SlideShare une entreprise Scribd logo
1  sur  22
What is Six Sigma?
• A goal of near perfection in meeting customer requirements
• A sweeping culture change effort to position a company for greater
customer satisfaction, profitability and competitiveness
• A comprehensive and flexible system for achieving, sustaining and
maximizing business success; uniquely driven by close understanding of
customer needs, disciplined use of facts, data, and statistical analysis, and
diligent attention to managing, improving and reinventing business
processes
(Source:The Six Sigma Way by Pande, Neuman and Cavanagh)
Is 99% Quality Good Enough?
 22,000 checks will be deducted from the wrong
bank accounts in the next 60 minutes.
 20,000 incorrect drug prescriptions will be written
in the next 12 months.
 12 babies will be given to the wrong parents each
day.
But is Six Sigma Realistic?
·
1
11
21
31
41
3 4 5 6 7
10
1
100
1K
10K
100K
765432
(66810 ppm)
· IRS – Tax Advice (phone-in)
Best in Class
(3.4 ppm)
Domestic Airline
Flight Fatality Rate
(0.43 ppm)
·(233 ppm)
Average
Company
Purchased Material
Lot Reject Rate
Air Line Baggage Handling
Wire Transfers
Journal Vouchers
Order Write-up
Payroll Processing
Doctor Prescription Writing
Restaurant Bills
·······
DefectsPerMillionOpportunities(DPMO)
SIGMA
Six Sigma Improvement Methods
DMAIC vs. DMADV
Define
Measure
Analyze
Design
Validate
Improve
Control
Continuous Improvement Reengineering
Six Sigma DMAIC Process
Measure
Control
Define
Analyze
Improve
Define: Define who your customers
are, and what their requirements are
for your products and services – Their
expectations. Define your team goals,
project boundaries, what you will focus
on and what you won’t. Define the
process you are striving to improve by
mapping the process.
Six Sigma DMAIC Process
Measure
Control
Define
Analyze
Improve
Measure: Eliminate guesswork and
assumptions about what customers need
and expect and how well processes are
working. Collect data from many sources
to determine speed in responding to
customer requests, defect types and how
frequently they occur, client feedback on
how processes fit their needs, how clients
rate us over time, etc. The data collection
may suggest Charter revision.
Six Sigma DMAIC Process
Measure
Control
Define
Analyze
Improve
Analyze: Grounded in the context of the
customer and competitive environment,
analyze is used to organize data and look
for process problems and opportunities.
This step helps to identify gaps between
current and goal performance, prioritize
opportunities to improve, identify sources
of variation and root causes of problems
in the process.
Six Sigma DMAIC Process
Measure
Control
Define
Analyze
Improve
Improve: Generate both obvious and
creative solutions to fix and prevent
problems. Finding creative solutions by
correcting root causes requires
innovation, technology and discipline.
Six Sigma DMAIC Process
Measure
Control
Define
Analyze
Improve
Control: Insure that the process
improvements, once implemented, will
“hold the gains” rather than revert to
the same problems again. Various
control tools such as statistical process
control can be used. Other tools such
as procedure documentation helps
institutionalize the improvement.
Six Sigma DMADV Process
Measure
Validate
Define
Analyze
Design
Design: Develop detailed design
for new process. Determine and
evaluate enabling elements.
Create control and testing plan for
new design. Use tools such as
simulation, benchmarking, DOE,
Quality Function Deployment
(QFD), FMECA analysis, and
cost/benefit analysis.
Six Sigma DMADV Process
Measure
Validate
Define
Analyze
Design
Validate: Test detailed design
with a pilot implementation. If
successful, develop and execute a
full-scale implementation. Tools
in this step include: planning
tools, flowcharts/other process
management techniques, and
work documentation.
Total Quality Management
 Quality system involving entire organization from
supplier to customer
 Objective: Meet or exceed customer needs through
company-wide continuous improvement
 Early proponents
 W. Edwards Deming
 J. M. Juran
 Philip B. Crosby
Total Quality Management
Principles
 Continuous improvement
 Employee empowerment
 Benchmarking
 Just-in-time (JIT)
 Knowledge of TQM tools
© 1995 Corel Corp.
Continuous Improvement
 Represents continual improvement of process &
customer satisfaction
 Involves all operations
& work units
 Other names
 Kaizen (Japanese)
 Zero-defects
 Six sigma
© 1984-1994 T/Maker Co.
Employee Empowerment
 Getting employees involved in product & process
improvements
• 85% of quality problems are due to process & material
• Techniques
• Talk to workers
• Support workers
 Let workers make decisions
 Build teams & quality circles
© 1995 Corel Corp.
Quality Circles
 Group of 6-12 employees from same work area
 Meet regularly to solve work-related problems
 4 hours/month
 Facilitator trains
& helps with
meetings
© 1995 Corel Corp.
Quality Costs
COST OF QUALITY IS THE COST OF
NON QUALITY
1: 10:100 Rule
“A stitch in time saves nine”
Types of Quality Costs
The cost of quality is generally classified into four
categories
1. Cost of Prevention
2. Cost of Appraisal
3. Cost of Internal Failure
4. Cost of External Failure
Quality Costs
Cost of Prevention
 Prevention costs include those activities which remove and
prevent defects from occurring in the production process.
 Included are such activities as quality planning, production
reviews, training, and engineering analysis, which are
incurred to ensure that poor quality is not produced.
Appraisal
 Those costs incurred to identify poor quality products after
they occur but before shipment to customers. e.g. Inspection
activity.
Quality Costs
Internal Failure
 Those incurred during the production process.
 Include such items as machine downtime, poor quality
materials, scrap, and rework.
External Failure
 Those incurred after the product is shipped.
 External failure costs include returns and allowances,
warranty costs, and hidden costs of customer dissatisfaction
and lost market share.
Benefits of TQM
 Greater customer loyalty
 Market share improvement
 Higher stock prices
 Reduced service calls
 Higher prices
 Greater productivity
Conclusion
Remember the earth revolves around the CUSTOMER.
Quality begets customers and customers beget quality. Let
us all have action plans to support quality, this will make
the world happy and earn us the blessing of God
Almighty.
“Actions are direct reflection of one’s intentions”

Contenu connexe

Tendances

Pda Visual Inspection 2009 Aldrich
Pda Visual Inspection 2009 AldrichPda Visual Inspection 2009 Aldrich
Pda Visual Inspection 2009 Aldrich
D Scott Aldrich
 

Tendances (20)

Six sigma
Six sigmaSix sigma
Six sigma
 
Qualioty management system
Qualioty management systemQualioty management system
Qualioty management system
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Challenges in international procurement
Challenges in international procurementChallenges in international procurement
Challenges in international procurement
 
USP <665> draft standard : A rational risk-based approach to characterization...
USP <665> draft standard : A rational risk-based approach to characterization...USP <665> draft standard : A rational risk-based approach to characterization...
USP <665> draft standard : A rational risk-based approach to characterization...
 
six sigma ppt
six sigma pptsix sigma ppt
six sigma ppt
 
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter ValidationEU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
 
PHARMACEUTICAL PROCESS VALIDATION CURRENT REGULATORY ASPECTS
PHARMACEUTICAL PROCESS VALIDATION CURRENT REGULATORY ASPECTSPHARMACEUTICAL PROCESS VALIDATION CURRENT REGULATORY ASPECTS
PHARMACEUTICAL PROCESS VALIDATION CURRENT REGULATORY ASPECTS
 
Equipment risk management - a quality systems approach
Equipment risk management  - a quality systems approachEquipment risk management  - a quality systems approach
Equipment risk management - a quality systems approach
 
Tqm
TqmTqm
Tqm
 
Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical Industry
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 
Critical Hazard in Management system
Critical Hazard in Management systemCritical Hazard in Management system
Critical Hazard in Management system
 
ICH Guideline – Q9
ICH Guideline – Q9ICH Guideline – Q9
ICH Guideline – Q9
 
Quality metrics
Quality metricsQuality metrics
Quality metrics
 
Pharmaceutical Validation
Pharmaceutical Validation Pharmaceutical Validation
Pharmaceutical Validation
 
PROCESS VALIDATION
PROCESS VALIDATIONPROCESS VALIDATION
PROCESS VALIDATION
 
1 5 equipment-qualification
1 5 equipment-qualification1 5 equipment-qualification
1 5 equipment-qualification
 
New EU Requirements for Qualification & Validation
New EU Requirements for Qualification & ValidationNew EU Requirements for Qualification & Validation
New EU Requirements for Qualification & Validation
 
Pda Visual Inspection 2009 Aldrich
Pda Visual Inspection 2009 AldrichPda Visual Inspection 2009 Aldrich
Pda Visual Inspection 2009 Aldrich
 

En vedette

BigRep-ONE-2-Brochure
BigRep-ONE-2-BrochureBigRep-ONE-2-Brochure
BigRep-ONE-2-Brochure
Mark Pierson
 
ở đâu thiết kế tvc quảng cáo uy tín
ở đâu thiết kế tvc quảng cáo uy tínở đâu thiết kế tvc quảng cáo uy tín
ở đâu thiết kế tvc quảng cáo uy tín
ilona884
 
Resume.BevieLaBrie
Resume.BevieLaBrieResume.BevieLaBrie
Resume.BevieLaBrie
Bevie LaBrie
 
Linux kursu-cekmekoy
Linux kursu-cekmekoyLinux kursu-cekmekoy
Linux kursu-cekmekoy
sersld67
 
Proceedings Article - Breaking the Command Barrier - February 2000
Proceedings Article - Breaking the Command Barrier - February 2000Proceedings Article - Breaking the Command Barrier - February 2000
Proceedings Article - Breaking the Command Barrier - February 2000
John Andrews
 

En vedette (18)

I
II
I
 
BigRep-ONE-2-Brochure
BigRep-ONE-2-BrochureBigRep-ONE-2-Brochure
BigRep-ONE-2-Brochure
 
地學概論2野柳
地學概論2野柳地學概論2野柳
地學概論2野柳
 
ở đâu thiết kế tvc quảng cáo uy tín
ở đâu thiết kế tvc quảng cáo uy tínở đâu thiết kế tvc quảng cáo uy tín
ở đâu thiết kế tvc quảng cáo uy tín
 
Análisis económico
Análisis económicoAnálisis económico
Análisis económico
 
enfermedades_de_transmisi_n_sexual
enfermedades_de_transmisi_n_sexualenfermedades_de_transmisi_n_sexual
enfermedades_de_transmisi_n_sexual
 
Current Resume 1.16
Current Resume 1.16Current Resume 1.16
Current Resume 1.16
 
Resume.BevieLaBrie
Resume.BevieLaBrieResume.BevieLaBrie
Resume.BevieLaBrie
 
DMAIC Vs. DMADV
DMAIC Vs. DMADVDMAIC Vs. DMADV
DMAIC Vs. DMADV
 
Sugestão da Brasscom de consulta pública prévia à regulamentação do Decreto 8...
Sugestão da Brasscom de consulta pública prévia à regulamentação do Decreto 8...Sugestão da Brasscom de consulta pública prévia à regulamentação do Decreto 8...
Sugestão da Brasscom de consulta pública prévia à regulamentação do Decreto 8...
 
Taller 4
Taller 4Taller 4
Taller 4
 
Pres3
Pres3Pres3
Pres3
 
Los Peligros del Internet
Los Peligros del InternetLos Peligros del Internet
Los Peligros del Internet
 
Linux kursu-cekmekoy
Linux kursu-cekmekoyLinux kursu-cekmekoy
Linux kursu-cekmekoy
 
Managing Cost in the Era of Healthcare Reform
Managing Cost in the Era of Healthcare Reform  Managing Cost in the Era of Healthcare Reform
Managing Cost in the Era of Healthcare Reform
 
MyCFO offers IPO Support, Small time entrepreneurs or grand scale businesses ...
MyCFO offers IPO Support, Small time entrepreneurs or grand scale businesses ...MyCFO offers IPO Support, Small time entrepreneurs or grand scale businesses ...
MyCFO offers IPO Support, Small time entrepreneurs or grand scale businesses ...
 
Pelajaran 1
Pelajaran 1Pelajaran 1
Pelajaran 1
 
Proceedings Article - Breaking the Command Barrier - February 2000
Proceedings Article - Breaking the Command Barrier - February 2000Proceedings Article - Breaking the Command Barrier - February 2000
Proceedings Article - Breaking the Command Barrier - February 2000
 

Similaire à 2 six sigma

DHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docxDHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docx
mariona83
 

Similaire à 2 six sigma (20)

Module 4_Session 5.pptx_Operations Management
Module 4_Session 5.pptx_Operations ManagementModule 4_Session 5.pptx_Operations Management
Module 4_Session 5.pptx_Operations Management
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
 
Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planning
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Six sigma QMS
Six sigma QMS Six sigma QMS
Six sigma QMS
 
Integrated Logistics Management
Integrated Logistics ManagementIntegrated Logistics Management
Integrated Logistics Management
 
DHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docxDHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docx
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay Anand
 
Project Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptxProject Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptx
 
Sixsigma
SixsigmaSixsigma
Sixsigma
 
Continuous improvement 6 sigma
Continuous improvement 6 sigmaContinuous improvement 6 sigma
Continuous improvement 6 sigma
 
Total Quality Managment
Total Quality ManagmentTotal Quality Managment
Total Quality Managment
 
Total quality control
Total quality controlTotal quality control
Total quality control
 
The Quality Standard: ISO 9000 , CMM and Six Sigma
The Quality Standard: ISO 9000 , CMM and Six SigmaThe Quality Standard: ISO 9000 , CMM and Six Sigma
The Quality Standard: ISO 9000 , CMM and Six Sigma
 
Six sigma control in total quality management copy
Six sigma control in total quality management   copySix sigma control in total quality management   copy
Six sigma control in total quality management copy
 
ICG 6 sigma transformation
ICG 6 sigma transformationICG 6 sigma transformation
ICG 6 sigma transformation
 
Six sigma
Six sigmaSix sigma
Six sigma
 
PPT on six sigma
PPT on six sigmaPPT on six sigma
PPT on six sigma
 
sixsigmavskaizen-110520221636-phpapp02.pdf
sixsigmavskaizen-110520221636-phpapp02.pdfsixsigmavskaizen-110520221636-phpapp02.pdf
sixsigmavskaizen-110520221636-phpapp02.pdf
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 

Plus de himachal pradesh technical university

Plus de himachal pradesh technical university (15)

List of corrections_to_is800_2007
List of corrections_to_is800_2007List of corrections_to_is800_2007
List of corrections_to_is800_2007
 
Is 800 2007_with_latest_ammendment
Is 800 2007_with_latest_ammendmentIs 800 2007_with_latest_ammendment
Is 800 2007_with_latest_ammendment
 
Is456 reinforcements fullinfo _slideup
Is456 reinforcements fullinfo _slideupIs456 reinforcements fullinfo _slideup
Is456 reinforcements fullinfo _slideup
 
Gate 2021 syllabus change
Gate 2021 syllabus changeGate 2021 syllabus change
Gate 2021 syllabus change
 
Flat slabs 2
Flat slabs 2Flat slabs 2
Flat slabs 2
 
Flat slabs 1
Flat slabs 1Flat slabs 1
Flat slabs 1
 
Design and analysis of slabs
Design and analysis of slabsDesign and analysis of slabs
Design and analysis of slabs
 
Som formula
Som formulaSom formula
Som formula
 
The stephen timoshenko collection
The stephen timoshenko collectionThe stephen timoshenko collection
The stephen timoshenko collection
 
Chapter 19(statically indeterminate beams continuous beams)
Chapter 19(statically indeterminate beams continuous beams)Chapter 19(statically indeterminate beams continuous beams)
Chapter 19(statically indeterminate beams continuous beams)
 
Chapter 18(beams of composite materials)
Chapter 18(beams of composite materials)Chapter 18(beams of composite materials)
Chapter 18(beams of composite materials)
 
Chapter 17(leaf springs)
Chapter 17(leaf springs)Chapter 17(leaf springs)
Chapter 17(leaf springs)
 
4 business process reengineering
4 business process reengineering4 business process reengineering
4 business process reengineering
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
1 quality & tqm
1 quality & tqm1 quality & tqm
1 quality & tqm
 

Dernier

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Dernier (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 

2 six sigma

  • 1. What is Six Sigma? • A goal of near perfection in meeting customer requirements • A sweeping culture change effort to position a company for greater customer satisfaction, profitability and competitiveness • A comprehensive and flexible system for achieving, sustaining and maximizing business success; uniquely driven by close understanding of customer needs, disciplined use of facts, data, and statistical analysis, and diligent attention to managing, improving and reinventing business processes (Source:The Six Sigma Way by Pande, Neuman and Cavanagh)
  • 2. Is 99% Quality Good Enough?  22,000 checks will be deducted from the wrong bank accounts in the next 60 minutes.  20,000 incorrect drug prescriptions will be written in the next 12 months.  12 babies will be given to the wrong parents each day.
  • 3. But is Six Sigma Realistic? · 1 11 21 31 41 3 4 5 6 7 10 1 100 1K 10K 100K 765432 (66810 ppm) · IRS – Tax Advice (phone-in) Best in Class (3.4 ppm) Domestic Airline Flight Fatality Rate (0.43 ppm) ·(233 ppm) Average Company Purchased Material Lot Reject Rate Air Line Baggage Handling Wire Transfers Journal Vouchers Order Write-up Payroll Processing Doctor Prescription Writing Restaurant Bills ······· DefectsPerMillionOpportunities(DPMO) SIGMA
  • 4. Six Sigma Improvement Methods DMAIC vs. DMADV Define Measure Analyze Design Validate Improve Control Continuous Improvement Reengineering
  • 5. Six Sigma DMAIC Process Measure Control Define Analyze Improve Define: Define who your customers are, and what their requirements are for your products and services – Their expectations. Define your team goals, project boundaries, what you will focus on and what you won’t. Define the process you are striving to improve by mapping the process.
  • 6. Six Sigma DMAIC Process Measure Control Define Analyze Improve Measure: Eliminate guesswork and assumptions about what customers need and expect and how well processes are working. Collect data from many sources to determine speed in responding to customer requests, defect types and how frequently they occur, client feedback on how processes fit their needs, how clients rate us over time, etc. The data collection may suggest Charter revision.
  • 7. Six Sigma DMAIC Process Measure Control Define Analyze Improve Analyze: Grounded in the context of the customer and competitive environment, analyze is used to organize data and look for process problems and opportunities. This step helps to identify gaps between current and goal performance, prioritize opportunities to improve, identify sources of variation and root causes of problems in the process.
  • 8. Six Sigma DMAIC Process Measure Control Define Analyze Improve Improve: Generate both obvious and creative solutions to fix and prevent problems. Finding creative solutions by correcting root causes requires innovation, technology and discipline.
  • 9. Six Sigma DMAIC Process Measure Control Define Analyze Improve Control: Insure that the process improvements, once implemented, will “hold the gains” rather than revert to the same problems again. Various control tools such as statistical process control can be used. Other tools such as procedure documentation helps institutionalize the improvement.
  • 10. Six Sigma DMADV Process Measure Validate Define Analyze Design Design: Develop detailed design for new process. Determine and evaluate enabling elements. Create control and testing plan for new design. Use tools such as simulation, benchmarking, DOE, Quality Function Deployment (QFD), FMECA analysis, and cost/benefit analysis.
  • 11. Six Sigma DMADV Process Measure Validate Define Analyze Design Validate: Test detailed design with a pilot implementation. If successful, develop and execute a full-scale implementation. Tools in this step include: planning tools, flowcharts/other process management techniques, and work documentation.
  • 12. Total Quality Management  Quality system involving entire organization from supplier to customer  Objective: Meet or exceed customer needs through company-wide continuous improvement  Early proponents  W. Edwards Deming  J. M. Juran  Philip B. Crosby
  • 13. Total Quality Management Principles  Continuous improvement  Employee empowerment  Benchmarking  Just-in-time (JIT)  Knowledge of TQM tools © 1995 Corel Corp.
  • 14. Continuous Improvement  Represents continual improvement of process & customer satisfaction  Involves all operations & work units  Other names  Kaizen (Japanese)  Zero-defects  Six sigma © 1984-1994 T/Maker Co.
  • 15. Employee Empowerment  Getting employees involved in product & process improvements • 85% of quality problems are due to process & material • Techniques • Talk to workers • Support workers  Let workers make decisions  Build teams & quality circles © 1995 Corel Corp.
  • 16. Quality Circles  Group of 6-12 employees from same work area  Meet regularly to solve work-related problems  4 hours/month  Facilitator trains & helps with meetings © 1995 Corel Corp.
  • 17. Quality Costs COST OF QUALITY IS THE COST OF NON QUALITY 1: 10:100 Rule “A stitch in time saves nine”
  • 18. Types of Quality Costs The cost of quality is generally classified into four categories 1. Cost of Prevention 2. Cost of Appraisal 3. Cost of Internal Failure 4. Cost of External Failure
  • 19. Quality Costs Cost of Prevention  Prevention costs include those activities which remove and prevent defects from occurring in the production process.  Included are such activities as quality planning, production reviews, training, and engineering analysis, which are incurred to ensure that poor quality is not produced. Appraisal  Those costs incurred to identify poor quality products after they occur but before shipment to customers. e.g. Inspection activity.
  • 20. Quality Costs Internal Failure  Those incurred during the production process.  Include such items as machine downtime, poor quality materials, scrap, and rework. External Failure  Those incurred after the product is shipped.  External failure costs include returns and allowances, warranty costs, and hidden costs of customer dissatisfaction and lost market share.
  • 21. Benefits of TQM  Greater customer loyalty  Market share improvement  Higher stock prices  Reduced service calls  Higher prices  Greater productivity
  • 22. Conclusion Remember the earth revolves around the CUSTOMER. Quality begets customers and customers beget quality. Let us all have action plans to support quality, this will make the world happy and earn us the blessing of God Almighty. “Actions are direct reflection of one’s intentions”