BUILDING	
  CONSTRUCTION	
  1	
  
Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Ibrahim	
  Adhnan	
  
0314694	
  
	
  
	
  
2	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  1	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity1:	
  Site	
  Setting	
  and	
  Site	
  Clearance	
  
Duration:	
  5	
  days	
  
Materials:	
  Steel	
  Fencing	
  
Equipment:	
  	
  Excavator,	
  Bump	
  Truck,	
  Dozer,	
  Chain	
  Saw,	
  Survey	
  Equipment	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  2	
  Truck/Dozer	
  Operators	
  
Technical	
  Information:	
  	
  
• Prior	
  to	
  the	
  commencement	
  of	
  the	
  site	
  clearing	
  Contractor	
  shall	
  establish	
  the	
  site	
  
boundary	
  
• Contractor	
  shall	
  erect	
  sufficient	
  safety	
  sign	
  to	
  notify	
  public	
  on	
  the	
  construction	
  
activities	
  shall	
  any	
  need	
  arise.	
  
• Contractor	
  shall	
  also	
  submit	
  their	
  proposed	
  dumping	
  site	
  for	
  approval	
  prior	
  to	
  
site	
  clearing	
  to	
  the	
  superintending	
  officer	
  
	
  
	
  
	
  
	
  
3	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  2	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  2:	
  Excavation	
  and	
  Earth	
  Works	
  
Duration:	
  5	
  days	
  
Materials:	
  Natural	
  Soil	
  
Equipment:	
  Excavator,	
  Pay	
  loader,	
  Six	
  Wheel	
  Truck,	
  Bob	
  Cat,	
  Shovel,	
  Meter	
  Tape	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  Truck	
  Driver,	
  Excavator	
  Operator	
  
Technical	
  Information:	
  	
  
• The	
  area	
  to	
  be	
  excavated	
  shall	
  be	
  properly	
  mark	
  and	
  clear	
  before	
  starting	
  the	
  works	
  
• The	
  depth	
  of	
  excavation	
  shall	
  be	
  periodically	
  checked	
  by	
  a	
  surveyor	
  to	
  avoid	
  over	
  
excavation	
  
	
  
	
  
4	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  3	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  	
  Pile	
  boring	
  and	
  reinforcement	
  installation	
  (Grid	
  a-­‐c)	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Duration:	
  	
  6	
  days	
  
Materials:	
  Steel	
  Bore,	
  Reinforcement	
  bar,	
  bar	
  bender	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Rebar	
  Bending	
  machine,	
  Boring	
  Machine	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  Boring	
  Machine	
  Operator,	
  Bar	
  Bending	
  Machine	
  
Technical	
  Information:	
  
• Survey	
  and	
  record	
  the	
  existing	
  ground	
  level	
  at	
  each	
  pile	
  location.	
  	
  
• Refer	
  to	
  the	
  reference	
  points	
  in	
  drawings	
  
	
  	
  
	
  
	
  
	
  
	
  
5	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  4	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  1:	
  	
  Pile	
  boring	
  and	
  reinforcement	
  installation	
  (Grid	
  e-­‐j)	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Duration:	
  	
  6	
  days	
  
Materials:	
  Steel	
  Bore,	
  Reinforcement	
  bar,	
  bar	
  bender	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Rebar	
  Bending	
  machine,	
  Boring	
  Machine	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  Boring	
  Machine	
  Operator,	
  Bar	
  Bending	
  Machine	
  
Technical	
  Information:	
  
• Survey	
  and	
  record	
  the	
  existing	
  ground	
  level	
  at	
  each	
  pile	
  location.	
  	
  
• Refer	
  to	
  the	
  reference	
  points	
  in	
  drawings	
  
• The	
  reinforcement	
  cage	
  will	
  be	
  fabricated	
  in	
  lay-­‐down	
  sections	
  
• type	
  and	
  size	
  of	
  the	
  steel	
  cage	
  will	
  be	
  according	
  to	
  drawings	
  
	
  	
  
	
  
	
  
	
  
	
  
6	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  5	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  :	
  	
  Pile	
  Filling	
   	
  
Duration:	
  	
  6	
  days	
  
Materials:	
  Concrete	
  
Equipment:	
  Concrete	
  mixer,	
  Concrete	
  dispenser,	
  Concrete	
  vibrator	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers	
  
Technical	
  Information:	
  
• The	
  self-­‐compacting	
  mixed	
  concrete	
  will	
  be	
  discharged	
  through	
  a	
  tremie	
  pipe,	
  which	
  
is	
  lowered	
  centrally	
  to	
  the	
  bottom	
  of	
  the	
  bored	
  hole	
  prior	
  to	
  filling	
  it	
  with	
  concrete.	
  
• All	
  completed	
  piles	
  shall	
  be	
  temporarily	
  barricaded	
  and	
  to	
  be	
  backfilled	
  to	
  ground	
  
level	
  with	
  a	
  suitable	
  material	
  the	
  next	
  day.	
  
	
  	
  
	
  
	
  
	
  
	
  
7	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  6	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  1:	
  Pile	
  Cap	
  construction	
  (Grid	
  a-­‐g)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  Reinforcement,	
  Timber	
  formwork	
  
Equipment:	
  Bar	
  Bending	
  Machine,	
  Saw,	
  Vibrating	
  Machine,	
  Concrete	
  Mixer	
  
Skilled	
  Worker:	
  3	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  
• Formwork	
  is	
  erected	
  according	
  to	
  the	
  design	
  
• Fix	
  pile	
  cap	
  reinforcement	
  in	
  the	
  framework	
  
• Apply	
  sufficient	
  vibration	
  	
  
• Pile	
  caps	
  distributes	
  the	
  load	
  from	
  the	
  above	
  structure	
  evenly	
  through	
  to	
  the	
  piles	
  
below.	
  
	
  
	
  
	
  
8	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  7	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity	
  2:	
  Stump	
  on	
  Pile	
  Cap	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  Reinforcement,	
  Timber	
  formwork	
  
Equipment:	
  Bar	
  Bending	
  Machine,	
  Saw,	
  Vibrating	
  Machine	
  
Skilled	
  Worker:	
  3	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  
• To	
  realign	
  the	
  level	
  of	
  the	
  substructure	
  to	
  ensure	
  the	
  ground	
  floor	
  and	
  	
  
corresponding	
  floors	
  are	
  level	
  
	
  
	
  
	
  
Construction	
  Activity	
  1:	
  Pile	
  Cap	
  construction	
  (grid	
  h)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  Reinforcement,	
  Timber	
  formwork	
  
Equipment:	
  Bar	
  Bending	
  Machine,	
  Saw,	
  Vibrating	
  Machine,	
  Concrete	
  Mixer	
  
Skilled	
  Worker:	
  3	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  
• Formwork	
  is	
  erected	
  according	
  to	
  the	
  design	
  
• Fix	
  pile	
  cap	
  reinforcement	
  in	
  the	
  framework	
  
• Apply	
  sufficient	
  vibration	
  	
  
• Pile	
  caps	
  distributes	
  the	
  load	
  from	
  the	
  above	
  structure	
  evenly	
  through	
  to	
  the	
  piles	
  
below.	
  
	
  
	
  
	
  
9	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  8	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  1:	
  Ground	
  Beam	
  Construction	
  (Grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcements,	
  timber	
  formworks	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  2:	
  Stump	
  on	
  Pile	
  Cap	
  (Grid	
  d-­‐i)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  Reinforcement,	
  Timber	
  formwork	
  
Equipment:	
  Bar	
  Bending	
  Machine,	
  Saw,	
  Vibrating	
  Machine	
  
Skilled	
  Worker:	
  3	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  
• To	
  realign	
  the	
  level	
  of	
  the	
  substructure	
  to	
  ensure	
  the	
  ground	
  floor	
  and	
  	
  
corresponding	
  floors	
  are	
  level	
  
	
  
	
  
10	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  9	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Ground	
  Beam	
  Construction	
  (Grid	
  c-­‐h)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcements,	
  timber	
  formworks	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Ground	
  beams	
  resist	
  applied	
  loads	
  with	
  a	
  rebar	
  spanning	
  
above	
  stumps	
  and	
  connect	
  piles	
  caps	
  together	
  into	
  a	
  web	
  network,	
  concrete	
  is	
  then	
  cast-­‐
in-­‐situ	
  
	
  
	
  
	
  
11	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
WEEK	
  10	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Ground	
  Floor	
  Slab	
  Construction	
  (grid	
  a-­‐e)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement	
  bars,	
  timber	
  formworks,	
  Damp	
  Proof	
  Membrane	
  
(DPM),	
  Rigid	
  Floor	
  Insulation	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  :	
  Structural	
  engineers	
  typically	
  call	
  for	
  slabs	
  to	
  be	
  casted	
  
between	
  4	
  and	
  20	
  inches	
  (100	
  and	
  500	
  millimeters)	
  thick,	
  thinner	
  slabs	
  are	
  also	
  used	
  for	
  
exterior	
  paving.	
  Slabs	
  are	
  supported	
  on	
  the	
  foundation	
  or	
  directly	
  on	
  the	
  subsoil,	
  it	
  will	
  
be	
  the	
  eventual	
  the	
  ground	
  floor	
  of	
  a	
  building.	
  The	
  slab	
  is	
  made	
  uniformly	
  thick,	
  
reinforced	
  in	
  one	
  or	
  more	
  directions	
  and	
  casted	
  intergrally	
  with	
  the	
  parallel	
  ground	
  
beams.	
  
	
  
	
  
	
  
	
  
12	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  11	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Ground	
  Floor	
  Slab	
  Construction	
  (grid	
  e-­‐k)	
  	
  
Duration:	
  	
  5	
  day	
  
Materials:	
  Concrete,	
  reinforcement	
  bars,	
  timber	
  formworks,	
  Damp	
  Proof	
  Membrane	
  
(DPM),	
  Rigid	
  Floor	
  Insulation	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  engineers	
  typically	
  call	
  for	
  slabs	
  to	
  be	
  casted	
  
between	
  4	
  and	
  20	
  inches	
  (100	
  and	
  500	
  millimeters)	
  thick,	
  thinner	
  slabs	
  are	
  also	
  used	
  for	
  
exterior	
  paving.	
  Slabs	
  are	
  supported	
  on	
  the	
  foundation	
  or	
  directly	
  on	
  the	
  subsoil,	
  it	
  will	
  
be	
  the	
  eventual	
  the	
  ground	
  floor	
  of	
  a	
  building.	
  The	
  slab	
  is	
  made	
  uniformly	
  thick,	
  
reinforced	
  in	
  one	
  or	
  more	
  directions	
  and	
  casted	
  intergrally	
  with	
  the	
  parallel	
  ground	
  
beams.	
  
	
  
	
  
	
  
	
  
13	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  12	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Ground	
  Floor	
  Columns	
  (grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  columns	
  are	
  built	
  to	
  bear	
  the	
  load	
  from	
  super	
  
structure	
  above	
  and	
  	
  transfer	
  it	
  downwards	
  into	
  foundation.	
  The	
  timber	
  formwork	
  is	
  
built	
  around	
  the	
  starter	
  bars	
  protruding	
  from	
  the	
  ground	
  floor	
  slab.	
  A	
  cage	
  is	
  bent	
  and	
  
placed	
  inside	
  before	
  concrete	
  is	
  vibrated	
  into	
  the	
  mould.	
  The	
  12”	
  (305cm)	
  column	
  can	
  
support	
  up	
  to	
  2000	
  square	
  ft	
  of	
  floor	
  area.	
  
	
  
	
  
	
  
14	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  13	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Ground	
  Floor	
  Columns	
  (grid	
  e-­‐k)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  columns	
  are	
  built	
  to	
  bear	
  the	
  load	
  from	
  super	
  
structure	
  above	
  and	
  	
  transfer	
  it	
  downwards	
  into	
  foundation.	
  The	
  timber	
  formwork	
  is	
  
built	
  around	
  the	
  starter	
  bars	
  protruding	
  from	
  the	
  ground	
  floor	
  slab.	
  A	
  cage	
  is	
  bent	
  and	
  
placed	
  inside	
  before	
  concrete	
  is	
  vibrated	
  into	
  the	
  mould.	
  The	
  12”	
  (305cm)	
  column	
  can	
  
support	
  up	
  to	
  2000	
  square	
  ft	
  of	
  floor	
  area.	
  
	
  
	
  
	
  
	
  
15	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  14	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  First	
  Floor	
  Beam	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Super	
  structure	
  columns	
  are	
  connect	
  together	
  via	
  beams,	
  they	
  
resist	
  applied	
  loads	
  	
   with	
  a	
  rebar	
  from	
  the	
  columns.	
  	
  	
  
	
  
	
  
	
  
16	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  15	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  First	
  Floor	
  Beam	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  :	
  Super	
  structure	
  columns	
  are	
  connect	
  together	
  via	
  beams,	
  they	
  
resist	
  applied	
  loads	
  	
   with	
  a	
  rebar	
  from	
  the	
  columns.	
  	
  	
  
	
  
	
  
	
  
	
  
	
  
17	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  16	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  First	
  Floor	
  Slab	
  (Grid	
  a-­‐g)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork,	
  DPM	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  The	
  slab	
  is	
  cast	
  intergally	
  with	
  the	
  beams	
  which	
  provide	
  
support	
  in	
  two	
  direction	
  
	
  
	
  
	
  
18	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  17	
  
	
  
	
  
	
  
	
  
	
   	
  
Construction	
  Activity	
  1:	
  First	
  Floor	
  Slab	
  (Grid	
  g-­‐k)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork,	
  DPM	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  The	
  slab	
  is	
  cast	
  intergally	
  with	
  the	
  beams	
  which	
  provide	
  
support	
  in	
  two	
  direction	
  
	
  
	
  
	
  
	
  
	
  Construction	
  Activity	
  2:	
  Ground	
  Floor	
  Wall	
  (Grid	
  a-­‐e)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Walls	
  seperate	
  exterior	
  and	
  interior	
  as	
  well	
  as	
  rooms.	
  Bricks	
  
are	
  laid	
  with	
  a	
  50/50	
  overlap	
  running	
  bond.	
  
	
  
	
  
	
  
19	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  18	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity	
  1:	
  Ground	
  Floor	
  Wall	
  (Grid	
  c-­‐j)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Walls	
  seperate	
  exterior	
  and	
  interior	
  as	
  well	
  as	
  rooms.	
  Bricks	
  
are	
  laid	
  with	
  a	
  50/50	
  overlap	
  running	
  bond.	
  
	
  
	
  
	
  Construction	
  Activity	
  2:	
  Ground	
  Floor	
  Stairs	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  :	
  Stairs	
  connect	
  individual	
  floors	
  together	
  by	
  means	
  of	
  a	
  series	
  
of	
  incremental	
  steps	
  that	
  allow	
  a	
  human	
  to	
  gradually	
  climb.	
  The	
  stairs	
  is	
  built	
  from	
  a	
  
starter	
  box,	
  which	
  is	
  a	
  series	
  of	
  starter	
  bars	
  protruding	
  from	
  the	
  ground	
  floor	
  slab.	
  Then	
  
timber	
  form	
  work	
  is	
  make	
  at	
  the	
  desired	
  pitch.	
  The	
  tread(depth)	
  and	
  riser(height)	
  is	
  
carefully	
  made	
  to	
  a	
  uniform	
  specifications.	
  The	
  half	
  turn	
  stairs	
  turns	
  180	
  degrees	
  
through	
  	
   	
  two	
  right	
  angles	
  at	
  an	
  intervening	
  landing.	
  This	
  space	
  floor	
  space	
  on	
  the	
  
revelant	
  floor	
  plans.	
  	
  
	
  
	
  
	
  
	
  
20	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  19	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  First	
  	
  Floor	
  Columns	
  (grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  columns	
  are	
  built	
  to	
  bear	
  the	
  load	
  from	
  super	
  
structure	
  above	
  and	
  	
  	
  transfer	
  it	
  downwards	
  into	
  foundation	
  
	
  
	
  
	
  
21	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  20	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  First	
  	
  Floor	
  Columns	
  (grid	
  e-­‐j)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  columns	
  are	
  built	
  to	
  bear	
  the	
  load	
  from	
  super	
  
structure	
  above	
  and	
  	
  	
  transfer	
  it	
  downwards	
  into	
  foundation	
  
	
  
	
  
	
  
	
  
	
  
22	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  21	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Second	
  Floor	
  Beam	
  (Grid	
  a-­‐e)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Super	
  structure	
  columns	
  are	
  connect	
  together	
  via	
  beams,	
  they	
  
resist	
  applied	
  loads	
  	
   with	
  a	
  rebar	
  from	
  the	
  columns.	
  	
  	
  
	
  
	
  
	
  
	
  
	
  
23	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  22	
  
	
   	
  
	
  
Construction	
  Activity:	
  Second	
  Floor	
  Beam	
  (Grid	
  c-­‐h)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Super	
  structure	
  columns	
  are	
  connect	
  together	
  via	
  beams,	
  they	
  
resist	
  applied	
  loads	
  	
   with	
  a	
  rebar	
  from	
  the	
  columns.	
  	
  	
  
	
  
	
  
	
  
	
  
	
  
24	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  23	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Second	
  Floor	
  Slab	
  (Grid	
  a-­‐g)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  ,	
  DPM	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  The	
  slab	
  is	
  cast	
  intergally	
  with	
  the	
  beams	
  which	
  provide	
  
support	
  in	
  two	
  direction	
  
	
  
	
  
	
  
	
  
	
  
25	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  24	
  
	
  
	
  
	
  
	
   	
  
Construction	
  Activity:	
  First	
  Floor	
  Wall	
  (Grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Walls	
  seperate	
  exterior	
  and	
  interior	
  as	
  well	
  as	
  rooms.	
  Bricks	
  
are	
  laid	
  with	
  a	
  50/50	
  overlap	
  running	
  bond.	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Second	
  Floor	
  Slab	
  (Grid	
  g-­‐j)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork,	
  DPM	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  The	
  slab	
  is	
  cast	
  intergally	
  with	
  the	
  beams	
  which	
  provide	
  
support	
  in	
  two	
  direction	
  
	
  
	
  
	
  
	
  
	
  
26	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  25	
  
	
  
	
   	
  
Construction	
  Activity	
  2:	
  First	
  Floor	
  Wall	
  (Grid	
  d-­‐j)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Walls	
  seperate	
  exterior	
  and	
  interior	
  as	
  well	
  as	
  rooms.	
  Bricks	
  
are	
  laid	
  with	
  a	
  50/50	
  overlap	
  running	
  bond.	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  1:	
  First	
  Floor	
  Stairs	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  
	
  
	
  
	
  
27	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  26	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Second	
  	
  Floor	
  Columns	
  (grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  columns	
  are	
  built	
  to	
  bear	
  the	
  load	
  from	
  super	
  
structure	
  above	
  and	
  	
  	
  transfer	
  it	
  downwards	
  into	
  foundation	
  
	
  
	
  
	
  
	
  
	
  
28	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  27	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Second	
  	
  Floor	
  Columns	
  (grid	
  e-­‐j)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Structural	
  columns	
  are	
  built	
  to	
  bear	
  the	
  load	
  from	
  super	
  
structure	
  above	
  and	
  	
  	
  transfer	
  it	
  downwards	
  into	
  foundation	
  
	
  
	
  
	
  
	
  
	
  
29	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  28	
   	
  
	
  
	
  
	
  
	
   	
  
	
  
	
  
Construction	
  Activity:	
  Roof	
  Beam	
  (Grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Super	
  structure	
  columns	
  are	
  connect	
  together	
  via	
  beams,	
  they	
  
resist	
  applied	
  loads	
  	
   with	
  a	
  rebar	
  from	
  the	
  columns.	
  	
  	
  
	
  
	
  
	
  
	
  
	
  
30	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  29	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Third	
  	
  Floor	
  Columns	
  (grid	
  c-­‐j))	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Super	
  structure	
  columns	
  are	
  connect	
  together	
  via	
  beams,	
  they	
  
resist	
  applied	
  loads	
  	
   with	
  a	
  rebar	
  from	
  the	
  columns.	
  	
  	
  
	
  
	
  
	
  
	
  
	
  
31	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  30	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Roof	
  Truss	
  (Grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Trusses	
  are	
  built	
  as	
  a	
  support	
  frame	
  work	
  for	
  the	
  pitched	
  roof	
  
	
  
	
  
	
  
32	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  31	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Roof	
  Truss	
  (Grid	
  a-­‐c)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Trusses	
  are	
  built	
  as	
  a	
  support	
  frame	
  work	
  for	
  the	
  pitched	
  roof	
  
	
  
	
  
	
  
	
  
33	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  32	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Roof	
  Construction	
  (Phase	
  1)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Roofs	
  are	
  the	
  protective	
  cover	
  of	
  a	
  building	
  against	
  rain,	
  snow	
  
and	
  wind	
  
	
  
	
  
	
  
34	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  
	
  
WEEK	
  33	
  
	
  
	
   	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity:	
  Roof	
  Construction	
  (Phase	
  2)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  Roofs	
  are	
  the	
  protective	
  cover	
  of	
  a	
  building	
  against	
  rain,	
  snow	
  
and	
  wind	
  
	
  
	
  
	
  
	
  
	
  
35	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  34	
  
	
  
	
  
Construction	
  Activity:	
  Second	
  Floor	
  Walls	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Concrete,	
  reinforcement,	
  timber	
  formwork	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Concrete	
  Vibrator,	
  Rebar	
  bending	
  machine,	
  table	
  saw,	
  concrete	
  mixer	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  5	
  General	
  Workers,	
  3	
  Bar	
  benders,	
  2	
  carpenters	
  
Technical	
  Information:	
  :	
  Walls	
  seperate	
  exterior	
  and	
  interior	
  as	
  well	
  as	
  rooms.	
  Bricks	
  
are	
  laid	
  with	
  a	
  50/50	
  overlap	
  running	
  bond	
  
	
  
	
  
	
  
36	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  35	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
Construction	
  Activity	
  1:	
  Curtain	
  Walls	
  Installation	
  	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Glass,	
  Steel,	
  Screws	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  walls	
  are	
  to	
  be	
  connected	
  to	
  the	
  ground	
  floor	
  and	
  beam	
  on	
  the	
  
upper	
  floor	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  2:	
  Railing	
  	
  Installation	
  	
  
Duration:	
  	
  3	
  days	
  
Materials:	
  Aluminium	
  handrail	
  (staircase),	
  Aluminium	
  guardrail	
  (balcony)	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  Railing	
  provide	
  a	
  sturdy	
  barrier	
  when	
  walking	
  around	
  
unenclosed	
  area.	
  The	
  handrail	
  is	
  installed	
  by	
  bolting	
  multiple	
  segments	
  of	
  the	
  rail	
  
system	
  to	
  the	
  tread.	
  Similarly,	
  guardrails	
  are	
  also	
  bolted	
  to	
  the	
  ground	
  but	
  typically	
  at	
  
the	
  edge	
  of	
  a	
  	
   balcony.	
  	
  
	
  
	
  
	
  
37	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  36	
  
	
  
	
  	
  
	
  	
   	
  
	
  
Construction	
  Activity	
  1:	
  Ground	
  Floor	
  door	
  framing	
  and	
  installation	
  	
  
Duration:	
  	
  2	
  days	
  
Materials:	
  Hollow	
  single	
  rabbet	
  metal	
  frame	
  	
  	
  	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver,	
  measuring	
  tape,	
  marker	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  Doors	
  are	
  openings	
  between	
  exterior	
  and	
  interior,	
  and	
  
between	
  rooms.	
  They	
  are	
  carefully	
  positioned	
  between	
  columns	
  where	
  the	
  wall	
  will	
  
eventually	
  be	
  made.	
  Doors	
  are	
  correctly	
  oriented	
  as	
  to	
  whether	
  they	
  open	
  in	
  or	
  out	
  and	
  
stood	
  up	
  right	
  with	
  wood	
  temporarily	
  nailed	
  to	
  columns	
  and	
  beams.	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  2:	
  Ground	
  Floor	
  window	
  framing	
  and	
  installation	
  	
  
Duration:	
  	
  3	
  days	
  
Materials:	
  Aluminium	
  casement	
  frame,	
  glass	
  window,	
  screws	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver,	
  measuring	
  tape,	
  marker	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  :	
  Windows	
  provide	
  ventilation	
  for	
  a	
  building,	
  a	
  casement	
  
window	
  provides	
  100%	
  ventilation.	
  A	
  window	
  frame	
  is	
  first	
  installed,	
  followed	
  by	
  the	
  
two	
  smaller	
  windows	
  and	
  their	
  pivot	
  brackets,	
  the	
  unit	
  is	
  topped	
  off	
  with	
  trimming	
  for	
  
aesthetics.	
  	
  	
  
	
  
	
  
	
  
	
  
38	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  37	
  
	
  
	
  	
  	
  
	
  
Construction	
  Activity	
  1:	
  First	
  Floor	
  door	
  framing	
  and	
  installation	
  	
  
Duration:	
  	
  2	
  days	
  
Materials:	
  Hollow	
  single	
  rabbet	
  metal	
  frame	
  	
  	
  	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver,	
  measuring	
  tape,	
  marker	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  Doors	
  are	
  openings	
  between	
  exterior	
  and	
  interior,	
  and	
  
between	
  rooms.	
  They	
  are	
  carefully	
  positioned	
  between	
  columns	
  where	
  the	
  wall	
  will	
  
eventually	
  be	
  made.	
  Doors	
  are	
  correctly	
  oriented	
  as	
  to	
  whether	
  they	
  open	
  in	
  or	
  out	
  and	
  
stood	
  up	
  right	
  with	
  wood	
  temporarily	
  nailed	
  to	
  columns	
  and	
  beams.	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  2:	
  First	
  Floor	
  window	
  framing	
  and	
  installation	
  	
  
Duration:	
  	
  3	
  days	
  
Materials:	
  Aluminium	
  casement	
  frame,	
  glass	
  window,	
  screws	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver,	
  measuring	
  tape,	
  marker	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  :	
  Windows	
  provide	
  ventilation	
  for	
  a	
  building,	
  a	
  casement	
  
window	
  provides	
  100%	
  ventilation.	
  A	
  window	
  frame	
  is	
  first	
  installed,	
  followed	
  by	
  the	
  
two	
  smaller	
  windows	
  and	
  their	
  pivot	
  brackets,	
  the	
  unit	
  is	
  topped	
  off	
  with	
  trimming	
  for	
  
aesthetics.	
  	
  	
  
	
  
	
  
	
  
	
  
39	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  	
  
WEEK	
  38	
  
	
  
	
  	
  	
  
	
  
Construction	
  Activity	
  1:	
  second	
  	
  Floor	
  door	
  framing	
  and	
  installation	
  	
  
Duration:	
  	
  2	
  days	
  
Materials:	
  Hollow	
  single	
  rabbet	
  metal	
  frame	
  	
  	
  	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver,	
  measuring	
  tape,	
  marker	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  Doors	
  are	
  openings	
  between	
  exterior	
  and	
  interior,	
  and	
  
between	
  rooms.	
  They	
  are	
  carefully	
  positioned	
  between	
  columns	
  where	
  the	
  wall	
  will	
  
eventually	
  be	
  made.	
  Doors	
  are	
  correctly	
  oriented	
  as	
  to	
  whether	
  they	
  open	
  in	
  or	
  out	
  and	
  
stood	
  up	
  right	
  with	
  wood	
  temporarily	
  nailed	
  to	
  columns	
  and	
  beams.	
  
	
  
	
  
	
  
	
  
	
  
Construction	
  Activity	
  2:	
  second	
  	
  Floor	
  window	
  framing	
  and	
  installation	
  	
  
Duration:	
  	
  3	
  days	
  
Materials:	
  Aluminium	
  casement	
  frame,	
  glass	
  window,	
  screws	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Wrench,	
  Level,	
  Screw	
  Driver,	
  measuring	
  tape,	
  marker	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  General	
  Workers,	
  1	
  Special	
  Worker	
  
Technical	
  Information:	
  :	
  :	
  Windows	
  provide	
  ventilation	
  for	
  a	
  building,	
  a	
  casement	
  
window	
  provides	
  100%	
  ventilation.	
  A	
  window	
  frame	
  is	
  first	
  installed,	
  followed	
  by	
  the	
  
two	
  smaller	
  windows	
  and	
  their	
  pivot	
  brackets,	
  the	
  unit	
  is	
  topped	
  off	
  with	
  trimming	
  for	
  
aesthetics.	
  	
  	
  
	
  
	
  
	
  
	
  
40	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
	
  	
  
WEEK	
  39	
  
	
  
	
  
	
  
	
  
WEEK	
  40	
  
	
  
	
  
	
  
WEEK	
  41	
  
	
  
	
   	
  
Construction	
  Activity:	
  Electrical	
  Wiring	
  	
  
Duration:	
  	
  7	
  days	
  
Materials:	
  insulated	
  cooper	
  wires,	
  electrical	
  tape,	
  connector	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Test	
  pen,	
  voltage	
  meter	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  electricians	
  
Technical	
  Information:	
  Electrical	
  cables	
  are	
  pulled	
  through	
  PVC	
  pipe	
  ambedded	
  in	
  the	
  
concrete	
  walls	
  or	
  along	
  the	
  wall	
  surface.	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Plumbing	
  	
  
Duration:	
  	
  7	
  days	
  
Materials:	
  assorted	
  dimensions	
  of	
  PVC	
  pipe,	
  connectors,	
  PVC	
  glue	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Saw,	
  measuring	
  tape	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  Plumber	
  	
  
Technical	
  Information:	
  Plumbing	
  is	
  essential	
  for	
  bringing	
  in	
  clean	
  water	
  into	
  a	
  building	
  
and	
  taking	
  waste	
  products	
  away.	
  PVC	
  pipes	
  are	
  pieced	
  together,	
  in	
  order	
  to	
  connect	
  
various	
  systems	
  together.	
  
	
  
	
  
	
  
Construction	
  Activity:	
  Sanitary	
  Fittings	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Ceramics	
  
Equipment:	
  Saw,	
  Measuring	
  tape,	
  drill	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  Special	
  Worker,	
  2	
  General	
  Workers	
  
Technical	
  Information:	
  Sanitary	
  fittings	
  such	
  as	
  sick,	
  water	
  closet	
  and	
  shower	
  are	
  
usually	
  bought	
  as	
  modular	
  units	
  and	
  are	
  easily	
  installed.	
  Just	
  connect	
  the	
  plumbing	
  to	
  
the	
  inlet	
  and	
  	
   outlet,	
  and	
  ensure	
  the	
  fastening	
  is	
  secure.	
  
	
  
	
  
	
  
41	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  42	
  
	
  
	
  
	
  
	
  
WEEK	
  43	
  
	
  
	
  
	
  
	
  
WEEK	
  44	
  
	
  
	
   	
  
Construction	
  Activity	
  	
  	
  :	
  Tiling	
  	
  (Second	
  	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Mortar,	
  Grout,	
  homogenenous	
  ceramic	
  tiles	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Putty	
  knife,	
  spacers,	
  level	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  Tilers	
  
Technical	
  Information:	
  Tiles	
  are	
  a	
  durable,	
  easy	
  to	
  clean	
  modular	
  finish	
  that	
  requires	
  
careful	
  installation	
  in	
  order	
  to	
  last	
  a	
  long	
  time.	
  A	
  tiling	
  pattern	
  is	
  first	
  determined	
  and	
  
the	
  tiler	
  spread	
  mortar	
  on	
  the	
  floor	
  surface.	
  The	
  tiles	
  are	
  uniformly	
  spaced	
  and	
  align	
  
with	
  the	
  aid	
  of	
  spacers.	
  The	
  gaps	
  are	
  made	
  to	
  allow	
  for	
  expansion	
  and	
  are	
  filled	
  with	
  
grout.	
  	
  
.	
  
	
  
	
  
	
  
Construction	
  Activity	
  :	
  Tiling	
  	
  (Ground	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Mortar,	
  Grout,	
  homogenenous	
  ceramic	
  tiles	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Putty	
  knife,	
  spacers,	
  level	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  Tilers	
  
Technical	
  Information:	
  Tiles	
  are	
  a	
  durable,	
  easy	
  to	
  clean	
  modular	
  finish	
  that	
  requires	
  
careful	
  installation	
  in	
  order	
  to	
  last	
  a	
  long	
  time.	
  A	
  tiling	
  pattern	
  is	
  first	
  determined	
  and	
  
the	
  tiler	
  spread	
  mortar	
  on	
  the	
  floor	
  surface.	
  The	
  tiles	
  are	
  uniformly	
  spaced	
  and	
  align	
  
with	
  the	
  aid	
  of	
  spacers.	
  The	
  gaps	
  are	
  made	
  to	
  allow	
  for	
  expansion	
  and	
  are	
  filled	
  with	
  
grout.	
  	
  
.	
  
	
  
	
  
	
  
Construction	
  Activity	
  	
  	
  :	
  Tiling	
  	
  (Second	
  	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Mortar,	
  Grout,	
  homogenenous	
  ceramic	
  tiles	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  Putty	
  knife,	
  spacers,	
  level	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  2	
  Tilers	
  
Technical	
  Information:	
  Tiles	
  are	
  a	
  durable,	
  easy	
  to	
  clean	
  modular	
  finish	
  that	
  requires	
  
careful	
  installation	
  in	
  order	
  to	
  last	
  a	
  long	
  time.	
  A	
  tiling	
  pattern	
  is	
  first	
  determined	
  and	
  
the	
  tiler	
  spread	
  mortar	
  on	
  the	
  floor	
  surface.	
  The	
  tiles	
  are	
  uniformly	
  spaced	
  and	
  align	
  
with	
  the	
  aid	
  of	
  spacers.	
  The	
  gaps	
  are	
  made	
  to	
  allow	
  for	
  expansion	
  and	
  are	
  filled	
  with	
  
grout.	
  	
  
.	
  
	
  
	
  
	
  
42	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  45	
  
	
  
	
  
	
  
WEEK	
  46	
  
	
  
	
  
	
  
	
  
WEEK	
  47	
  
	
  
	
  
	
  
Construction	
  Activity	
  	
  :	
  Plastering	
  (Ground	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Plaster	
  Board	
  	
  
Equipment:	
  Ramset	
  concrete	
  nailer,	
  Makita	
  concrete	
  driller,	
  Laser	
  Level	
  machine,	
  	
  
Plumbs,	
  Basic	
  hand	
  tools,	
  Makita	
  steel	
  bench	
  cutters,	
  Ceiling	
  gun,	
  Ladder,	
  Steel	
  square	
  
ruler,	
  Drilling	
  Machine	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  All	
  leveling	
  set	
  out	
  coordinates	
  shall	
  be	
  based	
  on	
  the	
  setting	
  
out	
  levels	
  provided	
  on	
  design.	
  
	
  
	
  
Construction	
  Activity	
  	
  :	
  Plastering	
  (first	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Plaster	
  Board	
  	
  
Equipment:	
  Ramset	
  concrete	
  nailer,	
  Makita	
  concrete	
  driller,	
  Laser	
  Level	
  machine,	
  	
  
Plumbs,	
  Basic	
  hand	
  tools,	
  Makita	
  steel	
  bench	
  cutters,	
  Ceiling	
  gun,	
  Ladder,	
  Steel	
  square	
  
ruler,	
  Drilling	
  Machine	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  All	
  leveling	
  set	
  out	
  coordinates	
  shall	
  be	
  based	
  on	
  the	
  setting	
  
out	
  levels	
  provided	
  on	
  design.	
  
	
  
	
  
Construction	
  Activity	
  	
  :	
  Plastering	
  (first	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Plaster	
  Board	
  	
  
Equipment:	
  Ramset	
  concrete	
  nailer,	
  Makita	
  concrete	
  driller,	
  Laser	
  Level	
  machine,	
  	
  
Plumbs,	
  Basic	
  hand	
  tools,	
  Makita	
  steel	
  bench	
  cutters,	
  Ceiling	
  gun,	
  Ladder,	
  Steel	
  square	
  
ruler,	
  Drilling	
  Machine	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  All	
  leveling	
  set	
  out	
  coordinates	
  shall	
  be	
  based	
  on	
  the	
  setting	
  
out	
  levels	
  provided	
  on	
  design.	
  
	
  
	
  
43	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  48	
  
	
  
	
  
	
  
WEEK	
  49	
  
	
  
	
  
	
  
	
  
	
  
WEEK	
  50	
  
	
  
Construction	
  Activity	
  	
  	
  :	
  Hardware	
  Installation	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  Stove	
  ventilation	
  hood,	
  kitchen	
  cabinets,	
  etc	
  	
  
Equipment:	
  Measuring	
  tape,	
  level,	
  screwdriver	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  :	
  After	
  wall	
  and	
  floor	
  finishs	
  are	
  completed,	
  fixed	
  furniture	
  and	
  
appliances	
  can	
  be	
  installed.	
  
Construction	
  Activity	
  	
  	
  :	
  Painting	
  (Ground	
  Floor	
  and	
  Part	
  of	
  First	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials	
  roller	
  brush.	
  Brush	
  extention	
  pole,	
  Masking	
  tape	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  large	
  bucket,	
  wheelbarrow,	
  trowel,	
  garden	
  hose	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  Paint	
  provides	
  an	
  added	
  layer	
  of	
  protection	
  to	
  the	
  applied	
  
surface.	
  There	
  3	
  components	
  to	
  paint;	
  primer	
  (improves	
  the	
  adhension	
  of	
  subsequent	
  
coats),	
  base	
  (pigmentation	
  give	
  colour)	
  and	
  sealer	
  (reduces	
  absorption	
  of	
  moisture)	
  
	
  
Construction	
  Activity	
  	
  	
  :	
  Painting	
  (First	
  Floor	
  and	
  second	
  	
  Floor)	
  
Duration:	
  	
  5	
  days	
  
Materials	
  roller	
  brush.	
  Brush	
  extention	
  pole,	
  Masking	
  tape	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Equipment:	
  large	
  bucket,	
  wheelbarrow,	
  trowel,	
  garden	
  hose	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  Paint	
  provides	
  an	
  added	
  layer	
  of	
  protection	
  to	
  the	
  applied	
  
surface.	
  There	
  3	
  components	
  to	
  paint;	
  primer	
  (improves	
  the	
  adhension	
  of	
  subsequent	
  
coats),	
  base	
  (pigmentation	
  give	
  colour)	
  and	
  sealer	
  (reduces	
  absorption	
  of	
  moisture)	
  
	
  
44	
   Project	
  2:	
  Construction	
  Activities	
  and	
  Process	
  |	
  Ibrahim	
  Adhnan	
  0314694	
  
	
  
WEEK	
  51	
  
	
  
	
  
	
  
	
  
	
  
WEEK	
  52	
  
	
  
	
  
Construction	
  Activity	
  	
  	
  :	
  Exterior	
  Finishes	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  lime	
  ,sand	
  ,water	
  
Equipment:	
  large	
  bucket,	
  wheelbarrow,	
  trowel,	
  garden	
  hose	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  :	
  Apply	
  the	
  render	
  to	
  the	
  wall	
  as	
  forcefully	
  as	
  possible	
  to	
  ensure	
  
that	
  it	
  keys	
  into	
  the	
  wall	
  well.	
  Once	
  the	
  first	
  coat	
  of	
  render	
  is	
  applied	
  but	
  not	
  yet	
  set,	
  
scratch	
  the	
  surface	
  throughout	
  the	
  wall	
  to	
  provide	
  a	
  key	
  for	
  the	
  next	
  layer	
  to	
  adhere	
  to.	
  
Best	
  done	
  on	
  cool	
  and	
  cloudy	
  day.	
  
	
  
Construction	
  Activity	
  	
  	
  :	
  Cleaning	
  
Duration:	
  	
  5	
  days	
  
Materials:	
  	
  
Equipment:	
  Mop,	
  cloth,	
  vacumn	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
Skilled	
  Worker:	
  3	
  General	
  Workers	
  
Technical	
  Information:	
  To	
  remove	
  	
  all	
  the	
  dirt	
  before	
  	
  Handing	
  over.	
  
	
  

Contenu connexe

Tendances

Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionDavid H Moloney
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Drilling rig components
Drilling rig componentsDrilling rig components
Drilling rig components美英 田
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipmentswetha110
 
Eqs unit 3 final
Eqs unit 3 finalEqs unit 3 final
Eqs unit 3 finaldhanapal143
 
BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1Cryslyn Tan
 
Construction Machines and Plants
Construction Machines and PlantsConstruction Machines and Plants
Construction Machines and PlantsXubitech
 
Structural excavation and backfill
Structural excavation and backfillStructural excavation and backfill
Structural excavation and backfillmamilli
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavationAl-Amin Ahmed Nabin
 
Types of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorTypes of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorAshwiniChaudhari13
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequenceRanjith Kumar
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement worksMohd Nizam Mohd Zan
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Minh Bui Si
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf
00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf
00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdfNeohChengAik
 

Tendances (20)

Concrete works
Concrete worksConcrete works
Concrete works
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Building construction
Building constructionBuilding construction
Building construction
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Drilling rig components
Drilling rig componentsDrilling rig components
Drilling rig components
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
 
Eqs unit 3 final
Eqs unit 3 finalEqs unit 3 final
Eqs unit 3 final
 
BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1
 
Construction Machines and Plants
Construction Machines and PlantsConstruction Machines and Plants
Construction Machines and Plants
 
Structural excavation and backfill
Structural excavation and backfillStructural excavation and backfill
Structural excavation and backfill
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavation
 
Types of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorTypes of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimator
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf
00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf
00-Slides-IEM Course-Site Supervision-Displ Piles-18 Jun 22 - Copy.pdf
 

En vedette

Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Dexter Ng
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Building construction
Building constructionBuilding construction
Building constructionLlyod cassidy
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 
Sequence of general works of building construction
Sequence of general works of building constructionSequence of general works of building construction
Sequence of general works of building constructionChelluri Srihari
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Columnমু সা
 
Understanding Building construction
Understanding Building construction Understanding Building construction
Understanding Building construction Llyod cassidy
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16Luisa Klein
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing ConstructionJoyce Wee
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group reportXingYue0907
 

En vedette (20)

Construction process
Construction processConstruction process
Construction process
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Building construction
Building constructionBuilding construction
Building construction
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Sequence of general works of building construction
Sequence of general works of building constructionSequence of general works of building construction
Sequence of general works of building construction
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Understanding Building construction
Understanding Building construction Understanding Building construction
Understanding Building construction
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
3.estimating
3.estimating3.estimating
3.estimating
 
Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing Construction
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 

Similaire à Construction activities and Process

Building Construction Project 2 Report
Building Construction Project 2 ReportBuilding Construction Project 2 Report
Building Construction Project 2 ReportappleManiac
 
Bcon final report
Bcon final reportBcon final report
Bcon final reportQing Cheng
 
Anchored Secant Pile Wall Presentation
Anchored Secant Pile Wall PresentationAnchored Secant Pile Wall Presentation
Anchored Secant Pile Wall PresentationKyle Beaudry, P.Eng
 
Earth House Field Building Process
Earth House Field Building ProcessEarth House Field Building Process
Earth House Field Building ProcessTimo Kettunen
 
A summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarA summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarDocumentStory
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Wael Nafad
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFShankar Ramasamy
 
One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)Cirilo Gazzingan III
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building ConstructionAdnan. Ali
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVAjachi Jha
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
Mouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxMouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxZakaria156221
 
101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E HeilandErik Heiland
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING Ram1239
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
Methodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxMethodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxharmanpnrgroup
 

Similaire à Construction activities and Process (20)

Building Construction Project 2 Report
Building Construction Project 2 ReportBuilding Construction Project 2 Report
Building Construction Project 2 Report
 
Bcon final report
Bcon final reportBcon final report
Bcon final report
 
Anchored Secant Pile Wall Presentation
Anchored Secant Pile Wall PresentationAnchored Secant Pile Wall Presentation
Anchored Secant Pile Wall Presentation
 
Earth House Field Building Process
Earth House Field Building ProcessEarth House Field Building Process
Earth House Field Building Process
 
A summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarA summer training at pwd b&r,hisar
A summer training at pwd b&r,hisar
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)
 
AH15019
AH15019AH15019
AH15019
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
 
,CV 2013
,CV 2013,CV 2013
,CV 2013
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CV
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
Mouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxMouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptx
 
101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
SITE REPORT
SITE REPORTSITE REPORT
SITE REPORT
 
Construction site
Construction siteConstruction site
Construction site
 
Methodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxMethodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptx
 

Dernier

Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 

Dernier (20)

Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 

Construction activities and Process

  • 1.           BUILDING  CONSTRUCTION  1   Project  2:  Construction  Activities  and  Process                                                                           Ibrahim  Adhnan   0314694      
  • 2. 2   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  1                                                         Construction  Activity1:  Site  Setting  and  Site  Clearance   Duration:  5  days   Materials:  Steel  Fencing   Equipment:    Excavator,  Bump  Truck,  Dozer,  Chain  Saw,  Survey  Equipment   Skilled  Worker:  5  General  Workers,  2  Truck/Dozer  Operators   Technical  Information:     • Prior  to  the  commencement  of  the  site  clearing  Contractor  shall  establish  the  site   boundary   • Contractor  shall  erect  sufficient  safety  sign  to  notify  public  on  the  construction   activities  shall  any  need  arise.   • Contractor  shall  also  submit  their  proposed  dumping  site  for  approval  prior  to   site  clearing  to  the  superintending  officer          
  • 3. 3   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  2                                                                                                           Construction  Activity  2:  Excavation  and  Earth  Works   Duration:  5  days   Materials:  Natural  Soil   Equipment:  Excavator,  Pay  loader,  Six  Wheel  Truck,  Bob  Cat,  Shovel,  Meter  Tape   Skilled  Worker:  5  General  Workers,  Truck  Driver,  Excavator  Operator   Technical  Information:     • The  area  to  be  excavated  shall  be  properly  mark  and  clear  before  starting  the  works   • The  depth  of  excavation  shall  be  periodically  checked  by  a  surveyor  to  avoid  over   excavation      
  • 4. 4   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  3                                                                                 Construction  Activity:    Pile  boring  and  reinforcement  installation  (Grid  a-­‐c)                                                                                                                   Duration:    6  days   Materials:  Steel  Bore,  Reinforcement  bar,  bar  bender                                                                                                                                                                                                             Equipment:  Rebar  Bending  machine,  Boring  Machine   Skilled  Worker:  5  General  Workers,  Boring  Machine  Operator,  Bar  Bending  Machine   Technical  Information:   • Survey  and  record  the  existing  ground  level  at  each  pile  location.     • Refer  to  the  reference  points  in  drawings              
  • 5. 5   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  4                                                                                 Construction  Activity  1:    Pile  boring  and  reinforcement  installation  (Grid  e-­‐j)                                                                                                     Duration:    6  days   Materials:  Steel  Bore,  Reinforcement  bar,  bar  bender                                                                                                                                                                                                     Equipment:  Rebar  Bending  machine,  Boring  Machine   Skilled  Worker:  5  General  Workers,  Boring  Machine  Operator,  Bar  Bending  Machine   Technical  Information:   • Survey  and  record  the  existing  ground  level  at  each  pile  location.     • Refer  to  the  reference  points  in  drawings   • The  reinforcement  cage  will  be  fabricated  in  lay-­‐down  sections   • type  and  size  of  the  steel  cage  will  be  according  to  drawings              
  • 6. 6   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  5                                                                                 Construction  Activity  :    Pile  Filling     Duration:    6  days   Materials:  Concrete   Equipment:  Concrete  mixer,  Concrete  dispenser,  Concrete  vibrator                                                                                                                                                     Skilled  Worker:  5  General  Workers   Technical  Information:   • The  self-­‐compacting  mixed  concrete  will  be  discharged  through  a  tremie  pipe,  which   is  lowered  centrally  to  the  bottom  of  the  bored  hole  prior  to  filling  it  with  concrete.   • All  completed  piles  shall  be  temporarily  barricaded  and  to  be  backfilled  to  ground   level  with  a  suitable  material  the  next  day.              
  • 7. 7   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  6                                                                                 Construction  Activity  1:  Pile  Cap  construction  (Grid  a-­‐g)   Duration:    5  days   Materials:  Concrete,  Reinforcement,  Timber  formwork   Equipment:  Bar  Bending  Machine,  Saw,  Vibrating  Machine,  Concrete  Mixer   Skilled  Worker:  3  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:   • Formwork  is  erected  according  to  the  design   • Fix  pile  cap  reinforcement  in  the  framework   • Apply  sufficient  vibration     • Pile  caps  distributes  the  load  from  the  above  structure  evenly  through  to  the  piles   below.        
  • 8. 8   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  7                                                         Construction  Activity  2:  Stump  on  Pile  Cap   Duration:    5  days   Materials:  Concrete,  Reinforcement,  Timber  formwork   Equipment:  Bar  Bending  Machine,  Saw,  Vibrating  Machine   Skilled  Worker:  3  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:   • To  realign  the  level  of  the  substructure  to  ensure  the  ground  floor  and     corresponding  floors  are  level         Construction  Activity  1:  Pile  Cap  construction  (grid  h)   Duration:    5  days   Materials:  Concrete,  Reinforcement,  Timber  formwork   Equipment:  Bar  Bending  Machine,  Saw,  Vibrating  Machine,  Concrete  Mixer   Skilled  Worker:  3  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:   • Formwork  is  erected  according  to  the  design   • Fix  pile  cap  reinforcement  in  the  framework   • Apply  sufficient  vibration     • Pile  caps  distributes  the  load  from  the  above  structure  evenly  through  to  the  piles   below.        
  • 9. 9   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  8                                                             Construction  Activity  1:  Ground  Beam  Construction  (Grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcements,  timber  formworks   Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                           Skilled  Worker:  3  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:           Construction  Activity  2:  Stump  on  Pile  Cap  (Grid  d-­‐i)   Duration:    5  days   Materials:  Concrete,  Reinforcement,  Timber  formwork   Equipment:  Bar  Bending  Machine,  Saw,  Vibrating  Machine   Skilled  Worker:  3  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:   • To  realign  the  level  of  the  substructure  to  ensure  the  ground  floor  and     corresponding  floors  are  level      
  • 10. 10   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  9                                                                                 Construction  Activity:  Ground  Beam  Construction  (Grid  c-­‐h)   Duration:    5  days   Materials:  Concrete,  reinforcements,  timber  formworks   Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                 Skilled  Worker:  3  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Ground  beams  resist  applied  loads  with  a  rebar  spanning   above  stumps  and  connect  piles  caps  together  into  a  web  network,  concrete  is  then  cast-­‐ in-­‐situ        
  • 11. 11   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694       WEEK  10                                                             Construction  Activity:  Ground  Floor  Slab  Construction  (grid  a-­‐e)   Duration:    5  days   Materials:  Concrete,  reinforcement  bars,  timber  formworks,  Damp  Proof  Membrane   (DPM),  Rigid  Floor  Insulation                                                                                                                                                                                               Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                               Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  :  Structural  engineers  typically  call  for  slabs  to  be  casted   between  4  and  20  inches  (100  and  500  millimeters)  thick,  thinner  slabs  are  also  used  for   exterior  paving.  Slabs  are  supported  on  the  foundation  or  directly  on  the  subsoil,  it  will   be  the  eventual  the  ground  floor  of  a  building.  The  slab  is  made  uniformly  thick,   reinforced  in  one  or  more  directions  and  casted  intergrally  with  the  parallel  ground   beams.          
  • 12. 12   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  11                                                                                   Construction  Activity:  Ground  Floor  Slab  Construction  (grid  e-­‐k)     Duration:    5  day   Materials:  Concrete,  reinforcement  bars,  timber  formworks,  Damp  Proof  Membrane   (DPM),  Rigid  Floor  Insulation                                                                                                                                                                                               Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  engineers  typically  call  for  slabs  to  be  casted   between  4  and  20  inches  (100  and  500  millimeters)  thick,  thinner  slabs  are  also  used  for   exterior  paving.  Slabs  are  supported  on  the  foundation  or  directly  on  the  subsoil,  it  will   be  the  eventual  the  ground  floor  of  a  building.  The  slab  is  made  uniformly  thick,   reinforced  in  one  or  more  directions  and  casted  intergrally  with  the  parallel  ground   beams.          
  • 13. 13   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  12                         Construction  Activity:  Ground  Floor  Columns  (grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                 Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  columns  are  built  to  bear  the  load  from  super   structure  above  and    transfer  it  downwards  into  foundation.  The  timber  formwork  is   built  around  the  starter  bars  protruding  from  the  ground  floor  slab.  A  cage  is  bent  and   placed  inside  before  concrete  is  vibrated  into  the  mould.  The  12”  (305cm)  column  can   support  up  to  2000  square  ft  of  floor  area.        
  • 14. 14   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  13                                                                                   Construction  Activity:  Ground  Floor  Columns  (grid  e-­‐k)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                     Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  columns  are  built  to  bear  the  load  from  super   structure  above  and    transfer  it  downwards  into  foundation.  The  timber  formwork  is   built  around  the  starter  bars  protruding  from  the  ground  floor  slab.  A  cage  is  bent  and   placed  inside  before  concrete  is  vibrated  into  the  mould.  The  12”  (305cm)  column  can   support  up  to  2000  square  ft  of  floor  area.          
  • 15. 15   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  14                         Construction  Activity:  First  Floor  Beam   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                         Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                           Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Super  structure  columns  are  connect  together  via  beams,  they   resist  applied  loads     with  a  rebar  from  the  columns.            
  • 16. 16   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  15                                                                       Construction  Activity:  First  Floor  Beam   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                       Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  :  Super  structure  columns  are  connect  together  via  beams,  they   resist  applied  loads     with  a  rebar  from  the  columns.                
  • 17. 17   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  16                                       Construction  Activity:  First  Floor  Slab  (Grid  a-­‐g)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork,  DPM                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                     Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  The  slab  is  cast  intergally  with  the  beams  which  provide   support  in  two  direction        
  • 18. 18   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  17               Construction  Activity  1:  First  Floor  Slab  (Grid  g-­‐k)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork,  DPM                                                                                                                                                             Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                       Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  The  slab  is  cast  intergally  with  the  beams  which  provide   support  in  two  direction            Construction  Activity  2:  Ground  Floor  Wall  (Grid  a-­‐e)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                   Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                       Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Walls  seperate  exterior  and  interior  as  well  as  rooms.  Bricks   are  laid  with  a  50/50  overlap  running  bond.        
  • 19. 19   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  18                 Construction  Activity  1:  Ground  Floor  Wall  (Grid  c-­‐j)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Walls  seperate  exterior  and  interior  as  well  as  rooms.  Bricks   are  laid  with  a  50/50  overlap  running  bond.        Construction  Activity  2:  Ground  Floor  Stairs   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  :  Stairs  connect  individual  floors  together  by  means  of  a  series   of  incremental  steps  that  allow  a  human  to  gradually  climb.  The  stairs  is  built  from  a   starter  box,  which  is  a  series  of  starter  bars  protruding  from  the  ground  floor  slab.  Then   timber  form  work  is  make  at  the  desired  pitch.  The  tread(depth)  and  riser(height)  is   carefully  made  to  a  uniform  specifications.  The  half  turn  stairs  turns  180  degrees   through      two  right  angles  at  an  intervening  landing.  This  space  floor  space  on  the   revelant  floor  plans.            
  • 20. 20   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  19                                                                                     Construction  Activity:  First    Floor  Columns  (grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                     Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  columns  are  built  to  bear  the  load  from  super   structure  above  and      transfer  it  downwards  into  foundation        
  • 21. 21   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  20           Construction  Activity:  First    Floor  Columns  (grid  e-­‐j)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                     Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  columns  are  built  to  bear  the  load  from  super   structure  above  and      transfer  it  downwards  into  foundation            
  • 22. 22   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  21             Construction  Activity:  Second  Floor  Beam  (Grid  a-­‐e)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                   Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Super  structure  columns  are  connect  together  via  beams,  they   resist  applied  loads     with  a  rebar  from  the  columns.                
  • 23. 23   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  22         Construction  Activity:  Second  Floor  Beam  (Grid  c-­‐h)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                   Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Super  structure  columns  are  connect  together  via  beams,  they   resist  applied  loads     with  a  rebar  from  the  columns.                
  • 24. 24   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  23                                                                                       Construction  Activity:  Second  Floor  Slab  (Grid  a-­‐g)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork  ,  DPM                                                                                                                                                                 Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                             Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  The  slab  is  cast  intergally  with  the  beams  which  provide   support  in  two  direction            
  • 25. 25   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  24             Construction  Activity:  First  Floor  Wall  (Grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                       Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Walls  seperate  exterior  and  interior  as  well  as  rooms.  Bricks   are  laid  with  a  50/50  overlap  running  bond.               Construction  Activity:  Second  Floor  Slab  (Grid  g-­‐j)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork,  DPM                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                     Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  The  slab  is  cast  intergally  with  the  beams  which  provide   support  in  two  direction            
  • 26. 26   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  25         Construction  Activity  2:  First  Floor  Wall  (Grid  d-­‐j)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                 Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Walls  seperate  exterior  and  interior  as  well  as  rooms.  Bricks   are  laid  with  a  50/50  overlap  running  bond.               Construction  Activity  1:  First  Floor  Stairs   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                   Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:        
  • 27. 27   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  26             Construction  Activity:  Second    Floor  Columns  (grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                         Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                             Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  columns  are  built  to  bear  the  load  from  super   structure  above  and      transfer  it  downwards  into  foundation            
  • 28. 28   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  27                                                                                   Construction  Activity:  Second    Floor  Columns  (grid  e-­‐j)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                       Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Structural  columns  are  built  to  bear  the  load  from  super   structure  above  and      transfer  it  downwards  into  foundation            
  • 29. 29   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  28                   Construction  Activity:  Roof  Beam  (Grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                   Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Super  structure  columns  are  connect  together  via  beams,  they   resist  applied  loads     with  a  rebar  from  the  columns.                
  • 30. 30   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  29           Construction  Activity:  Third    Floor  Columns  (grid  c-­‐j))   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                   Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Super  structure  columns  are  connect  together  via  beams,  they   resist  applied  loads     with  a  rebar  from  the  columns.                
  • 31. 31   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  30           Construction  Activity:  Roof  Truss  (Grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                 Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Trusses  are  built  as  a  support  frame  work  for  the  pitched  roof        
  • 32. 32   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  31                                                                                   Construction  Activity:  Roof  Truss  (Grid  a-­‐c)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                 Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Trusses  are  built  as  a  support  frame  work  for  the  pitched  roof          
  • 33. 33   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  32                                                                                       Construction  Activity:  Roof  Construction  (Phase  1)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                               Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                   Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Roofs  are  the  protective  cover  of  a  building  against  rain,  snow   and  wind        
  • 34. 34   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694         WEEK  33                   Construction  Activity:  Roof  Construction  (Phase  2)   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                           Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  Roofs  are  the  protective  cover  of  a  building  against  rain,  snow   and  wind            
  • 35. 35   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  34       Construction  Activity:  Second  Floor  Walls   Duration:    5  days   Materials:  Concrete,  reinforcement,  timber  formwork                                                                                                                                                                                     Equipment:  Concrete  Vibrator,  Rebar  bending  machine,  table  saw,  concrete  mixer                                                                         Skilled  Worker:  5  General  Workers,  3  Bar  benders,  2  carpenters   Technical  Information:  :  Walls  seperate  exterior  and  interior  as  well  as  rooms.  Bricks   are  laid  with  a  50/50  overlap  running  bond        
  • 36. 36   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  35                                       Construction  Activity  1:  Curtain  Walls  Installation     Duration:    5  days   Materials:  Glass,  Steel,  Screws   Equipment:  Wrench,  Level,  Screw  Driver   Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  walls  are  to  be  connected  to  the  ground  floor  and  beam  on  the   upper  floor           Construction  Activity  2:  Railing    Installation     Duration:    3  days   Materials:  Aluminium  handrail  (staircase),  Aluminium  guardrail  (balcony)   Equipment:  Wrench,  Level,  Screw  Driver   Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  Railing  provide  a  sturdy  barrier  when  walking  around   unenclosed  area.  The  handrail  is  installed  by  bolting  multiple  segments  of  the  rail   system  to  the  tread.  Similarly,  guardrails  are  also  bolted  to  the  ground  but  typically  at   the  edge  of  a     balcony.          
  • 37. 37   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  36                 Construction  Activity  1:  Ground  Floor  door  framing  and  installation     Duration:    2  days   Materials:  Hollow  single  rabbet  metal  frame         Equipment:  Wrench,  Level,  Screw  Driver,  measuring  tape,  marker                                                                                                                                               Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  Doors  are  openings  between  exterior  and  interior,  and   between  rooms.  They  are  carefully  positioned  between  columns  where  the  wall  will   eventually  be  made.  Doors  are  correctly  oriented  as  to  whether  they  open  in  or  out  and   stood  up  right  with  wood  temporarily  nailed  to  columns  and  beams.             Construction  Activity  2:  Ground  Floor  window  framing  and  installation     Duration:    3  days   Materials:  Aluminium  casement  frame,  glass  window,  screws                                                                                                                                                               Equipment:  Wrench,  Level,  Screw  Driver,  measuring  tape,  marker                                                                                                                                             Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  :  Windows  provide  ventilation  for  a  building,  a  casement   window  provides  100%  ventilation.  A  window  frame  is  first  installed,  followed  by  the   two  smaller  windows  and  their  pivot  brackets,  the  unit  is  topped  off  with  trimming  for   aesthetics.              
  • 38. 38   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  37             Construction  Activity  1:  First  Floor  door  framing  and  installation     Duration:    2  days   Materials:  Hollow  single  rabbet  metal  frame         Equipment:  Wrench,  Level,  Screw  Driver,  measuring  tape,  marker                                                                                                                                       Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  Doors  are  openings  between  exterior  and  interior,  and   between  rooms.  They  are  carefully  positioned  between  columns  where  the  wall  will   eventually  be  made.  Doors  are  correctly  oriented  as  to  whether  they  open  in  or  out  and   stood  up  right  with  wood  temporarily  nailed  to  columns  and  beams.             Construction  Activity  2:  First  Floor  window  framing  and  installation     Duration:    3  days   Materials:  Aluminium  casement  frame,  glass  window,  screws                                                                                                                                                         Equipment:  Wrench,  Level,  Screw  Driver,  measuring  tape,  marker                                                                                                                                       Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  :  Windows  provide  ventilation  for  a  building,  a  casement   window  provides  100%  ventilation.  A  window  frame  is  first  installed,  followed  by  the   two  smaller  windows  and  their  pivot  brackets,  the  unit  is  topped  off  with  trimming  for   aesthetics.              
  • 39. 39   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694         WEEK  38             Construction  Activity  1:  second    Floor  door  framing  and  installation     Duration:    2  days   Materials:  Hollow  single  rabbet  metal  frame         Equipment:  Wrench,  Level,  Screw  Driver,  measuring  tape,  marker                                                                                                                                                       Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  Doors  are  openings  between  exterior  and  interior,  and   between  rooms.  They  are  carefully  positioned  between  columns  where  the  wall  will   eventually  be  made.  Doors  are  correctly  oriented  as  to  whether  they  open  in  or  out  and   stood  up  right  with  wood  temporarily  nailed  to  columns  and  beams.             Construction  Activity  2:  second    Floor  window  framing  and  installation     Duration:    3  days   Materials:  Aluminium  casement  frame,  glass  window,  screws                                                                                                                                                                 Equipment:  Wrench,  Level,  Screw  Driver,  measuring  tape,  marker                                                                                                                                               Skilled  Worker:  2  General  Workers,  1  Special  Worker   Technical  Information:  :  :  Windows  provide  ventilation  for  a  building,  a  casement   window  provides  100%  ventilation.  A  window  frame  is  first  installed,  followed  by  the   two  smaller  windows  and  their  pivot  brackets,  the  unit  is  topped  off  with  trimming  for   aesthetics.              
  • 40. 40   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694         WEEK  39           WEEK  40         WEEK  41         Construction  Activity:  Electrical  Wiring     Duration:    7  days   Materials:  insulated  cooper  wires,  electrical  tape,  connector                                                                                                                                                                               Equipment:  Test  pen,  voltage  meter                                                                                                                                                                                                                                                                           Skilled  Worker:  2  electricians   Technical  Information:  Electrical  cables  are  pulled  through  PVC  pipe  ambedded  in  the   concrete  walls  or  along  the  wall  surface.         Construction  Activity:  Plumbing     Duration:    7  days   Materials:  assorted  dimensions  of  PVC  pipe,  connectors,  PVC  glue                                                                                                                                                         Equipment:  Saw,  measuring  tape                                                                                                                                                                                                                                                                                     Skilled  Worker:  Plumber     Technical  Information:  Plumbing  is  essential  for  bringing  in  clean  water  into  a  building   and  taking  waste  products  away.  PVC  pipes  are  pieced  together,  in  order  to  connect   various  systems  together.         Construction  Activity:  Sanitary  Fittings   Duration:    5  days   Materials:  Ceramics   Equipment:  Saw,  Measuring  tape,  drill                                                                                                                                                                                                                                                                 Skilled  Worker:  Special  Worker,  2  General  Workers   Technical  Information:  Sanitary  fittings  such  as  sick,  water  closet  and  shower  are   usually  bought  as  modular  units  and  are  easily  installed.  Just  connect  the  plumbing  to   the  inlet  and     outlet,  and  ensure  the  fastening  is  secure.        
  • 41. 41   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  42           WEEK  43           WEEK  44         Construction  Activity      :  Tiling    (Second    Floor)   Duration:    5  days   Materials:  Mortar,  Grout,  homogenenous  ceramic  tiles                                                                                                                                                                                                 Equipment:  Putty  knife,  spacers,  level                                                                                                                                                                                                                                                               Skilled  Worker:  2  Tilers   Technical  Information:  Tiles  are  a  durable,  easy  to  clean  modular  finish  that  requires   careful  installation  in  order  to  last  a  long  time.  A  tiling  pattern  is  first  determined  and   the  tiler  spread  mortar  on  the  floor  surface.  The  tiles  are  uniformly  spaced  and  align   with  the  aid  of  spacers.  The  gaps  are  made  to  allow  for  expansion  and  are  filled  with   grout.     .         Construction  Activity  :  Tiling    (Ground  Floor)   Duration:    5  days   Materials:  Mortar,  Grout,  homogenenous  ceramic  tiles                                                                                                                                                                                                 Equipment:  Putty  knife,  spacers,  level                                                                                                                                                                                                                                                               Skilled  Worker:  2  Tilers   Technical  Information:  Tiles  are  a  durable,  easy  to  clean  modular  finish  that  requires   careful  installation  in  order  to  last  a  long  time.  A  tiling  pattern  is  first  determined  and   the  tiler  spread  mortar  on  the  floor  surface.  The  tiles  are  uniformly  spaced  and  align   with  the  aid  of  spacers.  The  gaps  are  made  to  allow  for  expansion  and  are  filled  with   grout.     .         Construction  Activity      :  Tiling    (Second    Floor)   Duration:    5  days   Materials:  Mortar,  Grout,  homogenenous  ceramic  tiles                                                                                                                                                                                               Equipment:  Putty  knife,  spacers,  level                                                                                                                                                                                                                                                               Skilled  Worker:  2  Tilers   Technical  Information:  Tiles  are  a  durable,  easy  to  clean  modular  finish  that  requires   careful  installation  in  order  to  last  a  long  time.  A  tiling  pattern  is  first  determined  and   the  tiler  spread  mortar  on  the  floor  surface.  The  tiles  are  uniformly  spaced  and  align   with  the  aid  of  spacers.  The  gaps  are  made  to  allow  for  expansion  and  are  filled  with   grout.     .        
  • 42. 42   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  45         WEEK  46           WEEK  47         Construction  Activity    :  Plastering  (Ground  Floor)   Duration:    5  days   Materials:  Plaster  Board     Equipment:  Ramset  concrete  nailer,  Makita  concrete  driller,  Laser  Level  machine,     Plumbs,  Basic  hand  tools,  Makita  steel  bench  cutters,  Ceiling  gun,  Ladder,  Steel  square   ruler,  Drilling  Machine   Skilled  Worker:  3  General  Workers   Technical  Information:  All  leveling  set  out  coordinates  shall  be  based  on  the  setting   out  levels  provided  on  design.       Construction  Activity    :  Plastering  (first  Floor)   Duration:    5  days   Materials:  Plaster  Board     Equipment:  Ramset  concrete  nailer,  Makita  concrete  driller,  Laser  Level  machine,     Plumbs,  Basic  hand  tools,  Makita  steel  bench  cutters,  Ceiling  gun,  Ladder,  Steel  square   ruler,  Drilling  Machine   Skilled  Worker:  3  General  Workers   Technical  Information:  All  leveling  set  out  coordinates  shall  be  based  on  the  setting   out  levels  provided  on  design.       Construction  Activity    :  Plastering  (first  Floor)   Duration:    5  days   Materials:  Plaster  Board     Equipment:  Ramset  concrete  nailer,  Makita  concrete  driller,  Laser  Level  machine,     Plumbs,  Basic  hand  tools,  Makita  steel  bench  cutters,  Ceiling  gun,  Ladder,  Steel  square   ruler,  Drilling  Machine   Skilled  Worker:  3  General  Workers   Technical  Information:  All  leveling  set  out  coordinates  shall  be  based  on  the  setting   out  levels  provided  on  design.      
  • 43. 43   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  48         WEEK  49             WEEK  50     Construction  Activity      :  Hardware  Installation   Duration:    5  days   Materials:  Stove  ventilation  hood,  kitchen  cabinets,  etc     Equipment:  Measuring  tape,  level,  screwdriver                                                                                                                                                                                                                                 Skilled  Worker:  3  General  Workers   Technical  Information:  :  After  wall  and  floor  finishs  are  completed,  fixed  furniture  and   appliances  can  be  installed.   Construction  Activity      :  Painting  (Ground  Floor  and  Part  of  First  Floor)   Duration:    5  days   Materials  roller  brush.  Brush  extention  pole,  Masking  tape                                                                                                                                                                           Equipment:  large  bucket,  wheelbarrow,  trowel,  garden  hose     Skilled  Worker:  3  General  Workers   Technical  Information:  Paint  provides  an  added  layer  of  protection  to  the  applied   surface.  There  3  components  to  paint;  primer  (improves  the  adhension  of  subsequent   coats),  base  (pigmentation  give  colour)  and  sealer  (reduces  absorption  of  moisture)     Construction  Activity      :  Painting  (First  Floor  and  second    Floor)   Duration:    5  days   Materials  roller  brush.  Brush  extention  pole,  Masking  tape                                                                                                                                                                           Equipment:  large  bucket,  wheelbarrow,  trowel,  garden  hose     Skilled  Worker:  3  General  Workers   Technical  Information:  Paint  provides  an  added  layer  of  protection  to  the  applied   surface.  There  3  components  to  paint;  primer  (improves  the  adhension  of  subsequent   coats),  base  (pigmentation  give  colour)  and  sealer  (reduces  absorption  of  moisture)    
  • 44. 44   Project  2:  Construction  Activities  and  Process  |  Ibrahim  Adhnan  0314694     WEEK  51             WEEK  52       Construction  Activity      :  Exterior  Finishes   Duration:    5  days   Materials:  lime  ,sand  ,water   Equipment:  large  bucket,  wheelbarrow,  trowel,  garden  hose     Skilled  Worker:  3  General  Workers   Technical  Information:  :  Apply  the  render  to  the  wall  as  forcefully  as  possible  to  ensure   that  it  keys  into  the  wall  well.  Once  the  first  coat  of  render  is  applied  but  not  yet  set,   scratch  the  surface  throughout  the  wall  to  provide  a  key  for  the  next  layer  to  adhere  to.   Best  done  on  cool  and  cloudy  day.     Construction  Activity      :  Cleaning   Duration:    5  days   Materials:     Equipment:  Mop,  cloth,  vacumn                                                                                                                                                                                                                                                                                     Skilled  Worker:  3  General  Workers   Technical  Information:  To  remove    all  the  dirt  before    Handing  over.