morris is configured with three gas-
fired General Electric Frame 6B CTs, each with a heat-recovery steam
generator (HRSG).
2. Demonstration plant. Two TurboPHASE modules (TPMs) were installed at
Atlantic Power Corp.’s Morris Cogeneration Plant (lower left of photo) and
were recently performance tested. The TPMs each added over 3 MW of quick
response capacity to a Frame 6B combustion turbine and steam turbine system.
Courtesy: PowerPhase LLC
PowerPhase engineers ran a series of predictive performance models using
ThermoFlow in advance of the field tests. The models predicted that the CT
full-load performance would increase ~2.63 MW and the steam turbine by
~0.43 MW, for a total power increase of ~3.06 MW. The cost of the increased
output is the additional fuel burned by the CT (~10 MMBtu/hr) and the fuel
burned by the engine (~16.3 MMBtu/hr). Therefore, the incremental heat rate
of the unit with one TPM in service was expected to be on the order of 26.3
MMBtu/hr/3.06 MW = 8,650 Btu/kWh.
The demonstration test was conducted in two parts. The first test was designed
to demonstrate the increase in output capacity when using a single TPM. The
second test measured the response or ramping speed of the plant with one or
two TPMs injecting air into the plant’s CT1. Each of the TPMs used at Morris
is powered by MTU 20V4000L32 gas-fired engines, each rated at 2 MW.
Morris is also equipped with inlet chilling and HRSG duct-firing capability, and
both were in operation during the demonstration tests. The tests were conducted
with the CT at full power at an ambient temperature that averaged ~85F. At no
time during the tests were the operating limits of the CT exceeded.
Day One Tests. On the first day of testing, compressed air from TPM2 was
injected into CT1 as the system cycled off and on three times. Data was
collected at one-second intervals and then averaged. CT fuel flow
measurements were taken from plant instruments, and TPM fuel flow was
measured (at the inlet to the engine) at 16.3 MMBtu/hr as expected. TPM air
injection flow rate was measured by an annubar-type flow meter on the main
air header prior to entering the CT. The airflow from each TPM was measured
as 11.5 lb/sec at ~156 psi.
The measured test results at Morris showed that the average CT power boost
was 2.74 MW and that the steam turbine produced an additional 0.32 MW, for
a total power increase of 3.06 MW per TPM, very close to the prediction. As an
additional benefit, the TPM compressor intercoolers produced an average of 1.2
gallons per minute of clean water during the tests.
The second test of the day was measurement of the plant response to a demand
signal. The test procedure was to first ramp up TPM2 to full speed, no load. No
compressed air was produced by TPM2 while the system was idling. When
warmed up, TPM2 was ramped up to 75% load while venting the compressed
air produced to the atmosphere through a vent valve, bypassing the CT.
Simulating receipt of a demand signal with TPM2 at 75% load, the vent valve
was closed and the injection valve was opened, thereby sending compressed air
to the CT compressor discharge. The air injection quickly produced an
incremental power increase of about 1.5 MW, ramping up to ~2 MW when the
vent valve was fully closed and injection valve was fully open. Next, TPM2
was ramped to full power, and the CT responded by producing an increase of
~2.74 MW, with the steam plant power increase following. The test ended with
the load on TPM2 reduced to 75%, followed by opening the vent valve and
closing the air inject valve to the CT. Figure 3 shows the results of the response
testing completed on day one. The TPM was able to add much, although not all,
of the incremental power from the CT within the 60-second goal set by the
company.
3. Day one tests. Results of the first day of TurboPHASE demonstration tests
are illustrated. The blue line represents the temperature at the inlet to the
combustion turbine. The orange line shows the response of the combined cycle
plant to full air injection. Courtesy: PowerPhase LLC
Day Two Tests. The response tests were repeated on the second day of testing
using TPM1. Figure 4 illustrates the data collected during these tests, which
were very consistent with the previous day’s tests.
4. Day two tests. The test results of the second day of TurboPHASE demonstration tests
are illustrated. The last test of the day was with both TurboPHASE systems in operation
followed by a trip of one system. Courtesy: PowerPhase LLC
The second test of the day was to run both TPMs in parallel and inject the
produced compressed air into CT1. The final test simulated an unexpected trip
of a TPM. When the air supply from TPM2 ceased, a check valve in the TPM
prevented reverse flow, and TPM1 continued supplying compressed air to the
CT as expected.
The piping system pressure drop between the TPMs and the CT was ~11 psi
with one TPM operating (flowing 11.5 lb/sec) rising to ~40 psi with two TPMs
operating, so the airflow into the CT was slightly less than double (22 lb/sec).
The pressure drop effect is apparent in Figure 4 where a single TPM produces
~3 MW while two TPMs produce slightly under ~6 MW. A line size increase
from 6 inches to 8 inches would solve this problem, but since Morris doesn’t
anticipate operating the plant in this manner, the cost of the pipe size increase
isn’t justified.
Pluses and Minuses
Before assessing the results of the testing, it’s best to remember that this was
the first full-scale demonstration test of the TurboPHASE and we were privy to
only an overview of the testing and the performance results. That said, we are
still able to reflect on the performance of the system in relation to the important
ancillary services PJM and other RTOs desire: synchronized reserve, fast grid
regulation, and black start service.
Synchronized Reserve. A single TPM consists of a single MTU gas-fired
engine that will produce 2 MW were it fitted with a generator and operated
standalone, which is the obvious competitor to the TurboPHASE system.
Further, according to data on the MTU website, this model gas engine with a
generator operates at a heat rate of ~8,000 Btu/kWh, which is a very efficient
engine, and more efficient than the CT. This class engine, in “hot start
conditions” (usually defined as lubricating oil preheated, engine bearing
prelubricated, and cooling water preheated) can be started and synchronized to
the grid in ~60 seconds or less and reach full load in ~90 to 180 seconds. The
downside is the extra cost of the generator and switchgear.
The 60-second response of the TPM is based on the engine operating at 75%
load with compressed air bypassing the CT. A “start” signal puts the
compressed air into the CT and increased power is achieved in ~60 seconds in
the CT, about 2.75 MW. The capacitance in the HRSG and steam turbine
system brings the remaining ~0.25 MW along well after the 60-second goal.
Although the data provided did not state the time period, the two figures are
suggestive that the time lag is several minutes, as one would expect.
The report suggested that the average incremental heat rate of the TPM (8,650
Btu/kWh predicted) was 8,495 Btu/kWh based on the full ~3 MW power
increase. However, the fuel flow data taken from station instruments showed
significant variation, so it’s best to consider the incremental heat rate as
anecdotal rather than a hard number. Also, for comparison purposes, a more
appropriate incremental heat rate should be based on the CT output alone rather
than the CT plus steam turbine output because of the several-minute time lag of
the steam system.
How does the TurboPHASE stack up against using the same engine in a
standby package for synchronized reserve power? Both packages must be
running, in standby mode, and synchronized to the grid to qualify. However,
the engine-generator can be synchronized, kept at minimum load (lower fuel
consumption), and can take on 2 MW of load within ~30 seconds or so. The
TPM must also be running but held at 75% load in order to add 2.75 MW to the
grid within 60 seconds, but it does so at a higher heat rate than the engine-
generator alone. The economics are very CT and site specific.
Fast Grid Regulation. Once the TurboPHASE is operating, then its response
to rapid changes in grid demand must be considered. Although the specific data
wasn’t available, the TPM response to a step increase in load demand can be
estimated from Figures 3 and 4. The data does confirm that TurboPHASE
responds quickly, with the nearly vertical lines representing the CT response
followed by the slower steam turbine. The data also shows the CT responds in
about 2 to 3 minutes, with the additional steam turbine power available within
10 minutes. The standard PJM response requirement for grid regulation power
is 10 minutes. Regardless, adding the TPM did improve the grid response of the
Morris plant and may allow the plant to move into a grid response category
with a higher payment.
The competitive 2-MW gas-fired engine-generator could also be started,
synchronized, and at maximum load in less than the 10 minutes standard to
supply grid regulation power. But then again, a simple cycle Frame 7FA (227
MW) can start and reach 50% load within 10 minutes and then ramp up at 40
MW/min. Aeroderivative engines start and synchronize even faster.
Black Start Service. The TurboPHASE has the potential to become an
interesting black start option for some utilities with combined cycle plants.
However, it’s difficult to compete with a diesel engine when the weather gets
very cold (see “Prepare Your Gas Plant for Cold Weather Operations” in this
issue), particularly when natural gas supplies are limited for power generation
at some gas plants. The best black start systems will be an independent system
that can supply power to just the critical plant systems needed for restart. On
the other hand, a TPM can be installed in two to three months while a new
engine-generator will likely take six months or longer.
Final Analysis
TurboPHASE has the potential for reinvigorating existing combined cycle or
simple cycle plants with additional peaking capacity, especially during warmer
days when the output of the CT is otherwise limited. The response of the
TurboPHASE, from the limited information we have reviewed, is on the same
order as a gas-fired reciprocating engine. Efficiency leans toward the engine-
generator because the combined cycle plant has a higher heat rate. This balance
point could easily change should the TPM be installed on a more efficient CT,
although there aren’t many that CTs with a heat rate less than 8,000 Btu/kWh
(for example, the 60-Hz 7FA is 8,680 Btu/kWh).
On the other hand, the cost of a TPM is likely less than a bank of centrifugal
chillers and coils that are often used to increase CT power output during warm
weather. Also, since the TPM produces compressed air at 300 psi, the system
can be used on any CT with a compressor discharge pressure of 290 psi or less,
which includes many E-, F-, and G-class CTs and some aeroderivative engines,
assuming there is a suitable open port on the casing at the compressor
discharge.
The response of the TurboPHASE does meet the PJM requirements for grid
regulation power but only when the unit is running and the compressor is
charged and ready to dump compressed air into the CT. A potential owner must
consider the economics of balancing the regulation payments from PJM against
the cost of the TPM and the added fuel costs. Also, it probably goes without
saying that potential adopters must be located within an RTO that has a grid
fast regulation payment scheme.
What do the OEMs think about an owner adding compressed air into the engine
casing for peaking power or fast regulation purposes? General Electric’s GER-
3567H states, “GE [heavy duty] gas turbines are designed to allow up to 5% of
the compressor airflow for steam injection to the combustor and compressor
discharge.” If superheated steam injection is acceptable to GE, as it has been
for over 30 years, then one would expect that compressed air in like mass flow
will also be acceptable. Also, it seems to me that injecting clean compressed air
upstream of the combustor is certainly preferable to wet compression resulting
from the use of evaporative coolers. ■
— Dr. Robert Peltier, PE is POWER’s consulting editor.

Contenu connexe

Tendances

IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha powerAnish Ansari
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power PlantSmile Hossain
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul Hadi Rahmani
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALIMahendra Magre
 
Guru Nanak Dev thermal plant bathinda industrial training by hardeep
Guru Nanak Dev thermal  plant bathinda industrial training by hardeepGuru Nanak Dev thermal  plant bathinda industrial training by hardeep
Guru Nanak Dev thermal plant bathinda industrial training by hardeepHardeep Singh
 
Combined cycle power plant HRSG benefits
Combined cycle power plant HRSG benefitsCombined cycle power plant HRSG benefits
Combined cycle power plant HRSG benefitsMuhammad Kamran
 
Internship presentation1
Internship presentation1Internship presentation1
Internship presentation1Prashu Prakash
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222Ankit Poonia
 
2912471 summer training
2912471 summer training2912471 summer training
2912471 summer trainingDebasish Das
 
Power plant engineering unit 3 notes by Varun Pratap Singh
Power plant engineering unit 3 notes by Varun Pratap SinghPower plant engineering unit 3 notes by Varun Pratap Singh
Power plant engineering unit 3 notes by Varun Pratap SinghVarun Pratap Singh
 
All about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industryAll about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industryAnshul Tripathi
 
Power plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghPower plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghVarun Pratap Singh
 
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Internship report  RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. KayamkulamInternship report  RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. KayamkulamSreesankar Jayasingrajan
 
Combined cycle power project,dholpur
Combined cycle power project,dholpurCombined cycle power project,dholpur
Combined cycle power project,dholpurRajessh Garhwal
 
WASTE HEAT RECOVERY SYSTEM
WASTE HEAT RECOVERY SYSTEMWASTE HEAT RECOVERY SYSTEM
WASTE HEAT RECOVERY SYSTEMrohith30
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power PlantMd. Rimon Mia
 

Tendances (20)

IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha power
 
Adavance Power Plants
Adavance Power PlantsAdavance Power Plants
Adavance Power Plants
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALI
 
Guru Nanak Dev thermal plant bathinda industrial training by hardeep
Guru Nanak Dev thermal  plant bathinda industrial training by hardeepGuru Nanak Dev thermal  plant bathinda industrial training by hardeep
Guru Nanak Dev thermal plant bathinda industrial training by hardeep
 
Combined cycle power plant HRSG benefits
Combined cycle power plant HRSG benefitsCombined cycle power plant HRSG benefits
Combined cycle power plant HRSG benefits
 
Internship presentation1
Internship presentation1Internship presentation1
Internship presentation1
 
Training presentation
Training presentationTraining presentation
Training presentation
 
Thermal powerr plant
Thermal powerr plant  Thermal powerr plant
Thermal powerr plant
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
2912471 summer training
2912471 summer training2912471 summer training
2912471 summer training
 
Power plant engineering unit 3 notes by Varun Pratap Singh
Power plant engineering unit 3 notes by Varun Pratap SinghPower plant engineering unit 3 notes by Varun Pratap Singh
Power plant engineering unit 3 notes by Varun Pratap Singh
 
All about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industryAll about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industry
 
Power plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghPower plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap Singh
 
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Internship report  RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. KayamkulamInternship report  RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
 
Combined cycle power project,dholpur
Combined cycle power project,dholpurCombined cycle power project,dholpur
Combined cycle power project,dholpur
 
WASTE HEAT RECOVERY SYSTEM
WASTE HEAT RECOVERY SYSTEMWASTE HEAT RECOVERY SYSTEM
WASTE HEAT RECOVERY SYSTEM
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 

En vedette

For you $ اصبحت اعشقك واحب عشقي لعشقك
For you   $   اصبحت اعشقك واحب عشقي لعشقكFor you   $   اصبحت اعشقك واحب عشقي لعشقك
For you $ اصبحت اعشقك واحب عشقي لعشقكAhmed Shehata
 
Nase M El Ro7
Nase M El Ro7Nase M El Ro7
Nase M El Ro7al7beb
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlHossam Zein
 
Gas turbine market analysis for abc filters
Gas turbine market analysis for abc filtersGas turbine market analysis for abc filters
Gas turbine market analysis for abc filtersSriju Nair
 
For you señorita true love $ اصبحت اعشقك واحب عشقي لعشقك
For you señorita true love     $   اصبحت اعشقك واحب عشقي لعشقكFor you señorita true love     $   اصبحت اعشقك واحب عشقي لعشقك
For you señorita true love $ اصبحت اعشقك واحب عشقي لعشقكAhmed Shehata
 
حملة قومية: إفصل من أجل مصر
حملة قومية: إفصل من أجل مصرحملة قومية: إفصل من أجل مصر
حملة قومية: إفصل من أجل مصرGizaSystems
 
Optimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for GenerationOptimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for GenerationHossam Zein
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsLinkedIn
 
Designing Teams for Emerging Challenges
Designing Teams for Emerging ChallengesDesigning Teams for Emerging Challenges
Designing Teams for Emerging ChallengesAaron Irizarry
 

En vedette (9)

For you $ اصبحت اعشقك واحب عشقي لعشقك
For you   $   اصبحت اعشقك واحب عشقي لعشقكFor you   $   اصبحت اعشقك واحب عشقي لعشقك
For you $ اصبحت اعشقك واحب عشقي لعشقك
 
Nase M El Ro7
Nase M El Ro7Nase M El Ro7
Nase M El Ro7
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Gas turbine market analysis for abc filters
Gas turbine market analysis for abc filtersGas turbine market analysis for abc filters
Gas turbine market analysis for abc filters
 
For you señorita true love $ اصبحت اعشقك واحب عشقي لعشقك
For you señorita true love     $   اصبحت اعشقك واحب عشقي لعشقكFor you señorita true love     $   اصبحت اعشقك واحب عشقي لعشقك
For you señorita true love $ اصبحت اعشقك واحب عشقي لعشقك
 
حملة قومية: إفصل من أجل مصر
حملة قومية: إفصل من أجل مصرحملة قومية: إفصل من أجل مصر
حملة قومية: إفصل من أجل مصر
 
Optimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for GenerationOptimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for Generation
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving Cars
 
Designing Teams for Emerging Challenges
Designing Teams for Emerging ChallengesDesigning Teams for Emerging Challenges
Designing Teams for Emerging Challenges
 

Similaire à Options for optimizing combined cycle plants

Icetech paper the future of marine propulsion - gas hybrid power plants
Icetech paper   the future of marine propulsion - gas hybrid power plantsIcetech paper   the future of marine propulsion - gas hybrid power plants
Icetech paper the future of marine propulsion - gas hybrid power plantsEdward Eastlack, MSc
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Anurak Atthasit
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET Journal
 
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...IRJET Journal
 
07 ii-gas combined-cycle
07 ii-gas combined-cycle07 ii-gas combined-cycle
07 ii-gas combined-cycleIIT Kanpur
 
96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbinemanojg1990
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalRazin Sazzad Molla
 
IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...
IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...
IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...IRJET Journal
 
Handbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccHandbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccRAULCARDENASHUAMAN
 
ADVANCED INTERNAL COMBUSTION ENGINE RESEARCH
ADVANCED INTERNAL COMBUSTION ENGINE RESEARCHADVANCED INTERNAL COMBUSTION ENGINE RESEARCH
ADVANCED INTERNAL COMBUSTION ENGINE RESEARCHWendy Berg
 
Cogeneration
CogenerationCogeneration
Cogenerationskdass23
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaRazin Sazzad Molla
 
Review on Boiler Control Automation for Sugar Industries
Review on Boiler Control Automation for Sugar IndustriesReview on Boiler Control Automation for Sugar Industries
Review on Boiler Control Automation for Sugar IndustriesIRJET Journal
 
IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...
IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...
IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...IRJET Journal
 
Analysis of Process Parameters to Improve Power Plant Efficiency
Analysis of Process Parameters to Improve Power Plant EfficiencyAnalysis of Process Parameters to Improve Power Plant Efficiency
Analysis of Process Parameters to Improve Power Plant EfficiencyIOSRJMCE
 

Similaire à Options for optimizing combined cycle plants (20)

Gmrc Conf
Gmrc ConfGmrc Conf
Gmrc Conf
 
Icetech paper the future of marine propulsion - gas hybrid power plants
Icetech paper   the future of marine propulsion - gas hybrid power plantsIcetech paper   the future of marine propulsion - gas hybrid power plants
Icetech paper the future of marine propulsion - gas hybrid power plants
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power Plant
 
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
 
07 ii-gas combined-cycle
07 ii-gas combined-cycle07 ii-gas combined-cycle
07 ii-gas combined-cycle
 
96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine
 
1q05 performancemonitoring
1q05 performancemonitoring1q05 performancemonitoring
1q05 performancemonitoring
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine final
 
GE LMS100
GE LMS100 GE LMS100
GE LMS100
 
Wcemc04
Wcemc04Wcemc04
Wcemc04
 
IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...
IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...
IRJET- Performance of Homogeneous Charge Compression Ignition Engine with Euc...
 
Handbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccHandbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calcc
 
ADVANCED INTERNAL COMBUSTION ENGINE RESEARCH
ADVANCED INTERNAL COMBUSTION ENGINE RESEARCHADVANCED INTERNAL COMBUSTION ENGINE RESEARCH
ADVANCED INTERNAL COMBUSTION ENGINE RESEARCH
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad Molla
 
Review on Boiler Control Automation for Sugar Industries
Review on Boiler Control Automation for Sugar IndustriesReview on Boiler Control Automation for Sugar Industries
Review on Boiler Control Automation for Sugar Industries
 
GREEN ENGINE 2
GREEN ENGINE 2GREEN ENGINE 2
GREEN ENGINE 2
 
IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...
IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...
IRJET- Experimentation of Performance and Emission Test in Single Cylinder SI...
 
Analysis of Process Parameters to Improve Power Plant Efficiency
Analysis of Process Parameters to Improve Power Plant EfficiencyAnalysis of Process Parameters to Improve Power Plant Efficiency
Analysis of Process Parameters to Improve Power Plant Efficiency
 

Plus de Hossam Zein

the engins that power the future.
the engins that power the future.the engins that power the future.
the engins that power the future.Hossam Zein
 
01 nuclear energy_overview
01 nuclear energy_overview01 nuclear energy_overview
01 nuclear energy_overviewHossam Zein
 
00 history of_nuclear_fission_short_vers
00 history of_nuclear_fission_short_vers00 history of_nuclear_fission_short_vers
00 history of_nuclear_fission_short_versHossam Zein
 
LMFBR - Superphenix
LMFBR - SuperphenixLMFBR - Superphenix
LMFBR - SuperphenixHossam Zein
 
Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...
Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...
Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...Hossam Zein
 
امن الطاقة والبني التختيه في ضوء التخديات الخالية
امن الطاقة والبني التختيه في ضوء التخديات الخاليةامن الطاقة والبني التختيه في ضوء التخديات الخالية
امن الطاقة والبني التختيه في ضوء التخديات الخاليةHossam Zein
 
Development of of power plants functionality
Development of of power plants functionality Development of of power plants functionality
Development of of power plants functionality Hossam Zein
 
Estimating appliance and home electronic energy use
Estimating appliance and home electronic energy useEstimating appliance and home electronic energy use
Estimating appliance and home electronic energy useHossam Zein
 
3 things to consider when installing solar power at home
3 things to consider when installing solar power at home3 things to consider when installing solar power at home
3 things to consider when installing solar power at homeHossam Zein
 
Planning and Zoning for Solar in North Carolina - Pandzsolar2014
Planning and Zoning for Solar  in North Carolina - Pandzsolar2014Planning and Zoning for Solar  in North Carolina - Pandzsolar2014
Planning and Zoning for Solar in North Carolina - Pandzsolar2014Hossam Zein
 
sonnen solar tracker 1/2
sonnen solar tracker 1/2sonnen solar tracker 1/2
sonnen solar tracker 1/2Hossam Zein
 
SolTrK_data_sheet solar control
SolTrK_data_sheet solar controlSolTrK_data_sheet solar control
SolTrK_data_sheet solar controlHossam Zein
 
sonnen solar tracker 2
sonnen solar tracker 2sonnen solar tracker 2
sonnen solar tracker 2Hossam Zein
 
SMA - SUNNY DESIGN 3 and SUNNY DESIGN WEB
SMA - SUNNY DESIGN 3 and SUNNY DESIGN WEBSMA - SUNNY DESIGN 3 and SUNNY DESIGN WEB
SMA - SUNNY DESIGN 3 and SUNNY DESIGN WEBHossam Zein
 
Solar Power Analysis and Design Specifications Houston solar
Solar Power Analysis and  Design Specifications Houston solarSolar Power Analysis and  Design Specifications Houston solar
Solar Power Analysis and Design Specifications Houston solarHossam Zein
 
Terminal High Altitude Area Defense THAAD
Terminal High Altitude Area Defense THAAD Terminal High Altitude Area Defense THAAD
Terminal High Altitude Area Defense THAAD Hossam Zein
 
multi mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOMEmulti mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOMEHossam Zein
 
القبـة الحـديديـة | IRon DoMe
القبـة الحـديديـة | IRon DoMeالقبـة الحـديديـة | IRon DoMe
القبـة الحـديديـة | IRon DoMeHossam Zein
 
THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000
  THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000  THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000
THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000Hossam Zein
 
Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008
Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008
Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008Hossam Zein
 

Plus de Hossam Zein (20)

the engins that power the future.
the engins that power the future.the engins that power the future.
the engins that power the future.
 
01 nuclear energy_overview
01 nuclear energy_overview01 nuclear energy_overview
01 nuclear energy_overview
 
00 history of_nuclear_fission_short_vers
00 history of_nuclear_fission_short_vers00 history of_nuclear_fission_short_vers
00 history of_nuclear_fission_short_vers
 
LMFBR - Superphenix
LMFBR - SuperphenixLMFBR - Superphenix
LMFBR - Superphenix
 
Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...
Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...
Climate change-implications-for-the-energy-sector-summary-from-ipcc-ar5-2014-...
 
امن الطاقة والبني التختيه في ضوء التخديات الخالية
امن الطاقة والبني التختيه في ضوء التخديات الخاليةامن الطاقة والبني التختيه في ضوء التخديات الخالية
امن الطاقة والبني التختيه في ضوء التخديات الخالية
 
Development of of power plants functionality
Development of of power plants functionality Development of of power plants functionality
Development of of power plants functionality
 
Estimating appliance and home electronic energy use
Estimating appliance and home electronic energy useEstimating appliance and home electronic energy use
Estimating appliance and home electronic energy use
 
3 things to consider when installing solar power at home
3 things to consider when installing solar power at home3 things to consider when installing solar power at home
3 things to consider when installing solar power at home
 
Planning and Zoning for Solar in North Carolina - Pandzsolar2014
Planning and Zoning for Solar  in North Carolina - Pandzsolar2014Planning and Zoning for Solar  in North Carolina - Pandzsolar2014
Planning and Zoning for Solar in North Carolina - Pandzsolar2014
 
sonnen solar tracker 1/2
sonnen solar tracker 1/2sonnen solar tracker 1/2
sonnen solar tracker 1/2
 
SolTrK_data_sheet solar control
SolTrK_data_sheet solar controlSolTrK_data_sheet solar control
SolTrK_data_sheet solar control
 
sonnen solar tracker 2
sonnen solar tracker 2sonnen solar tracker 2
sonnen solar tracker 2
 
SMA - SUNNY DESIGN 3 and SUNNY DESIGN WEB
SMA - SUNNY DESIGN 3 and SUNNY DESIGN WEBSMA - SUNNY DESIGN 3 and SUNNY DESIGN WEB
SMA - SUNNY DESIGN 3 and SUNNY DESIGN WEB
 
Solar Power Analysis and Design Specifications Houston solar
Solar Power Analysis and  Design Specifications Houston solarSolar Power Analysis and  Design Specifications Houston solar
Solar Power Analysis and Design Specifications Houston solar
 
Terminal High Altitude Area Defense THAAD
Terminal High Altitude Area Defense THAAD Terminal High Altitude Area Defense THAAD
Terminal High Altitude Area Defense THAAD
 
multi mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOMEmulti mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOME
 
القبـة الحـديديـة | IRon DoMe
القبـة الحـديديـة | IRon DoMeالقبـة الحـديديـة | IRon DoMe
القبـة الحـديديـة | IRon DoMe
 
THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000
  THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000  THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000
THE EGYPTIAN MILITARY AND the arab Israeli Military balance CSIS report 2000
 
Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008
Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008
Israeli-Syrian Air and SAM Strength Analysis/ CSIS report 2008
 

Dernier

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Dernier (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Options for optimizing combined cycle plants

  • 1. Preparedby.HossamAhmedZein 2015 Optimizingcombinedcycle powerplantsefficiency ‫ــــ‬Options for Optimizing Combined Cycle Plants ‫ــــ‬Quickly Boost Your Combustion Turbine Response CEPC Egypt :) :(
  • 2. Options for Optimizing Combined Cycle Plants 12/01/2015 | Thomas W. Overton, JD With low gas prices and renewable generation boosting demand and capacity factors for combined cycle plants, plant operators are being called upon to squeeze out every last megawatt from their systems. Fortunately, there have never been more ways to do it. Here are some you may not have thought of. Gas-fired power is booming—even more than expected. For only the second time ever, but also the second time this year, gas generated more electricity in a month in the U.S. than coal. According to statistics from the Energy Information Administration (EIA), in July 2015 coal generated 139 TWh, while natural gas generated 140 TWh. Those statistics are a stark break from 2014, when coal produced 150 TWh and gas was responsible for only 114 TWh. While coal remained in the lead with a 34.5%-to-31.1% advantage in the power mix through July, those numbers represent a fairly substantial departure from EIA predictions. In its Annual Energy Outlook this year, the EIA predicted gas would reach a 31% share—in 2040. With gas-fired plants being called upon to shoulder an ever-growing share of the power mix, plant owners are looking for more and better ways to squeeze extra performance out of their equipment, without breaking the bank. While gas turbine manufacturers such as GE, Siemens, and Mitsubishi-Hitachi Power Systems offer a selection of upgrade packages to improve performance, these kinds of choices are both expensive and require significant down time. For plants that are not in the position to undertake costly outages and upgrades, and those newer plants already operating state-of-the-art equipment, there are still some ways to tweak out a few extra kilowatts.
  • 3. Clean-Up Time Jeff Fassett of IEM Energy Consultants, who spoke to POWER in October, recommended that plant operators think first about cleanliness. Fassett pointed out that a substantial portion of a turbine’s energy is used by the compressor, which means dirty compressor blades can have a serious effect on efficiency. “When the blades are dirty, the airflow is more turbulent, and that will degrade performance.” Of course, the importance of maintaining inlet filters and keeping intake air clean isn’t a novel idea. Poor-quality inlet air can also lead to blade erosion and corrosion of turbine components, both of which will hurt efficiency. One problem is that the effects of poor-quality air are cumulative: Though cleaning can address blade fouling to some extent, restoring original turbine performance is typically not possible—and erosion can only be addressed by replacement. Thus, it behooves turbine operators to keep air quality as high as possible from initial startup. But Fassett said the solution he recommends isn’t one operators often take: Swapping out standard ASHRAE filters for HEPA-rated filters. “The common approach is just changing the filters more often,” he said, “but this doesn’t get to the root problem,” which is that lower-rated filters allow more particulate matter into the turbine and that everything getting into the compressor that doesn’t belong there degrades both short-term and long-term performance. Fassett has worked with plant managers to upgrade their turbine filters, which usually involves a retrofit, depending on the configuration of the filter house. A number of companies currently market gas turbine HEPA filters. Louisville, Ky.–based AAF, which has supplied HEPA filters for more than 50 F-class turbines worldwide, estimates that using these filters can recover 6% of the power output normally lost to engine fouling. With HEPA filters, time between turbine cleaning cycles can be at least 8,000 hours (Figure 1). Though the use
  • 4. of HEPA filters results in a larger pressure differential, the initial power loss is more than compensated for by substantially increased cleanliness and reduced downtime. 1. Clean sweep. The differences in turbine blade fouling from operating with different filters can be dramatic. The left photo shows turbine blades after 8,000 hours with a HEPA filter; the right photo, after 2,000 hours with a standard filter. Courtesy: AAF International Bill Lovejoy, chief engineer for engineering services firm NAES, concurred on the importance of maintaining cleanliness, not just because of impact on the turbine blades but also because of the effects dirty filters will have on performance. “It can catch up to you over time, and you are really hurting yourself. You pay for that pressure drop in your overall efficiency.” Operational Adjustments Another performance element Fassett recommends that operators think about is the low-load setpoints on their gas turbines—not just because of effects on the gas turbine but also the downstream effects on the steam turbine. “When the steam turbine is operating at low loads, you can exhaust the thermal energy before the steam reaches the final stages and get condensation. That can cause erosion of the turbine blades.”
  • 5. Fassett said low-load setpoints for the gas turbines need to consider effects not just on the turbines themselves but also on the rest of the plant. Other efficiency losses can be found and eliminated by thinking about ways energy may be escaping the system. “One site we worked with has an auxiliary boiler and is using it to keep vacuum on the steam turbine generator,” Fassett said. “All excess steam is being piped to the heat-recovery steam generator (HRSG) to keep the boilers warm, so hot restarts are minimized.” Another relatively simple tweak is installing heat blankets to insulate the steam turbine, which cuts down on cold restarts, he said. Aftermarket Add-Ons In addition to relatively simple tweaks, there are more sophisticated aftermarket tuning solutions that can be added to existing plants. EthosEnergy has marketed its ECOMAX automated combustion tuning system for several years. ECOMAX is designed to address performance instabilities that can result from manual tuning to maintain emissions compliance, particularly for NOx. Operating with lean premixed flames in the combustor keeps NOx low but can cause instability in combustion dynamics, which can damage turbine components over time. These instabilities are exacerbated by large ambient temperature swings—common in many areas where gas is a major element of the power mix, such as the U.S. Southwest and West Coast— as well as by fuel quality and instrument drift. When the operating envelope strays outside the optimized range, performance will suffer and emissions can fall out of compliance. Using real-time monitoring of combustion and emissions, the ECOMAX system automatically tunes combustion to keep the turbine within the optimized operational envelope (Figure 2). ECOMAX can communicate directly with the turbine or integrate with the plant’s digital control system.
  • 6. 2. Autopilot. The ECOMAX automated combustion tuning system is capable of monitoring a range of key turbine operating parameters and keeping output within a specified range to avoid emissions problems and to maintain peak performance. Courtesy: EthosEnergy ECOMAX can also be used to boost performance, as necessary, with the addition of the Tru-Curve option, which raises the baseload fuel-air ratio while still controlling emissions and combustion dynamics. Tru-Curve can be turned on and off as desired. EthosEnergy says the ECOMAX Tru-Curve package can improve heat rate by 0.20% to 0.25% and boost power output by up to 11 MW, depending on the size of the plant. Another, more outside-the-box upgrade is the Turbophase compressed air peaking power system. Offered by Jupiter, Fla.–based Powerphase, the Turbophase unit uses a separate reciprocating engine to add additional compression to the turbine air inlet, without the use of steam or water injection, which can cause operational issues. Powerphase says this system allows faster peaking response than existing options, allowing 10% to 20% additional peaking power capability and up to 7% heat rate improvement, depending on the model of turbine.
  • 7. Low-Load Combined Cycle Operation Combined cycle plants often do not operate in combined cycle mode at low loads because the system is optimized for baseload operation, and improper optimization can result in damage to the heat recovery steam generator, as well as emissions violations. However, giving up the ability to operate at low loads can mean lost revenue. Many of the newest models of combined cycle plants are designed for load following and low-load operation, but with the right approach, some older plants can optimize their operations for low-load generation as well. The Electric Power Research Institute (EPRI) recently conducted a proprietary study determining the best ways to optimize combined cycle operation at a plant using GE 7FA turbines. Though proper optimization procedures will vary from plant to plant and depend on operational profiles, the EPRI study found that a tradeoff between lower exhaust gas temperature and higher exhaust flow would allow lower-load operation without damage to the HRSG and without causing NOx emissions to spike. Making it work requires careful monitoring of NOx and CO emission levels, combustion dynamics, attemperator performance, main steam-line superheater level, and inlet-guide vane position, in order to determine the minimum generation load at the lowest possible turbi0ne-exhaust temperature. Though there are trade-offs with nearly any performance enhancement, plant operators have more options these days than ever. — Thomas W. Overton, JD is a POWER associate editor. Quickly Boost Your Combustion Turbine Response 10/01/2014 | Dr. Robert Peltier, PE
  • 8. Morris Cogeneration, a combined cycle cogeneration plant near Chicago, has installed TurboPHASE, a fast-responding, modular “turbocharger” installed to boost capacity and PJM regulation revenue. How does it perform? Twice this year, PJM flirted with blackouts when brutal winter storms (dubbed a polar vortex) struck the Eastern U.S. in January. The cold weather set a new winter peak demand record of 141,500 MW on Jan. 7, busting the record set in February 2007 by nearly 5,000 MW. In fact, the five biggest demands ever placed on the PJM grid, and eight of the 10 largest, occurred between Jan. 7 and Jan. 30. PJM reported that at one point, 36,000 MW was out of service due to forced outages, which amounts to 20% of its installed capacity. Adam Keech, director of wholesale market operations, is reported by RTO Insider as saying— the morning after setting the winter peak record—“We really exhausted every megawatt we had on the system.” Peaking capacity and fast unit response is a necessity during summer and winter peaks, and many regional transmission organizations (RTOs) are willing to pay well for the service. A solid majority of new plant construction in PJM is gas fired, led by simple or combined cycle plants. Simple cycle combustion turbine (CT) plants are less efficient than combined cycle plants but are able to start more rapidly and add valuable power to the grid in minutes, which is extremely valuable to a system like PJM as synchronized reserve, fast grid regulation, or black start service. In fact, ancillary service payments often justify the cost of constructing a simple cycle peaking plant. A New Option Jupiter, Florida–based PowerPhase LLC has successfully demonstrated a new technology called TurboPHASE that may allow an existing simple cycle CT or combined cycle plant to add as much as 10% to 20% more power to the grid in seconds, depending on plant configuration, addressing the quick-start and fast- response needs of the modern grid. The TurboPHASE system consists of a multistage intercooled centrifugal compressor that delivers hot compressed air to the CT’s compressor discharge section, thereby allowing the CT to operate at its rated capacity irrespective of
  • 9. the ambient conditions (5C to 50C) or altitude (Figure 1). The system takes advantage of the CT operating below its limits during hot weather much like an inlet chiller or evaporative cooling system, although TurboPHASE can also operate in conjunction with either of those inlet cooling options. 1. Turbocharging combustion turbines. TurboPHASE consists of four main components: engine, gearbox, compressor, and recuperator. A gas-fired engine-compressor set produces compressed air that is added to the combustion turbine’s compressor discharge section to negate the effect of a high ambient temperature performance derate. Courtesy: PowerPhase LLC A separately fueled reciprocating engine direct drives the compressor. The heat from the exhaust of the engine is used to heat the compressed air in the recuperator before entering the CT compressor section. On an operating CT, TurboPHASE is said to be able to ramp to full load in 60 seconds or less and from part load to full load in 10 seconds or less. This design feature is sure to be of interest to grid dispatchers anxious to have the ability to quickly backfill lost capacity during a system emergency or to quickly respond to the intermittency of renewable resources. Field Tests Completed Two prototype TurboPHASE modules (TPMs) were tested in August, and the data and test results were provided to POWER on an exclusive basis. The tests
  • 10. were conducted at Atlantic Power Corp.’s Morris Cogeneration Plant (Morris), located just outside Chicago (Figure 2). The gas-fired 177-MW combined cycle facility is located within the Equistar Chemicals petrochemical plant in Morris, Ill. All of the steam (after passing through a steam turbine) and a portion of the electricity produced by the plant is sold to Equistar, and the remainder of the power is sold into the PJM West market. Morris is configured with three gas- fired General Electric Frame 6B CTs, each with a heat-recovery steam generator (HRSG). 2. Demonstration plant. Two TurboPHASE modules (TPMs) were installed at Atlantic Power Corp.’s Morris Cogeneration Plant (lower left of photo) and were recently performance tested. The TPMs each added over 3 MW of quick response capacity to a Frame 6B combustion turbine and steam turbine system. Courtesy: PowerPhase LLC PowerPhase engineers ran a series of predictive performance models using ThermoFlow in advance of the field tests. The models predicted that the CT full-load performance would increase ~2.63 MW and the steam turbine by ~0.43 MW, for a total power increase of ~3.06 MW. The cost of the increased
  • 11. output is the additional fuel burned by the CT (~10 MMBtu/hr) and the fuel burned by the engine (~16.3 MMBtu/hr). Therefore, the incremental heat rate of the unit with one TPM in service was expected to be on the order of 26.3 MMBtu/hr/3.06 MW = 8,650 Btu/kWh. The demonstration test was conducted in two parts. The first test was designed to demonstrate the increase in output capacity when using a single TPM. The second test measured the response or ramping speed of the plant with one or two TPMs injecting air into the plant’s CT1. Each of the TPMs used at Morris is powered by MTU 20V4000L32 gas-fired engines, each rated at 2 MW. Morris is also equipped with inlet chilling and HRSG duct-firing capability, and both were in operation during the demonstration tests. The tests were conducted with the CT at full power at an ambient temperature that averaged ~85F. At no time during the tests were the operating limits of the CT exceeded. Day One Tests. On the first day of testing, compressed air from TPM2 was injected into CT1 as the system cycled off and on three times. Data was collected at one-second intervals and then averaged. CT fuel flow measurements were taken from plant instruments, and TPM fuel flow was measured (at the inlet to the engine) at 16.3 MMBtu/hr as expected. TPM air injection flow rate was measured by an annubar-type flow meter on the main air header prior to entering the CT. The airflow from each TPM was measured as 11.5 lb/sec at ~156 psi. The measured test results at Morris showed that the average CT power boost was 2.74 MW and that the steam turbine produced an additional 0.32 MW, for a total power increase of 3.06 MW per TPM, very close to the prediction. As an additional benefit, the TPM compressor intercoolers produced an average of 1.2 gallons per minute of clean water during the tests. The second test of the day was measurement of the plant response to a demand signal. The test procedure was to first ramp up TPM2 to full speed, no load. No compressed air was produced by TPM2 while the system was idling. When warmed up, TPM2 was ramped up to 75% load while venting the compressed air produced to the atmosphere through a vent valve, bypassing the CT.
  • 12. Simulating receipt of a demand signal with TPM2 at 75% load, the vent valve was closed and the injection valve was opened, thereby sending compressed air to the CT compressor discharge. The air injection quickly produced an incremental power increase of about 1.5 MW, ramping up to ~2 MW when the vent valve was fully closed and injection valve was fully open. Next, TPM2 was ramped to full power, and the CT responded by producing an increase of ~2.74 MW, with the steam plant power increase following. The test ended with the load on TPM2 reduced to 75%, followed by opening the vent valve and closing the air inject valve to the CT. Figure 3 shows the results of the response testing completed on day one. The TPM was able to add much, although not all, of the incremental power from the CT within the 60-second goal set by the company. 3. Day one tests. Results of the first day of TurboPHASE demonstration tests are illustrated. The blue line represents the temperature at the inlet to the combustion turbine. The orange line shows the response of the combined cycle plant to full air injection. Courtesy: PowerPhase LLC
  • 13. Day Two Tests. The response tests were repeated on the second day of testing using TPM1. Figure 4 illustrates the data collected during these tests, which were very consistent with the previous day’s tests. 4. Day two tests. The test results of the second day of TurboPHASE demonstration tests are illustrated. The last test of the day was with both TurboPHASE systems in operation followed by a trip of one system. Courtesy: PowerPhase LLC The second test of the day was to run both TPMs in parallel and inject the produced compressed air into CT1. The final test simulated an unexpected trip of a TPM. When the air supply from TPM2 ceased, a check valve in the TPM prevented reverse flow, and TPM1 continued supplying compressed air to the CT as expected. The piping system pressure drop between the TPMs and the CT was ~11 psi with one TPM operating (flowing 11.5 lb/sec) rising to ~40 psi with two TPMs operating, so the airflow into the CT was slightly less than double (22 lb/sec). The pressure drop effect is apparent in Figure 4 where a single TPM produces
  • 14. ~3 MW while two TPMs produce slightly under ~6 MW. A line size increase from 6 inches to 8 inches would solve this problem, but since Morris doesn’t anticipate operating the plant in this manner, the cost of the pipe size increase isn’t justified. Pluses and Minuses Before assessing the results of the testing, it’s best to remember that this was the first full-scale demonstration test of the TurboPHASE and we were privy to only an overview of the testing and the performance results. That said, we are still able to reflect on the performance of the system in relation to the important ancillary services PJM and other RTOs desire: synchronized reserve, fast grid regulation, and black start service. Synchronized Reserve. A single TPM consists of a single MTU gas-fired engine that will produce 2 MW were it fitted with a generator and operated standalone, which is the obvious competitor to the TurboPHASE system. Further, according to data on the MTU website, this model gas engine with a generator operates at a heat rate of ~8,000 Btu/kWh, which is a very efficient engine, and more efficient than the CT. This class engine, in “hot start conditions” (usually defined as lubricating oil preheated, engine bearing prelubricated, and cooling water preheated) can be started and synchronized to the grid in ~60 seconds or less and reach full load in ~90 to 180 seconds. The downside is the extra cost of the generator and switchgear. The 60-second response of the TPM is based on the engine operating at 75% load with compressed air bypassing the CT. A “start” signal puts the compressed air into the CT and increased power is achieved in ~60 seconds in the CT, about 2.75 MW. The capacitance in the HRSG and steam turbine system brings the remaining ~0.25 MW along well after the 60-second goal. Although the data provided did not state the time period, the two figures are suggestive that the time lag is several minutes, as one would expect. The report suggested that the average incremental heat rate of the TPM (8,650 Btu/kWh predicted) was 8,495 Btu/kWh based on the full ~3 MW power increase. However, the fuel flow data taken from station instruments showed
  • 15. significant variation, so it’s best to consider the incremental heat rate as anecdotal rather than a hard number. Also, for comparison purposes, a more appropriate incremental heat rate should be based on the CT output alone rather than the CT plus steam turbine output because of the several-minute time lag of the steam system. How does the TurboPHASE stack up against using the same engine in a standby package for synchronized reserve power? Both packages must be running, in standby mode, and synchronized to the grid to qualify. However, the engine-generator can be synchronized, kept at minimum load (lower fuel consumption), and can take on 2 MW of load within ~30 seconds or so. The TPM must also be running but held at 75% load in order to add 2.75 MW to the grid within 60 seconds, but it does so at a higher heat rate than the engine- generator alone. The economics are very CT and site specific. Fast Grid Regulation. Once the TurboPHASE is operating, then its response to rapid changes in grid demand must be considered. Although the specific data wasn’t available, the TPM response to a step increase in load demand can be estimated from Figures 3 and 4. The data does confirm that TurboPHASE responds quickly, with the nearly vertical lines representing the CT response followed by the slower steam turbine. The data also shows the CT responds in about 2 to 3 minutes, with the additional steam turbine power available within 10 minutes. The standard PJM response requirement for grid regulation power is 10 minutes. Regardless, adding the TPM did improve the grid response of the Morris plant and may allow the plant to move into a grid response category with a higher payment. The competitive 2-MW gas-fired engine-generator could also be started, synchronized, and at maximum load in less than the 10 minutes standard to supply grid regulation power. But then again, a simple cycle Frame 7FA (227 MW) can start and reach 50% load within 10 minutes and then ramp up at 40 MW/min. Aeroderivative engines start and synchronize even faster. Black Start Service. The TurboPHASE has the potential to become an interesting black start option for some utilities with combined cycle plants. However, it’s difficult to compete with a diesel engine when the weather gets
  • 16. very cold (see “Prepare Your Gas Plant for Cold Weather Operations” in this issue), particularly when natural gas supplies are limited for power generation at some gas plants. The best black start systems will be an independent system that can supply power to just the critical plant systems needed for restart. On the other hand, a TPM can be installed in two to three months while a new engine-generator will likely take six months or longer. Final Analysis TurboPHASE has the potential for reinvigorating existing combined cycle or simple cycle plants with additional peaking capacity, especially during warmer days when the output of the CT is otherwise limited. The response of the TurboPHASE, from the limited information we have reviewed, is on the same order as a gas-fired reciprocating engine. Efficiency leans toward the engine- generator because the combined cycle plant has a higher heat rate. This balance point could easily change should the TPM be installed on a more efficient CT, although there aren’t many that CTs with a heat rate less than 8,000 Btu/kWh (for example, the 60-Hz 7FA is 8,680 Btu/kWh). On the other hand, the cost of a TPM is likely less than a bank of centrifugal chillers and coils that are often used to increase CT power output during warm weather. Also, since the TPM produces compressed air at 300 psi, the system can be used on any CT with a compressor discharge pressure of 290 psi or less, which includes many E-, F-, and G-class CTs and some aeroderivative engines, assuming there is a suitable open port on the casing at the compressor discharge. The response of the TurboPHASE does meet the PJM requirements for grid regulation power but only when the unit is running and the compressor is charged and ready to dump compressed air into the CT. A potential owner must consider the economics of balancing the regulation payments from PJM against the cost of the TPM and the added fuel costs. Also, it probably goes without saying that potential adopters must be located within an RTO that has a grid fast regulation payment scheme.
  • 17. What do the OEMs think about an owner adding compressed air into the engine casing for peaking power or fast regulation purposes? General Electric’s GER- 3567H states, “GE [heavy duty] gas turbines are designed to allow up to 5% of the compressor airflow for steam injection to the combustor and compressor discharge.” If superheated steam injection is acceptable to GE, as it has been for over 30 years, then one would expect that compressed air in like mass flow will also be acceptable. Also, it seems to me that injecting clean compressed air upstream of the combustor is certainly preferable to wet compression resulting from the use of evaporative coolers. ■ — Dr. Robert Peltier, PE is POWER’s consulting editor.