3. Ivan Sanders
Ivan Sanders is a SharePoint MVP/MCT Author and independent consultant with
more than 15 years of broad-based hands-on experience with the design and
development of mission-critical applications that include Business Intelligence
Dashboards in the enterprise and deployment of Microsoft products, while
delivering nothing but Microsoft SharePoint solutions since 2004.
Ivan is active in the SharePoint Community through the MSDN and TechNet
forums, Teched and PDC Birds of a Feather, SharePoint Saturday, SharePoint
Conferences, SharePoint ShopTalk, INETA, GITCA, and Local Southern California
User Groups.
twitter http://twitter.com/iasanders
LinkedIn http://www.linkedin.com/in/iasanders,
Blog http://msmvps.com/blogs/ivansanders
MVP Profile https://mvp.support.microsoft.com/profile/Ivan.Sanders
6. Component SharePoint 2010 Minimum SharePoint “2013” Minimum
Requirement Requirement
Processor 64-bit, four cores 64-bit, four cores
RAM 4 GB for developer or evaluation use 4 GB for developer or evaluation use
8 GB for production use in a single 8 GB for production use in a single server
server or multiple server farm or in a multiple server farm
Hard disk 80 GB for system drive 80 GB for system drive
Maintain twice as much free space as Maintain twice as much free space as you
you have RAM for production have RAM for production environments.
environments.
7. Component SharePoint 2010 Minimum SharePoint “2013” Minimum
Requirement Requirement
Processor 64-bit, 4 cores for small deployments 64-bit, 4 cores for small deployments
64-bit, 8 cores for medium deployments 64-bit, 8 cores for medium deployments
RAM 8 GB for small deployments 8 GB for small deployments
16 GB for medium deployments 16 GB for medium deployments
Hard disk 80 GB for system drive 80 GB for system drive
Hard disk space is dependent on the Hard disk space is dependent on the size
size of your SharePoint content of your SharePoint content
8. Feature Multidimensional Tabular
RAM Some (16/32 GB) A lot (64/128)
RAM Speed Important Crucial
Number of cores 4/8/16 4/8/16
Core speed Less Important Crucial
Disk speed Very Important NA
SSD Disk Usage Strongly recommended NA
Network speed Important Important
Concurrency Pretty good Not enough experience…
Ideas are brought to the team or we think of them (ex: How customers engage with our products?)Identify the data, clean it, and capture it.Build a report in the DW.This usually takes 4, 5, or 6 weeks depending on the data, report, etc.Often times when the stakeholder looks at the report, they say something like "Now that I see this, I really want X.“