Page | 1
1. INTRODUCTION
1.1 PROJECT DESCIRPTION
The project is named "Taylors Sport Complex Construction Project", involves the
construction of a sport complex in Taylor's University Lakeside Campus, Subang Jaya,
Selangor, Malaysia. The land has a total area of 68,797 square meters and it is owned and
managed by Taylor's Education Group Sdn Bhd.
The Taylor’s sport center will be a full-service multisport complex situated along the
Taylor’s University Lakeside Campus jalan Taylors, Subang Jaya, 47500, Subang Jaya,
Selangor. The Taylor’s sport and recreation area located beside the car park zone G and F
and also near to the Academic block E. There are currently a semi-indoor basketball court
and two tennis courts. Propose to upgrade and renovate the current sport center is due to
high demanding sport facilities.
Selected site
Page | 2
Location of the site
Current Taylor’s University’s sport and
recreation area
Page | 3
We have done some site analysis about the current sport and recreation area of the
Taylors University and we found that there are some reason why the renovations and
upgrade is needed.
1) Fails to provide sufficient sport court for Taylor’s student.
2) Surrounding of the sport area is lack of greenery area.
3) The facilities too old and need to repair.
4) Only some sport can be perform.
The agreement of this project brief is estimated to be signed on 29th July 2013 and the
whole construction is estimated to take about 7 months.
1.2 PROJECT BACKGROUND
Taylor's University Lakeside Campus is a Subang Jaya Lake area on the outskirts of
Kuala Lumpur has had many incarnations—first it was a tin mining field, then an illegal
dumpsite, finally it became a squatter occupied by the homeless.
After a major rehabilitation program, the site has been transformed into an international
school in 2010—Taylor’s Lakeside Campus now sits on the banks of the lake, wrapped
closely around the water’s edge. The university takes advantage of this natural water
body, formed initially by early mining activities, to formulate its environmental strategies
and revitalize it into a key part of the campus.
1.3 PROJECT OBJECTIVES:
The main objectives of the project are:
1. Provide balance life for students.
2. Provide the sufficient facilities for students to perform their sport.
3. Increase the types of sport facilities in the campus.
4. Provide a better quality service.
1.4 PROJECT SCOPE
In this project, the department aims to build a sports complex which is semi- indoor.
There will be 3 floors which will have 2 Futsal courts, 6 badminton courts, 2 basketball
courts respectively. The purpose of building the sports complex is for the students'
entertainment and their free time.
The scope of the project is a 50m x 50m sports complex with 2 basketball courts each
measuring 28m x 15m, 6 badminton courts each measuring 13.4m x 6.1m and 1 Futsal
court measuring 25m x 42m.
Page | 4
1.5 KEY to Success
1) Atmosphere of facility: By creating an unmatched "cool" atmosphere in The
Supreme Courts through the use of first class equipment, floors, colors, and big
screen TVs, people will want to frequent our facility often and our ability to retain
members will be enhanced.
2) Knowledgeable/qualified staff and management: By providing the users of the
facility with knowledgeable and qualified staff who show genuine concern for the
patrons, people will feel comfortable and confident that The Taylors Sport
Complex can meet all of their sport and fitness needs.
2. SPECIFICATIONS
2.1 RISK
Funding: In case the funding is not enough, the project will be slowed down, postpone or
worst, abandoned.
Approval: The Authority’s approval will really affect the project, in case the Authority
do not give out an approval for the project, the project cannot be carried out.
Failure to attract or retain top talent: If we cannot find the right talent for the
construction, there might be some problems that will be triggered and it might need to
take a longer time that will trigger more problems in the future, e.g. client will lose their
interest in the project.
Injury to workers: In case something like this happens, problems will be triggered, e.g.
the cost of the treatment.
2.2 CONSTRAINTS
Pollution: The remnant of the construction materials will pollute the surroundings of the
construction site, during the construction work. The sound of the construction work will
disturb the activity around the construction site and will distribute to a sound pollution.
Safety: The safety around the construction site will be hard to guarantee, the construction
process and materials might endanger the safety of people passing by near the
construction site.
Inconvenient: The students not allow performing their sport during the construction
period. And they need to find the other places to do their activities.
Page | 5
2.3 ASSUMPTIONS
The Taylors Sport Complex will be a full-service multisport complex.
The operation hours will be from 6a.m. - 12a.m.
The user will be the students of Taylors University.
The staffs are from the department of Taylor’s facilities management team.
Students can perform their sport in the campus.
It will help in our campus facilities improvement.
It will help the students have a healthier life by having sport activities.
2.4 TIMESCALE FOR PROJECT
Page | 6
3. PROJECT MANAGEMENT TEAM
3.1 TEAM MEMBERS
Key Members Person-in-charge Company Company Address
Architect Kishant Kumar
Landscape Architect Ronn Chua GREN Landscape
Service
L-2-02, Level 2,Sunway
Pyramid Shopping
Mall, 46510 Petaling
Jaya, Selangor
Structural Engineer Calv Chee
Contractor Teo Chong Yih CY contracting
berhad
No. 1 Jalan Besar
47500 Subang Jaya,
Selangor Darul Ehsan
Malaysia
Quantity Surveyor Jake Sia Chyi Sern (CSS)Chyi Sern
Surveyors
Level 2, 123 Monopoly
Lane, Derry 12345,
Bandar Puteri,
Selangor,47100,
Malaysia
3.2 OBJECTIVES
To completely understand the students' needs and plan, design and build a sport complex
for the student.
Page | 7
3.3 TASKS
Architect
Observe construction of Taylors Sport Complex to ensure that site work will meet
the specifications of construction documents when the construction have
completed.
Submit modification of the design of Taylors Sport Complex during construction
to contractor.
Adapt a project to real life site conditions, correct errors and remedy omissions to
the construction documents.
Provide an estimate for the cost work Taylors Sport Complex. As cost
requirements change, architect has to update and refine cost estimate and share
the information with contractor and owner.
Architect recommends alternative solution to resolve any variations to original
budgets.
Conduct an assessment of the site for the owner
Consider the operations and performance of the facilities and make
recommendations for maintenance and improvement.
Landscape Architect
Overseeing the design of a variety of projects, including urban regeneration schemes,
pedestrian schemes, road or retail schemes, and maintaining the character of sites of
natural beauty;
Establishing general landscape requirements with clients;
Conducting preliminary studies of the site (including contours, soil, ecology, buildings,
roads);
Assessing a site's potential to meet the client's specifications;
Carrying out environmental impact assessments;
Seeking and taking into account the views of local residents, potential users, and parties
with a vested interest in the project;
accurately preparing and presenting detailed plans and working drawings, including
applications, construction details and specifications for the project using computer-aided
design (CAD) packages or similar design software;
Presenting proposals to clients, dealing with enquiries and negotiating any amendments
to the final design;
Matching the client's wishes with your knowledge of what will work best;
Contacting and coordinating manufacturers and suppliers;
Putting work out to tender, selecting a contractor and manager (mainly for larger
projects), and leading cross-functional teams;
Making site visits;
Ensuring deadlines are met;
Liaising with other professionals on the project;
Page | 8
Monitoring and checking work on-site (on large projects, landscape managers may do
this type of supervisory work);
Authorizing payment once work has been satisfactorily completed;
Attending public inquiries to give evidence if necessary;
Generating new business opportunities.
Structural Engineer
Design structures to withstand stresses & pressures (Do not bend, twist, collapse or
vibrate, remain strong and secure throughout their use.
Choose appropriate materials to meet design specifications
Analysis configurations of the basic structural components of Taylors Sport Complex
Calculate pressure, stress & strains that each component (beam & lintel) will experience
from other parts of the structure due to human use or environmental pressure.
Liaising with architect to agree an safe designs and fit the aesthetic concept of
construction
Considering the strength of various material
Examining structures at risk of collapse and advising how to improve their structure
integrity
Making drawings, specifications and computer models of structures for building
contractors.
Investigating ground conditions and analyzing results of site tests
Applying expert knowledge of the forces that act on various structure
Use computers and computer-aided design (CAD) technology for simulation process.
Contractor
To perform and complete a task that is assigned or created
Checking whether the clients are aware of their duties
Cooperate with other working parties
Consult with the workers in good time
Provide workers under their control with relevant information
Ensure the structure is built as per drawings
Lease with consultants, sub-traders and owner to achieve the common goal of work being
completed on time.
Applying for building permits
Securing the property
Managing personal on site
Providing temporary utilities on site
Providing site surveying & engineering
Page | 9
Disposing or recycling of construction waste
Monitoring schedules & cash flows
Maintaining accurate records
Quantity Surveyor
Preparation of Feasibility Studies
Estimating to define project budgets
Analysis of the effect of design changes on the project budget
Cost planning to refine the budget as the design documents develop
Preparation of Bills of Quantities to assist in the tender process
Provision of cost control services during construction
Assessment of the contractor’s progress claims
Assessment of variation and delay claims
Procurement of subcontractors and labour to carry out specialist trade works
Negotiation and settlement of accounts
Monthly forecasting and cost reporting
Monthly negotiation and agreement of payments for works carried out
Determination of the final project cost
Preparation of tax depreciation reports for investors and property owners
Expert witness reports to assist in the settlement of building disputes
4. STAKEHOLDERS
These are the stakeholders have so far been identified for the project:
4.1 PRIMARY USERS
The students of Taylor's University Lakeside Campus, especially for students who love
sport and wanted to perform their sport activities in the campus.
Page | 10
4.2 GOVERNMENT AND STATUTORY AUTHORITIES
THE APPROVAL
no Procedure
1 Submission to Local Authority through OSC
Builders can apply for all the pre-building approvals at the One Stop Center of the
Municipality of Kuala Lumpur. However, the builder still needs to visit each of the
agencies that provide the pre-approvals in order to obtain confirmation. The One
Stop Center charges a processing fee of MYR 480. This process is partly regulated
by Federal Territory (Planning) Act, 1982.
Agency: Subang Jaya Municipal Counsil MPSJ
2 Obtain Development Order (DO) from Planning Dept
Planning permission, which is issued as a Development Order by the Planning
Department of the local authority, authorizes development of the land. The permit is
valid for 12 months, within which time construction must begin.
The processing time for the applications is usually as follows:
• 120 days for large-scale projects (consisting of complicated development plans,
buildings of more than five levels, construction involving layout plans for a
development area of more than 2 acres, or projects affecting the population density
and change of zone area)
• 60 days for mid-scale projects (requiring construction plans of buildings of fewer
than five levels, a temporary change in land/building usage involving a land area of
fewer than 5,000 square feet or involving changes/additions/alterations made to the
available shops/housing units)
• 45 days for small-scale projects (involving suggested additions/changes/alterations
to existing bungalow units, two-story units and terrace units, and new bungalow units
built in accordance with approved layout plans only)
Agency: Subang Jaya Municipal Counsil MPSJ
3 Obtain Water Approval
Water related approvals are regulated by Water Services Industry Act 2006, section
45
Agency: Water Authority SYABAS
4 Obtain Sewerage Approval
Agency: Sewage Services Department IWK
5 Obtain Fire Safety (Arch) Comment
Page | 11
Fire safety procedures are regulated by Fire Services Act 1988 and Uniform Building
Bylaws 1984 (Chapter 8)
Agency: Fire Department
6 Obtain Hoarding & Signboard Approval
Agency: Subang Jaya Municipal Counsil MPSJ
7 Obtain RORO Bin Approval
Agency: Subang Jaya Municipal Counsil MPSJ
8 Obtain Earthwork Approval
Agency: Subang Jaya Municipal Counsil MPSJ
9 Obtain Road and Drainage Approval
Agency: Subang Jaya Municipal Counsil MPSJ
10 Obtain Landscape Approval
Agency: Subang Jaya Municipal Counsil MPSJ
11 Obtain Street Lighting Approval
Street lightning regulations are governed by Street, Drainage and Building Act, 1974
Agency: Subang Jaya Municipal Counsil MPSJ
12 Obtain Car Park Approval
Agency: Subang Jaya Municipal Counsil MPSJ
13 Obtain MSMA and SPAH Approvals
Agency: Subang Jaya Municipal Counsil MPSJ
14 Obtain Building Plan Approval
The approval of the building plans authorizes construction of the building within 12
months from the date of approval. Approval is granted by the Building Department of
the local authority.
The filing fees for the application for building plan approval are MYR 10.00 per 10 sq.
m. or any part thereof (a minimum of MYR 100.00) under the First Schedule of the
Page | 12
Federal Territory of Kuala Lumpur Building By-Laws of 1985. In the case here,
involving a 1,300.6 sq. m. built-up area, the application fee would be MYR 1,300.60.
Agency: Subang Jaya Municipal Counsil MPSJ
15 Obtain Fire Safety (M&E) Approval
Agency: Fire Department
16 Obtain Permission to start work from Building Department (KMB)
Agency: Subang Jaya Municipal Counsil MPSJ
17 Notification to start Earthwork from Engineering Department (B FORM)
Agency: Subang Jaya Municipal Counsil MPSJ
18 Notification to Start Sewerage Work (PDC 6)
Agency: Subang Jaya Municipal Counsil MPSJ
19 Request sewerage inspection
Agency: Sewage Services Department IWK
20 Sewerage inspection
Agency: Sewage Services Department IWK
21 Sewerage report
Agency: Sewage Services Department IWK
22 Request Road & Drainage Clearance
After construction has been completed, a final inspection is conducted by the
Building Department to issue its approval. Approval is granted only after all approvals
are obtained from the various departments listed in the development order, and is
meant to ensure that the construction has been completed in compliance with the
approved building plan and the requirements listed in it. The period of 3 to 4 months
is just an estimate and might vary with the time it takes the various other departments
or agencies to issue their approvals.
The Building Department supervises the construction work stage-by-stage by
Page | 13
conducting on-site inspections and reviewing the progress report usually submitted
by the architect after each stage.
Agency: Sewage Services Department IWK
23 Road and Drainage Inspection
Agency: Subang Jaya Municipal Counsil MPSJ
24 Road and Drainage Report
Agency: Subang Jaya Municipal Counsil MPSJ
25 Request Sewerage Clearance
Agency: Sewage Services Department IWK
26 Sewerage Inspection
Agency: Sewage Services Department IWK
27 Sewerage Report
Agency: Sewage Services Department IWK
28 Request Fire Safety Clearance
Agency: Fire Department
29 Fire Safety Inspection
Agency: Fire Department
30 Fire Safety Report
Agency: Fire Department
31 Request Water Clearance
Agency: Water Authority SYABAS
32 Water Inspection
Agency: Water Authority SYABAS
33 Water Report
Agency: Water Authority SYABAS
34 Deposit G1 - G21 Forms and F Form to OSC
The Certificate of Completion has been introduced substituting the Certificate of
Fitness for Occupation in 2007. Upon the coming into force (in force from November
Page | 14
27, 2007) of By-Law 23 of the Building (Federal Territory of Kuala
Lumpur)(Amendment) By-Laws 1985, the Certificate of Completion is issued when
forms G1 to G21 in respect of stage certifications as set out in the Second Schedule
of the By-Laws 1985 have been duly certified and received by the principal
submitting person. This person must also certify in Form F that the construction and
completion of building was under his supervision and that to the best of his
knowledge and belief the building has been constructed and completed in
accordance with the Act, the By-Laws and the approved plans.
Agency: Subang Jaya Municipal Counsil MPSJ
35 Deposit G1 - G21 Forms and F Form to Board of Arch / Eng Malaysia
A copy of forms G1 G2 should also be submitted to the Order of Architects and
Engineers of Malaysia
Agency: Board of Architects’ and Engineers of Malaysia
36 Obtain Water Connection
Agency: Water Authority SYABAS
37 Obtain Telco Connection
Agency: Telekom Malaysia (Telco)
Page | 15
5. BUDGET
5.1 PRELIMINARY BUDGET STRUCTURE
Start-up Requirements
Start-up Expenses
Legal RM30,000
Air Structure RM415,000
Hardwood Floors RM160,000
Basketball Rims, Stands... RM55,000
Exercise Equipment and Misc. RM150,000
Stucco RM8,000
Block Fence RM90,000
Concrete Footings and Slab RM185,000
Site Preparation RM20,000
Consultants RM3,500
Mechanical RM25,000
Second Floor Development and Offices RM210,000
Office Equipment RM65,000
Paving and Landscaping RM112,000
Management Fee RM100,000
Promotional Costs RM40,000
Design Fees RM30,000
Land RM465,000
Total Start-up Expenses RM2,163,500
Start-up Assets
Cash Required RM336,500
Start-up Inventory RM0
Other Current Assets RM0
Long-term Assets RM0
Total Assets RM336,500
Total Requirements RM2,500,000
Page | 16
Start-up Funding
Start-up Expenses to Fund RM2,163,500
Start-up Assets to Fund RM336,500
Total Funding Required RM2,500,000
Assets
Non-cash Assets from Start-up RM0
Cash Requirements from Start-up RM336,500
Additional Cash Raised RM0
Cash Balance on Starting Date RM336,500
Total Assets RM336,500
Liabilities and Capital
Liabilities
Current Borrowing RM0
Long-term Liabilities RM1,250,000
Accounts Payable (Outstanding Bills) RM0
Other Current Liabilities (interest-free) RM0
Total Liabilities RM1,250,000
Capital
Planned Investment
Investor 1 RM100,000
Investor 2 RM100,000
Investor 3 RM100,000
Investor 4 RM100,000
Investor 5 RM100,000
Investor 6 RM100,000
Investor 7 RM100,000
Investor 8 RM100,000
Other RM450,000
Additional Investment Requirement RM0
Total Planned Investment RM1,250,000
Loss at Start-up (Start-up Expenses) (RM2,163,500)
Total Capital (RM913,500)
Total Capital and Liabilities RM336,500
Total Funding RM2,500,000
Page | 17
5.2 EXCLUSIONS
The Taylors Sport Complex will be a full-service multisport complex situated along
Taylors University lakeside, Subang Jaya, Selangor. There are currently no other sports
facilities like this one anywhere in Subang Jaya. This plan will be used to define the
scope of our services, as well as a means of gaining the necessary investments to open the
facility. It will also be used on a continual basis in the evaluation of The Taylors Sport
Complex mission, goals, and objectives. The keys to success for The Taylors Sport
complex are our ability to provide the best service and facility, creating an unmatched
"cool" atmosphere where people will like to be, and hiring qualified/certified and
knowledgeable staff to aid in the running of our programs and leagues.
5.3 Mission
The Taylors Sport complex is a multisport and fitness complex designed to be used by
the students of Taylors University and the surrounding areas. It is our mission to provide
the best programs, staff, and equipment, to fully meet the various sports and fitness needs
of Taylor’s students, to provide an ideal place for students to perform their sport activity.
Besides providing an excellent service for students, The Taylors Sport complex is
determined to create an unmatched sporting atmosphere that will add to the enjoyment of
every student and employee of the facility. Dedicated to the community, The Taylors
Sport complex strives to support and sponsor community events, as well as host them
whenever possible. Our hope is that through the use of our facility, members' enjoyment
and appreciation for sports, fitness, and for life will be enhanced.
Page | 18
6. Reference documents/ resources
6.1 Reference link
http://www.bplans.com/multi_sport_complex_business_plan/services_fc.php#.UfVA5qI
3BXk
http://www.rehdainstitute.com/research-a-resources/property-development/osc.html
http://www.reference.com/motif/computers/sample-of-a-tender-document
http://www.peeplo.com/search/?q=example%20tender%20document&type=web&fro
m=adg159
http://www.techrepublic.com/article/help-for-writing-a-project-brief/
http://blog.archability.com/?p=91
http://www.google.com/url?sa=t&rct=j&q=project%20brief&source=web&cd=8&cad=rj
a&sqi=2&ved=0CEMQFjAH&url=http%3A%2F%2Fwww.pmadvice.co.uk%2FUserFiles%2F
File%2FFree%2520Downloads%2FProject%2520Brief.doc&ei=rUX1UaD4K4vM9AS564HA
BQ&usg=AFQjCNH7zb6QZaFy1DJ46CW1pEKe5O7D6g&bvm=bv.49784469,d.eWU
http://www.designingbuildings.co.uk/wiki/Project_brief
http://projects.oucs.ox.ac.uk/spbp/SPBPprojectBrief.pdf
http://www.google.com/url?sa=t&rct=j&q=project%20brief&source=web&cd=14&cad=
rja&sqi=2&ved=0CGYQFjAN&url=http%3A%2F%2Fwww.egovernment.tas.gov.au%2F__d
ata%2Fassets%2Fword_doc%2F0011%2F77978%2FProject_brief_template_and_guide_f
or_very_small_projects.dot&ei=rUX1UaD4K4vM9AS564HABQ&usg=AFQjCNGodFvHAvL
KcN6S82kV6Pp-tgdEaQ&bvm=bv.49784469,d.eWU
http://www.hpw.qld.gov.au/SiteCollectionDocuments/CWMFProjectDefinition.pdf
http://portal.meathvec.ie/schools/ratoath/studentactivity/Subjects/Construction%20St
udies/Document%20Library/Furniture%20Brief%20guide.pdf
http://www.apuc-
scot.ac.uk/uploads/Docs/pdf/Guide%20to%20Procuring%20Construction%20Projects%2
029-6-11.pdf
http://portal.surrey.ac.uk/portal/page?_pageid=1638,1532736&_dad=portal&_schema
=PORTAL
Page | 19

Contenu connexe

Tendances

Pendidikan moral Melindungi hak pengguna
Pendidikan moral Melindungi hak penggunaPendidikan moral Melindungi hak pengguna
Pendidikan moral Melindungi hak penggunaStella Lim
 
pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanFiQahh AmiNn
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Kegagalan cerun
Kegagalan cerunKegagalan cerun
Kegagalan cerunHoKuokHow
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Reportarmada7000
 
Contoh Borang kaji selidik - Survey
Contoh Borang kaji selidik - Survey Contoh Borang kaji selidik - Survey
Contoh Borang kaji selidik - Survey Mohd Nizam Mohd Zan
 
Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...
Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...
Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...Mohd Nizam Mohd Zan
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction ContractSarah Fox
 
Saluran agihan
Saluran agihan Saluran agihan
Saluran agihan Kit Cokiez
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentHaziq1511
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case studyamira688
 
Tanggungjawab sosial
Tanggungjawab sosialTanggungjawab sosial
Tanggungjawab sosialSITI HAJAR
 
Road laws and acts in Malaysia -highway engineering
Road laws and acts in Malaysia -highway engineeringRoad laws and acts in Malaysia -highway engineering
Road laws and acts in Malaysia -highway engineeringPavitrah Segaran
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
surat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industrisurat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industriXiao Doubles
 

Tendances (20)

Pendidikan moral Melindungi hak pengguna
Pendidikan moral Melindungi hak penggunaPendidikan moral Melindungi hak pengguna
Pendidikan moral Melindungi hak pengguna
 
SPK JKR Malaysia: Terminologi
SPK JKR Malaysia: TerminologiSPK JKR Malaysia: Terminologi
SPK JKR Malaysia: Terminologi
 
pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
 
Tangga
TanggaTangga
Tangga
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Kegagalan cerun
Kegagalan cerunKegagalan cerun
Kegagalan cerun
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Report
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Muet speaking tips
Muet speaking tipsMuet speaking tips
Muet speaking tips
 
Contoh Borang kaji selidik - Survey
Contoh Borang kaji selidik - Survey Contoh Borang kaji selidik - Survey
Contoh Borang kaji selidik - Survey
 
Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...
Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...
Kajian Terhadap Masalah-masalah Yang Dihadapi Oleh Penghuni-penghuni Di Rumah...
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract
 
Saluran agihan
Saluran agihan Saluran agihan
Saluran agihan
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case study
 
Tanggungjawab sosial
Tanggungjawab sosialTanggungjawab sosial
Tanggungjawab sosial
 
Road laws and acts in Malaysia -highway engineering
Road laws and acts in Malaysia -highway engineeringRoad laws and acts in Malaysia -highway engineering
Road laws and acts in Malaysia -highway engineering
 
Scraper
ScraperScraper
Scraper
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
surat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industrisurat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industri
 

En vedette

Pp group assignment
Pp group assignmentPp group assignment
Pp group assignmentwendyteosy
 
Estimating letters
Estimating lettersEstimating letters
Estimating lettersZIyeeTan
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)Hasif Alias
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.lucaschinsheng
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment PresentationHaziq1511
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment ReportMelvin Lim
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group AssignmentHaziq1511
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompaHasif Alias
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 AssignmentMelvin Lim
 
Estimating tender presentation
Estimating tender presentation Estimating tender presentation
Estimating tender presentation seenyeeyong
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.lucaschinsheng
 
Assignment 2 - Buildsoft Software
Assignment 2 - Buildsoft SoftwareAssignment 2 - Buildsoft Software
Assignment 2 - Buildsoft SoftwareKai Yun Pang
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationHasif Alias
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationkohwenqi
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientPang Khai Shuen
 
Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Lee Pei Gie
 

En vedette (20)

Estimating
EstimatingEstimating
Estimating
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 
Estimating tender presentation
Estimating tender presentation Estimating tender presentation
Estimating tender presentation
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
 
Assignment 2 - Buildsoft Software
Assignment 2 - Buildsoft SoftwareAssignment 2 - Buildsoft Software
Assignment 2 - Buildsoft Software
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
 
Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )
 

Similaire à Group Component

Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
Project brief
Project briefProject brief
Project briefkerneng
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1suzzanekan
 
Pm assignment-2-report
Pm assignment-2-reportPm assignment-2-report
Pm assignment-2-reportChong Yu Xuan
 
Project brief
Project brief Project brief
Project brief PK146
 
Project management container pavilion
Project management container pavilionProject management container pavilion
Project management container pavilionjerryycc
 
Ici final project
Ici final projectIci final project
Ici final project温 庄壁
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf温 庄壁
 
ICI final project
ICI final projectICI final project
ICI final projectLY97
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2itsmylifesl
 
Project brief
Project brief Project brief
Project brief Haziq1511
 

Similaire à Group Component (20)

Project background
Project backgroundProject background
Project background
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Project brief
Project briefProject brief
Project brief
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Pm assignment-2-report
Pm assignment-2-reportPm assignment-2-report
Pm assignment-2-report
 
Individual ici
Individual iciIndividual ici
Individual ici
 
Ici individual
Ici individualIci individual
Ici individual
 
Project brief
Project briefProject brief
Project brief
 
Project brief
Project brief Project brief
Project brief
 
Project management container pavilion
Project management container pavilionProject management container pavilion
Project management container pavilion
 
Project Name
 Project Name                                       Project Name
Project Name
 
Ici final project
Ici final projectIci final project
Ici final project
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
 
ICI final project
ICI final projectICI final project
ICI final project
 
Project management
Project managementProject management
Project management
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
 
Project brief
Project brief Project brief
Project brief
 

Plus de Jäkê Čhŷį Śêrñ (20)

Meas 4-presentation
Meas 4-presentationMeas 4-presentation
Meas 4-presentation
 
Purpose
PurposePurpose
Purpose
 
Shd group-report
Shd group-reportShd group-report
Shd group-report
 
Sustainable housing development assignment
Sustainable housing development assignmentSustainable housing development assignment
Sustainable housing development assignment
 
Management science
Management scienceManagement science
Management science
 
Measurement 3 assignment
Measurement 3 assignmentMeasurement 3 assignment
Measurement 3 assignment
 
Site surveying
Site surveying Site surveying
Site surveying
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise building
 
Telecommunication for high rise building presentation
Telecommunication for high rise building presentationTelecommunication for high rise building presentation
Telecommunication for high rise building presentation
 
Building materials report 2
Building materials report 2Building materials report 2
Building materials report 2
 
Dulux paints
Dulux paintsDulux paints
Dulux paints
 
Building material report
Building material reportBuilding material report
Building material report
 
Assignment 2 edited
Assignment 2 editedAssignment 2 edited
Assignment 2 edited
 
Objective of site visit
Objective of site visitObjective of site visit
Objective of site visit
 
Business charity driveeee
Business charity driveeeeBusiness charity driveeee
Business charity driveeee
 
Journal2
Journal2Journal2
Journal2
 
Journal1
Journal1Journal1
Journal1
 
Assign 2
Assign 2Assign 2
Assign 2
 
The sponge
The spongeThe sponge
The sponge
 
Accounts project
Accounts projectAccounts project
Accounts project
 

Dernier

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 

Dernier (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 

Group Component

  • 1. Page | 1 1. INTRODUCTION 1.1 PROJECT DESCIRPTION The project is named "Taylors Sport Complex Construction Project", involves the construction of a sport complex in Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia. The land has a total area of 68,797 square meters and it is owned and managed by Taylor's Education Group Sdn Bhd. The Taylor’s sport center will be a full-service multisport complex situated along the Taylor’s University Lakeside Campus jalan Taylors, Subang Jaya, 47500, Subang Jaya, Selangor. The Taylor’s sport and recreation area located beside the car park zone G and F and also near to the Academic block E. There are currently a semi-indoor basketball court and two tennis courts. Propose to upgrade and renovate the current sport center is due to high demanding sport facilities. Selected site
  • 2. Page | 2 Location of the site Current Taylor’s University’s sport and recreation area
  • 3. Page | 3 We have done some site analysis about the current sport and recreation area of the Taylors University and we found that there are some reason why the renovations and upgrade is needed. 1) Fails to provide sufficient sport court for Taylor’s student. 2) Surrounding of the sport area is lack of greenery area. 3) The facilities too old and need to repair. 4) Only some sport can be perform. The agreement of this project brief is estimated to be signed on 29th July 2013 and the whole construction is estimated to take about 7 months. 1.2 PROJECT BACKGROUND Taylor's University Lakeside Campus is a Subang Jaya Lake area on the outskirts of Kuala Lumpur has had many incarnations—first it was a tin mining field, then an illegal dumpsite, finally it became a squatter occupied by the homeless. After a major rehabilitation program, the site has been transformed into an international school in 2010—Taylor’s Lakeside Campus now sits on the banks of the lake, wrapped closely around the water’s edge. The university takes advantage of this natural water body, formed initially by early mining activities, to formulate its environmental strategies and revitalize it into a key part of the campus. 1.3 PROJECT OBJECTIVES: The main objectives of the project are: 1. Provide balance life for students. 2. Provide the sufficient facilities for students to perform their sport. 3. Increase the types of sport facilities in the campus. 4. Provide a better quality service. 1.4 PROJECT SCOPE In this project, the department aims to build a sports complex which is semi- indoor. There will be 3 floors which will have 2 Futsal courts, 6 badminton courts, 2 basketball courts respectively. The purpose of building the sports complex is for the students' entertainment and their free time. The scope of the project is a 50m x 50m sports complex with 2 basketball courts each measuring 28m x 15m, 6 badminton courts each measuring 13.4m x 6.1m and 1 Futsal court measuring 25m x 42m.
  • 4. Page | 4 1.5 KEY to Success 1) Atmosphere of facility: By creating an unmatched "cool" atmosphere in The Supreme Courts through the use of first class equipment, floors, colors, and big screen TVs, people will want to frequent our facility often and our ability to retain members will be enhanced. 2) Knowledgeable/qualified staff and management: By providing the users of the facility with knowledgeable and qualified staff who show genuine concern for the patrons, people will feel comfortable and confident that The Taylors Sport Complex can meet all of their sport and fitness needs. 2. SPECIFICATIONS 2.1 RISK Funding: In case the funding is not enough, the project will be slowed down, postpone or worst, abandoned. Approval: The Authority’s approval will really affect the project, in case the Authority do not give out an approval for the project, the project cannot be carried out. Failure to attract or retain top talent: If we cannot find the right talent for the construction, there might be some problems that will be triggered and it might need to take a longer time that will trigger more problems in the future, e.g. client will lose their interest in the project. Injury to workers: In case something like this happens, problems will be triggered, e.g. the cost of the treatment. 2.2 CONSTRAINTS Pollution: The remnant of the construction materials will pollute the surroundings of the construction site, during the construction work. The sound of the construction work will disturb the activity around the construction site and will distribute to a sound pollution. Safety: The safety around the construction site will be hard to guarantee, the construction process and materials might endanger the safety of people passing by near the construction site. Inconvenient: The students not allow performing their sport during the construction period. And they need to find the other places to do their activities.
  • 5. Page | 5 2.3 ASSUMPTIONS The Taylors Sport Complex will be a full-service multisport complex. The operation hours will be from 6a.m. - 12a.m. The user will be the students of Taylors University. The staffs are from the department of Taylor’s facilities management team. Students can perform their sport in the campus. It will help in our campus facilities improvement. It will help the students have a healthier life by having sport activities. 2.4 TIMESCALE FOR PROJECT
  • 6. Page | 6 3. PROJECT MANAGEMENT TEAM 3.1 TEAM MEMBERS Key Members Person-in-charge Company Company Address Architect Kishant Kumar Landscape Architect Ronn Chua GREN Landscape Service L-2-02, Level 2,Sunway Pyramid Shopping Mall, 46510 Petaling Jaya, Selangor Structural Engineer Calv Chee Contractor Teo Chong Yih CY contracting berhad No. 1 Jalan Besar 47500 Subang Jaya, Selangor Darul Ehsan Malaysia Quantity Surveyor Jake Sia Chyi Sern (CSS)Chyi Sern Surveyors Level 2, 123 Monopoly Lane, Derry 12345, Bandar Puteri, Selangor,47100, Malaysia 3.2 OBJECTIVES To completely understand the students' needs and plan, design and build a sport complex for the student.
  • 7. Page | 7 3.3 TASKS Architect Observe construction of Taylors Sport Complex to ensure that site work will meet the specifications of construction documents when the construction have completed. Submit modification of the design of Taylors Sport Complex during construction to contractor. Adapt a project to real life site conditions, correct errors and remedy omissions to the construction documents. Provide an estimate for the cost work Taylors Sport Complex. As cost requirements change, architect has to update and refine cost estimate and share the information with contractor and owner. Architect recommends alternative solution to resolve any variations to original budgets. Conduct an assessment of the site for the owner Consider the operations and performance of the facilities and make recommendations for maintenance and improvement. Landscape Architect Overseeing the design of a variety of projects, including urban regeneration schemes, pedestrian schemes, road or retail schemes, and maintaining the character of sites of natural beauty; Establishing general landscape requirements with clients; Conducting preliminary studies of the site (including contours, soil, ecology, buildings, roads); Assessing a site's potential to meet the client's specifications; Carrying out environmental impact assessments; Seeking and taking into account the views of local residents, potential users, and parties with a vested interest in the project; accurately preparing and presenting detailed plans and working drawings, including applications, construction details and specifications for the project using computer-aided design (CAD) packages or similar design software; Presenting proposals to clients, dealing with enquiries and negotiating any amendments to the final design; Matching the client's wishes with your knowledge of what will work best; Contacting and coordinating manufacturers and suppliers; Putting work out to tender, selecting a contractor and manager (mainly for larger projects), and leading cross-functional teams; Making site visits; Ensuring deadlines are met; Liaising with other professionals on the project;
  • 8. Page | 8 Monitoring and checking work on-site (on large projects, landscape managers may do this type of supervisory work); Authorizing payment once work has been satisfactorily completed; Attending public inquiries to give evidence if necessary; Generating new business opportunities. Structural Engineer Design structures to withstand stresses & pressures (Do not bend, twist, collapse or vibrate, remain strong and secure throughout their use. Choose appropriate materials to meet design specifications Analysis configurations of the basic structural components of Taylors Sport Complex Calculate pressure, stress & strains that each component (beam & lintel) will experience from other parts of the structure due to human use or environmental pressure. Liaising with architect to agree an safe designs and fit the aesthetic concept of construction Considering the strength of various material Examining structures at risk of collapse and advising how to improve their structure integrity Making drawings, specifications and computer models of structures for building contractors. Investigating ground conditions and analyzing results of site tests Applying expert knowledge of the forces that act on various structure Use computers and computer-aided design (CAD) technology for simulation process. Contractor To perform and complete a task that is assigned or created Checking whether the clients are aware of their duties Cooperate with other working parties Consult with the workers in good time Provide workers under their control with relevant information Ensure the structure is built as per drawings Lease with consultants, sub-traders and owner to achieve the common goal of work being completed on time. Applying for building permits Securing the property Managing personal on site Providing temporary utilities on site Providing site surveying & engineering
  • 9. Page | 9 Disposing or recycling of construction waste Monitoring schedules & cash flows Maintaining accurate records Quantity Surveyor Preparation of Feasibility Studies Estimating to define project budgets Analysis of the effect of design changes on the project budget Cost planning to refine the budget as the design documents develop Preparation of Bills of Quantities to assist in the tender process Provision of cost control services during construction Assessment of the contractor’s progress claims Assessment of variation and delay claims Procurement of subcontractors and labour to carry out specialist trade works Negotiation and settlement of accounts Monthly forecasting and cost reporting Monthly negotiation and agreement of payments for works carried out Determination of the final project cost Preparation of tax depreciation reports for investors and property owners Expert witness reports to assist in the settlement of building disputes 4. STAKEHOLDERS These are the stakeholders have so far been identified for the project: 4.1 PRIMARY USERS The students of Taylor's University Lakeside Campus, especially for students who love sport and wanted to perform their sport activities in the campus.
  • 10. Page | 10 4.2 GOVERNMENT AND STATUTORY AUTHORITIES THE APPROVAL no Procedure 1 Submission to Local Authority through OSC Builders can apply for all the pre-building approvals at the One Stop Center of the Municipality of Kuala Lumpur. However, the builder still needs to visit each of the agencies that provide the pre-approvals in order to obtain confirmation. The One Stop Center charges a processing fee of MYR 480. This process is partly regulated by Federal Territory (Planning) Act, 1982. Agency: Subang Jaya Municipal Counsil MPSJ 2 Obtain Development Order (DO) from Planning Dept Planning permission, which is issued as a Development Order by the Planning Department of the local authority, authorizes development of the land. The permit is valid for 12 months, within which time construction must begin. The processing time for the applications is usually as follows: • 120 days for large-scale projects (consisting of complicated development plans, buildings of more than five levels, construction involving layout plans for a development area of more than 2 acres, or projects affecting the population density and change of zone area) • 60 days for mid-scale projects (requiring construction plans of buildings of fewer than five levels, a temporary change in land/building usage involving a land area of fewer than 5,000 square feet or involving changes/additions/alterations made to the available shops/housing units) • 45 days for small-scale projects (involving suggested additions/changes/alterations to existing bungalow units, two-story units and terrace units, and new bungalow units built in accordance with approved layout plans only) Agency: Subang Jaya Municipal Counsil MPSJ 3 Obtain Water Approval Water related approvals are regulated by Water Services Industry Act 2006, section 45 Agency: Water Authority SYABAS 4 Obtain Sewerage Approval Agency: Sewage Services Department IWK 5 Obtain Fire Safety (Arch) Comment
  • 11. Page | 11 Fire safety procedures are regulated by Fire Services Act 1988 and Uniform Building Bylaws 1984 (Chapter 8) Agency: Fire Department 6 Obtain Hoarding & Signboard Approval Agency: Subang Jaya Municipal Counsil MPSJ 7 Obtain RORO Bin Approval Agency: Subang Jaya Municipal Counsil MPSJ 8 Obtain Earthwork Approval Agency: Subang Jaya Municipal Counsil MPSJ 9 Obtain Road and Drainage Approval Agency: Subang Jaya Municipal Counsil MPSJ 10 Obtain Landscape Approval Agency: Subang Jaya Municipal Counsil MPSJ 11 Obtain Street Lighting Approval Street lightning regulations are governed by Street, Drainage and Building Act, 1974 Agency: Subang Jaya Municipal Counsil MPSJ 12 Obtain Car Park Approval Agency: Subang Jaya Municipal Counsil MPSJ 13 Obtain MSMA and SPAH Approvals Agency: Subang Jaya Municipal Counsil MPSJ 14 Obtain Building Plan Approval The approval of the building plans authorizes construction of the building within 12 months from the date of approval. Approval is granted by the Building Department of the local authority. The filing fees for the application for building plan approval are MYR 10.00 per 10 sq. m. or any part thereof (a minimum of MYR 100.00) under the First Schedule of the
  • 12. Page | 12 Federal Territory of Kuala Lumpur Building By-Laws of 1985. In the case here, involving a 1,300.6 sq. m. built-up area, the application fee would be MYR 1,300.60. Agency: Subang Jaya Municipal Counsil MPSJ 15 Obtain Fire Safety (M&E) Approval Agency: Fire Department 16 Obtain Permission to start work from Building Department (KMB) Agency: Subang Jaya Municipal Counsil MPSJ 17 Notification to start Earthwork from Engineering Department (B FORM) Agency: Subang Jaya Municipal Counsil MPSJ 18 Notification to Start Sewerage Work (PDC 6) Agency: Subang Jaya Municipal Counsil MPSJ 19 Request sewerage inspection Agency: Sewage Services Department IWK 20 Sewerage inspection Agency: Sewage Services Department IWK 21 Sewerage report Agency: Sewage Services Department IWK 22 Request Road & Drainage Clearance After construction has been completed, a final inspection is conducted by the Building Department to issue its approval. Approval is granted only after all approvals are obtained from the various departments listed in the development order, and is meant to ensure that the construction has been completed in compliance with the approved building plan and the requirements listed in it. The period of 3 to 4 months is just an estimate and might vary with the time it takes the various other departments or agencies to issue their approvals. The Building Department supervises the construction work stage-by-stage by
  • 13. Page | 13 conducting on-site inspections and reviewing the progress report usually submitted by the architect after each stage. Agency: Sewage Services Department IWK 23 Road and Drainage Inspection Agency: Subang Jaya Municipal Counsil MPSJ 24 Road and Drainage Report Agency: Subang Jaya Municipal Counsil MPSJ 25 Request Sewerage Clearance Agency: Sewage Services Department IWK 26 Sewerage Inspection Agency: Sewage Services Department IWK 27 Sewerage Report Agency: Sewage Services Department IWK 28 Request Fire Safety Clearance Agency: Fire Department 29 Fire Safety Inspection Agency: Fire Department 30 Fire Safety Report Agency: Fire Department 31 Request Water Clearance Agency: Water Authority SYABAS 32 Water Inspection Agency: Water Authority SYABAS 33 Water Report Agency: Water Authority SYABAS 34 Deposit G1 - G21 Forms and F Form to OSC The Certificate of Completion has been introduced substituting the Certificate of Fitness for Occupation in 2007. Upon the coming into force (in force from November
  • 14. Page | 14 27, 2007) of By-Law 23 of the Building (Federal Territory of Kuala Lumpur)(Amendment) By-Laws 1985, the Certificate of Completion is issued when forms G1 to G21 in respect of stage certifications as set out in the Second Schedule of the By-Laws 1985 have been duly certified and received by the principal submitting person. This person must also certify in Form F that the construction and completion of building was under his supervision and that to the best of his knowledge and belief the building has been constructed and completed in accordance with the Act, the By-Laws and the approved plans. Agency: Subang Jaya Municipal Counsil MPSJ 35 Deposit G1 - G21 Forms and F Form to Board of Arch / Eng Malaysia A copy of forms G1 G2 should also be submitted to the Order of Architects and Engineers of Malaysia Agency: Board of Architects’ and Engineers of Malaysia 36 Obtain Water Connection Agency: Water Authority SYABAS 37 Obtain Telco Connection Agency: Telekom Malaysia (Telco)
  • 15. Page | 15 5. BUDGET 5.1 PRELIMINARY BUDGET STRUCTURE Start-up Requirements Start-up Expenses Legal RM30,000 Air Structure RM415,000 Hardwood Floors RM160,000 Basketball Rims, Stands... RM55,000 Exercise Equipment and Misc. RM150,000 Stucco RM8,000 Block Fence RM90,000 Concrete Footings and Slab RM185,000 Site Preparation RM20,000 Consultants RM3,500 Mechanical RM25,000 Second Floor Development and Offices RM210,000 Office Equipment RM65,000 Paving and Landscaping RM112,000 Management Fee RM100,000 Promotional Costs RM40,000 Design Fees RM30,000 Land RM465,000 Total Start-up Expenses RM2,163,500 Start-up Assets Cash Required RM336,500 Start-up Inventory RM0 Other Current Assets RM0 Long-term Assets RM0 Total Assets RM336,500 Total Requirements RM2,500,000
  • 16. Page | 16 Start-up Funding Start-up Expenses to Fund RM2,163,500 Start-up Assets to Fund RM336,500 Total Funding Required RM2,500,000 Assets Non-cash Assets from Start-up RM0 Cash Requirements from Start-up RM336,500 Additional Cash Raised RM0 Cash Balance on Starting Date RM336,500 Total Assets RM336,500 Liabilities and Capital Liabilities Current Borrowing RM0 Long-term Liabilities RM1,250,000 Accounts Payable (Outstanding Bills) RM0 Other Current Liabilities (interest-free) RM0 Total Liabilities RM1,250,000 Capital Planned Investment Investor 1 RM100,000 Investor 2 RM100,000 Investor 3 RM100,000 Investor 4 RM100,000 Investor 5 RM100,000 Investor 6 RM100,000 Investor 7 RM100,000 Investor 8 RM100,000 Other RM450,000 Additional Investment Requirement RM0 Total Planned Investment RM1,250,000 Loss at Start-up (Start-up Expenses) (RM2,163,500) Total Capital (RM913,500) Total Capital and Liabilities RM336,500 Total Funding RM2,500,000
  • 17. Page | 17 5.2 EXCLUSIONS The Taylors Sport Complex will be a full-service multisport complex situated along Taylors University lakeside, Subang Jaya, Selangor. There are currently no other sports facilities like this one anywhere in Subang Jaya. This plan will be used to define the scope of our services, as well as a means of gaining the necessary investments to open the facility. It will also be used on a continual basis in the evaluation of The Taylors Sport Complex mission, goals, and objectives. The keys to success for The Taylors Sport complex are our ability to provide the best service and facility, creating an unmatched "cool" atmosphere where people will like to be, and hiring qualified/certified and knowledgeable staff to aid in the running of our programs and leagues. 5.3 Mission The Taylors Sport complex is a multisport and fitness complex designed to be used by the students of Taylors University and the surrounding areas. It is our mission to provide the best programs, staff, and equipment, to fully meet the various sports and fitness needs of Taylor’s students, to provide an ideal place for students to perform their sport activity. Besides providing an excellent service for students, The Taylors Sport complex is determined to create an unmatched sporting atmosphere that will add to the enjoyment of every student and employee of the facility. Dedicated to the community, The Taylors Sport complex strives to support and sponsor community events, as well as host them whenever possible. Our hope is that through the use of our facility, members' enjoyment and appreciation for sports, fitness, and for life will be enhanced.
  • 18. Page | 18 6. Reference documents/ resources 6.1 Reference link http://www.bplans.com/multi_sport_complex_business_plan/services_fc.php#.UfVA5qI 3BXk http://www.rehdainstitute.com/research-a-resources/property-development/osc.html http://www.reference.com/motif/computers/sample-of-a-tender-document http://www.peeplo.com/search/?q=example%20tender%20document&type=web&fro m=adg159 http://www.techrepublic.com/article/help-for-writing-a-project-brief/ http://blog.archability.com/?p=91 http://www.google.com/url?sa=t&rct=j&q=project%20brief&source=web&cd=8&cad=rj a&sqi=2&ved=0CEMQFjAH&url=http%3A%2F%2Fwww.pmadvice.co.uk%2FUserFiles%2F File%2FFree%2520Downloads%2FProject%2520Brief.doc&ei=rUX1UaD4K4vM9AS564HA BQ&usg=AFQjCNH7zb6QZaFy1DJ46CW1pEKe5O7D6g&bvm=bv.49784469,d.eWU http://www.designingbuildings.co.uk/wiki/Project_brief http://projects.oucs.ox.ac.uk/spbp/SPBPprojectBrief.pdf http://www.google.com/url?sa=t&rct=j&q=project%20brief&source=web&cd=14&cad= rja&sqi=2&ved=0CGYQFjAN&url=http%3A%2F%2Fwww.egovernment.tas.gov.au%2F__d ata%2Fassets%2Fword_doc%2F0011%2F77978%2FProject_brief_template_and_guide_f or_very_small_projects.dot&ei=rUX1UaD4K4vM9AS564HABQ&usg=AFQjCNGodFvHAvL KcN6S82kV6Pp-tgdEaQ&bvm=bv.49784469,d.eWU http://www.hpw.qld.gov.au/SiteCollectionDocuments/CWMFProjectDefinition.pdf http://portal.meathvec.ie/schools/ratoath/studentactivity/Subjects/Construction%20St udies/Document%20Library/Furniture%20Brief%20guide.pdf http://www.apuc- scot.ac.uk/uploads/Docs/pdf/Guide%20to%20Procuring%20Construction%20Projects%2 029-6-11.pdf http://portal.surrey.ac.uk/portal/page?_pageid=1638,1532736&_dad=portal&_schema =PORTAL