EFFECT OF HUDHUD CYCLONE ON THE DEVELOPMENT OF VISAKHAPATNAM AS
SMART AND GREEN CITY- A CASE STUDY
VR Sankar Cheela1
, Ramesh raju B2
, Gopala Raju SSSV3
, KVGD Balaji4
1
Assistant Professor, Department of Civil Engineering, MVGR College of Engineering, Vizianagaram
2
Associate Professor, Department of Civil Engineering, MVGR College of Engineering, Vizianagaram
3
Professor, Department of Civil Engineering, MVGR College of Engineering, Vizianagaram,
E-Mail: sssvgopalaraju@gmail.com, Ph No: 9492229222
4
Professor, Department of Civil Engineering, GITAM University, Visakhapatnam
Abstract
The present study discusses on preliminary survey on the awareness levels of different classes of people on disaster alarming and
management system. This provided fundamental initiative for developing a plan for green and smart city. 57% of the survey
included the participants from age group 15- 35 age and 43% from age group above 35 years age. 49% are from educational
sector, 21% are from government and private sector, 30% from others. 31% are part of cyclones, 9% are part of floods, 59% are
part of landslides. The survey revealed that 70% increase in the awareness levels on disaster alarming system. 50% people are
aware of disaster management system before tsunami while it increased by 44% after tsunami. The technological development has
catered a better scope in facing the disasters of this sort. The public private participatory approach would bring better results in
developing a better disaster alarming, management and green city.
Key words: Disaster alarming system, Disaster management system, smart city
.................................................................................................***.......................................................................................
1. INTRODUCTION
Hudhud was one of the two strongest tropical cyclones of
2014 within the Bay of Bengal. On October 6th
, 2014 near
Andaman Sea under the influence of the upper air cyclonic
circulation the storm originated as a low pressure system.
Open water shaped a constructive atmosphere for formation
of depression. Tropical cyclone formation alert (TCFA) [1]
was issued by the Joint Typhoon Warning Center (JTWC).
At long island, Andaman depression made its first landfall.
The intensity of the storm increased at a rapid rate after
entering the Bay of Bengal. On October 10th
, 2014 with
moderate wind shear the tropical cyclone formed a
microwave eye feature escalating its impact [2,3,4]
. With a
minimum central pressure of 950 mbar (28.05 inHg) and
three-minute average wind speeds of 185 km/h (115 mph)
the cyclone underwent rapid intensification and developed
an eye at its center on October 11th
, 2014. Hudhud
underwent landfall near Visakhapatnam on October 12th
,
2014 near 17.7°N 83.3°E.[5,6,7,8]
Peak strength of 3 minute
wind speeds of 175km/h and minimum central pressure of
960mbar were reached. It drifted northwards causing
profound rainfall in the areas of Madhya Pradesh, Uttar
Pradesh and Nepal. Prevalent snow fall in Uttar Pradesh and
Nepal occurred in later stages. It has been classified as
category 4 under saffir- simpson scale. The government
alerted nine out of thirteen districts of Andhra Pradesh. It
declared and alert sounding nine. Half a million people were
evacuated and were put in the relief camps. National
Disaster Response Force (NDRF) mobilized 35 teams in
Andhra Pradesh and Odisa. 38 trains were cancelled on
October 12th
, 2014. Fishermen were warned and were
evacuated. The National Highway, one of the major roads
traversing was shut down after trees were uprooted due to
storm force. Within hours of hitting the coast, the cyclone
severed and damaged Naval Dockyard, Vizag steel plant,
Hindustan Petroleum Limited and other major industries in
the city. Visakhapatnam Airport was flooded, roof of the
terminal was torn, and radar and navigational aids were
destroyed. Strong winds and heavy rainfall uprooted trees,
damaged power supply and communication systems, leading
to disruption in power supply and connectivity [9,10]
. With
the extensive damage the residents of coastal districts were
without power supply and communication for an average
period of ten days. The government has undertaken
initiatives in restoring the basic needs [11,12]
.
2. STUDY AREA
Visakhapatnam is also known as City of Destiny, is one of
the swiftly emergent metropolitan cities in south India.
Topographically, Visakhapatnam is located north east corner
of Andhra Pradesh between 17°31’42” - 17°55’29”
Northern Latitude to 83°2’5” - 83°25’17” Eastern latitude at
an average elevation of 3 meters above sea level surrounded
by Kailasa Hills on North, Yarada hills on South, Narva
hills on west and Bay of Bengal on East. The city gets
moderate rainfall of 1202 mm largely between June to
October. On account of its elevation, Visakhapatnam has hot
and humid climate comparable to those of other temperature
regions. The city covers the local planning area of 544 sq.
kms. The Greater Visakhapatnam Municipal Corporation
(GVMC) consists of Municipal Corporation of
Visakhapatnam, 32 merged villages and Gajuwaka
municipality. The population of Visakhapatnam as per 2001
census is 9.69 lakhs while that in 2011 is 17.06 lakhs
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 28
indicating the growth of population as 79% during 2001 to
2011. Merging of the surrounding villages and
municipalities is a significant contributing factor for the
rapid increase in percentage of population. GVMC has been
divided into six zones consisting of 72 wards. The GVMC is
concerned with the prime areas of public health, solid waste
management including health care waste, sanitation and
education. Participatory approach is adopted to develop
Visakhapatnam into smart city.
2.1 Screening Methodology
Development projects require mitigation, evaluation and
assessment of various factors which play a vital role in
decision making. Among various alternatives available for
nurturing city of destiny into smart city it is necessary to
undertake a preliminary assessment in reaching to a better
solution. In the process of impact assessment the
preliminary process embark on with screening process in
which various surveys are to be conducted. As part of this
process an initial study was performed with a set of
questions for deciding various options for developing a
better city and disaster management system. The following
is set of first round questions:
1. Share your experiences about previous disasters
occurred in Visakhapatnam.
2. Rate and share your views on disaster alarming system.
3. Rate and share your views on disaster management
system.
4. Share your views in developing Green & Smart
Visakhapatnam.
3. RESULTS AND DISCUSSIONS
3.1 Classes Of Participants Based On Age Group
Preliminary surveys were conducted in the study area for a
period of five days for collecting the views from different
classes of people. The criteria one for dividing the class of
participants was divided based on the age group. 15 -25
years, 25-35 years, 35-50 years, 50-60 years, greater than 60
years were considered. Figure 1 represents the gender wise
percentage of people participated. 36% male and 24%
female from 15-25 age group, 26% male and 28% female
from 25-35 age group,18% male and 28% female from 35-
50 age group, 13% male and 14% female from 50-60 age
group, 8% male and 7% female from greater than 60 age
group participated in the survey. Overall 57% of the survey
included the participants from age group 15- 35 age and
43% from age group above 35 years age.
Figure 1: Gender Vs. Age Group
3.2 Classes of participants based on profession
The criteria two for dividing the class of participants was
divided based on the profession. It is classified into
Students, government sector, private sector, academics and
others. Figure 2 represents the profession wise percentage of
people participated. 41% male and 38% female are students,
13% male and 3% female are working in government sector,
15% male and 7% female are working in private sector, 10%
male and 7% female are working as academicians, 21%
male and 45% female are classified as others which included
self financed, non-working people. Overall 49% are from
educational sector, 21% are from government and private
sector, 30% from others.
Figure 2: Gender vs. Profession
3.3 Disasters occurred in Visakhapatnam
After the state division, Visakhapatnam has been recognized
as one of the central zones for developing the industrial
corridor. The government has been planning to nurture this
city as a smart city. During this process period the place has
been affected by one of very severe cyclone named Hudhud.
The government has decided to start from scratch and take
initiatives in shaping into green and smart city from the day
after this cyclone. As the location of the city lies near to sea
it is necessary to understand about the various disasters
occurred previously. Figure 3 represents the percentage of
people who are part of disasters occurred in Visakhapatnam.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 29
As part of this the participants shared their experiences
about the past disasters. 31% are part of cyclones, 9% are
part of floods, 59% are part of landslides occurred and no
hurricanes and typhoons occurred. They shared their
experiences about the severe cyclone in the year 1977,
Tsunami in year 2004 which are considered to be most
disastrous disasters occurred before. Odisa cyclone in year
1999, Cyclone Phailin, Cyclone Nilofar and many more
included the list of tropical cyclones affected
Visakhapatnam. As the city is covered by the hills in the
three directions, during rainy season landslides occurred.
Figure 3: Type of disaters occurred in Visakhapatnam
3.4 Disaster alarming system for Hudhud
Disaster alarming system plays a major role in creating
awareness to the residents of the affected area during the
disaster period. A survey was made to understand about the
awareness system among various categories of people.
Figure 4 represents the percentage of awareness among
people about disaster alarming system. During tsunami
period 14% of people are aware of disaster alarming system,
44% people are having an idea about alarming system while
42% people are not aware of these systems. During Hudhud
cyclone 85% of people are aware of disaster alarming
system, 3% people are have a idea about alarming system
while 12% people are not aware of these systems. The
participants expressed that it is after tsunami many efforts
were made to make people aware of the alarming systems
and high initiatives were taken by the Indian Metrological
Department (IMD) in estimating and forecast the disasters
prior hand. The dynamics of the Hudhud cyclone were
foretold by IMD before 5 days. The participants expressed
that the alarming system was excellent and the cyclone
reached the landfall as predicted which played a major role
in reduction of death toll to a great extent.
Figure 4: Percentage of awareness among people about
disaster alarming system
3.5 Restoration and rehabilitation activities
Restoring of transportation, communication and power
supply in a very short span of time was achieved due to the
awareness created by the disaster management system
initiatives.
A survey was made to understand about the awareness
system among various categories of people. Figure 4
represents the percentage of awareness among people about
disaster management system. During cyclones of this sort
previously 38% of people are aware of disaster management
system, 9% people are have an idea about this system while
53% people are not aware of these systems. During tsunami
period 50% of people are aware of disaster management
system, 15% people are have a idea about this system while
35% people are not aware of these systems. During Hudhud
cyclone 94% of people are aware of disaster management
system, 3% people have an idea about alarming system, 3%
people are not aware of these systems. The survey provided
that the government has taken better initiatives after tsunami
effect in making people to have an awareness to sustain the
life after disaster. The initiatives and technological
advancements during this span have provided a better
platform for speedy recovery of the city from the disaster.
Public-Private participation created hand-in-hand for the
government to commence enhanced rehabilitation activities.
Figure 5: Percentage of awareness among people about
disaster management system
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 30
3.6 Developing Green and Smart Visakhapatnam.
Eight key aspects of the smart city include governance,
energy, building, mobility, infrastructure, technology,
healthcare and citizen. The smart city utilizes information
and communication technologies for the development of
physical infrastructure engaging the residents of the city to
participate in innovative designing and development of
strong economic, social and cultural developments [13,14,15]
.
The development shall include low cost, affordable housing,
transit oriented development, e-solutions for various
activities and inclusive of social and commercial
architecture. The smart city plan shall include electrification
of all households with power availability for at least 8 hours
per day, intelligent transport systems, safe waste disposal
units, effective disaster management systems and risk
reduction technologies, Electric vehicle charging stations in
all urban areas and along all state and national highways,
utilization of renewable sources of energy[16,17]
.
CONCLUSIONS
1. The surveys reveled that that 31% are part of cyclones,
9% are part of floods, 59% are part of landslides
occurred and no hurricanes and typhoons occurred in
previous years.
2. Awareness on disaster alarming and risk reduction
technologies are to be encouraged and initiatives are to
be taken through public private participation
3. The disaster management system should be well
connected to the people through information and
communication methodologies.
4. The plan of shaping the city into smart and green city
shall include the governance, energy, building,
mobility, infrastructure, technology, healthcare aspects
into consideration.
REFERENCES
1. "Tropical Cyclone Formation Alert – Issued at 1330
UTC, 7 October 2014.". Joint Typhoon Warning
Center.
2. "Tropical Weather Outlook for North Indian Ocean
Issued at 0600 UTC of October 7, 2014.". India
Meteorological Department.
3. "Cyclonic Storm Hudhud over north Andaman Sea &
adjoining southeast Bay of Bengal.". India
Meteorological Department.
4. "Very Severe Cyclonic Storm, HUDHUD over the Bay
of Bengal (7-14 October 2014): A Report". India
Meteorological Department.
5. "Hudhud intensifies: Andhra Pradesh, Odisha on high
alert". India Today. India Today.
6. "Cyclone Hudhud Effect: 38 Trains Cancelled on
October 12". 11 October 2014.
7. "Cyclone Hudhud Heads for Odisha, After Battering
Andaman and Nicobar Islands". NDTV. 8 October
2014.
8. "Cyclone Hudhud: 1.11 lakh people in Andhra
Pradesh evacuated".
9. "Cyclone warning centre at Vizag also hit by
Hudhud". news. biharprabha.com. IANS. 12 October
2014.
10. "Relief operations begin in cyclone-hit Andhra". 13
October 2014.
11. "Hudhud rips through Visakhapatnam airport". Times
of India (Hyderabad). 14 October 2014.
12. "Cyclone Hudhud triggers Heavy rainfall in Southern
Odisha". news. biharprabha.com. IANS. 12 October
2014.
13. Beck, A. and Stave, K. (2011). “Understanding urban
quality of life and sustainability,” presented at the 29th
International Conference of the System Dynamics
Society Washington, DC, July
14. Bengtsson, F. and AŁgerfalk, P. J. (2011).
“Information technology as a change actant in
sustainability innovation: insights from Uppsala,”
Journal of Strategic Information Systems, vol. 16 (4),
96–112
15. Brinkman, J. (2011). “Supporting sustainability
through smart infrastructures: the case of Amsterdam,”
Network Industries Quarterly, vol. 13 (3)
16. Hutchins, M. J. and Sutherland, J. W. (2008). “An
exploration of measures of social sustainability and
their application to supply chain decisions,” Journal of
Cleaner Production, vol. 16, 1688-1698
17. Munda, G. (2006). “Social multi-criteria evaluation for
urban sustainability policies,” Land Use Policy:
Elsevier Ltd, vol. 23, 86-94

Contenu connexe

Tendances

Case study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra YadavCase study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra YadavNarendra Yadav
 
uttarakhand flood disaster 2013
uttarakhand flood disaster 2013uttarakhand flood disaster 2013
uttarakhand flood disaster 2013'VD' Vishnu
 
Powerpoint on Indian flood (2015 Chennai flood)
Powerpoint on Indian flood (2015 Chennai flood)Powerpoint on Indian flood (2015 Chennai flood)
Powerpoint on Indian flood (2015 Chennai flood)AdrizaBera
 
India Legal 15 October 2016
India Legal 15 October 2016 India Legal 15 October 2016
India Legal 15 October 2016 ENC
 
Uttarakhand floods (Post disaster)
Uttarakhand floods (Post disaster)Uttarakhand floods (Post disaster)
Uttarakhand floods (Post disaster)Jigar Panot
 
Flood in uttarakhand
Flood in uttarakhandFlood in uttarakhand
Flood in uttarakhandAnupam Rathi
 
disaster in uttarakhand 2013
disaster in uttarakhand 2013disaster in uttarakhand 2013
disaster in uttarakhand 2013yashgaba
 
India Legal 11 March 2019
India Legal 11 March 2019India Legal 11 March 2019
India Legal 11 March 2019ENC
 
Uttarkashi report final
Uttarkashi report finalUttarkashi report final
Uttarkashi report finalbiswarupc
 
Uttrakhand disaster tad 2014-11
Uttrakhand disaster tad 2014-11Uttrakhand disaster tad 2014-11
Uttrakhand disaster tad 2014-11Vijay Kumar
 
Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013Beda Choudhury
 
Kerala flood August 2018
Kerala flood August 2018Kerala flood August 2018
Kerala flood August 2018Ritesh Singh
 
Cloudburst in uk new ppt
Cloudburst in uk  new pptCloudburst in uk  new ppt
Cloudburst in uk new pptpgayatrinaidu
 

Tendances (20)

The Kedarnath Trajedy
The Kedarnath TrajedyThe Kedarnath Trajedy
The Kedarnath Trajedy
 
Case study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra YadavCase study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
 
Supercyclone of Odisha
Supercyclone of OdishaSupercyclone of Odisha
Supercyclone of Odisha
 
uttarakhand flood disaster 2013
uttarakhand flood disaster 2013uttarakhand flood disaster 2013
uttarakhand flood disaster 2013
 
Powerpoint on Indian flood (2015 Chennai flood)
Powerpoint on Indian flood (2015 Chennai flood)Powerpoint on Indian flood (2015 Chennai flood)
Powerpoint on Indian flood (2015 Chennai flood)
 
India Legal 15 October 2016
India Legal 15 October 2016 India Legal 15 October 2016
India Legal 15 October 2016
 
Uttarakhand floods (Post disaster)
Uttarakhand floods (Post disaster)Uttarakhand floods (Post disaster)
Uttarakhand floods (Post disaster)
 
Flood in uttarakhand
Flood in uttarakhandFlood in uttarakhand
Flood in uttarakhand
 
Kerala Floods
Kerala FloodsKerala Floods
Kerala Floods
 
Chennai floods 2015 report
Chennai floods 2015 reportChennai floods 2015 report
Chennai floods 2015 report
 
disaster in uttarakhand 2013
disaster in uttarakhand 2013disaster in uttarakhand 2013
disaster in uttarakhand 2013
 
India Legal 11 March 2019
India Legal 11 March 2019India Legal 11 March 2019
India Legal 11 March 2019
 
Uttarkashi report final
Uttarkashi report finalUttarkashi report final
Uttarkashi report final
 
Uttrakhand disaster tad 2014-11
Uttrakhand disaster tad 2014-11Uttrakhand disaster tad 2014-11
Uttrakhand disaster tad 2014-11
 
Uttarakhand Disaster
Uttarakhand DisasterUttarakhand Disaster
Uttarakhand Disaster
 
Uttarakhand
UttarakhandUttarakhand
Uttarakhand
 
Kedarnath cloudburst
Kedarnath cloudburstKedarnath cloudburst
Kedarnath cloudburst
 
Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013Flood in Uttarakhand, 2013
Flood in Uttarakhand, 2013
 
Kerala flood August 2018
Kerala flood August 2018Kerala flood August 2018
Kerala flood August 2018
 
Cloudburst in uk new ppt
Cloudburst in uk  new pptCloudburst in uk  new ppt
Cloudburst in uk new ppt
 

En vedette

Cyclones
CyclonesCyclones
CyclonesTrev
 
Cyclone Nikhil & Mazar
Cyclone Nikhil & MazarCyclone Nikhil & Mazar
Cyclone Nikhil & Mazarsubzero64
 
Cyclone power point
Cyclone power pointCyclone power point
Cyclone power pointStacey
 
A comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go cloudsA comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go cloudseSAT Publishing House
 
Study on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandStudy on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandeSAT Publishing House
 
Run time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingRun time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingeSAT Publishing House
 
Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...eSAT Publishing House
 
Evolution of social developer network in oss survey
Evolution of social developer network in oss surveyEvolution of social developer network in oss survey
Evolution of social developer network in oss surveyeSAT Publishing House
 
The use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingThe use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingeSAT Publishing House
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...eSAT Publishing House
 
Approaches to the numerical solving of fuzzy
Approaches to the numerical solving of fuzzyApproaches to the numerical solving of fuzzy
Approaches to the numerical solving of fuzzyeSAT Publishing House
 
A simplified design of multiplier for multi layer feed forward hardware neura...
A simplified design of multiplier for multi layer feed forward hardware neura...A simplified design of multiplier for multi layer feed forward hardware neura...
A simplified design of multiplier for multi layer feed forward hardware neura...eSAT Publishing House
 
Smart automobile security system using labview
Smart automobile security system using labviewSmart automobile security system using labview
Smart automobile security system using labvieweSAT Publishing House
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stationseSAT Publishing House
 
A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...eSAT Publishing House
 
Design and performance analysis of band pass filter
Design and performance analysis of band pass filterDesign and performance analysis of band pass filter
Design and performance analysis of band pass filtereSAT Publishing House
 

En vedette (20)

Cyclones
CyclonesCyclones
Cyclones
 
Cyclone Nikhil & Mazar
Cyclone Nikhil & MazarCyclone Nikhil & Mazar
Cyclone Nikhil & Mazar
 
Cyclone
CycloneCyclone
Cyclone
 
Cyclones
CyclonesCyclones
Cyclones
 
Cyclones!!!!
Cyclones!!!!Cyclones!!!!
Cyclones!!!!
 
Cyclone
CycloneCyclone
Cyclone
 
Cyclone power point
Cyclone power pointCyclone power point
Cyclone power point
 
A comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go cloudsA comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go clouds
 
Study on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandStudy on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sand
 
Run time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingRun time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration using
 
Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...
 
Evolution of social developer network in oss survey
Evolution of social developer network in oss surveyEvolution of social developer network in oss survey
Evolution of social developer network in oss survey
 
The use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingThe use of polynomial shape function in the buckling
The use of polynomial shape function in the buckling
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...
 
Approaches to the numerical solving of fuzzy
Approaches to the numerical solving of fuzzyApproaches to the numerical solving of fuzzy
Approaches to the numerical solving of fuzzy
 
A simplified design of multiplier for multi layer feed forward hardware neura...
A simplified design of multiplier for multi layer feed forward hardware neura...A simplified design of multiplier for multi layer feed forward hardware neura...
A simplified design of multiplier for multi layer feed forward hardware neura...
 
Smart automobile security system using labview
Smart automobile security system using labviewSmart automobile security system using labview
Smart automobile security system using labview
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stations
 
A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...
 
Design and performance analysis of band pass filter
Design and performance analysis of band pass filterDesign and performance analysis of band pass filter
Design and performance analysis of band pass filter
 

Similaire à Effect of hudhud cyclone on the development of visakhapatnam as smart and green city a case study

Disaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptxDisaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptxShamsMukhtar1
 
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...IRJET Journal
 
Community based Early Warning System
Community based Early Warning SystemCommunity based Early Warning System
Community based Early Warning SystemArvind Kumar
 
Vishwakarma Yojana an Approach towards Rurbanization Dayal
Vishwakarma Yojana an Approach towards Rurbanization DayalVishwakarma Yojana an Approach towards Rurbanization Dayal
Vishwakarma Yojana an Approach towards Rurbanization Dayalijtsrd
 
Need for Disaster Risk Resilience: A case of India
Need for Disaster Risk Resilience: A case of IndiaNeed for Disaster Risk Resilience: A case of India
Need for Disaster Risk Resilience: A case of IndiaIRJET Journal
 
The impact of the floods in the Kuzhur panchayat and the depth of the floods ...
The impact of the floods in the Kuzhur panchayat and the depth of the floods ...The impact of the floods in the Kuzhur panchayat and the depth of the floods ...
The impact of the floods in the Kuzhur panchayat and the depth of the floods ...IRJET Journal
 
Agnivesh_Dissertation (1) (1)
Agnivesh_Dissertation (1) (1)Agnivesh_Dissertation (1) (1)
Agnivesh_Dissertation (1) (1)Agnivesh Mandala
 
Disaster management in india challenges and opportunities
Disaster management in india  challenges and opportunitiesDisaster management in india  challenges and opportunities
Disaster management in india challenges and opportunitiesShubham Agrawal
 
INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...
INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...
INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...IRJET Journal
 
Uttarakhand tragedy
Uttarakhand tragedyUttarakhand tragedy
Uttarakhand tragedyGarv Jain
 
IRJET-About Urban Sprawl: A Case Study of Ahmedabad City
IRJET-About Urban Sprawl: A Case Study of Ahmedabad CityIRJET-About Urban Sprawl: A Case Study of Ahmedabad City
IRJET-About Urban Sprawl: A Case Study of Ahmedabad CityIRJET Journal
 
Disaster Risks Associated with the State of Rajasthan
Disaster Risks Associated with the State of RajasthanDisaster Risks Associated with the State of Rajasthan
Disaster Risks Associated with the State of Rajasthanijtsrd
 
IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...
IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...
IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...Kazi Mahfuzur Rahman
 
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUES
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUESDISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUES
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUESIRJET Journal
 
Approach of irw towards urban safety collective action for resilient urban ...
Approach of irw towards urban safety   collective action for resilient urban ...Approach of irw towards urban safety   collective action for resilient urban ...
Approach of irw towards urban safety collective action for resilient urban ...M. Mizanur Rahman
 
Approach of IRW-B towards urban safety
Approach of IRW-B towards urban safety  Approach of IRW-B towards urban safety
Approach of IRW-B towards urban safety Mizanur Mithun
 
22ESC-241 / BECSK301 notes M-2 (ppt).pdf
22ESC-241 / BECSK301 notes M-2 (ppt).pdf22ESC-241 / BECSK301 notes M-2 (ppt).pdf
22ESC-241 / BECSK301 notes M-2 (ppt).pdfsunilbirkur
 

Similaire à Effect of hudhud cyclone on the development of visakhapatnam as smart and green city a case study (20)

Disaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptxDisaster Management in Andhra Pradesh....pptx
Disaster Management in Andhra Pradesh....pptx
 
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...
 
Community based Early Warning System
Community based Early Warning SystemCommunity based Early Warning System
Community based Early Warning System
 
Vishwakarma Yojana an Approach towards Rurbanization Dayal
Vishwakarma Yojana an Approach towards Rurbanization DayalVishwakarma Yojana an Approach towards Rurbanization Dayal
Vishwakarma Yojana an Approach towards Rurbanization Dayal
 
Need for Disaster Risk Resilience: A case of India
Need for Disaster Risk Resilience: A case of IndiaNeed for Disaster Risk Resilience: A case of India
Need for Disaster Risk Resilience: A case of India
 
The impact of the floods in the Kuzhur panchayat and the depth of the floods ...
The impact of the floods in the Kuzhur panchayat and the depth of the floods ...The impact of the floods in the Kuzhur panchayat and the depth of the floods ...
The impact of the floods in the Kuzhur panchayat and the depth of the floods ...
 
Agnivesh_Dissertation (1) (1)
Agnivesh_Dissertation (1) (1)Agnivesh_Dissertation (1) (1)
Agnivesh_Dissertation (1) (1)
 
Disaster management in india challenges and opportunities
Disaster management in india  challenges and opportunitiesDisaster management in india  challenges and opportunities
Disaster management in india challenges and opportunities
 
INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...
INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...
INFRASTRUCTURE MAPPING FOR POST FLOOD DISASTER MITIGATION IN PALA MUNCIPALITY...
 
Uttarakhand tragedy
Uttarakhand tragedyUttarakhand tragedy
Uttarakhand tragedy
 
IJET-V2I5P24
IJET-V2I5P24IJET-V2I5P24
IJET-V2I5P24
 
IRJET-About Urban Sprawl: A Case Study of Ahmedabad City
IRJET-About Urban Sprawl: A Case Study of Ahmedabad CityIRJET-About Urban Sprawl: A Case Study of Ahmedabad City
IRJET-About Urban Sprawl: A Case Study of Ahmedabad City
 
Disaster Risks Associated with the State of Rajasthan
Disaster Risks Associated with the State of RajasthanDisaster Risks Associated with the State of Rajasthan
Disaster Risks Associated with the State of Rajasthan
 
IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...
IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...
IMPACT OF URBAN PARTNERSHIP FOR POVERTY REDUCTION (UPPR) PROJECT: A CASE STUD...
 
Smart Village
Smart VillageSmart Village
Smart Village
 
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUES
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUESDISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUES
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUES
 
Approach of irw towards urban safety collective action for resilient urban ...
Approach of irw towards urban safety   collective action for resilient urban ...Approach of irw towards urban safety   collective action for resilient urban ...
Approach of irw towards urban safety collective action for resilient urban ...
 
Approach of IRW-B towards urban safety
Approach of IRW-B towards urban safety  Approach of IRW-B towards urban safety
Approach of IRW-B towards urban safety
 
CK2017: Mainstreaming Urban Climate Resilience in Indian Cities
CK2017: Mainstreaming Urban Climate Resilience in Indian Cities CK2017: Mainstreaming Urban Climate Resilience in Indian Cities
CK2017: Mainstreaming Urban Climate Resilience in Indian Cities
 
22ESC-241 / BECSK301 notes M-2 (ppt).pdf
22ESC-241 / BECSK301 notes M-2 (ppt).pdf22ESC-241 / BECSK301 notes M-2 (ppt).pdf
22ESC-241 / BECSK301 notes M-2 (ppt).pdf
 

Plus de eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Disaster recovery sustainable housing
Disaster recovery sustainable housingDisaster recovery sustainable housing
Disaster recovery sustainable housingeSAT Publishing House
 
Detection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environmentDetection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environmenteSAT Publishing House
 
Cyclone disaster on housing and coastal area
Cyclone disaster on housing and coastal areaCyclone disaster on housing and coastal area
Cyclone disaster on housing and coastal areaeSAT Publishing House
 

Plus de eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Disaster recovery sustainable housing
Disaster recovery sustainable housingDisaster recovery sustainable housing
Disaster recovery sustainable housing
 
Detection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environmentDetection of hazard prone areas in the upper himalayan region in gis environment
Detection of hazard prone areas in the upper himalayan region in gis environment
 
Cyclone disaster on housing and coastal area
Cyclone disaster on housing and coastal areaCyclone disaster on housing and coastal area
Cyclone disaster on housing and coastal area
 

Dernier

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 

Dernier (20)

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Effect of hudhud cyclone on the development of visakhapatnam as smart and green city a case study

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 27 EFFECT OF HUDHUD CYCLONE ON THE DEVELOPMENT OF VISAKHAPATNAM AS SMART AND GREEN CITY- A CASE STUDY VR Sankar Cheela1 , Ramesh raju B2 , Gopala Raju SSSV3 , KVGD Balaji4 1 Assistant Professor, Department of Civil Engineering, MVGR College of Engineering, Vizianagaram 2 Associate Professor, Department of Civil Engineering, MVGR College of Engineering, Vizianagaram 3 Professor, Department of Civil Engineering, MVGR College of Engineering, Vizianagaram, E-Mail: sssvgopalaraju@gmail.com, Ph No: 9492229222 4 Professor, Department of Civil Engineering, GITAM University, Visakhapatnam Abstract The present study discusses on preliminary survey on the awareness levels of different classes of people on disaster alarming and management system. This provided fundamental initiative for developing a plan for green and smart city. 57% of the survey included the participants from age group 15- 35 age and 43% from age group above 35 years age. 49% are from educational sector, 21% are from government and private sector, 30% from others. 31% are part of cyclones, 9% are part of floods, 59% are part of landslides. The survey revealed that 70% increase in the awareness levels on disaster alarming system. 50% people are aware of disaster management system before tsunami while it increased by 44% after tsunami. The technological development has catered a better scope in facing the disasters of this sort. The public private participatory approach would bring better results in developing a better disaster alarming, management and green city. Key words: Disaster alarming system, Disaster management system, smart city .................................................................................................***....................................................................................... 1. INTRODUCTION Hudhud was one of the two strongest tropical cyclones of 2014 within the Bay of Bengal. On October 6th , 2014 near Andaman Sea under the influence of the upper air cyclonic circulation the storm originated as a low pressure system. Open water shaped a constructive atmosphere for formation of depression. Tropical cyclone formation alert (TCFA) [1] was issued by the Joint Typhoon Warning Center (JTWC). At long island, Andaman depression made its first landfall. The intensity of the storm increased at a rapid rate after entering the Bay of Bengal. On October 10th , 2014 with moderate wind shear the tropical cyclone formed a microwave eye feature escalating its impact [2,3,4] . With a minimum central pressure of 950 mbar (28.05 inHg) and three-minute average wind speeds of 185 km/h (115 mph) the cyclone underwent rapid intensification and developed an eye at its center on October 11th , 2014. Hudhud underwent landfall near Visakhapatnam on October 12th , 2014 near 17.7°N 83.3°E.[5,6,7,8] Peak strength of 3 minute wind speeds of 175km/h and minimum central pressure of 960mbar were reached. It drifted northwards causing profound rainfall in the areas of Madhya Pradesh, Uttar Pradesh and Nepal. Prevalent snow fall in Uttar Pradesh and Nepal occurred in later stages. It has been classified as category 4 under saffir- simpson scale. The government alerted nine out of thirteen districts of Andhra Pradesh. It declared and alert sounding nine. Half a million people were evacuated and were put in the relief camps. National Disaster Response Force (NDRF) mobilized 35 teams in Andhra Pradesh and Odisa. 38 trains were cancelled on October 12th , 2014. Fishermen were warned and were evacuated. The National Highway, one of the major roads traversing was shut down after trees were uprooted due to storm force. Within hours of hitting the coast, the cyclone severed and damaged Naval Dockyard, Vizag steel plant, Hindustan Petroleum Limited and other major industries in the city. Visakhapatnam Airport was flooded, roof of the terminal was torn, and radar and navigational aids were destroyed. Strong winds and heavy rainfall uprooted trees, damaged power supply and communication systems, leading to disruption in power supply and connectivity [9,10] . With the extensive damage the residents of coastal districts were without power supply and communication for an average period of ten days. The government has undertaken initiatives in restoring the basic needs [11,12] . 2. STUDY AREA Visakhapatnam is also known as City of Destiny, is one of the swiftly emergent metropolitan cities in south India. Topographically, Visakhapatnam is located north east corner of Andhra Pradesh between 17°31’42” - 17°55’29” Northern Latitude to 83°2’5” - 83°25’17” Eastern latitude at an average elevation of 3 meters above sea level surrounded by Kailasa Hills on North, Yarada hills on South, Narva hills on west and Bay of Bengal on East. The city gets moderate rainfall of 1202 mm largely between June to October. On account of its elevation, Visakhapatnam has hot and humid climate comparable to those of other temperature regions. The city covers the local planning area of 544 sq. kms. The Greater Visakhapatnam Municipal Corporation (GVMC) consists of Municipal Corporation of Visakhapatnam, 32 merged villages and Gajuwaka municipality. The population of Visakhapatnam as per 2001 census is 9.69 lakhs while that in 2011 is 17.06 lakhs
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 28 indicating the growth of population as 79% during 2001 to 2011. Merging of the surrounding villages and municipalities is a significant contributing factor for the rapid increase in percentage of population. GVMC has been divided into six zones consisting of 72 wards. The GVMC is concerned with the prime areas of public health, solid waste management including health care waste, sanitation and education. Participatory approach is adopted to develop Visakhapatnam into smart city. 2.1 Screening Methodology Development projects require mitigation, evaluation and assessment of various factors which play a vital role in decision making. Among various alternatives available for nurturing city of destiny into smart city it is necessary to undertake a preliminary assessment in reaching to a better solution. In the process of impact assessment the preliminary process embark on with screening process in which various surveys are to be conducted. As part of this process an initial study was performed with a set of questions for deciding various options for developing a better city and disaster management system. The following is set of first round questions: 1. Share your experiences about previous disasters occurred in Visakhapatnam. 2. Rate and share your views on disaster alarming system. 3. Rate and share your views on disaster management system. 4. Share your views in developing Green & Smart Visakhapatnam. 3. RESULTS AND DISCUSSIONS 3.1 Classes Of Participants Based On Age Group Preliminary surveys were conducted in the study area for a period of five days for collecting the views from different classes of people. The criteria one for dividing the class of participants was divided based on the age group. 15 -25 years, 25-35 years, 35-50 years, 50-60 years, greater than 60 years were considered. Figure 1 represents the gender wise percentage of people participated. 36% male and 24% female from 15-25 age group, 26% male and 28% female from 25-35 age group,18% male and 28% female from 35- 50 age group, 13% male and 14% female from 50-60 age group, 8% male and 7% female from greater than 60 age group participated in the survey. Overall 57% of the survey included the participants from age group 15- 35 age and 43% from age group above 35 years age. Figure 1: Gender Vs. Age Group 3.2 Classes of participants based on profession The criteria two for dividing the class of participants was divided based on the profession. It is classified into Students, government sector, private sector, academics and others. Figure 2 represents the profession wise percentage of people participated. 41% male and 38% female are students, 13% male and 3% female are working in government sector, 15% male and 7% female are working in private sector, 10% male and 7% female are working as academicians, 21% male and 45% female are classified as others which included self financed, non-working people. Overall 49% are from educational sector, 21% are from government and private sector, 30% from others. Figure 2: Gender vs. Profession 3.3 Disasters occurred in Visakhapatnam After the state division, Visakhapatnam has been recognized as one of the central zones for developing the industrial corridor. The government has been planning to nurture this city as a smart city. During this process period the place has been affected by one of very severe cyclone named Hudhud. The government has decided to start from scratch and take initiatives in shaping into green and smart city from the day after this cyclone. As the location of the city lies near to sea it is necessary to understand about the various disasters occurred previously. Figure 3 represents the percentage of people who are part of disasters occurred in Visakhapatnam.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 29 As part of this the participants shared their experiences about the past disasters. 31% are part of cyclones, 9% are part of floods, 59% are part of landslides occurred and no hurricanes and typhoons occurred. They shared their experiences about the severe cyclone in the year 1977, Tsunami in year 2004 which are considered to be most disastrous disasters occurred before. Odisa cyclone in year 1999, Cyclone Phailin, Cyclone Nilofar and many more included the list of tropical cyclones affected Visakhapatnam. As the city is covered by the hills in the three directions, during rainy season landslides occurred. Figure 3: Type of disaters occurred in Visakhapatnam 3.4 Disaster alarming system for Hudhud Disaster alarming system plays a major role in creating awareness to the residents of the affected area during the disaster period. A survey was made to understand about the awareness system among various categories of people. Figure 4 represents the percentage of awareness among people about disaster alarming system. During tsunami period 14% of people are aware of disaster alarming system, 44% people are having an idea about alarming system while 42% people are not aware of these systems. During Hudhud cyclone 85% of people are aware of disaster alarming system, 3% people are have a idea about alarming system while 12% people are not aware of these systems. The participants expressed that it is after tsunami many efforts were made to make people aware of the alarming systems and high initiatives were taken by the Indian Metrological Department (IMD) in estimating and forecast the disasters prior hand. The dynamics of the Hudhud cyclone were foretold by IMD before 5 days. The participants expressed that the alarming system was excellent and the cyclone reached the landfall as predicted which played a major role in reduction of death toll to a great extent. Figure 4: Percentage of awareness among people about disaster alarming system 3.5 Restoration and rehabilitation activities Restoring of transportation, communication and power supply in a very short span of time was achieved due to the awareness created by the disaster management system initiatives. A survey was made to understand about the awareness system among various categories of people. Figure 4 represents the percentage of awareness among people about disaster management system. During cyclones of this sort previously 38% of people are aware of disaster management system, 9% people are have an idea about this system while 53% people are not aware of these systems. During tsunami period 50% of people are aware of disaster management system, 15% people are have a idea about this system while 35% people are not aware of these systems. During Hudhud cyclone 94% of people are aware of disaster management system, 3% people have an idea about alarming system, 3% people are not aware of these systems. The survey provided that the government has taken better initiatives after tsunami effect in making people to have an awareness to sustain the life after disaster. The initiatives and technological advancements during this span have provided a better platform for speedy recovery of the city from the disaster. Public-Private participation created hand-in-hand for the government to commence enhanced rehabilitation activities. Figure 5: Percentage of awareness among people about disaster management system
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 16 | ICPECDM-2014 | Dec-2014, Available @ http://www.ijret.org 30 3.6 Developing Green and Smart Visakhapatnam. Eight key aspects of the smart city include governance, energy, building, mobility, infrastructure, technology, healthcare and citizen. The smart city utilizes information and communication technologies for the development of physical infrastructure engaging the residents of the city to participate in innovative designing and development of strong economic, social and cultural developments [13,14,15] . The development shall include low cost, affordable housing, transit oriented development, e-solutions for various activities and inclusive of social and commercial architecture. The smart city plan shall include electrification of all households with power availability for at least 8 hours per day, intelligent transport systems, safe waste disposal units, effective disaster management systems and risk reduction technologies, Electric vehicle charging stations in all urban areas and along all state and national highways, utilization of renewable sources of energy[16,17] . CONCLUSIONS 1. The surveys reveled that that 31% are part of cyclones, 9% are part of floods, 59% are part of landslides occurred and no hurricanes and typhoons occurred in previous years. 2. Awareness on disaster alarming and risk reduction technologies are to be encouraged and initiatives are to be taken through public private participation 3. The disaster management system should be well connected to the people through information and communication methodologies. 4. The plan of shaping the city into smart and green city shall include the governance, energy, building, mobility, infrastructure, technology, healthcare aspects into consideration. REFERENCES 1. "Tropical Cyclone Formation Alert – Issued at 1330 UTC, 7 October 2014.". Joint Typhoon Warning Center. 2. "Tropical Weather Outlook for North Indian Ocean Issued at 0600 UTC of October 7, 2014.". India Meteorological Department. 3. "Cyclonic Storm Hudhud over north Andaman Sea & adjoining southeast Bay of Bengal.". India Meteorological Department. 4. "Very Severe Cyclonic Storm, HUDHUD over the Bay of Bengal (7-14 October 2014): A Report". India Meteorological Department. 5. "Hudhud intensifies: Andhra Pradesh, Odisha on high alert". India Today. India Today. 6. "Cyclone Hudhud Effect: 38 Trains Cancelled on October 12". 11 October 2014. 7. "Cyclone Hudhud Heads for Odisha, After Battering Andaman and Nicobar Islands". NDTV. 8 October 2014. 8. "Cyclone Hudhud: 1.11 lakh people in Andhra Pradesh evacuated". 9. "Cyclone warning centre at Vizag also hit by Hudhud". news. biharprabha.com. IANS. 12 October 2014. 10. "Relief operations begin in cyclone-hit Andhra". 13 October 2014. 11. "Hudhud rips through Visakhapatnam airport". Times of India (Hyderabad). 14 October 2014. 12. "Cyclone Hudhud triggers Heavy rainfall in Southern Odisha". news. biharprabha.com. IANS. 12 October 2014. 13. Beck, A. and Stave, K. (2011). “Understanding urban quality of life and sustainability,” presented at the 29th International Conference of the System Dynamics Society Washington, DC, July 14. Bengtsson, F. and AŁgerfalk, P. J. (2011). “Information technology as a change actant in sustainability innovation: insights from Uppsala,” Journal of Strategic Information Systems, vol. 16 (4), 96–112 15. Brinkman, J. (2011). “Supporting sustainability through smart infrastructures: the case of Amsterdam,” Network Industries Quarterly, vol. 13 (3) 16. Hutchins, M. J. and Sutherland, J. W. (2008). “An exploration of measures of social sustainability and their application to supply chain decisions,” Journal of Cleaner Production, vol. 16, 1688-1698 17. Munda, G. (2006). “Social multi-criteria evaluation for urban sustainability policies,” Land Use Policy: Elsevier Ltd, vol. 23, 86-94