Cost of Poor Quality
Outline
Define
Cost of Poor
Quality
Where we
stand?
Benefits Way Forward
Define
• Joseph Juran - first discussed the cost of quality analysis in 1951
Define
PREVENTION
APPRAISAL
INTERNAL FAILURE
EXTERNAL FAILURE
Define
Focus on Cost of Poor Quality
Benefits of COPQ
 Direct contribution in profit
 Identify quality improvement candidates;
• Identify all failures costs
• Detect root causes and eliminate them
 Promotes the effective use of resources – Hidden factory concept
 Measure of the success of projects
 Provides incentives for doing the job right first time.
Benefits of COPQ
q
Q
• In 2007, U.S. construction industry expenditures were $1.246 trillion and out
of these, $62 billion (5%) were wasted on the direct cost of rework alone.
(Bureau of Economic Analysis, 2009)
• Annual turnover of the Australian construction industry was estimated at $A32
billion per annum whereas the cost of rework was approximated at $A4
billion (12.5%) per annum.
(Construction Expert Group, 1993)
• An average contractor is estimated to spend between 5-10 percent of the
project cost on rework.
(Construction Industry Development Board (CIBD))
Benefits of COPQ
Initiate accurate measurement of
Cost of Poor Quality
Way Forward
But how??
Senior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ program
Way Forward
All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis
- Juran- Juran
All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis
- Juran- Juran
Determine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurement
Start with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs only
Select any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQ
Selection of projectSelection of projectSelection of projectSelection of project
Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning)Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning)
Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement)Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement)
Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement)Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement)
Way Forward
Select any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activities
• Only measuring COPQ will not resolve the problems of a company
• Shall identify activities that need to be done in order to improve the quality
level of the company
Way Forward
Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area;
Perform root cause analysisPerform root cause analysisPerform root cause analysisPerform root cause analysis Suggest corrective actionSuggest corrective actionSuggest corrective actionSuggest corrective action
Results will not be over-nightResults will not be over-nightResults will not be over-nightResults will not be over-night
Way Forward
Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in;
Prevention CostPrevention CostPrevention CostPrevention Cost Appraisal CostAppraisal CostAppraisal CostAppraisal Cost
Management should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is high
Fix the Leak
Way Forward
q
Q
(in US $)
(H&S Motor Company, USA)
Way Forward
COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;
!! Overcome Psychological Inertia, to save all initiatives !!
Way Forward
Conclusion
 Use COPQ as a tool to identify improvement areas (Prevention
or Appraisal) in order to eliminate internal and external failures.
Failures
Eccentric Rebars Right First Time
Taking the revision cloud too seriously Red-bull reinforced concrete
Failures
Thank YouThank You

Contenu connexe

Tendances

Tendances (20)

Ch 7 qm
Ch 7 qmCh 7 qm
Ch 7 qm
 
OEE
OEEOEE
OEE
 
Apqp fundamentals
Apqp fundamentalsApqp fundamentals
Apqp fundamentals
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?
 
Costof quality
Costof qualityCostof quality
Costof quality
 
Cost of poor quality
Cost of  poor qualityCost of  poor quality
Cost of poor quality
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
APQP
APQPAPQP
APQP
 
Iatf 16949 training
Iatf 16949 trainingIatf 16949 training
Iatf 16949 training
 
Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
PPAP
PPAPPPAP
PPAP
 
Best Damn D-FMEA Method!
Best Damn D-FMEA Method!Best Damn D-FMEA Method!
Best Damn D-FMEA Method!
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 

En vedette

Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantagesImran Jamil
 
Controlling the Cost of Poor Quality
Controlling the Cost of Poor QualityControlling the Cost of Poor Quality
Controlling the Cost of Poor QualitySadashiv Borgaonkar
 
Term paper - impact of organizational culture on enterprise risk management (...
Term paper - impact of organizational culture on enterprise risk management (...Term paper - impact of organizational culture on enterprise risk management (...
Term paper - impact of organizational culture on enterprise risk management (...Imran Jamil
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic ConceptsImran Jamil
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaImran Jamil
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentationImran Jamil
 
PMI Project Risk Management
PMI Project Risk ManagementPMI Project Risk Management
PMI Project Risk ManagementImran Jamil
 
Document Management Spectrum
Document Management SpectrumDocument Management Spectrum
Document Management SpectrumRoland Driesen
 
Document Management 2010 Analysis
Document Management 2010 AnalysisDocument Management 2010 Analysis
Document Management 2010 AnalysisReal Story Group
 
Man power review and HR budget
Man power review and  HR budgetMan power review and  HR budget
Man power review and HR budgetWalid Al Wakeel
 
Quality and Cost Management: Methods and Results
Quality and Cost Management: Methods and ResultsQuality and Cost Management: Methods and Results
Quality and Cost Management: Methods and Resultstimwrodgers
 
Smsvn quality attitude
Smsvn quality attitudeSmsvn quality attitude
Smsvn quality attitudeNam Trung
 
Concepts on Models to Measure Organizational Readiness for Disaster
Concepts on Models to Measure Organizational Readiness for DisasterConcepts on Models to Measure Organizational Readiness for Disaster
Concepts on Models to Measure Organizational Readiness for DisasterDavid Merrick II
 
Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3Nam Trung
 

En vedette (20)

Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantages
 
Controlling the Cost of Poor Quality
Controlling the Cost of Poor QualityControlling the Cost of Poor Quality
Controlling the Cost of Poor Quality
 
Term paper - impact of organizational culture on enterprise risk management (...
Term paper - impact of organizational culture on enterprise risk management (...Term paper - impact of organizational culture on enterprise risk management (...
Term paper - impact of organizational culture on enterprise risk management (...
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic Concepts
 
Cost Of Quality
Cost Of QualityCost Of Quality
Cost Of Quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
Performance on a budget
Performance on a budgetPerformance on a budget
Performance on a budget
 
PMI Project Risk Management
PMI Project Risk ManagementPMI Project Risk Management
PMI Project Risk Management
 
Human Capital Analytics
Human Capital AnalyticsHuman Capital Analytics
Human Capital Analytics
 
Document Management Spectrum
Document Management SpectrumDocument Management Spectrum
Document Management Spectrum
 
Human Capital Analytics 2.2016
Human Capital Analytics 2.2016Human Capital Analytics 2.2016
Human Capital Analytics 2.2016
 
Document Management 2010 Analysis
Document Management 2010 AnalysisDocument Management 2010 Analysis
Document Management 2010 Analysis
 
Man power review and HR budget
Man power review and  HR budgetMan power review and  HR budget
Man power review and HR budget
 
Quality and Cost Management: Methods and Results
Quality and Cost Management: Methods and ResultsQuality and Cost Management: Methods and Results
Quality and Cost Management: Methods and Results
 
Smsvn quality attitude
Smsvn quality attitudeSmsvn quality attitude
Smsvn quality attitude
 
Concepts on Models to Measure Organizational Readiness for Disaster
Concepts on Models to Measure Organizational Readiness for DisasterConcepts on Models to Measure Organizational Readiness for Disaster
Concepts on Models to Measure Organizational Readiness for Disaster
 
Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3
 

Similaire à Copq benefits of correct measurement (for slideshare)

Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentationDr Ezzat Mansour
 
Quality is a cost
Quality is a costQuality is a cost
Quality is a costbatch18
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviewsNick Pelham
 
OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)Samuel Harrell
 
Project Management Essentials
Project Management EssentialsProject Management Essentials
Project Management EssentialsQBI Institute
 
Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012Jon Halladay
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2amitsonuksms
 
Commissioning for Profit, Performance and Windsurfing Bomex 2016
Commissioning for Profit, Performance and Windsurfing Bomex 2016  Commissioning for Profit, Performance and Windsurfing Bomex 2016
Commissioning for Profit, Performance and Windsurfing Bomex 2016 Murray Guy
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxAhmedAltantawi
 
Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Giriraj Srinivasan
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-shortdrdej19
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-shortDr Fereidoun Dejahang
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsDoina Dobre, P.Eng, GSC
 
039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-abilitydrdej19
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis trainingPaul King
 

Similaire à Copq benefits of correct measurement (for slideshare) (20)

Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentation
 
Introduction to quality management
Introduction to quality managementIntroduction to quality management
Introduction to quality management
 
Quality is a cost
Quality is a costQuality is a cost
Quality is a cost
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviews
 
OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)OOW 2008 Bonneville Power Administration (Ver#09052008)
OOW 2008 Bonneville Power Administration (Ver#09052008)
 
Project Management Essentials
Project Management EssentialsProject Management Essentials
Project Management Essentials
 
Business case using Cost of Quality
Business case using Cost of QualityBusiness case using Cost of Quality
Business case using Cost of Quality
 
Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012Addressing Quality Performance Across Supply Partners 2012
Addressing Quality Performance Across Supply Partners 2012
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
 
Commissioning for Profit, Performance and Windsurfing Bomex 2016
Commissioning for Profit, Performance and Windsurfing Bomex 2016  Commissioning for Profit, Performance and Windsurfing Bomex 2016
Commissioning for Profit, Performance and Windsurfing Bomex 2016
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating Considerations
 
039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-ability
 
039 Integrating Constructability
039 Integrating Constructability039 Integrating Constructability
039 Integrating Constructability
 
139 workplan
139 workplan139 workplan
139 workplan
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis training
 
COQ-Vestas
COQ-VestasCOQ-Vestas
COQ-Vestas
 

Plus de Imran Jamil

A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost managementImran Jamil
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time managementImran Jamil
 
6 project quality management (ij)
6  project quality management (ij)6  project quality management (ij)
6 project quality management (ij)Imran Jamil
 
Project risk management
Project risk managementProject risk management
Project risk managementImran Jamil
 
Project time management
Project time managementProject time management
Project time managementImran Jamil
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleImran Jamil
 
Project management a brief intro
Project management   a brief introProject management   a brief intro
Project management a brief introImran Jamil
 
Quality Assurance and Quality Control - Areas of Improvement
Quality Assurance and Quality Control - Areas of ImprovementQuality Assurance and Quality Control - Areas of Improvement
Quality Assurance and Quality Control - Areas of ImprovementImran Jamil
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentationImran Jamil
 
Cost of poor quality presentation5
Cost of poor quality presentation5Cost of poor quality presentation5
Cost of poor quality presentation5Imran Jamil
 

Plus de Imran Jamil (12)

A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
6 project quality management (ij)
6  project quality management (ij)6  project quality management (ij)
6 project quality management (ij)
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project time management
Project time managementProject time management
Project time management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project management a brief intro
Project management   a brief introProject management   a brief intro
Project management a brief intro
 
Quality Assurance and Quality Control - Areas of Improvement
Quality Assurance and Quality Control - Areas of ImprovementQuality Assurance and Quality Control - Areas of Improvement
Quality Assurance and Quality Control - Areas of Improvement
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentation
 
CSWIP Intro
CSWIP IntroCSWIP Intro
CSWIP Intro
 
Cost of poor quality presentation5
Cost of poor quality presentation5Cost of poor quality presentation5
Cost of poor quality presentation5
 

Dernier

The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 

Dernier (20)

The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 

Copq benefits of correct measurement (for slideshare)

  • 1. Cost of Poor Quality
  • 2. Outline Define Cost of Poor Quality Where we stand? Benefits Way Forward
  • 3. Define • Joseph Juran - first discussed the cost of quality analysis in 1951
  • 5. Define Focus on Cost of Poor Quality
  • 6. Benefits of COPQ  Direct contribution in profit  Identify quality improvement candidates; • Identify all failures costs • Detect root causes and eliminate them  Promotes the effective use of resources – Hidden factory concept  Measure of the success of projects  Provides incentives for doing the job right first time.
  • 8. • In 2007, U.S. construction industry expenditures were $1.246 trillion and out of these, $62 billion (5%) were wasted on the direct cost of rework alone. (Bureau of Economic Analysis, 2009) • Annual turnover of the Australian construction industry was estimated at $A32 billion per annum whereas the cost of rework was approximated at $A4 billion (12.5%) per annum. (Construction Expert Group, 1993) • An average contractor is estimated to spend between 5-10 percent of the project cost on rework. (Construction Industry Development Board (CIBD)) Benefits of COPQ
  • 9. Initiate accurate measurement of Cost of Poor Quality Way Forward But how??
  • 10. Senior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ programSenior Management support is critical for implementing COPQ program Way Forward All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis - Juran- Juran All quality improvement occurs on a project-by-project basisAll quality improvement occurs on a project-by-project basis - Juran- Juran
  • 11. Determine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurementDetermine level of detail for COPQ measurement Start with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs onlyStart with Internal and External Failure costs only Select any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQSelect any pilot project for measurement of COPQ Selection of projectSelection of projectSelection of projectSelection of project Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning)Formation of COPQ teamFormation of COPQ team (preferably QA&QC + Planning)(preferably QA&QC + Planning) Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement)Mandate is given to COPQ teamMandate is given to COPQ team (for accurate measurement)(for accurate measurement) Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement)Monthly reporting from COPQ teamMonthly reporting from COPQ team (Areas of improvement)(Areas of improvement) Way Forward Select any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activitiesSelect any specific activity or activities
  • 12. • Only measuring COPQ will not resolve the problems of a company • Shall identify activities that need to be done in order to improve the quality level of the company Way Forward Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area;Once COPQ team identify improvement area; Perform root cause analysisPerform root cause analysisPerform root cause analysisPerform root cause analysis Suggest corrective actionSuggest corrective actionSuggest corrective actionSuggest corrective action
  • 13. Results will not be over-nightResults will not be over-nightResults will not be over-nightResults will not be over-night Way Forward Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in;Corrective action can be investment in; Prevention CostPrevention CostPrevention CostPrevention Cost Appraisal CostAppraisal CostAppraisal CostAppraisal Cost Management should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is highManagement should not react if COPQ value is high
  • 14. Fix the Leak Way Forward q Q
  • 15. (in US $) (H&S Motor Company, USA) Way Forward COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;COPQ team identified improvement area;
  • 16. !! Overcome Psychological Inertia, to save all initiatives !! Way Forward
  • 17. Conclusion  Use COPQ as a tool to identify improvement areas (Prevention or Appraisal) in order to eliminate internal and external failures.
  • 19. Taking the revision cloud too seriously Red-bull reinforced concrete Failures

Notes de l'éditeur

  1. Monthly Reporting : Identify Baseline and then target for improvement
  2. Monthly Reporting : Identify Baseline and then target for improvement
  3. Monthly Reporting : Identify Baseline and then target for improvement
  4. Monthly Reporting : Identify Baseline and then target for improvement