SlideShare une entreprise Scribd logo
1  sur  83
Télécharger pour lire hors ligne
James Chi & Jeff Clark - Grom Associates, Inc.
                                          Ed Sullivan - EnteGreat, Inc.
                        Rapid Commercialization Strategies
                            for Pharmaceutical and Biotech
                                                Companies


[ DENISE MISSONAK
 SAP POINT OF CONTACT
 MEMBER SINCE: 1998




                                                             [ CHUCK WEBBER
                                                              ASUG INSTALLATION MEMBER
                                                              MEMBER SINCE:2008



                                    [ MALCOM POULIN
                                     ASUG ASSOCIATE MEMBER
                                     MEMBER SINCE:1998
Key Learning Points

                    Understand the business drivers for
                    rapid commercialization in life science
                    Understand the benefits which rapid
                    commercialization provides for life
                    science companies
                    Develop insight into the challenges of
                    achieving rapid commercialization
                    Understand the proven pre-configured
                    solutions which Grom and Entegreat
                    have built to accelerate rapid
                    commercialization
Real Experience.
Real Advantage. •
                      Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Agenda

                    Introduction
                    Business Context and Success
                    Strategies for R&D / Commercialization
                    Rapid Commercialization Solution
                    Overview
                      Integrated Portfolio and Project
                      Management (IPPM)
                      Rapid Compliant Commercialization
                    Questions

Real Experience.
Real Advantage. •
                      Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
Company Overviews
                                    GROM                                                                         EnteGreat

             Founded in 1982                                                                          Founded in 2000 - Mgmt team has
             Privately held                                                                           been working together since 1982
             Leading provider of strategy,                                                            Privately held
             integration, operation, and support                                                      Leading provider of supply chain &
             services for complex business                                                            manufacturing systems consulting and
             software solutions                                                                       solution integration services
                 Full off-shore capabilities                                                              Extensive experience integrating
             Fortune 2000 customers in life                                                               SAP with plant environments since
             sciences & healthcare, consumer                                                              1994
             products, aerospace & defense,                                                           Fortune 500 customers in life
             discrete manufacturing, and                                                              sciences, consumer products, pulp &
             technology services                                                                      paper, and specialty chemicals
             SAP National Partner since 1994                                                          Active roles in industry groups such
             Other competencies include Oracle,                                                       as: ISA, MESA, Supply Chain Council,
             Peoplesoft, JD Edwards, and Siebel.                                                      World Batch Forum, and APICS
             ~350+ consultants                                                                        SAP NetWeaver certification
             Independent and Unbiased                                                                 Independent and Unbiased


Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Rapid Commercialization
               Business Context




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
The Pharmaceutical Industry is Under a Great
  Deal of Pressure
         The pharmaceutical environment is becoming more and more
           challenging. Pharmaceutical companies are pressured to
         deliver revenue and earnings growth under tough conditions.

                    External Market Dynamics                                                             Internal Industry Pressures
             Ageing population will drive up                                                             Rising commercialization costs. The
             utilization. The number of citizens over                                                    average cost of developing a new drug
             age 65 is expected to double over the                                                       is over $800MM.
             next 40 years.                                                                              Declining R&D productivity. Number of
             Chronic diseases, such as diabetes, are                                                     FDA approvals have remained flat over
             projected to become more prevalent.                                                         past decade.
             Increasing payer Influence and role of                                                      Shorter product exclusivity due to
             government.                                                                                 increased competition from other
             Diminishing willingness to pay premium                                                      branded and generic drugs.
             prices for branded pharmaceuticals.                                                         Increased regulatory stringency
             The share of generic drugs have tripled
             over the past two decades.



Real Experience.
Real Advantage. •
                       Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                  EnteGreat, Inc. All rights reserved.
For Pharmaceutical R&D, These are Bittersweet
    Times
Creating Safe and Effective New Medicines
  The Potential Has Never Been Greater
    Exciting scientific advances offer greater
    potential than ever before for discovering                                                             “…The next ten years will be seen as
                                                                                                            a signal point of transition in health
    new, more effective ways to fight disease                                                                care. Medicine will be transformed
                                                                                                            from an instinctive art of alleviating
    Wave of scientific advances and new                                                                                symptoms to a science of
    technologies have begun to change how                                                                     personalized health care. The next
                                                                                                                 decade will be viewed by future
    medicines are discovered.                                                                                      generations as the time when
                                                                                                               treatments became preventative,
    Growing knowledge of how diseases work                                                                       predictive, and personalized…”
    at the genetic and molecular levels has
    opened up new drug targets                                                                                                   Michael Leavitt
                                                                                                                         Secretary of Health and
    Treatments based on an individual’s                                                                                         Human Services
    genetic make-up show great promise to
    improve health care
                                    Pharmaceutical Research and Manufacturers of America,
                 Pharmaceutical Industry Profile 2007 (Washington, DC: PhRMA, March 2007)
  Real Experience.
  Real Advantage. •
                         Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                    EnteGreat, Inc. All rights reserved.
For Pharmaceutical R&D, These are Bittersweet
  Times (Continued)




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
For Pharmaceutical R&D, These are Bittersweet
  Times (Continued)
                                                                                                      Source: innovation.org




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Big Pharmaceutical Companies Are Undergoing
     Significant Changes to Adapt
                                           Sample Big Pharma Corporate Strategy Map
                                                                               Maximize shareholder value
                                Grow                                                                                                    Develop R&D
                                                                 Optimize cost                            Grow earnings
 Financial                    revenue                                                                                                   pipeline value


                                                  Become the Leader in delivering value to customers
                                                                                                                             Business              Policy
                             Patients                               Payers                               Physicians
Customer                                                                                                                     Partners           Stakeholders


                                                            Build effective and efficient business model
 Internal                 Focus on key                              Rethink the way                             Rethink the way           Establish a efficient
  Process                  therapeutic                              we research and                             we commercialize             and adaptive
Capabilities                  areas                                develop new drugs                               new drugs                business model


                                                                   Create a high performing organization
  People &
                        Create high performance                                        Develop transformational                        Develop the
   Culture                       culture                                                        leaders                             capabilities to win



                                      = Direct contribution by R&D                                                    = Focus of today’s
                                      = Indirect contribution by R&D                                                    presentation
   Real Experience.
   Real Advantage. •
                       Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                  EnteGreat, Inc. All rights reserved.
Rapid Development & Commercialization
   Bottom Line Contributions
 “…Drugs developed by the
fastest companies enjoyed as
much as a 17-month speed
advantage over average
performers and a 28.5 month
median development cycle and
a 7.1 month regulatory cycle
advantage over those of the
slowest companies…”
 “…Fastest companies focus and
prioritize resources better and kill
projects sooner…Fastest
companies terminated 56% of
discontinued projects in Phase I
versus 36% for slowest
companies…”           Tufts Center for the Study of Drug Development (CSDD),
                    Impact Report, Volume 8, Number 5, September/October 2006
 Real Experience.
 Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Rapid Development & Commercialization
  Bottom Line Contributions (Continued)

 “…A one-day advantage
typically saves $37,000 in out-of-
pocket development costs and
nets an additional $1.1 million in
daily prescription revenue for an
average performing drug…”
 “…Drugs developed by the
fastest companies saved $30
million in out-of-pocket
development costs and gained
$1.1 billion in incremental
prescription revenue each,
                                                                                                        Tufts Center for the Study of Drug Development (CSDD),
compared to those of the slowest                                                                      Impact Report, Volume 8, Number 5, September/October 2006

companies…”

Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Rapid Commercialization
                 Solution Overview




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
GROM Solution Portfolio for Life Sciences

                                    Marketing &                                              Rapid              Compliant
     Solutions
     Industry


                                    Field Sales                                          Commercialization     Manufacturing

                                    Channel                                                   Supply Chain
                                                                                                             Lean Manufacturing
                                   Management                                                 Optimization




                                            Validation and Quality Assurance
  Industry

  Threads
  Specific




                                            Regulatory Compliance

                                            Data Migration and Data Governance
     Methodology
      Base GEM




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Solution Overview – Rapid Commercialization
Solution




                                                              Rapid Commercialization

                        Portfolio                           R&D Project                                Specification       Recipe                Electronic
                       Management                           Management                                 Management        Management                Filing
Components




                                                             Integrated                                                 Inventory And             Internal
                        Product                                                                       Manufacturing
                                                             Production                                                   Warehouse             Production
                      Development                                                                      Execution
                                                              Planning                                                   Management              Ramp-up

                      Manufacturing                                                                                                            Contract Mfg.
                                                            Clinical Trial                              Electronic         Quality
                      Performance                                                                                                               Production
                                                           Supply Chain                                Batch Record      Management
                        Analysis                                                                                                                 Ramp-up
Value Levers




                         Faster                      Increased Personnel                                 Lower NPDI
                                                                                                                       Increased Revenue      Lower IT Costs
                     Time-to-Market                      Productivity                                      Costs

                                                        Improved Capital                             Established
                     Improved Plant                                                                                    Increased Market         Architecture
                                                          Planning and                            Process & Change
                       Utilization                                                                                           Share             Simplification
                                                           Investment                                  Control

                                                                                                                              = Areas with accelerated solutions


               Real Experience.
               Real Advantage. •
                                   Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                              EnteGreat, Inc. All rights reserved.
Solutions Featured in Today’s Presentation




                                                         Integrated Portfolio and Project Management


                                                                                                        Rapid Compliant
                                                                                                      Commercialization




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Solution Review:
     Integrated Portfolio and
   Project Management (IPPM)




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Portfolio And Project Management:
  Why This Is An Important Topic
     Tufts CSDD Outlook 2007 Report on Globalization & Outsourcing
 “…The industry is stepping up its
use of global outsourcing practices
to speed development and reduce
associated costs...”
 “…Growing clinical trials volume and
scope, are prompting drug sponsors to
increase their reliance on foreign
based investigators and patients…”
 “…Many top pharmaceutical
companies project that, within two to
three years, up to 65% of their FDA-
regulated clinical trials will be
conducted abroad…”
 “…Demand for CRO services is
expected to grow by 16% annually
over the next five years…”

                    Managing R&D activities across diverse and widely dispersed
                     teams is becoming an exceptionally difficult proposition…
Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Portfolio And Project Management
   Competitive Advantages To be Gained
 According to a benchmark
conducted by the Aberdeen
Group, Best-in-Class
performers enjoy significant
performance advantages
over their competitors,
including:
          28% more likely to meet
         product development cost
         targets than the Industry
         Average and over three-times
         as likely as Laggard
         companies
           52% more likely to hit target
         launch dates than the
         Industry Average and 3.3- executed, it can provide
                         …But when well
         times as likely asa Laggards competitive advantage
                             significant to
         hit these targets
 Real Experience.
 Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Portfolio And Project Management
  Needed Capabilities and Enablers
                   Before a company can expect the full benefits of
                  globalization and outsourcing, it must develop the
               necessary capabilities to enable global R&D collaboration.

                    Key Business Capabilities                                                             Key Technology Enablers
               Standardized processes across global                                                      Integrated project, program, and
               R&D chain for both internal and external                                                  resource management tools
               resources                                                                                 Real-time, web-enabled, interactive
               Centralized and secure access to                                                          collaboration tools
               development data                                                                          Product Lifecycle Management (PLM)
               Formal project and program                                                                Product Data Management (PDM)
               management methodologies
               Formal review process that includes
               external parties throughout development
               process
               Design performance / metrics formally
               measured across global R&D chain



Real Experience.
Real Advantage. •
                       Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                  EnteGreat, Inc. All rights reserved.
Integrated Portfolio & Project Mgt.
    Solution Roadmap
                       IPPM
                      Maturity
                       Level


                                                                                                                                      xRPM
       OPTIMIZE                                                                                                         Portfolio      Portfolio     Resource
                                                                                                                      Management      Evaluations   Management




                                                                                                           PLM
MANAGE AND
COLLABORATE                                                                                                                Recipe
                                                                                cProjects                  cFolders
                                                                                                                         Management




                                               Project System
                                  Activity &                  Material                Financial
                                Milestone Mgt                Planning                 Planning                                        Pre-Configured
                                                                                                                                         Solution
                                  Document                Procurement                  Time
                                 Management                Activities                Recording                                           Offering
      CONTROL
                                    Capacity                Production                 Budget
                                   Evaluation               Activities                 Control

  Real Experience.
  Real Advantage. •
                                                                                                                                                                 Time
                         Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                    EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                        Materials
                        Contract services
                    Document processing (with e-signature approval)
                    Cost Allocation
                        Automatic postings
                        Manually apportioned
                    Financial analysis
                    Budget control
                    Capacity evaluation & leveling
                    Please refer to the “supplementary reference materials” section
Real Experience.
Real Advantage. •
                       towards the back of this presentation for additional details
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Pre-Configured R&D Project System Solution
                    Pre-defined R&D project WBS template
                    Integrated process design with materials management,
                    procurement, manufacturing, and finance
                    Pre-defined work centers roles
                    Baseline PS Module Configuration
                    Baseline SAP DMS Configuration (with e-signature activation)
                    Baseline SAP CATS Configuration
                    Baseline SAP PP Configuration (work center capacity
                    management)
                    Pre-defined SAP security profiles
                    Pre-Configured Solution Project Documentation
                        Business process flows
                        User / functional requirements specifications
                        Business process procedures
                        Unit / integration test scripts
                        End-user training materialssystem solution can save a
                        Our pre-configured R&D project
Real Experience.       typical project up to 3 months in design and implementation
Real Advantage. •
                       Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                  EnteGreat, Inc. All rights reserved.
Solution Review:
                          Rapid Compliant
                         Commercialization




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Overall Business Objective
• Shorten the time and reduce the cost to move from clinical supply
  manufacturing to scaled-up commercial manufacturing

                                                                                                          Rapid Compliant
                                                                                                         Commercialization
                                                                                                            Accelerate




• Eliminate the “toss it over the wall” syndrome after approval

                               Early                         Late                                 Over    Early          Improved
         R&D                  Clinical                      Clinical                              The    Commercial       Commercial
                              Supply                        Supply                                Wall   Supply           Supply
                                                                                                   ?
Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Capability Requirements
           According to a cross-industry analysis performed by the
          Aberdeen Group*, the characteristics of a winning formula-
                based product development strategy include:

                                                   Key Business Capabilities
             Integrated Product Data Architecture - To support both production scaling and
             regulatory requirements
             Detailed Audit Trail – Throughout the entire material flow
             Integration with Value Chain Participants – To enable quick and complete
             reporting on all product and ingredient sourcing and distribution data
             Demonstrated Regulatory Compliance – Proactive management brand integrity
             and risks, fines, and fees associated with non-compliance. Inspire confidence with
             regulatory agencies and speed up regulatory review cycles.
             Speed and Access to all Relevant Product Data – Provide direct and immediate
             access to regulatory compliance information to both production and product
             development personnel.


Real Experience.    * = “Formula-Based Product Development: Recipes for Compliance and Success”, Aberdeen Group, Nov. 2004
Real Advantage. •
                         Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                    EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  The Business Benefits are Quantifiable

             Areas of Average Business Improvement Across Maturities

IMPROVEMENT AREA                                                                                      BEST-IN-CLASS
Reduction in Product Costs                                                                                    17.5%

Reduction in Engineering Change Orders Cycle Time                                                             75%

Reduction in Design Cycles                                                                               25% - 35%

Reduction in Time-to-Volume Cycles                                                                       10% - 15%

Reduce Search Times / Improve Engineering                                                                15% - 20%
Productivity
New Product Revenue as a % of Total Revenue                                                                   28%

Counterfeiting, Grey Market Cost Reduction                                                                    31%

New Product Costs as a % of Planned Product Costs                                                             69%
                        Source: “The Design for Compliance Benchmark Report”, AberdeenGroup, September 2004

Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                               EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
    Solution Roadmap
              Program Maturity
                 & Coverage

                                                                                                                   Leverage Infrastructure
  DEPLOY                                                                                                           and Accelerate Process
 PROGRAM
                                                                                                                 Late Stage         Inline Mfg.    Contract Mfg.
                                                                                                              Clinical Mfg. Site         Site          Site
                                                                                                                Deployment          Deployment      Deployment
                                                                                                                              Integrated Supply
                                                                                                                          Chain Execution & Visibility


                                                                                    Implement PLM &
REALIZE AND                                                                         ERP Solution Pilot
 STABILIZE
                                                                          ISA-88 Recipe              Electronic      Enforced
                                                                                                                    Manufacturing
                                                                           Management              Batch Record     Compliance
                                                                            Electronic               Integrated     CAPA / NCR
                                                                                                    Planning and
                                                                          Product Data                Analytics     Management



STANDARDIZE                       Establish Foundational
                                       Capabilities                                                                                 Modular & Configurable
                              ISA-88-based                                       Automated                                            Solution Offering
                                 Recipe                ISA-95-based              Compliance
                                Modeling              Interoperability           Processes
                                Standard                Internal Mfg.           External Mfg.
                                 Solution               Architecture            Architecture
                               Architecture             Assessment              Assessment

  Real Experience.
                                                                                                                                                                   Time
  Real Advantage. •
                      Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                 EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Solution Architecture Overview

            mySAP PLM
                                                               Definition (in Late Stage Clinical & Commercialization)
               SAP ERP                                 Material                    Personnel            Equipment      Sequence of        Work
                                                     Requirements                 Requirements         Requirements     Operations     Procedures




  SAP ERP             3rd Party                                Execution (in Late Stage Clinical & Commercialization)
                     Applications
                                                                                                                                        Electronic
                     Shop Floor                        Material                     Personnel          Equipment        Sequence
NetWeaver                                                                                                                                 Work
                      Systems                         Qualification                Qualification       Qualification   Enforcement
  Portal                                                                                                                               Instructions




                SAP ERP

                                                                       Documentation                                         Optimization
              NetWeaver
                Portal                                                          Electronic                             Process Analytics       KPIs
               SAP xMII                                                        Batch Record
Real Experience.
Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Conceptual Architecture

            mySAP PLM
                                                               Definition (in Late Stage Clinical & Commercialization)
               SAP ERP                                 Material                    Personnel            Equipment      Sequence of        Work
                                                     Requirements                 Requirements         Requirements     Operations     Procedures




                                                                                      Manufacturing Assets
                                                                                      & Procedures Models
                                                                                          Using ISA-88

  SAP ERP             3rd Party                                Execution (in Late Stage Clinical & Commercialization)
                     Applications
                                                                                                                                        Electronic
                     Shop Floor                        Material                     Personnel          Equipment        Sequence
NetWeaver                                                                                                                                 Work
                      Systems                         Qualification                Qualification       Qualification   Enforcement
  Portal                                                                                                                               Instructions
                          Segmentation Of Manufacturing Resource and Activity
                          Models Into Standard Formats Enables Application of
                                    Uniform Policies and Procedures
                SAP ERP

                                                                       Documentation                                         Optimization
              NetWeaver
                Portal                                                          Electronic                             Process Analytics       KPIs
               SAP xMII                                                        Batch Record
Real Experience.
Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Conceptual Architecture

            mySAP PLM
                                                               Definition (in Late Stage Clinical & Commercialization)
               SAP ERP                                 Material                    Personnel            Equipment     Sequence of        Work
                                                     Requirements                 Requirements         Requirements    Operations     Procedures



                                                                      21 CFR 211                                          21 CFR 58       21 CFR 600/610
                                                                   (Pharmaceutical)                                        (Labs)           (Biological)



  SAP ERP             3rd Party                                Execution (in Late Stage Clinical & Commercialization)
                     Applications
                      The Regulator’s Motivation and Intent As Expressed in
                                                                                        Electronic
NetWeaver            Shop Floor   Law, Additional Guidance, andSequence
                                   Material     Personnel    Equipment
                                                                                          Work
                                 Qualification Qualification Qualification Enforcement
  Portal              Systems   Actual Assessments and Judgments                       Instructions




                SAP ERP

                                                                       Documentation                                        Optimization
              NetWeaver                                                         Electronic
                Portal                                                                                                Process Analytics        KPIs
               SAP xMII                                                        Batch Record
Real Experience.
Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Solution Architecture

                                                                                                          SAP NetWeaver
                      PLM                           APO                                BI


                      HR              QM                PM               MM              PP-PI
                                                                                                                     EBR
                              ERP

                                                   XI                                    xMII                               ODA



                         ISA-95 Documents (B2MML + Evolving Part 4)                                                         OPC


                    3rd Party               3rd Party                 3rd Party               3rd Party      DCS /    Historian /
                       HR                     LIMS                      EAM                     MES          Batch     SCADA




Real Experience.
Real Advantage. •
                       Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                  EnteGreat, Inc. All rights reserved.
What is EnteGreat’s                                                                                   ?

   Simply stated…
   Compliant Manufacturing Framework® is a library of
   proven best practices accelerators for executing
   regulated manufacturing using SAP
                    Proven templates for defining manufacturing objects and
                    activities in a cGMP environment using industry standards
                    such as ISA-88 and ISA-95
                    Proven templates and examples for configuring and
                    implementing cGMP manufacturing applications
                    Proven content for US FDA/GAMP CSV documentation
                    Proven content for training and system documentation

CMF® provides materials that accelerate the development of an SAP-
  based cGMP shop floor manufacturing execution environment
Real Experience.
Real Advantage. •
                      Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                 EnteGreat, Inc. All rights reserved.
Accelerated Solution for Rapid Compliant
   Commercialization – Benefits of using CMF®
By using the same Compliant Manufacturing Framework for late stage
       clinical supply manufacturing that supports commercial
    manufacturing, companies can achieve these added benefits:
        Seamless transition for manufacturing systems
        Instant integration into the supply chain
        Eliminates re-engineering or revalidation
        Ready to begin compliance work in commercial
        production
        CSVs and most documentation already in place
        Facilitates efficient processing of post-approval
        changes
        Increases clinical supply manufacturing
        efficiency
        Rapid access to data for bi-directional exchange,
        analysis, and continuous improvement
 Real Experience.
 Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                EnteGreat, Inc. All rights reserved.
Schedule Acceleration: The                                                                                     Advantage


Typical Project Timeline Without CMF-based Prototyping


                    Proof Of
                    Concept



                                                                Pilot




                                                                                                     Initial
                                                                                                Implementation




                                                                                                                 Deployment / Roll-Out




Real Experience.
Real Advantage. •
                        Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                   EnteGreat, Inc. All rights reserved.
Schedule Acceleration: The                                                                                     Advantage


Typical Project Timeline Without CMF-based Prototyping


                    Proof Of
                    Concept
                                                                                                                    Schedule
                                                                Pilot
                                                                                                                    Compression
                                                                                                                    Opportunities
                                                                                                     Initial
                                                                                                Implementation




                                                                                                                 Deployment / Roll-Out




Real Experience.
Real Advantage. •
                        Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                   EnteGreat, Inc. All rights reserved.
Schedule Acceleration: The                                                                                           Advantage


                    Project Timeline With CMF-based Prototyping


                    Proof Of
                    Concept

                                                                                                                       Overall Schedule
                                                Pilot                                                                  Reduction and
                                                                                                                       Quicker Payback
                                                                       Initial
                                                                  Implementation




                                                                                                   Deployment / Roll-Out




Real Experience.
Real Advantage. •
                        Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                   EnteGreat, Inc. All rights reserved.
Rapid Compliant Commercialization
  Business Benefits
           Improved New Product Development & Introduction
                    • Faster product-to-market
                    • Standardized mechanism for product definition / data architecture
                      from Development to Commercialization
           Improved Supply Chain Performance
                    • Increased responsiveness and flexibility
                    • Improved manufacturing reliability and performance against plan
           Reduced Labor (Operations & Quality)
                    • Reduced effort to transform Clinical product definition data for
                      Commercialization
           Improved Batch Review / Dispositioning & Product Release
                    • Elimination of “clerical” batch record errors via Electronic Batch
                      Record
                    • Exception-based electronic batch record review
           Improved Quality and Compliance
                    • Compliant First-Time
                    • Supports top-down quality management (QSIT)
           Drives Continuous Improvement
               • Timely access to accurate, current, and complete mfg data
                    • Feedback from Commercialization to Development
                    • Direct bi-directional transfer of product / production data
Real Experience.
Real Advantage. •
                      Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                 EnteGreat, Inc. All rights reserved.
Questions




                    We’ll gladly take additional questions
                            after today’s session.
                         Just stop by booth 1787 !!


Real Experience.
Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Thank you for participating
                                                                                         Please remember to complete and return your
                                                                                                 evaluation form following this session.
                                                                          For ongoing education on this area of focus, visit the
                                                                           Year-Round Community page at www.asug.com/yrc
                         James Chi
                     Grom Associates
                    908-483-2000 x253
                      jchi@grom.com

                          Jeff Clark
                    908-483-2000 x256
                                                                                                        [SESSION CODE: 4400


                     jclark@grom.com

                    Edward Sullivan
             EnteGreat, Inc.
              412-523-2723
        ed_sullivan@entegreat.com




Real Experience.
Real Advantage. •
                      Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
                                                                 EnteGreat, Inc. All rights reserved.
Supplementary Reference
              Materials:
      Pre-Configured PS Solution
              In Details




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Standardized R&D Project WBS Template




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Standardized R&D Project WBS Template


                                                                                                      Project Structure Area




    Details Area




                                                                                                            Work list and
                                                                                                            Template Area




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Standardized R&D Project WBS Template




    Tabular View
                                                                                                      Gantt Chart




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Progress Analysis Report

                                                      Actual                                Remaining   Planned
                                                                                                                  Delay
                                                      Work                                    Work       Work




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Progress Analysis Report – Export to Excel




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Labor Activity Processing
  Labor Assignment & Planning


                                                                                                      Personnel assignment




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Labor Activity Processing
  Time Entry Through CATS




                        Actual Work (Time)




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Labor Activity Processing
  Time Entry Approval




    Approved Work Hours




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
   Labor Activity Processing
   Booking of Actual Labor Hours to Project




Approved Work Hours
Transferred to Project




 Real Experience.
 Real Advantage. •
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Pre-Configured PS Solution for R&D
  Labor Activity Processing
  Plan vs Actual Labor Hour & Cost Reporting
                                                                                                               Costs

R&D Personnel                                                                                         Actual           Plan
  assigned to
Internal Activity




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Experimental Manufacturing Activity Processing
  BOM Assigned To Project Activity




                                                                                                      BOM assigned to
                                                                                                       Project Activity




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Experimental Manufacturing Activity Processing
  Planned Order to Process Order Conversion


                                                                                                            MRP result




                                                                                                      Convert Planned Order
                                                                                                        to Process Order




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Experimental Manufacturing Activity Processing
  Assignment of WBS Number to Process Order


                                                                                                             Costs
                                                                                                      Plan   Actual   Variance




                                                            Process Order

Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  Material Planning



                                                                    Reservation
  Material

                                                                                                      Quantity




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  Material Consumption




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  Booking of Material Costs to Project


                                                                                                      Costs
                                                                                              Plan    Actual   Variance




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
      Planned vs Actual Material Cost Analysis
      Across Projects
                                                           For All
                                                       Selected Project
                                                                                                                   Costs
                                                                                                          Actual   Plan    Variance

P
R
O
J
E                                                                                   Raw Material Consumption
C
T




    Real Experience.
    Real Advantage. •
                        Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  External Service Order Planning




                                                                                                       Purchase
                                                                                                      Requisition
                                             Service Activity



Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  Service Acceptance Through Entry Sheets




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  Booking of External Services to Project


                                                                                                      Costs
                                                                                            Plan      Actual   Variance




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Consumption & Procurement Activity Processing
  External Services Analysis




                                                                                                      Status Indicator




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Document Processing
  With e-Signature Approval

                                                                                                          Document Status




                    Digital Signature




Real Experience.
Real Advantage. •
                        Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Document Processing
  With e-Signature Approval




                                                                                                      Document attached to
                                                                                                        Project Activity




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Cost Allocation
  Manual Cost Apportionment to Project




                                                                                                      Amount




     ‘R&D Generics’                                   ‘Travel & Enter…’                                   Project Root WBS
       Cost Center                                      Cost Element -                                         Element
                                                           612000




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Cost Allocation
  Booking of Apportioned Costs to Project



                                                                                                               Costs
                                                                                                      Actual   Plan    Variance

     612000 – Travel & Entertainment




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Financial Analysis
  Planned vs Actual Costs Analysis
  Hierarchical View


                                                                                               Costs
                                                                       Plan                    Actual   Variance




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Financial Analysis
  Planned vs Actual Costs Analysis
  Cost Element View

                                                   For Selected Project

                                                                                                               Costs
                                                                                                      Actual   Plan    Variance




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Budget Control
  Allocation of Budget to Project
  WBS Element View


                                                                                                      Planned Costs of Project

                                                               Budget allocated
WBS Element




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Budget Control
  Allocation of Budget to Project
  Fiscal Period View


                                                                                                      Budget allocated


Period                                                                                                                   Planned Costs of
                                                                                                                             Project




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Budget Control
  Message When Budget is Exceeded


                                                                                                       Control Message When Project
                                                                                                      Costs Exceeds Allocated Budget




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Budget Control
  Budget vs Actual Cost Analysis


                                                                                                      Costs
                                                                                    Budget            Actual   Variance
                    For Selected
                      Project




                                                                                                                   Summary
                                                                                                                  – Year wise




Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Project System Solution for R&D
  Integrated Business Processes
                    Standardized R&D project WBS template
                    Labor activity processing – time entry through
                    CATS
                    Experimental manufacturing activity processing –
                    integrated with existing planning processes
                    Consumption & procurement activity processing
                       Materials
                       Contract services
                    Document processing (with e-signature
                    approval)
                    Cost Allocation
                       Automatic postings
                       Manually apportioned
                    Financial analysis
Real Experience.
Real Advantage. •   Budget control
                     Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
Capacity Evaluation & Leveling
  Resource Capacity Analysis
                                                                                                      Capacity Planning




                      Overload




         Capacity Evaluation

Real Experience.
Real Advantage. •
                    Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.

Contenu connexe

Tendances

Mon1545 powerof cloud-dougclark-ibm
Mon1545 powerof cloud-dougclark-ibmMon1545 powerof cloud-dougclark-ibm
Mon1545 powerof cloud-dougclark-ibmeurocloud
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply ChainNatashaS7
 
Guidon High Performance Culture Webinar
Guidon High Performance Culture WebinarGuidon High Performance Culture Webinar
Guidon High Performance Culture WebinarMelissa Sopwith
 
Sustainable development report
Sustainable development reportSustainable development report
Sustainable development reportKhaja Hameed
 
707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...
707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...
707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...shyrtg
 
Dow Acquires Rohm & Haas Presentation
Dow Acquires Rohm & Haas PresentationDow Acquires Rohm & Haas Presentation
Dow Acquires Rohm & Haas Presentationfinance5
 

Tendances (11)

Mon1545 powerof cloud-dougclark-ibm
Mon1545 powerof cloud-dougclark-ibmMon1545 powerof cloud-dougclark-ibm
Mon1545 powerof cloud-dougclark-ibm
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Intel's Triple Bottom Line
Intel's Triple Bottom LineIntel's Triple Bottom Line
Intel's Triple Bottom Line
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply Chain
 
Guidon High Performance Culture Webinar
Guidon High Performance Culture WebinarGuidon High Performance Culture Webinar
Guidon High Performance Culture Webinar
 
Sustainable development report
Sustainable development reportSustainable development report
Sustainable development report
 
707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...
707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...
707 ethicsand complianceduediligenceinmergersacquisitionsandmajorcorporateeve...
 
Savi chapter3
Savi chapter3Savi chapter3
Savi chapter3
 
2009 global reputation pulse
2009 global reputation pulse2009 global reputation pulse
2009 global reputation pulse
 
CTO Survey 2013
CTO Survey 2013CTO Survey 2013
CTO Survey 2013
 
Dow Acquires Rohm & Haas Presentation
Dow Acquires Rohm & Haas PresentationDow Acquires Rohm & Haas Presentation
Dow Acquires Rohm & Haas Presentation
 

En vedette

En vedette (13)

Langkawi Cable Car
Langkawi Cable CarLangkawi Cable Car
Langkawi Cable Car
 
Dubrovnik air and sea views (杜布羅夫尼克海空景觀)
Dubrovnik air and sea views (杜布羅夫尼克海空景觀)Dubrovnik air and sea views (杜布羅夫尼克海空景觀)
Dubrovnik air and sea views (杜布羅夫尼克海空景觀)
 
A Lucky Bear
A Lucky BearA Lucky Bear
A Lucky Bear
 
PlanetPass media kit
PlanetPass media kitPlanetPass media kit
PlanetPass media kit
 
Amusement park
Amusement parkAmusement park
Amusement park
 
Cable car and west end
Cable car and west endCable car and west end
Cable car and west end
 
tripXOXO - Discover & Book tours and activities instatntly , worldwide !
tripXOXO - Discover & Book tours and activities instatntly , worldwide ! tripXOXO - Discover & Book tours and activities instatntly , worldwide !
tripXOXO - Discover & Book tours and activities instatntly , worldwide !
 
Cape Town
Cape TownCape Town
Cape Town
 
A cable car
A cable carA cable car
A cable car
 
Role of a Pharmacologist By Dr.Harmanjit Singh
Role of a Pharmacologist By Dr.Harmanjit SinghRole of a Pharmacologist By Dr.Harmanjit Singh
Role of a Pharmacologist By Dr.Harmanjit Singh
 
ON THE TOP
ON THE TOPON THE TOP
ON THE TOP
 
Graduating susp bridge to ropeways and cable cars in Nepal by Bhim Updhyaya
Graduating susp bridge to ropeways and cable cars in Nepal by Bhim UpdhyayaGraduating susp bridge to ropeways and cable cars in Nepal by Bhim Updhyaya
Graduating susp bridge to ropeways and cable cars in Nepal by Bhim Updhyaya
 
Ppt for tranmission media
Ppt for tranmission mediaPpt for tranmission media
Ppt for tranmission media
 

Similaire à Rapid Commercialization Strategies in Life Sciences

George W. Buckley Chairman, President and Chief Executive Officer
George W. Buckley Chairman, President and Chief Executive OfficerGeorge W. Buckley Chairman, President and Chief Executive Officer
George W. Buckley Chairman, President and Chief Executive Officerfinance10
 
Wipro summer internship_2012_vgsom
Wipro summer internship_2012_vgsomWipro summer internship_2012_vgsom
Wipro summer internship_2012_vgsomJishnu Roychaudhuri
 
WGA Services Overview
WGA Services OverviewWGA Services Overview
WGA Services OverviewWGAOCM
 
Sustainability is the New Green
Sustainability is the New GreenSustainability is the New Green
Sustainability is the New GreenEric Vessels
 
Dow Accelerates Implementation of its Transformational Strategy Presentation
Dow Accelerates Implementation of its Transformational Strategy PresentationDow Accelerates Implementation of its Transformational Strategy Presentation
Dow Accelerates Implementation of its Transformational Strategy Presentationfinance5
 
E&C Industry Review By Scott Boutwell Jan09
E&C Industry Review By Scott Boutwell Jan09E&C Industry Review By Scott Boutwell Jan09
E&C Industry Review By Scott Boutwell Jan09Scott Boutwell, LEED AP
 
Houston Baptist University Student Marketing Presentation 0409
Houston Baptist University Student Marketing Presentation 0409Houston Baptist University Student Marketing Presentation 0409
Houston Baptist University Student Marketing Presentation 0409Jonathan_Fisher
 
Guerin Associates Nov 2011
Guerin Associates   Nov 2011Guerin Associates   Nov 2011
Guerin Associates Nov 2011michaelguerin
 
Chap002 MIS
Chap002 MISChap002 MIS
Chap002 MISAMIT ROY
 
Alan.brache
Alan.bracheAlan.brache
Alan.bracheNASAPMC
 
America's Most Productive: Large Sales Force Analysis
America's Most Productive: Large Sales Force AnalysisAmerica's Most Productive: Large Sales Force Analysis
America's Most Productive: Large Sales Force Analysisassessmentedge
 
Secret To Successful Execution Share
Secret To Successful Execution ShareSecret To Successful Execution Share
Secret To Successful Execution ShareAquent
 
"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference
"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference
"10th Contract Manufacturing for Pharmaceuticals and Biotech Conferencecassie111
 
Strategic Management Analysis Of Pakistan Tobacco Company 2008
Strategic Management Analysis Of Pakistan Tobacco Company 2008Strategic Management Analysis Of Pakistan Tobacco Company 2008
Strategic Management Analysis Of Pakistan Tobacco Company 2008Jawad Iqbal
 
Newport discussion corporate sustainability reporting using sap grc v3
 Newport discussion   corporate sustainability reporting using sap grc v3 Newport discussion   corporate sustainability reporting using sap grc v3
Newport discussion corporate sustainability reporting using sap grc v3William Newman
 
Introduction to Gartner
Introduction to GartnerIntroduction to Gartner
Introduction to Gartnerjasoncreane
 
S Ma Rt Sustainable Standards 101 2 15 08
S Ma Rt Sustainable Standards 101 2 15 08S Ma Rt Sustainable Standards 101 2 15 08
S Ma Rt Sustainable Standards 101 2 15 08sustainableproducts
 
Teradata Overview
Teradata OverviewTeradata Overview
Teradata OverviewTeradata
 
5 Medical Distribution Strategies Doomed to Fail in 2012
5 Medical Distribution Strategies Doomed to Fail in 20125 Medical Distribution Strategies Doomed to Fail in 2012
5 Medical Distribution Strategies Doomed to Fail in 2012Gunter Wessels
 

Similaire à Rapid Commercialization Strategies in Life Sciences (20)

George W. Buckley Chairman, President and Chief Executive Officer
George W. Buckley Chairman, President and Chief Executive OfficerGeorge W. Buckley Chairman, President and Chief Executive Officer
George W. Buckley Chairman, President and Chief Executive Officer
 
Wipro summer internship_2012_vgsom
Wipro summer internship_2012_vgsomWipro summer internship_2012_vgsom
Wipro summer internship_2012_vgsom
 
WGA Services Overview
WGA Services OverviewWGA Services Overview
WGA Services Overview
 
Sustainability is the New Green
Sustainability is the New GreenSustainability is the New Green
Sustainability is the New Green
 
Dow Accelerates Implementation of its Transformational Strategy Presentation
Dow Accelerates Implementation of its Transformational Strategy PresentationDow Accelerates Implementation of its Transformational Strategy Presentation
Dow Accelerates Implementation of its Transformational Strategy Presentation
 
E&C Industry Review By Scott Boutwell Jan09
E&C Industry Review By Scott Boutwell Jan09E&C Industry Review By Scott Boutwell Jan09
E&C Industry Review By Scott Boutwell Jan09
 
Houston Baptist University Student Marketing Presentation 0409
Houston Baptist University Student Marketing Presentation 0409Houston Baptist University Student Marketing Presentation 0409
Houston Baptist University Student Marketing Presentation 0409
 
Guerin Associates Nov 2011
Guerin Associates   Nov 2011Guerin Associates   Nov 2011
Guerin Associates Nov 2011
 
Chap002 MIS
Chap002 MISChap002 MIS
Chap002 MIS
 
Alan.brache
Alan.bracheAlan.brache
Alan.brache
 
Bma Final Deck
Bma Final DeckBma Final Deck
Bma Final Deck
 
America's Most Productive: Large Sales Force Analysis
America's Most Productive: Large Sales Force AnalysisAmerica's Most Productive: Large Sales Force Analysis
America's Most Productive: Large Sales Force Analysis
 
Secret To Successful Execution Share
Secret To Successful Execution ShareSecret To Successful Execution Share
Secret To Successful Execution Share
 
"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference
"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference
"10th Contract Manufacturing for Pharmaceuticals and Biotech Conference
 
Strategic Management Analysis Of Pakistan Tobacco Company 2008
Strategic Management Analysis Of Pakistan Tobacco Company 2008Strategic Management Analysis Of Pakistan Tobacco Company 2008
Strategic Management Analysis Of Pakistan Tobacco Company 2008
 
Newport discussion corporate sustainability reporting using sap grc v3
 Newport discussion   corporate sustainability reporting using sap grc v3 Newport discussion   corporate sustainability reporting using sap grc v3
Newport discussion corporate sustainability reporting using sap grc v3
 
Introduction to Gartner
Introduction to GartnerIntroduction to Gartner
Introduction to Gartner
 
S Ma Rt Sustainable Standards 101 2 15 08
S Ma Rt Sustainable Standards 101 2 15 08S Ma Rt Sustainable Standards 101 2 15 08
S Ma Rt Sustainable Standards 101 2 15 08
 
Teradata Overview
Teradata OverviewTeradata Overview
Teradata Overview
 
5 Medical Distribution Strategies Doomed to Fail in 2012
5 Medical Distribution Strategies Doomed to Fail in 20125 Medical Distribution Strategies Doomed to Fail in 2012
5 Medical Distribution Strategies Doomed to Fail in 2012
 

Rapid Commercialization Strategies in Life Sciences

  • 1. James Chi & Jeff Clark - Grom Associates, Inc. Ed Sullivan - EnteGreat, Inc. Rapid Commercialization Strategies for Pharmaceutical and Biotech Companies [ DENISE MISSONAK SAP POINT OF CONTACT MEMBER SINCE: 1998 [ CHUCK WEBBER ASUG INSTALLATION MEMBER MEMBER SINCE:2008 [ MALCOM POULIN ASUG ASSOCIATE MEMBER MEMBER SINCE:1998
  • 2. Key Learning Points Understand the business drivers for rapid commercialization in life science Understand the benefits which rapid commercialization provides for life science companies Develop insight into the challenges of achieving rapid commercialization Understand the proven pre-configured solutions which Grom and Entegreat have built to accelerate rapid commercialization Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 3. Agenda Introduction Business Context and Success Strategies for R&D / Commercialization Rapid Commercialization Solution Overview Integrated Portfolio and Project Management (IPPM) Rapid Compliant Commercialization Questions Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved.
  • 4. Company Overviews GROM EnteGreat Founded in 1982 Founded in 2000 - Mgmt team has Privately held been working together since 1982 Leading provider of strategy, Privately held integration, operation, and support Leading provider of supply chain & services for complex business manufacturing systems consulting and software solutions solution integration services Full off-shore capabilities Extensive experience integrating Fortune 2000 customers in life SAP with plant environments since sciences & healthcare, consumer 1994 products, aerospace & defense, Fortune 500 customers in life discrete manufacturing, and sciences, consumer products, pulp & technology services paper, and specialty chemicals SAP National Partner since 1994 Active roles in industry groups such Other competencies include Oracle, as: ISA, MESA, Supply Chain Council, Peoplesoft, JD Edwards, and Siebel. World Batch Forum, and APICS ~350+ consultants SAP NetWeaver certification Independent and Unbiased Independent and Unbiased Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 5. Rapid Commercialization Business Context Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 6. The Pharmaceutical Industry is Under a Great Deal of Pressure The pharmaceutical environment is becoming more and more challenging. Pharmaceutical companies are pressured to deliver revenue and earnings growth under tough conditions. External Market Dynamics Internal Industry Pressures Ageing population will drive up Rising commercialization costs. The utilization. The number of citizens over average cost of developing a new drug age 65 is expected to double over the is over $800MM. next 40 years. Declining R&D productivity. Number of Chronic diseases, such as diabetes, are FDA approvals have remained flat over projected to become more prevalent. past decade. Increasing payer Influence and role of Shorter product exclusivity due to government. increased competition from other Diminishing willingness to pay premium branded and generic drugs. prices for branded pharmaceuticals. Increased regulatory stringency The share of generic drugs have tripled over the past two decades. Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 7. For Pharmaceutical R&D, These are Bittersweet Times Creating Safe and Effective New Medicines The Potential Has Never Been Greater Exciting scientific advances offer greater potential than ever before for discovering “…The next ten years will be seen as a signal point of transition in health new, more effective ways to fight disease care. Medicine will be transformed from an instinctive art of alleviating Wave of scientific advances and new symptoms to a science of technologies have begun to change how personalized health care. The next decade will be viewed by future medicines are discovered. generations as the time when treatments became preventative, Growing knowledge of how diseases work predictive, and personalized…” at the genetic and molecular levels has opened up new drug targets Michael Leavitt Secretary of Health and Treatments based on an individual’s Human Services genetic make-up show great promise to improve health care Pharmaceutical Research and Manufacturers of America, Pharmaceutical Industry Profile 2007 (Washington, DC: PhRMA, March 2007) Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 8. For Pharmaceutical R&D, These are Bittersweet Times (Continued) Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 9. For Pharmaceutical R&D, These are Bittersweet Times (Continued) Source: innovation.org Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 10. Big Pharmaceutical Companies Are Undergoing Significant Changes to Adapt Sample Big Pharma Corporate Strategy Map Maximize shareholder value Grow Develop R&D Optimize cost Grow earnings Financial revenue pipeline value Become the Leader in delivering value to customers Business Policy Patients Payers Physicians Customer Partners Stakeholders Build effective and efficient business model Internal Focus on key Rethink the way Rethink the way Establish a efficient Process therapeutic we research and we commercialize and adaptive Capabilities areas develop new drugs new drugs business model Create a high performing organization People & Create high performance Develop transformational Develop the Culture culture leaders capabilities to win = Direct contribution by R&D = Focus of today’s = Indirect contribution by R&D presentation Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 11. Rapid Development & Commercialization Bottom Line Contributions “…Drugs developed by the fastest companies enjoyed as much as a 17-month speed advantage over average performers and a 28.5 month median development cycle and a 7.1 month regulatory cycle advantage over those of the slowest companies…” “…Fastest companies focus and prioritize resources better and kill projects sooner…Fastest companies terminated 56% of discontinued projects in Phase I versus 36% for slowest companies…” Tufts Center for the Study of Drug Development (CSDD), Impact Report, Volume 8, Number 5, September/October 2006 Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 12. Rapid Development & Commercialization Bottom Line Contributions (Continued) “…A one-day advantage typically saves $37,000 in out-of- pocket development costs and nets an additional $1.1 million in daily prescription revenue for an average performing drug…” “…Drugs developed by the fastest companies saved $30 million in out-of-pocket development costs and gained $1.1 billion in incremental prescription revenue each, Tufts Center for the Study of Drug Development (CSDD), compared to those of the slowest Impact Report, Volume 8, Number 5, September/October 2006 companies…” Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 13. Rapid Commercialization Solution Overview Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 14. GROM Solution Portfolio for Life Sciences Marketing & Rapid Compliant Solutions Industry Field Sales Commercialization Manufacturing Channel Supply Chain Lean Manufacturing Management Optimization Validation and Quality Assurance Industry Threads Specific Regulatory Compliance Data Migration and Data Governance Methodology Base GEM Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 15. Solution Overview – Rapid Commercialization Solution Rapid Commercialization Portfolio R&D Project Specification Recipe Electronic Management Management Management Management Filing Components Integrated Inventory And Internal Product Manufacturing Production Warehouse Production Development Execution Planning Management Ramp-up Manufacturing Contract Mfg. Clinical Trial Electronic Quality Performance Production Supply Chain Batch Record Management Analysis Ramp-up Value Levers Faster Increased Personnel Lower NPDI Increased Revenue Lower IT Costs Time-to-Market Productivity Costs Improved Capital Established Improved Plant Increased Market Architecture Planning and Process & Change Utilization Share Simplification Investment Control = Areas with accelerated solutions Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 16. Solutions Featured in Today’s Presentation Integrated Portfolio and Project Management Rapid Compliant Commercialization Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 17. Solution Review: Integrated Portfolio and Project Management (IPPM) Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 18. Portfolio And Project Management: Why This Is An Important Topic Tufts CSDD Outlook 2007 Report on Globalization & Outsourcing “…The industry is stepping up its use of global outsourcing practices to speed development and reduce associated costs...” “…Growing clinical trials volume and scope, are prompting drug sponsors to increase their reliance on foreign based investigators and patients…” “…Many top pharmaceutical companies project that, within two to three years, up to 65% of their FDA- regulated clinical trials will be conducted abroad…” “…Demand for CRO services is expected to grow by 16% annually over the next five years…” Managing R&D activities across diverse and widely dispersed teams is becoming an exceptionally difficult proposition… Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 19. Portfolio And Project Management Competitive Advantages To be Gained According to a benchmark conducted by the Aberdeen Group, Best-in-Class performers enjoy significant performance advantages over their competitors, including: 28% more likely to meet product development cost targets than the Industry Average and over three-times as likely as Laggard companies 52% more likely to hit target launch dates than the Industry Average and 3.3- executed, it can provide …But when well times as likely asa Laggards competitive advantage significant to hit these targets Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 20. Portfolio And Project Management Needed Capabilities and Enablers Before a company can expect the full benefits of globalization and outsourcing, it must develop the necessary capabilities to enable global R&D collaboration. Key Business Capabilities Key Technology Enablers Standardized processes across global Integrated project, program, and R&D chain for both internal and external resource management tools resources Real-time, web-enabled, interactive Centralized and secure access to collaboration tools development data Product Lifecycle Management (PLM) Formal project and program Product Data Management (PDM) management methodologies Formal review process that includes external parties throughout development process Design performance / metrics formally measured across global R&D chain Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 21. Integrated Portfolio & Project Mgt. Solution Roadmap IPPM Maturity Level xRPM OPTIMIZE Portfolio Portfolio Resource Management Evaluations Management PLM MANAGE AND COLLABORATE Recipe cProjects cFolders Management Project System Activity & Material Financial Milestone Mgt Planning Planning Pre-Configured Solution Document Procurement Time Management Activities Recording Offering CONTROL Capacity Production Budget Evaluation Activities Control Real Experience. Real Advantage. • Time Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 22. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Budget control Capacity evaluation & leveling Please refer to the “supplementary reference materials” section Real Experience. Real Advantage. • towards the back of this presentation for additional details Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 23. Pre-Configured R&D Project System Solution Pre-defined R&D project WBS template Integrated process design with materials management, procurement, manufacturing, and finance Pre-defined work centers roles Baseline PS Module Configuration Baseline SAP DMS Configuration (with e-signature activation) Baseline SAP CATS Configuration Baseline SAP PP Configuration (work center capacity management) Pre-defined SAP security profiles Pre-Configured Solution Project Documentation Business process flows User / functional requirements specifications Business process procedures Unit / integration test scripts End-user training materialssystem solution can save a Our pre-configured R&D project Real Experience. typical project up to 3 months in design and implementation Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 24. Solution Review: Rapid Compliant Commercialization Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 25. Rapid Compliant Commercialization Overall Business Objective • Shorten the time and reduce the cost to move from clinical supply manufacturing to scaled-up commercial manufacturing Rapid Compliant Commercialization Accelerate • Eliminate the “toss it over the wall” syndrome after approval Early Late Over Early Improved R&D Clinical Clinical The Commercial Commercial Supply Supply Wall Supply Supply ? Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 26. Rapid Compliant Commercialization Capability Requirements According to a cross-industry analysis performed by the Aberdeen Group*, the characteristics of a winning formula- based product development strategy include: Key Business Capabilities Integrated Product Data Architecture - To support both production scaling and regulatory requirements Detailed Audit Trail – Throughout the entire material flow Integration with Value Chain Participants – To enable quick and complete reporting on all product and ingredient sourcing and distribution data Demonstrated Regulatory Compliance – Proactive management brand integrity and risks, fines, and fees associated with non-compliance. Inspire confidence with regulatory agencies and speed up regulatory review cycles. Speed and Access to all Relevant Product Data – Provide direct and immediate access to regulatory compliance information to both production and product development personnel. Real Experience. * = “Formula-Based Product Development: Recipes for Compliance and Success”, Aberdeen Group, Nov. 2004 Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 27. Rapid Compliant Commercialization The Business Benefits are Quantifiable Areas of Average Business Improvement Across Maturities IMPROVEMENT AREA BEST-IN-CLASS Reduction in Product Costs 17.5% Reduction in Engineering Change Orders Cycle Time 75% Reduction in Design Cycles 25% - 35% Reduction in Time-to-Volume Cycles 10% - 15% Reduce Search Times / Improve Engineering 15% - 20% Productivity New Product Revenue as a % of Total Revenue 28% Counterfeiting, Grey Market Cost Reduction 31% New Product Costs as a % of Planned Product Costs 69% Source: “The Design for Compliance Benchmark Report”, AberdeenGroup, September 2004 Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 28. Rapid Compliant Commercialization Solution Roadmap Program Maturity & Coverage Leverage Infrastructure DEPLOY and Accelerate Process PROGRAM Late Stage Inline Mfg. Contract Mfg. Clinical Mfg. Site Site Site Deployment Deployment Deployment Integrated Supply Chain Execution & Visibility Implement PLM & REALIZE AND ERP Solution Pilot STABILIZE ISA-88 Recipe Electronic Enforced Manufacturing Management Batch Record Compliance Electronic Integrated CAPA / NCR Planning and Product Data Analytics Management STANDARDIZE Establish Foundational Capabilities Modular & Configurable ISA-88-based Automated Solution Offering Recipe ISA-95-based Compliance Modeling Interoperability Processes Standard Internal Mfg. External Mfg. Solution Architecture Architecture Architecture Assessment Assessment Real Experience. Time Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 29. Rapid Compliant Commercialization Solution Architecture Overview mySAP PLM Definition (in Late Stage Clinical & Commercialization) SAP ERP Material Personnel Equipment Sequence of Work Requirements Requirements Requirements Operations Procedures SAP ERP 3rd Party Execution (in Late Stage Clinical & Commercialization) Applications Electronic Shop Floor Material Personnel Equipment Sequence NetWeaver Work Systems Qualification Qualification Qualification Enforcement Portal Instructions SAP ERP Documentation Optimization NetWeaver Portal Electronic Process Analytics KPIs SAP xMII Batch Record Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 30. Rapid Compliant Commercialization Conceptual Architecture mySAP PLM Definition (in Late Stage Clinical & Commercialization) SAP ERP Material Personnel Equipment Sequence of Work Requirements Requirements Requirements Operations Procedures Manufacturing Assets & Procedures Models Using ISA-88 SAP ERP 3rd Party Execution (in Late Stage Clinical & Commercialization) Applications Electronic Shop Floor Material Personnel Equipment Sequence NetWeaver Work Systems Qualification Qualification Qualification Enforcement Portal Instructions Segmentation Of Manufacturing Resource and Activity Models Into Standard Formats Enables Application of Uniform Policies and Procedures SAP ERP Documentation Optimization NetWeaver Portal Electronic Process Analytics KPIs SAP xMII Batch Record Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 31. Rapid Compliant Commercialization Conceptual Architecture mySAP PLM Definition (in Late Stage Clinical & Commercialization) SAP ERP Material Personnel Equipment Sequence of Work Requirements Requirements Requirements Operations Procedures 21 CFR 211 21 CFR 58 21 CFR 600/610 (Pharmaceutical) (Labs) (Biological) SAP ERP 3rd Party Execution (in Late Stage Clinical & Commercialization) Applications The Regulator’s Motivation and Intent As Expressed in Electronic NetWeaver Shop Floor Law, Additional Guidance, andSequence Material Personnel Equipment Work Qualification Qualification Qualification Enforcement Portal Systems Actual Assessments and Judgments Instructions SAP ERP Documentation Optimization NetWeaver Electronic Portal Process Analytics KPIs SAP xMII Batch Record Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 32. Rapid Compliant Commercialization Solution Architecture SAP NetWeaver PLM APO BI HR QM PM MM PP-PI EBR ERP XI xMII ODA ISA-95 Documents (B2MML + Evolving Part 4) OPC 3rd Party 3rd Party 3rd Party 3rd Party DCS / Historian / HR LIMS EAM MES Batch SCADA Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 33. What is EnteGreat’s ? Simply stated… Compliant Manufacturing Framework® is a library of proven best practices accelerators for executing regulated manufacturing using SAP Proven templates for defining manufacturing objects and activities in a cGMP environment using industry standards such as ISA-88 and ISA-95 Proven templates and examples for configuring and implementing cGMP manufacturing applications Proven content for US FDA/GAMP CSV documentation Proven content for training and system documentation CMF® provides materials that accelerate the development of an SAP- based cGMP shop floor manufacturing execution environment Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 34. Accelerated Solution for Rapid Compliant Commercialization – Benefits of using CMF® By using the same Compliant Manufacturing Framework for late stage clinical supply manufacturing that supports commercial manufacturing, companies can achieve these added benefits: Seamless transition for manufacturing systems Instant integration into the supply chain Eliminates re-engineering or revalidation Ready to begin compliance work in commercial production CSVs and most documentation already in place Facilitates efficient processing of post-approval changes Increases clinical supply manufacturing efficiency Rapid access to data for bi-directional exchange, analysis, and continuous improvement Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 35. Schedule Acceleration: The Advantage Typical Project Timeline Without CMF-based Prototyping Proof Of Concept Pilot Initial Implementation Deployment / Roll-Out Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 36. Schedule Acceleration: The Advantage Typical Project Timeline Without CMF-based Prototyping Proof Of Concept Schedule Pilot Compression Opportunities Initial Implementation Deployment / Roll-Out Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 37. Schedule Acceleration: The Advantage Project Timeline With CMF-based Prototyping Proof Of Concept Overall Schedule Pilot Reduction and Quicker Payback Initial Implementation Deployment / Roll-Out Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 38. Rapid Compliant Commercialization Business Benefits Improved New Product Development & Introduction • Faster product-to-market • Standardized mechanism for product definition / data architecture from Development to Commercialization Improved Supply Chain Performance • Increased responsiveness and flexibility • Improved manufacturing reliability and performance against plan Reduced Labor (Operations & Quality) • Reduced effort to transform Clinical product definition data for Commercialization Improved Batch Review / Dispositioning & Product Release • Elimination of “clerical” batch record errors via Electronic Batch Record • Exception-based electronic batch record review Improved Quality and Compliance • Compliant First-Time • Supports top-down quality management (QSIT) Drives Continuous Improvement • Timely access to accurate, current, and complete mfg data • Feedback from Commercialization to Development • Direct bi-directional transfer of product / production data Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 39. Questions We’ll gladly take additional questions after today’s session. Just stop by booth 1787 !! Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 40. Thank you for participating Please remember to complete and return your evaluation form following this session. For ongoing education on this area of focus, visit the Year-Round Community page at www.asug.com/yrc James Chi Grom Associates 908-483-2000 x253 jchi@grom.com Jeff Clark 908-483-2000 x256 [SESSION CODE: 4400 jclark@grom.com Edward Sullivan EnteGreat, Inc. 412-523-2723 ed_sullivan@entegreat.com Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat Inc. All rights reserved. EnteGreat, Inc. All rights reserved.
  • 41. Supplementary Reference Materials: Pre-Configured PS Solution In Details Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 42. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 43. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 44. Pre-Configured PS Solution for R&D Standardized R&D Project WBS Template Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 45. Pre-Configured PS Solution for R&D Standardized R&D Project WBS Template Project Structure Area Details Area Work list and Template Area Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 46. Pre-Configured PS Solution for R&D Standardized R&D Project WBS Template Tabular View Gantt Chart Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 47. Pre-Configured PS Solution for R&D Progress Analysis Report Actual Remaining Planned Delay Work Work Work Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 48. Pre-Configured PS Solution for R&D Progress Analysis Report – Export to Excel Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 49. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 50. Pre-Configured PS Solution for R&D Labor Activity Processing Labor Assignment & Planning Personnel assignment Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 51. Pre-Configured PS Solution for R&D Labor Activity Processing Time Entry Through CATS Actual Work (Time) Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 52. Pre-Configured PS Solution for R&D Labor Activity Processing Time Entry Approval Approved Work Hours Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 53. Pre-Configured PS Solution for R&D Labor Activity Processing Booking of Actual Labor Hours to Project Approved Work Hours Transferred to Project Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 54. Pre-Configured PS Solution for R&D Labor Activity Processing Plan vs Actual Labor Hour & Cost Reporting Costs R&D Personnel Actual Plan assigned to Internal Activity Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 55. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 56. Experimental Manufacturing Activity Processing BOM Assigned To Project Activity BOM assigned to Project Activity Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 57. Experimental Manufacturing Activity Processing Planned Order to Process Order Conversion MRP result Convert Planned Order to Process Order Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 58. Experimental Manufacturing Activity Processing Assignment of WBS Number to Process Order Costs Plan Actual Variance Process Order Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 59. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 60. Consumption & Procurement Activity Processing Material Planning Reservation Material Quantity Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 61. Consumption & Procurement Activity Processing Material Consumption Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 62. Consumption & Procurement Activity Processing Booking of Material Costs to Project Costs Plan Actual Variance Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 63. Consumption & Procurement Activity Processing Planned vs Actual Material Cost Analysis Across Projects For All Selected Project Costs Actual Plan Variance P R O J E Raw Material Consumption C T Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 64. Consumption & Procurement Activity Processing External Service Order Planning Purchase Requisition Service Activity Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 65. Consumption & Procurement Activity Processing Service Acceptance Through Entry Sheets Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 66. Consumption & Procurement Activity Processing Booking of External Services to Project Costs Plan Actual Variance Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 67. Consumption & Procurement Activity Processing External Services Analysis Status Indicator Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 68. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 69. Document Processing With e-Signature Approval Document Status Digital Signature Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 70. Document Processing With e-Signature Approval Document attached to Project Activity Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 71. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 72. Cost Allocation Manual Cost Apportionment to Project Amount ‘R&D Generics’ ‘Travel & Enter…’ Project Root WBS Cost Center Cost Element - Element 612000 Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 73. Cost Allocation Booking of Apportioned Costs to Project Costs Actual Plan Variance 612000 – Travel & Entertainment Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 74. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 75. Financial Analysis Planned vs Actual Costs Analysis Hierarchical View Costs Plan Actual Variance Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 76. Financial Analysis Planned vs Actual Costs Analysis Cost Element View For Selected Project Costs Actual Plan Variance Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 77. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 78. Budget Control Allocation of Budget to Project WBS Element View Planned Costs of Project Budget allocated WBS Element Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 79. Budget Control Allocation of Budget to Project Fiscal Period View Budget allocated Period Planned Costs of Project Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 80. Budget Control Message When Budget is Exceeded Control Message When Project Costs Exceeds Allocated Budget Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 81. Budget Control Budget vs Actual Cost Analysis Costs Budget Actual Variance For Selected Project Summary – Year wise Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 82. Project System Solution for R&D Integrated Business Processes Standardized R&D project WBS template Labor activity processing – time entry through CATS Experimental manufacturing activity processing – integrated with existing planning processes Consumption & procurement activity processing Materials Contract services Document processing (with e-signature approval) Cost Allocation Automatic postings Manually apportioned Financial analysis Real Experience. Real Advantage. • Budget control Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.
  • 83. Capacity Evaluation & Leveling Resource Capacity Analysis Capacity Planning Overload Capacity Evaluation Real Experience. Real Advantage. • Copyright © 2008 Grom Associates, Inc. and EnteGreat, Inc. All rights reserved.