2. PROJECT OVERVIEWPROJECT OVERVIEW
HP-II PROJECT is being implemented in
Punjab along with other 12 States and 8
Central Agencies since 2006.
The Cost of Punjab Component is
Rs.46.65 Crores as par last revised cost
of 2013.
Work executed physically so far is
nearly 80%.
Expenditure incurred is about Rs. 33.25
Crores (excluding Land Cost of Rs. 3.62 Crores)
which is about 70% of Project cost.
3. ACHIEVEMENTS
• Installation of Ground Water network for GW data
observation have been completed and in operation.
• Surface water network for data observation have
been completed and in operation.
• Hydro metrological network (Digital Rain Gauges) is
being installed and near completion.
• The works of construction of State Data Center
at SAS Nagar and Sub Divisional Data Centers (3
Nos.) are in progress and nearly 80% work
executed so for.
4. PROJECT COMPONENTSPROJECT COMPONENTS
Punjab is a new state in implementation of HP-II
and carried out the following components :-
i. Installation of Ground Water Network
ii. Installation of Surface Water Network.
iii. Hydro-meteorological Network for Observation
of Data.
iv. Data Management and transmission System
v. Institutional improvement, strengthening and
Training of staff.
4
5. ACHIEVEMENTS- Component Wise
A. Ground Water Observation Network
700 Medium GWOW and 50 Deep GWOW have been
installed in the State and are operational.
100 Digital Water Level Recorder (DWLR) have been
installed and are operational.
50 DWLR with Telemetry System for Real time data
observation and transmission have been installed and
are working.
Existing laboratory has been upgraded to level II for
Chemical testing & characterization of water samples.
8. B. Surface Water Observation Network
Upgradation and modernization of 25 discharge measuring
sites have been completed and are operational.
Digital Water Level Recorders with Telemetry system on
8 out of 9 discharge sites have been installed for
discharge measurement and real time transmission of
data.
Sutlej, Ravi and Beas Rivers have been provided with
discharge measuring instruments with ADCPs.
.
8
9.
10. C. Hydro- Meteorological Network
Under the Project the existing RG in the state are
proposed to be upgraded /replaced and in total 81
RG(11 SRG+70DRG) stations have been proposed.
Upgrading/ replacement of existing 11 SRG have been
completed.
Installation 70 No. Digital Rain Gauges is in progress
and likely to be completed shortly. These DRG will
transmit real time data telemetrically to the Central
Office.
12. D. Data Management and Institutional Strengthening
Validation, Processing and storage of observed data of
SW & GW has been taken up.
Section offices, stores in the field have been
constructed and sub-divisional data center offices are
near completion.
The State Data Centre at SAS Nagar is under
construction and is likely to be completed shortly. This
building will house various offices of Water Resources
under one roof along with other facilities such as water
testing, data storage, data transmission etc.
16. Sub Divisional Data CenterSub Divisional Data Center
KhannaKhanna (OUTER VIEW)(OUTER VIEW)
17. Sub Divisional Data CenterSub Divisional Data Center
KhannaKhanna (Inner View)(Inner View)
18. Application and Dissemination/Application and Dissemination/
Sale of dataSale of data
• The observed data will be analysed and
stored in a systematic way for use on
WR Projects and allied works.
• Presently observed data is being shared
with State agencies and CGWB.
• Data will be shared with other agencies
and users as per policy prescribed under
this project and state’s policy.