SlideShare une entreprise Scribd logo
1  sur  15
EIA For Better
Design
Institution of Environmental Sciences
EIA Discussion Forum
Eleni Antoniades
18 March 2021
Eleni Antoniades
Project Environmental Lead
Construction Environmental Management and Assessment
Aviation and Infrastructure
Trustee and Board Member of the IES
email: e.antoniades@eaenvironmental.com
linkedin.com/in/eleniantoniadesenvironmental
EIA Process
General public environmental awareness has increased in recent years in the UK, with the growth of
pressure groups and a greater interest in climate change as well as protected and designated sites
As environmental professionals working in EIA, we are increasingly finding ourselves working on
projects which are opposed by residents of the local and wider community.
How can we, as EIA professionals use our expertise to positively influence the design process? What are
the barriers to this may and how can they be overcome?
EIA Regulations
The requirement to avoid, prevent, reduce, off-set and mitigate environmental mpacts is written into
the EIA Regulations:
EIA Town and Country Planning As Amended in 2017
(3) An environmental statement is a statement which includes at least
(c) a description of any features of the proposed development, or measures envisaged in order to avoid,
prevent or reduce and, if possible, offset likely significant adverse effects on the environment;
(d) a description of the reasonable alternatives studied by the developer, which are relevant to the
proposed development and its specific characteristics, and an indication of the main reasons for the
option chosen, taking into account the effects of the development on the environment
) if the decision is— (i) to grant planning permission or subsequent consent—
a description of any features of the development and any measures envisaged in order to avoid, prevent,
reduce and, if possible, offset, likely significant adverse effects on the environment; and
7. A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified
significant adverse effects on the environment and, where appropriate, of any proposed monitoring
arrangements (for example the preparation of a post-project analysis). That description should explain
the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or
offset, and should cover both the construction and operational phases
The Challenge
As EIA is intended to be an iterative process which feeds into the design, we need to
understand why as EIA professionals we often find ourselves assessing a project at a stage
where we can have limited influence over the key design elements.
The key to unlocking this is for environmental professionals working in EIA (EIA Project
Leads, EIA Co-ordinators and Topic Specialists) to become involved at the very early stages
of a project (feasibility and options appraisal) and for the environmental elements to have an
equal weighting with engineering and economic impacts.
The polls at the start of this forum we asked:
1) As an environmental professional, have you worked on the environmental assessment at
feasibility stage of projects? Yes/ No
2) As an environmental professional, have you worked on the environmental assessment at
the options appraisal stage of projects? Yes/ No
3) As an environmental professional, have you worked on the environmental assessment at
the EIA Report or ES Report stage of projects? Yes/ No
Feasibility
Stage of a re-
opening of a
railway line
between
Bentley and
Bordon
Options Appraisal Stage Airport Development- Site selection
or route selection
Options Appraisal Stage: e.g. since 1991, 51 proposals have
been considered for improving the A303 in the Stonehenge
area
EIA Stage/ES Stage –most likely site will be selected,
preferred route option is most likely to be selected, outline
design will be in place
We will break out into groups:
1. Feasibility Stage
2. Options Appraisal
3. EIA Report/ ES Stage
Where we can discuss the barriers to influencing the design at each of these stages
1. Feasibility Stage
 Have you had the opportunity to assess a project at the feasibility stage?
 Have you ever worked on a project which did not go past the feasibility stage on purely environmental grounds?
 It is likely that a Client/Developer would approach consultants for feasibility study with the requirement for positive outcome.
Has there been pressure to make the project be feasible, in your experience?
2. Options Appraisal
 Have you had the opportunity to carry out options appraisal during a project’s development and if so which tools did you use
(e.g. DfT Transport Appraisal Guidance)
 Did the environmental elements have equal weighting with engineering and economic, or was it carried out retrospectively?
 What weighting do you believe environmental assessment should have on the options appraisal and should an option be rejected
purely on environmental grounds
EIA Report/ ES Stage
 Do you typically play an active role in the design of a project as part of the design team, along with civil /structural engineers?
 Are you typically given a project route/building/structure which has already been designed and required to assess this in the
EIA Report?
 In your experience has your advice as an environmental professional been incorporated into the design process and influenced
the design OR has design changed following public consultation /Statutory Consultee feedback?
1. Feasibility Stage
Have you had the opportunity to assess a project at the feasibility stage?
Have you ever worked on a project which did not go past the feasibility stage on
purely environmental grounds?
 It is likely that a Client/Developer would approach consultants for feasibility study
with the requirement for positive outcome. Has there been pressure to make the
project work?
© Leo Hillier Photography, RAF Marham Runway
2) Options Appraisal Stage
Have you had the opportunity to carry out options appraisal during a
project’s development and if so which tools did you use (e.g. Transport
Appraisal Guidance)
Did the environmental elements have equal weighting with engineering
and economic, or was it carried out retrospectively?
What weighting do you believe environmental assessment should have on
the options appraisal and should an option be rejected purely on
environmental grounds
© Leo Hillier Photography, RAF Marham Runway
3) EIA Report/ ES Stage
Do you typically play an active role in the design of a
project as part of the design team, along with civil
/structural engineers?
Are you typically given a project
route/building/structure which has already been
designed and required to assess this in the EIA Report?
In your experience has your advice as an environmental
professional been incorporated into the design process
and influenced the design OR has design changed
following public consultation /Statutory Consultee?
(c) Photo: Moreas Construction
Conclusion
 Feasibility stage: at earlier stages of a project, during
feasibility there is more scope to avoid environmentally
sensitive sites entirely and to prevent adverse
environmental impacts
 Options appraisal stage: there is scope to prevent and
reduce environmental impacts
 EIA Report Stage: there is scope to reduce, mitigate and
off-set
 Potential for influence can decrease over time
 Become involved at earlier stages of a project
 Environment to have equal weighting with engineering
and economic appraisal
 EIA Report / ES Stage should be an opportunity to
provide enhancement and improvements to the
environment

Contenu connexe

Plus de IES / IAQM

16.00 Updates to CURED and CREAM Emissions Models.pdf
16.00 Updates to CURED and CREAM Emissions Models.pdf16.00 Updates to CURED and CREAM Emissions Models.pdf
16.00 Updates to CURED and CREAM Emissions Models.pdfIES / IAQM
 
15.30 Reducing Construction Emissions.pdf
15.30 Reducing Construction Emissions.pdf15.30 Reducing Construction Emissions.pdf
15.30 Reducing Construction Emissions.pdfIES / IAQM
 
15.30 Ethical considerations when determining air quality policies.pdf
15.30 Ethical considerations when determining air quality policies.pdf15.30 Ethical considerations when determining air quality policies.pdf
15.30 Ethical considerations when determining air quality policies.pdfIES / IAQM
 
14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf
14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf
14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdfIES / IAQM
 
14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...
14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...
14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...IES / IAQM
 
14.30 The discord between limit value compliance and the LAQM objective regim...
14.30 The discord between limit value compliance and the LAQM objective regim...14.30 The discord between limit value compliance and the LAQM objective regim...
14.30 The discord between limit value compliance and the LAQM objective regim...IES / IAQM
 
14.00 Developments in occupational hygiene and air quality.pdf
14.00 Developments in occupational hygiene and air quality.pdf14.00 Developments in occupational hygiene and air quality.pdf
14.00 Developments in occupational hygiene and air quality.pdfIES / IAQM
 
12.15 Insights from the Clean Air Networks Conference.pdf
12.15 Insights from the Clean Air Networks Conference.pdf12.15 Insights from the Clean Air Networks Conference.pdf
12.15 Insights from the Clean Air Networks Conference.pdfIES / IAQM
 
12.00 Applied Source Apportionment using Low Cost Sensors.pdf
12.00 Applied Source Apportionment  using Low Cost Sensors.pdf12.00 Applied Source Apportionment  using Low Cost Sensors.pdf
12.00 Applied Source Apportionment using Low Cost Sensors.pdfIES / IAQM
 
11.15 Addressing emissions from NRMM.pdf
11.15 Addressing emissions from NRMM.pdf11.15 Addressing emissions from NRMM.pdf
11.15 Addressing emissions from NRMM.pdfIES / IAQM
 
09.45 Dispersion modelling considerations for Net Zero and air quality.pdf
09.45 Dispersion modelling considerations for Net Zero and air quality.pdf09.45 Dispersion modelling considerations for Net Zero and air quality.pdf
09.45 Dispersion modelling considerations for Net Zero and air quality.pdfIES / IAQM
 
09.15Measuring air pollutant emissions using novel techniques.pdf
09.15Measuring air pollutant emissions using novel techniques.pdf09.15Measuring air pollutant emissions using novel techniques.pdf
09.15Measuring air pollutant emissions using novel techniques.pdfIES / IAQM
 
17.00 Integrating the Environment Act air quality targets into the planning s...
17.00 Integrating the Environment Act air quality targets into the planning s...17.00 Integrating the Environment Act air quality targets into the planning s...
17.00 Integrating the Environment Act air quality targets into the planning s...IES / IAQM
 
16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...
16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...
16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...IES / IAQM
 
16.00 Addressing Air Pollution in Net Zero work.pdf
16.00 Addressing Air Pollution in Net Zero work.pdf16.00 Addressing Air Pollution in Net Zero work.pdf
16.00 Addressing Air Pollution in Net Zero work.pdfIES / IAQM
 
14.50 Air Quality Assessment of a Carbon Capture Centre.pdf
14.50 Air Quality Assessment of a Carbon Capture Centre.pdf14.50 Air Quality Assessment of a Carbon Capture Centre.pdf
14.50 Air Quality Assessment of a Carbon Capture Centre.pdfIES / IAQM
 
14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...
14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...
14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...IES / IAQM
 
14.30 Air Quality and Climate Change Lessons Learned.pdf
14.30 Air Quality and Climate Change Lessons Learned.pdf14.30 Air Quality and Climate Change Lessons Learned.pdf
14.30 Air Quality and Climate Change Lessons Learned.pdfIES / IAQM
 
14.00 Air Quality Challenges of Carbon Capture.pdf
14.00 Air Quality Challenges of Carbon Capture.pdf14.00 Air Quality Challenges of Carbon Capture.pdf
14.00 Air Quality Challenges of Carbon Capture.pdfIES / IAQM
 
12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdf12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdfIES / IAQM
 

Plus de IES / IAQM (20)

16.00 Updates to CURED and CREAM Emissions Models.pdf
16.00 Updates to CURED and CREAM Emissions Models.pdf16.00 Updates to CURED and CREAM Emissions Models.pdf
16.00 Updates to CURED and CREAM Emissions Models.pdf
 
15.30 Reducing Construction Emissions.pdf
15.30 Reducing Construction Emissions.pdf15.30 Reducing Construction Emissions.pdf
15.30 Reducing Construction Emissions.pdf
 
15.30 Ethical considerations when determining air quality policies.pdf
15.30 Ethical considerations when determining air quality policies.pdf15.30 Ethical considerations when determining air quality policies.pdf
15.30 Ethical considerations when determining air quality policies.pdf
 
14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf
14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf
14.50 The Impact of the Clean Air Zone on Air Quality in Birmingham.pdf
 
14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...
14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...
14.40 The role of clean air zones in achieving the UK’s net-zero emissions ta...
 
14.30 The discord between limit value compliance and the LAQM objective regim...
14.30 The discord between limit value compliance and the LAQM objective regim...14.30 The discord between limit value compliance and the LAQM objective regim...
14.30 The discord between limit value compliance and the LAQM objective regim...
 
14.00 Developments in occupational hygiene and air quality.pdf
14.00 Developments in occupational hygiene and air quality.pdf14.00 Developments in occupational hygiene and air quality.pdf
14.00 Developments in occupational hygiene and air quality.pdf
 
12.15 Insights from the Clean Air Networks Conference.pdf
12.15 Insights from the Clean Air Networks Conference.pdf12.15 Insights from the Clean Air Networks Conference.pdf
12.15 Insights from the Clean Air Networks Conference.pdf
 
12.00 Applied Source Apportionment using Low Cost Sensors.pdf
12.00 Applied Source Apportionment  using Low Cost Sensors.pdf12.00 Applied Source Apportionment  using Low Cost Sensors.pdf
12.00 Applied Source Apportionment using Low Cost Sensors.pdf
 
11.15 Addressing emissions from NRMM.pdf
11.15 Addressing emissions from NRMM.pdf11.15 Addressing emissions from NRMM.pdf
11.15 Addressing emissions from NRMM.pdf
 
09.45 Dispersion modelling considerations for Net Zero and air quality.pdf
09.45 Dispersion modelling considerations for Net Zero and air quality.pdf09.45 Dispersion modelling considerations for Net Zero and air quality.pdf
09.45 Dispersion modelling considerations for Net Zero and air quality.pdf
 
09.15Measuring air pollutant emissions using novel techniques.pdf
09.15Measuring air pollutant emissions using novel techniques.pdf09.15Measuring air pollutant emissions using novel techniques.pdf
09.15Measuring air pollutant emissions using novel techniques.pdf
 
17.00 Integrating the Environment Act air quality targets into the planning s...
17.00 Integrating the Environment Act air quality targets into the planning s...17.00 Integrating the Environment Act air quality targets into the planning s...
17.00 Integrating the Environment Act air quality targets into the planning s...
 
16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...
16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...
16.30 Environmental Assessment Levels in relation to Carbon Capture and Stora...
 
16.00 Addressing Air Pollution in Net Zero work.pdf
16.00 Addressing Air Pollution in Net Zero work.pdf16.00 Addressing Air Pollution in Net Zero work.pdf
16.00 Addressing Air Pollution in Net Zero work.pdf
 
14.50 Air Quality Assessment of a Carbon Capture Centre.pdf
14.50 Air Quality Assessment of a Carbon Capture Centre.pdf14.50 Air Quality Assessment of a Carbon Capture Centre.pdf
14.50 Air Quality Assessment of a Carbon Capture Centre.pdf
 
14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...
14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...
14.40 Assessing Air Quality and Climate Change Impacts for Offshore Wind Farm...
 
14.30 Air Quality and Climate Change Lessons Learned.pdf
14.30 Air Quality and Climate Change Lessons Learned.pdf14.30 Air Quality and Climate Change Lessons Learned.pdf
14.30 Air Quality and Climate Change Lessons Learned.pdf
 
14.00 Air Quality Challenges of Carbon Capture.pdf
14.00 Air Quality Challenges of Carbon Capture.pdf14.00 Air Quality Challenges of Carbon Capture.pdf
14.00 Air Quality Challenges of Carbon Capture.pdf
 
12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdf12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdf
 

Dernier

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxhossanmdjobayer103
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 

Dernier (20)

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 

EIA for Better Design

  • 1. EIA For Better Design Institution of Environmental Sciences EIA Discussion Forum Eleni Antoniades 18 March 2021
  • 2. Eleni Antoniades Project Environmental Lead Construction Environmental Management and Assessment Aviation and Infrastructure Trustee and Board Member of the IES email: e.antoniades@eaenvironmental.com linkedin.com/in/eleniantoniadesenvironmental
  • 3. EIA Process General public environmental awareness has increased in recent years in the UK, with the growth of pressure groups and a greater interest in climate change as well as protected and designated sites As environmental professionals working in EIA, we are increasingly finding ourselves working on projects which are opposed by residents of the local and wider community. How can we, as EIA professionals use our expertise to positively influence the design process? What are the barriers to this may and how can they be overcome?
  • 4. EIA Regulations The requirement to avoid, prevent, reduce, off-set and mitigate environmental mpacts is written into the EIA Regulations: EIA Town and Country Planning As Amended in 2017 (3) An environmental statement is a statement which includes at least (c) a description of any features of the proposed development, or measures envisaged in order to avoid, prevent or reduce and, if possible, offset likely significant adverse effects on the environment; (d) a description of the reasonable alternatives studied by the developer, which are relevant to the proposed development and its specific characteristics, and an indication of the main reasons for the option chosen, taking into account the effects of the development on the environment ) if the decision is— (i) to grant planning permission or subsequent consent— a description of any features of the development and any measures envisaged in order to avoid, prevent, reduce and, if possible, offset, likely significant adverse effects on the environment; and 7. A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis). That description should explain the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases
  • 5. The Challenge As EIA is intended to be an iterative process which feeds into the design, we need to understand why as EIA professionals we often find ourselves assessing a project at a stage where we can have limited influence over the key design elements. The key to unlocking this is for environmental professionals working in EIA (EIA Project Leads, EIA Co-ordinators and Topic Specialists) to become involved at the very early stages of a project (feasibility and options appraisal) and for the environmental elements to have an equal weighting with engineering and economic impacts. The polls at the start of this forum we asked: 1) As an environmental professional, have you worked on the environmental assessment at feasibility stage of projects? Yes/ No 2) As an environmental professional, have you worked on the environmental assessment at the options appraisal stage of projects? Yes/ No 3) As an environmental professional, have you worked on the environmental assessment at the EIA Report or ES Report stage of projects? Yes/ No
  • 6. Feasibility Stage of a re- opening of a railway line between Bentley and Bordon
  • 7. Options Appraisal Stage Airport Development- Site selection or route selection
  • 8. Options Appraisal Stage: e.g. since 1991, 51 proposals have been considered for improving the A303 in the Stonehenge area
  • 9. EIA Stage/ES Stage –most likely site will be selected, preferred route option is most likely to be selected, outline design will be in place
  • 10. We will break out into groups: 1. Feasibility Stage 2. Options Appraisal 3. EIA Report/ ES Stage Where we can discuss the barriers to influencing the design at each of these stages 1. Feasibility Stage  Have you had the opportunity to assess a project at the feasibility stage?  Have you ever worked on a project which did not go past the feasibility stage on purely environmental grounds?  It is likely that a Client/Developer would approach consultants for feasibility study with the requirement for positive outcome. Has there been pressure to make the project be feasible, in your experience? 2. Options Appraisal  Have you had the opportunity to carry out options appraisal during a project’s development and if so which tools did you use (e.g. DfT Transport Appraisal Guidance)  Did the environmental elements have equal weighting with engineering and economic, or was it carried out retrospectively?  What weighting do you believe environmental assessment should have on the options appraisal and should an option be rejected purely on environmental grounds EIA Report/ ES Stage  Do you typically play an active role in the design of a project as part of the design team, along with civil /structural engineers?  Are you typically given a project route/building/structure which has already been designed and required to assess this in the EIA Report?  In your experience has your advice as an environmental professional been incorporated into the design process and influenced the design OR has design changed following public consultation /Statutory Consultee feedback?
  • 11. 1. Feasibility Stage Have you had the opportunity to assess a project at the feasibility stage? Have you ever worked on a project which did not go past the feasibility stage on purely environmental grounds?  It is likely that a Client/Developer would approach consultants for feasibility study with the requirement for positive outcome. Has there been pressure to make the project work? © Leo Hillier Photography, RAF Marham Runway
  • 12. 2) Options Appraisal Stage Have you had the opportunity to carry out options appraisal during a project’s development and if so which tools did you use (e.g. Transport Appraisal Guidance) Did the environmental elements have equal weighting with engineering and economic, or was it carried out retrospectively? What weighting do you believe environmental assessment should have on the options appraisal and should an option be rejected purely on environmental grounds © Leo Hillier Photography, RAF Marham Runway
  • 13. 3) EIA Report/ ES Stage Do you typically play an active role in the design of a project as part of the design team, along with civil /structural engineers? Are you typically given a project route/building/structure which has already been designed and required to assess this in the EIA Report? In your experience has your advice as an environmental professional been incorporated into the design process and influenced the design OR has design changed following public consultation /Statutory Consultee? (c) Photo: Moreas Construction
  • 14.
  • 15. Conclusion  Feasibility stage: at earlier stages of a project, during feasibility there is more scope to avoid environmentally sensitive sites entirely and to prevent adverse environmental impacts  Options appraisal stage: there is scope to prevent and reduce environmental impacts  EIA Report Stage: there is scope to reduce, mitigate and off-set  Potential for influence can decrease over time  Become involved at earlier stages of a project  Environment to have equal weighting with engineering and economic appraisal  EIA Report / ES Stage should be an opportunity to provide enhancement and improvements to the environment