3/31/2011 11:00 UTC Unit  1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ  In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreased RPV temperature increased RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - Power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – Lighting to Central Control Room AC power available – power to instrumentation  - Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is shown uncovered (Stable) Around half of Fuel is uncovered  (Stable) Around half of Fuel is uncovered  (Stable) Not applicable due to outage plant status Pressure of RPV Stable Stable Stable CV Pressure Drywell Decreased Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Water injection to CV No information No information No information Spent Fuel Pool Status Spraying to be considered Freshwater injection to the Fuel Pool Cooling Line Freshwater  injection via Fuel Pool Cooling Line and Periodic spraying Seawater injection via Fuel Pool Cooling Line and Periodic spraying
3/31/2011 11:00 UTC Unit  5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building  Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Contenu connexe

Plus de International Atomic Energy Agency

Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...International Atomic Energy Agency
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)International Atomic Energy Agency
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)International Atomic Energy Agency
 

Plus de International Atomic Energy Agency (20)

Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
 
Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 
Table summary of reactor unit status at 18-april 2011
Table  summary of reactor unit status at 18-april 2011Table  summary of reactor unit status at 18-april 2011
Table summary of reactor unit status at 18-april 2011
 

Summary of Reactor Status (31 March 2011, 14.00 UTC)

  • 1. 3/31/2011 11:00 UTC Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreased RPV temperature increased RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - Power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – Lighting to Central Control Room AC power available – power to instrumentation - Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is shown uncovered (Stable) Around half of Fuel is uncovered (Stable) Around half of Fuel is uncovered (Stable) Not applicable due to outage plant status Pressure of RPV Stable Stable Stable CV Pressure Drywell Decreased Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Water injection to CV No information No information No information Spent Fuel Pool Status Spraying to be considered Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Seawater injection via Fuel Pool Cooling Line and Periodic spraying
  • 2. 3/31/2011 11:00 UTC Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Notes de l'éditeur

  1. 03/31/11 14:23
  2. 03/31/11 14:23