International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 733
HAZARD IDENTIFICATION AND RISK ASSESSMENT IN WATCH
MANUFACTURING PROCESS
Vishwanathan M1, Dr. Muthukumar K2, Jishin Jayan T3
1
PG Student, Industrial Safety Engineering, Department of Mechanical Engineering, BIT, Sathyamangalam
2Professor, Industrial Safety Engineering, Department of Mechanical Engineering, BIT, Sathyamangalam
3Assistant Professor, Industrial Safety Engineering, Department of Mechanical Engineering, BIT, Sathyamangalam
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract: There are different types of hazards in the watch manufacturing process. The processes involve handling of various
hazardous chemicals and usage of different machines. The tool used here is Hazard identification and risk assessment, or HIRA
system. It is a risk assessment tool that can help users identify hazards and estimate the risk associated with each one. This risk
assessment tool will detect potential hazards in each department's task. Therisksassociatedwiththehazardwill beestimatedand
categorized once the danger has been recognized.
Keywords: risk, hazard, safety, and analysis.
1. INTRODUCTION
In this plant division the focus is on manufacturing watches and wearables. The manufacturing process involves use of
chemicals, flammable gases and number machines that contributes to different types of hazards. Thus, the project mainly
focuses on identifying these hazards and methods to reduce its risk value. Hazard Identification Risk Assessment (HIRA) is
involving in identifying all the hazards and evaluating its risk level. It discusses about what are the things that can go wrong,
how bad it could it be and how often it might happen.
2. HAZARD IDENTIFICATION AND RISK ASSESSMENT
Hazards are the sources which can make potential damages. No industry can be fully free from its own hazards and risks. To
reduce these hazards various hazard identification process is to be carried out. Hazard Identification andRisk Assessment isa
tool used to identify the hazards and rating the hazards based on its risk level. After identifying the hazards, theyare analyzed
qualitatively and quantitatively to check whether they are in the acceptable level. HIRA is a combination of qualitative and
quantitative method. The quantitative methods analyze various data numerically. The steps involved in HIRA are
 Work Activities Classification
 Hazard Identification
 Risk Assessment
 Monitor and review
2.1. WORK ACTIVITIES CLASSIFICATION
The initial step is to identify the various work activities carried out in the process. This level includes dividing the processinto
multiple baby activities. The concept of working, machines used, control methods, special hazards are identified in this level.
The activities maybe routine or non-routine. Defining the work activity by their routine whether it is daily done or weekly or
monthly sometimes.
2.2. IDENTIFICATION OF HAZARDS
Hazard identification is an important factor in any process to be safely carried out. Identification of hazards involves serious
field work to track different potential hazards. The team must be possessing some knowledge on identifying these hazards.
Apart from the team itself, feedback from the workforce also helps in make the task quite efficient. Every sub-activity must be
clearly studied and identified its hazards. Using Failure Mode Effective Analysis helps the process more efficient since it
addresses all the hazards in case of any system or other related failures to the process.
2.3. RISK ASSESSMENT
Risk assessment's purpose is to analyze the risk and hazards identified before. It discusses about who might get harmed and
the consequences of the identified hazards in different ways, the guidelines to mitigate or reduce its risk level, evaluating the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 734
hazards basis on its risk priority number and implement precautionary measures to avoid them. Basically, qualitative, and
quantitative are the two methods used for the risk assessment. Risk assessment normally comparestheestimated risk against
the risk criteria using various scales. Hierarchy of controls are then implemented to control the identified hazards in different
forms. Elimination is most adopted method in controlling the hazards since it drastically reduces the risk level.
2.3.1 RANKING
The method we used to rank the identified hazard is Risk Priority Number (RPN). Ranking of risks is a quantitative method in
which we get the values. Ranking values for each hazard are calculated based on three factors:
 Probability of occurrence
 Severity rate
 Hierarchy of controls
Risk Score = Probability Rate X Severity Rate
Probability of occurrence
Probability of occurrence is an assessment of how likely a hazard can occur. A hazard that is frequent may result in high
probability of damage. A rating scale of 1 to 5 is given based on the table 1.
Table 1- Probability of occurrence
Rating Description Examples of Description
5 Almost certain
Event occurs often and constant exposure to hazard. Very high
probability of damage.
4 Likely
Event might probably occur and known history of occurrence.
Frequent exposure to hazard. High probability of damage.
3 Possible
Event could occur at some time and history of single occurrence.
Regular or occasional exposure to hazard. Moderate probability of
damage.
2 Unlikely
Event is not likely to occur and known occurrence. Infrequent
exposure to hazard. Low probability of damage.
1 Rare
Event may occur occasionally and no reported occurrence. Rare
exposure to hazard. Very low probability of damage.
Severity rate
The severity rate plays an important role in the hazard assessment process. A hazard that may have less probability of
occurrence but having higher severity rate may causes serious damage. Severity rate tell us about how hard it damages the
people and the surroundings. A rating of 1 to 5 is given based on the table 2.
Table 2 - Severity rating
Rating Parameter Severity
5 Numerous fatalities, irrecoverable property damage and
productivity
Catastrophic
4 Approximately one single fatality major property damage if
hazard is realized
Fatal
3 Non-fatal injury, permanent disability Serious
2 Disabling but not permanent injury Minor
1 Minor abrasion, bruises, cuts, first aid type injury Negligible
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 735
2.4 MONITOR AND REVIEW
Monitoring and reviewing should be planned and is a part of the assessment process. Every hazard that are identified and
rectified must be recorded. And any changes made in the process are also recorded accordinglywhich will behelpful infurther
proceedings. The process must be reviewed annually assuring its appropriate operations and checked for its risk levels. This
helps management in improving the control methods and thus reducing the hazard level.
3. MANUFACTURING PROCESS
The manufacturing processes involves different types of machines, tools, and chemical handling.Theonlyheavymachineused
in the process is hydraulic press machine all others are light machines since the component manufactured is smaller size. The
hazardous chemicals are stored and handled in safe manner. Other processes include electroplating, oiling, annealing and
polishing. The chemical treatment process is one division that includes major number of hazards.
4. RESULT
Major hazards and its solutions.
1. Transfer of Isopar liquid (flammable) using mechanical hand pump – Since it is a flammable liquid using mechanical
frictional pump may produce heat and induce fire. To avoid this a diaphragm type can be used which has no frictional part in
contact with the liquid transfer
2. Heat stress in annealing process – working prolonged periodonhotarea resultsinheatstressamongworkers.Installationof
local ventilation and heat ventilation system in the work area will solve this problem.
3. Auto bowl motor in open condition – Any rotating parts in work area without guard could result in accident. A secure safety
guard can be installed around the auto bowl.
4. Handling of Cyanide – Even though the cyanide is used in very little quantity and handled in very careful manner we cannot
agree it is safe. The cyanide must be substituted with some other less hazardous chemical.
5. Electric Shock – Electroplating shop is the place where electrical circuits are used among thelargequantityofliquids(which
is a good conductor) for the process. This electric apparatus switches can be covered with silicon covers which could prevent
contact with liquid and thus avoids short circuits.
6. Fall of person due to slippage – The shop is highly spilled liquids on the floor that cause slip of persons working in the shop.
To avoid this, rough surface platform can be installed with acid proofing for which acidic chemicals are used in the shop floor.
7. Injury of hand by case pipe fixing machine – This happens when the operator has to holdthecasepipeagainstthespindlefor
mounting it on the case. For this a magnetic spindle which is capable of holding the case pipe on itsowncanbeinstalled.Also,a
sensor at the mounting area of the case can be used and used interlinked with the ON switch to avoid the injury.
8. Hand injury by the water-resistant testing machine – The closinglidofthe water-resistanttestingmachineisheavyandifnot
held by one position it may fall over to its close position that may injure hand it is placed over there. This can be avoided by
providing spring tension to the closing lid of the machine.
5. CONCLUSION
HIRA investigation was carried out in the different process involved in manufacturing watch. Hazard Identification and Risk
Assessment tool was used to identify various hazards and Risk priority number with risk matrix wereusedto quantifytherisk
levels. Major hazards are identified and suitable solutions to reduce the risk levels are given.
REFERENCES:
[1] Gokul, Raj S dan Shivasankaran, N. 2014. Hazard Identification And RiskAssessmentInDeinkingPlant.InternationalJournal
Of Research In Aeronautical And Mechanical Engineering. Vol.2 Issue.3, Pages: 202-208.
[2] Koller, G., Fishcer, U., Hungerbuhler, K., 2001. Comparison of Methods Suitable for Assessing The Hazard Potential of
Chemical Processes During Early Design Phases. Trans IchemE, Vol 79 May, Part B.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 736
[3] Kumar, M.Saravana dan Kumar, Dr. P. Senthil. 2014. Hazard Identification and Risk Assessment in Foundry. IOSR Journal of
Mechanical and Civil Engineering (IOSR-JMCE).
[4] Dunjo J, Fthenakis V, Vilchez, JA, Arnaldos J, “Hazard and operability (HAZOP) analysis, A literature review” Journal
Hazardous Material. Vol. 173, No. 1, (2009) pp 19 - 32.
[5] Health and Safety Management. Principles and Best Practice, FT Prentice Hall, London. Gallagher, C., Underhill, E., and
Rimmer, M. (2001).
[6] Kotek, L., Tabas, M., “HAZOP study with qualitative risk analysis for prioritization of corrective and preventive actions”,
Procedia Engineering, Vol. 42, No. 4, (2012), pp 808 – 815.
[7] Legget, David J, “Lab - HIRA: Hazard Identification and Risk Analysis for the Chemical Research Laboratory Part 2. Risk
Analysis of Laboratory Operations”, Journal of Chemical Health & Safety, September - October, (2012), pp 25-36.
[8] Lim, Stephen S., et al. "A comparative risk assessment of burden of disease and injury attributable to 67 risk factors and risk
factor clusters in 21 regions, 1990–2010: a systematic analysis for the Global Burden of Disease Study 2010." The lancet
380.9859 (2013).
[9] Cagno, E., F. Caron, and M. Mancini (2002). "Risk analysis in plant commissioning: the Multilevel Hazop." Reliability
Engineering & System Safety 77(3): 309-323.
[10]Khairul Akmal S, Che Ani MN, Ismail AK (2015) Investigation the effective of the hazard identification, risk assessment and
determining control (HIRADC) in manufacturing process. Int J Innov Res Adv Eng 2(8):80– 83
[11]K. R. A. Roehan Yuniar and A. Desrianty, "Proposed Improvement Safety and Health Management System (SMK3) Method
Using Hazard Identification and Risk Assessment (HIRA)", Online Journal of Institut Teknologi Nasional, vol. 2, 2014.

Contenu connexe

Similaire à HAZARD IDENTIFICATION AND RISK ASSESSMENT IN WATCH MANUFACTURING PROCESS

Risk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in MyanmarRisk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in Myanmarijtsrd
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Yuvraj Shrivastava
 
Running the risk | Insight, issue 2
Running the risk | Insight, issue 2Running the risk | Insight, issue 2
Running the risk | Insight, issue 2Team Consulting Ltd
 
Determining Condition Monitoring
Determining Condition MonitoringDetermining Condition Monitoring
Determining Condition MonitoringKerry Williams
 
Developing Accident Avoidance Program for Occupational Safety and Health
Developing Accident Avoidance Program for Occupational Safety and HealthDeveloping Accident Avoidance Program for Occupational Safety and Health
Developing Accident Avoidance Program for Occupational Safety and Healththeijes
 
IRJET- Factors that Influence Safety Performance & Strategies for Promoti...
IRJET-  	  Factors that Influence Safety Performance & Strategies for Promoti...IRJET-  	  Factors that Influence Safety Performance & Strategies for Promoti...
IRJET- Factors that Influence Safety Performance & Strategies for Promoti...IRJET Journal
 
Study on Safety Management System of Manufacturing Industry
Study on Safety Management System of Manufacturing Industry   Study on Safety Management System of Manufacturing Industry
Study on Safety Management System of Manufacturing Industry IRJET Journal
 
Risk Management Appraisal - A tool for successful Infrastructure project
Risk Management Appraisal - A tool for successful Infrastructure projectRisk Management Appraisal - A tool for successful Infrastructure project
Risk Management Appraisal - A tool for successful Infrastructure projectIRJET Journal
 
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...IRJET Journal
 
A Human-Centric Approach to Oil & Gas Industry Safety
A Human-Centric Approach to Oil & Gas Industry SafetyA Human-Centric Approach to Oil & Gas Industry Safety
A Human-Centric Approach to Oil & Gas Industry SafetyCognizant
 
Safety in design paper a live picture of organisational risk by linking risk...
Safety in design paper  a live picture of organisational risk by linking risk...Safety in design paper  a live picture of organisational risk by linking risk...
Safety in design paper a live picture of organisational risk by linking risk...Alex Apostolou
 
Comparative study of Cyber Security Assessment Tools
Comparative study of Cyber Security Assessment ToolsComparative study of Cyber Security Assessment Tools
Comparative study of Cyber Security Assessment ToolsIRJET Journal
 
IRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera SoftwareIRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera SoftwareIRJET Journal
 
Operational Risk Management - A Gateway to managing the risk profile of your...
Operational Risk Management -  A Gateway to managing the risk profile of your...Operational Risk Management -  A Gateway to managing the risk profile of your...
Operational Risk Management - A Gateway to managing the risk profile of your...Eneni Oduwole
 
CHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRY
CHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRYCHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRY
CHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRYIRJET Journal
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentanandeee88
 
Behaviour Based Safety Approach in Shipyard
Behaviour Based Safety Approach in ShipyardBehaviour Based Safety Approach in Shipyard
Behaviour Based Safety Approach in ShipyardIRJET Journal
 

Similaire à HAZARD IDENTIFICATION AND RISK ASSESSMENT IN WATCH MANUFACTURING PROCESS (20)

Risk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in MyanmarRisk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in Myanmar
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
Running the risk | Insight, issue 2
Running the risk | Insight, issue 2Running the risk | Insight, issue 2
Running the risk | Insight, issue 2
 
Determining Condition Monitoring
Determining Condition MonitoringDetermining Condition Monitoring
Determining Condition Monitoring
 
Developing Accident Avoidance Program for Occupational Safety and Health
Developing Accident Avoidance Program for Occupational Safety and HealthDeveloping Accident Avoidance Program for Occupational Safety and Health
Developing Accident Avoidance Program for Occupational Safety and Health
 
IRJET- Factors that Influence Safety Performance & Strategies for Promoti...
IRJET-  	  Factors that Influence Safety Performance & Strategies for Promoti...IRJET-  	  Factors that Influence Safety Performance & Strategies for Promoti...
IRJET- Factors that Influence Safety Performance & Strategies for Promoti...
 
Study on Safety Management System of Manufacturing Industry
Study on Safety Management System of Manufacturing Industry   Study on Safety Management System of Manufacturing Industry
Study on Safety Management System of Manufacturing Industry
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management Appraisal - A tool for successful Infrastructure project
Risk Management Appraisal - A tool for successful Infrastructure projectRisk Management Appraisal - A tool for successful Infrastructure project
Risk Management Appraisal - A tool for successful Infrastructure project
 
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
 
A Human-Centric Approach to Oil & Gas Industry Safety
A Human-Centric Approach to Oil & Gas Industry SafetyA Human-Centric Approach to Oil & Gas Industry Safety
A Human-Centric Approach to Oil & Gas Industry Safety
 
Safety in design paper a live picture of organisational risk by linking risk...
Safety in design paper  a live picture of organisational risk by linking risk...Safety in design paper  a live picture of organisational risk by linking risk...
Safety in design paper a live picture of organisational risk by linking risk...
 
Comparative study of Cyber Security Assessment Tools
Comparative study of Cyber Security Assessment ToolsComparative study of Cyber Security Assessment Tools
Comparative study of Cyber Security Assessment Tools
 
IRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera SoftwareIRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera Software
 
Operational Risk Management - A Gateway to managing the risk profile of your...
Operational Risk Management -  A Gateway to managing the risk profile of your...Operational Risk Management -  A Gateway to managing the risk profile of your...
Operational Risk Management - A Gateway to managing the risk profile of your...
 
Introduction.ppt
Introduction.pptIntroduction.ppt
Introduction.ppt
 
CHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRY
CHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRYCHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRY
CHEMICAL SAFETY ANALYSIS IN WATCH MANUFACTURING INDUSTRY
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Behaviour Based Safety Approach in Shipyard
Behaviour Based Safety Approach in ShipyardBehaviour Based Safety Approach in Shipyard
Behaviour Based Safety Approach in Shipyard
 
ASTM Standard E 2500 for Commissioning and Qualifications
ASTM Standard E 2500 for Commissioning and QualificationsASTM Standard E 2500 for Commissioning and Qualifications
ASTM Standard E 2500 for Commissioning and Qualifications
 

Plus de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Plus de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Dernier

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 

Dernier (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 

HAZARD IDENTIFICATION AND RISK ASSESSMENT IN WATCH MANUFACTURING PROCESS

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 733 HAZARD IDENTIFICATION AND RISK ASSESSMENT IN WATCH MANUFACTURING PROCESS Vishwanathan M1, Dr. Muthukumar K2, Jishin Jayan T3 1 PG Student, Industrial Safety Engineering, Department of Mechanical Engineering, BIT, Sathyamangalam 2Professor, Industrial Safety Engineering, Department of Mechanical Engineering, BIT, Sathyamangalam 3Assistant Professor, Industrial Safety Engineering, Department of Mechanical Engineering, BIT, Sathyamangalam ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract: There are different types of hazards in the watch manufacturing process. The processes involve handling of various hazardous chemicals and usage of different machines. The tool used here is Hazard identification and risk assessment, or HIRA system. It is a risk assessment tool that can help users identify hazards and estimate the risk associated with each one. This risk assessment tool will detect potential hazards in each department's task. Therisksassociatedwiththehazardwill beestimatedand categorized once the danger has been recognized. Keywords: risk, hazard, safety, and analysis. 1. INTRODUCTION In this plant division the focus is on manufacturing watches and wearables. The manufacturing process involves use of chemicals, flammable gases and number machines that contributes to different types of hazards. Thus, the project mainly focuses on identifying these hazards and methods to reduce its risk value. Hazard Identification Risk Assessment (HIRA) is involving in identifying all the hazards and evaluating its risk level. It discusses about what are the things that can go wrong, how bad it could it be and how often it might happen. 2. HAZARD IDENTIFICATION AND RISK ASSESSMENT Hazards are the sources which can make potential damages. No industry can be fully free from its own hazards and risks. To reduce these hazards various hazard identification process is to be carried out. Hazard Identification andRisk Assessment isa tool used to identify the hazards and rating the hazards based on its risk level. After identifying the hazards, theyare analyzed qualitatively and quantitatively to check whether they are in the acceptable level. HIRA is a combination of qualitative and quantitative method. The quantitative methods analyze various data numerically. The steps involved in HIRA are  Work Activities Classification  Hazard Identification  Risk Assessment  Monitor and review 2.1. WORK ACTIVITIES CLASSIFICATION The initial step is to identify the various work activities carried out in the process. This level includes dividing the processinto multiple baby activities. The concept of working, machines used, control methods, special hazards are identified in this level. The activities maybe routine or non-routine. Defining the work activity by their routine whether it is daily done or weekly or monthly sometimes. 2.2. IDENTIFICATION OF HAZARDS Hazard identification is an important factor in any process to be safely carried out. Identification of hazards involves serious field work to track different potential hazards. The team must be possessing some knowledge on identifying these hazards. Apart from the team itself, feedback from the workforce also helps in make the task quite efficient. Every sub-activity must be clearly studied and identified its hazards. Using Failure Mode Effective Analysis helps the process more efficient since it addresses all the hazards in case of any system or other related failures to the process. 2.3. RISK ASSESSMENT Risk assessment's purpose is to analyze the risk and hazards identified before. It discusses about who might get harmed and the consequences of the identified hazards in different ways, the guidelines to mitigate or reduce its risk level, evaluating the
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 734 hazards basis on its risk priority number and implement precautionary measures to avoid them. Basically, qualitative, and quantitative are the two methods used for the risk assessment. Risk assessment normally comparestheestimated risk against the risk criteria using various scales. Hierarchy of controls are then implemented to control the identified hazards in different forms. Elimination is most adopted method in controlling the hazards since it drastically reduces the risk level. 2.3.1 RANKING The method we used to rank the identified hazard is Risk Priority Number (RPN). Ranking of risks is a quantitative method in which we get the values. Ranking values for each hazard are calculated based on three factors:  Probability of occurrence  Severity rate  Hierarchy of controls Risk Score = Probability Rate X Severity Rate Probability of occurrence Probability of occurrence is an assessment of how likely a hazard can occur. A hazard that is frequent may result in high probability of damage. A rating scale of 1 to 5 is given based on the table 1. Table 1- Probability of occurrence Rating Description Examples of Description 5 Almost certain Event occurs often and constant exposure to hazard. Very high probability of damage. 4 Likely Event might probably occur and known history of occurrence. Frequent exposure to hazard. High probability of damage. 3 Possible Event could occur at some time and history of single occurrence. Regular or occasional exposure to hazard. Moderate probability of damage. 2 Unlikely Event is not likely to occur and known occurrence. Infrequent exposure to hazard. Low probability of damage. 1 Rare Event may occur occasionally and no reported occurrence. Rare exposure to hazard. Very low probability of damage. Severity rate The severity rate plays an important role in the hazard assessment process. A hazard that may have less probability of occurrence but having higher severity rate may causes serious damage. Severity rate tell us about how hard it damages the people and the surroundings. A rating of 1 to 5 is given based on the table 2. Table 2 - Severity rating Rating Parameter Severity 5 Numerous fatalities, irrecoverable property damage and productivity Catastrophic 4 Approximately one single fatality major property damage if hazard is realized Fatal 3 Non-fatal injury, permanent disability Serious 2 Disabling but not permanent injury Minor 1 Minor abrasion, bruises, cuts, first aid type injury Negligible
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 735 2.4 MONITOR AND REVIEW Monitoring and reviewing should be planned and is a part of the assessment process. Every hazard that are identified and rectified must be recorded. And any changes made in the process are also recorded accordinglywhich will behelpful infurther proceedings. The process must be reviewed annually assuring its appropriate operations and checked for its risk levels. This helps management in improving the control methods and thus reducing the hazard level. 3. MANUFACTURING PROCESS The manufacturing processes involves different types of machines, tools, and chemical handling.Theonlyheavymachineused in the process is hydraulic press machine all others are light machines since the component manufactured is smaller size. The hazardous chemicals are stored and handled in safe manner. Other processes include electroplating, oiling, annealing and polishing. The chemical treatment process is one division that includes major number of hazards. 4. RESULT Major hazards and its solutions. 1. Transfer of Isopar liquid (flammable) using mechanical hand pump – Since it is a flammable liquid using mechanical frictional pump may produce heat and induce fire. To avoid this a diaphragm type can be used which has no frictional part in contact with the liquid transfer 2. Heat stress in annealing process – working prolonged periodonhotarea resultsinheatstressamongworkers.Installationof local ventilation and heat ventilation system in the work area will solve this problem. 3. Auto bowl motor in open condition – Any rotating parts in work area without guard could result in accident. A secure safety guard can be installed around the auto bowl. 4. Handling of Cyanide – Even though the cyanide is used in very little quantity and handled in very careful manner we cannot agree it is safe. The cyanide must be substituted with some other less hazardous chemical. 5. Electric Shock – Electroplating shop is the place where electrical circuits are used among thelargequantityofliquids(which is a good conductor) for the process. This electric apparatus switches can be covered with silicon covers which could prevent contact with liquid and thus avoids short circuits. 6. Fall of person due to slippage – The shop is highly spilled liquids on the floor that cause slip of persons working in the shop. To avoid this, rough surface platform can be installed with acid proofing for which acidic chemicals are used in the shop floor. 7. Injury of hand by case pipe fixing machine – This happens when the operator has to holdthecasepipeagainstthespindlefor mounting it on the case. For this a magnetic spindle which is capable of holding the case pipe on itsowncanbeinstalled.Also,a sensor at the mounting area of the case can be used and used interlinked with the ON switch to avoid the injury. 8. Hand injury by the water-resistant testing machine – The closinglidofthe water-resistanttestingmachineisheavyandifnot held by one position it may fall over to its close position that may injure hand it is placed over there. This can be avoided by providing spring tension to the closing lid of the machine. 5. CONCLUSION HIRA investigation was carried out in the different process involved in manufacturing watch. Hazard Identification and Risk Assessment tool was used to identify various hazards and Risk priority number with risk matrix wereusedto quantifytherisk levels. Major hazards are identified and suitable solutions to reduce the risk levels are given. REFERENCES: [1] Gokul, Raj S dan Shivasankaran, N. 2014. Hazard Identification And RiskAssessmentInDeinkingPlant.InternationalJournal Of Research In Aeronautical And Mechanical Engineering. Vol.2 Issue.3, Pages: 202-208. [2] Koller, G., Fishcer, U., Hungerbuhler, K., 2001. Comparison of Methods Suitable for Assessing The Hazard Potential of Chemical Processes During Early Design Phases. Trans IchemE, Vol 79 May, Part B.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 01 | Jan 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 736 [3] Kumar, M.Saravana dan Kumar, Dr. P. Senthil. 2014. Hazard Identification and Risk Assessment in Foundry. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE). [4] Dunjo J, Fthenakis V, Vilchez, JA, Arnaldos J, “Hazard and operability (HAZOP) analysis, A literature review” Journal Hazardous Material. Vol. 173, No. 1, (2009) pp 19 - 32. [5] Health and Safety Management. Principles and Best Practice, FT Prentice Hall, London. Gallagher, C., Underhill, E., and Rimmer, M. (2001). [6] Kotek, L., Tabas, M., “HAZOP study with qualitative risk analysis for prioritization of corrective and preventive actions”, Procedia Engineering, Vol. 42, No. 4, (2012), pp 808 – 815. [7] Legget, David J, “Lab - HIRA: Hazard Identification and Risk Analysis for the Chemical Research Laboratory Part 2. Risk Analysis of Laboratory Operations”, Journal of Chemical Health & Safety, September - October, (2012), pp 25-36. [8] Lim, Stephen S., et al. "A comparative risk assessment of burden of disease and injury attributable to 67 risk factors and risk factor clusters in 21 regions, 1990–2010: a systematic analysis for the Global Burden of Disease Study 2010." The lancet 380.9859 (2013). [9] Cagno, E., F. Caron, and M. Mancini (2002). "Risk analysis in plant commissioning: the Multilevel Hazop." Reliability Engineering & System Safety 77(3): 309-323. [10]Khairul Akmal S, Che Ani MN, Ismail AK (2015) Investigation the effective of the hazard identification, risk assessment and determining control (HIRADC) in manufacturing process. Int J Innov Res Adv Eng 2(8):80– 83 [11]K. R. A. Roehan Yuniar and A. Desrianty, "Proposed Improvement Safety and Health Management System (SMK3) Method Using Hazard Identification and Risk Assessment (HIRA)", Online Journal of Institut Teknologi Nasional, vol. 2, 2014.