Required information Fhe forlowng information applies to the questions dispiayed below] At the end of June, the job cost sheets at Ace Roofets show the following costs accurmiated on three jobs. Addisional Informetion a. Job 5 was started in May, and the following costs were assigned to it in May direct materials, $6,jiog, direct laboe. $2100, and apolied ovevhead, $1,200. Job 5 was finshed in June b. Job 6 and 1067 were started in June, Job 6 was finished in Jane, and Job 7 is to be completed in July c. Overhead cost is appled wath a predetermined rate based on diect labor cost. The predetermined overhead rate did not change acioss these months. 2. What is the total cost of direct labor used in June?.