2. OverviewOverview
Projects were approved in 2003 and 2005Projects were approved in 2003 and 2005
Form the only major continuous transportationForm the only major continuous transportation
corridor that could serve as an alternate to the 91corridor that could serve as an alternate to the 91
FreewayFreeway
Address traffic congestion for Corona’s futureAddress traffic congestion for Corona’s future
In the City’s best interest to keep these projectsIn the City’s best interest to keep these projects
3. Mid County Parkway in 2008 withMid County Parkway in 2008 with
Irvine-Corona Expressway connectionIrvine-Corona Expressway connection
4. BackgroundBackground
East-West Transportation Corridor was approved byEast-West Transportation Corridor was approved by
the RCTC Board in June 2003the RCTC Board in June 2003
Irvine-Corona Expressway Tunnel was approved byIrvine-Corona Expressway Tunnel was approved by
the RCTC Board in December 2005the RCTC Board in December 2005
These projects already have received substantialThese projects already have received substantial
public reviewpublic review
These projects are a giftThese projects are a gift
5. Benefits of the Cajalco-Ramona corridorBenefits of the Cajalco-Ramona corridor
to the Cityto the City
More than twice the traffic benefit compared to anyMore than twice the traffic benefit compared to any
other alternate corridorother alternate corridor
More than twice the economic benefitMore than twice the economic benefit
Improved safety and a reduction in accidentsImproved safety and a reduction in accidents
Less than one-third of the disruption to residentsLess than one-third of the disruption to residents
6. Need for this Alternate CorridorNeed for this Alternate Corridor
A straightened/ widened Cajalco Road cannot meetA straightened/ widened Cajalco Road cannot meet
future travel demandfuture travel demand
Traffic is expected to increase up to 500 percent byTraffic is expected to increase up to 500 percent by
20302030
Cajalco Road cannot function as a freewayCajalco Road cannot function as a freeway
A 30-minute trip would be 90 minutesA 30-minute trip would be 90 minutes
Congestion on the 91 Freeway will worsen by 2030Congestion on the 91 Freeway will worsen by 2030
7. Irvine-Corona Expressway TunnelIrvine-Corona Expressway Tunnel
Approved by the OCTA and RCTC Boards in 2005Approved by the OCTA and RCTC Boards in 2005
Included in OCTA’s 2015 SR-91 Implementation PlanIncluded in OCTA’s 2015 SR-91 Implementation Plan
8. Private ProjectsPrivate Projects
Both projects could be privately planned, designed,Both projects could be privately planned, designed,
constructed, and financedconstructed, and financed
Eliminates engineering and cost concernsEliminates engineering and cost concerns
10. Impacts on CoronaImpacts on Corona
More trafficMore traffic
More noiseMore noise
Worse air qualityWorse air quality
Worse emergency response timesWorse emergency response times
A reduction in the quality of lifeA reduction in the quality of life
11. Suggested ActionsSuggested Actions
Ensure that planning and right-of-way preservation forEnsure that planning and right-of-way preservation for
the East-West Transportation Corridor and thethe East-West Transportation Corridor and the
Irvine-Corona Expressway tunnel are kept in theIrvine-Corona Expressway tunnel are kept in the
County General PlanCounty General Plan
Work with the cities of Riverside and Moreno ValleyWork with the cities of Riverside and Moreno Valley
Take formal actionTake formal action