21. Result Summary
Unstandardized PLN Power
Improperly-installed bolt
Improperly-installed Tower Supporting W
Lightning Rod is not installed
Grounding resistance is more than 1 oh
23. Result Summary
Unstandardized PLN Power
Improperly-installed bolt
The Tower Foot Holder is Unstandardiz
Lightning Rod is not installed
Grounding resistance is more than 1 oh
24. Transmisi installation
Combat Kuningan kota
Install Newlink mle cmbt kuningan - kadug
Combat Combat Cirendang
Install Newlink mle cmbt Cirendang – Gn.
Installation Support by : Kisel, Module Support by : SS Jabar
41. Correction
Hasil Instalasi CME yang Nok
Instalasi link lamban, karena moduel fa
dari cibolerang
Instalasi link terkesan tidak terplanning
karena menggunakan 7GHz di jarak
No Path quality report dari mitra instala
Alokasi BTS dismantle yang tidak sesu
plan combat. Teralokasikan bts outdo
combat cirendang
42. Result Installation
No blankspot di cirendang & rest area k
No blankspot di sekitar area kuningan k
rsud kuningan
High traffic. Prefer to upgrade 2g trx an
proposed bts 3g