JAMES R. ELSER
12 Shady Hill Road                                                                                                (610) 627-2280
Moylan, Pennsylvania 19065                                                                                  jelser4228@aol.com


               Projects managed and/or estimated:
1973-1994
PECo Projects, Engineering Staff Team Member; Peach Bottom and Limerick Emergency Response Controls and System
Installation and Design ($5m), Eddystone Generating Station, Units 3 and 4 Gas Conversion ($18m), Eddystone Generating
Station, Unit 1 & 2 Turbine Rotor Replacement ($8m), Cromby Generating Station, Scrubber Replacement ($20m), Peach
Bottom Unit 2 and 3 Condenser Replacement ($15m), Baldwin-Lima Plant Demolition and Remediation Project.($1m), Limerick
Construction Site Demobilization ($11m), Peach Bottom Generating Station Spent Fuel Rack Upgrade(10M), Eddystone
Generating Station, Feed-water Heater(s) Replacement ($1.5m), Managed the sale of all PECo capital assets for a period of 5
years, fleet vehicles, cranes, scrap metals, inventory, computer systems, generating units, jet engines, ($5-$1m annually), etc.
Limerick Generating Station Radiology and Chemical Labs; managed as part of the nuclear generating station licensing and
startup. Coordinated and managed activates of owner purchased and installed equipment and systems for fuel load of new
facility; Implemented Nuclear Regulatory design changes, post Three Mile Island accident. Involved modification of backup
electrical systems, upgrading of HVAC and rad-waste controls; Managed a team of consultants and craft in execution of a fast
track project to meet plant startup milestone dates ($10m).

1978-1980
Design- Build; PA Designed/Estimated/Managed construction of: a three bedroom, two bathroom contemporary, passive solar
frame house. This included a detached three car, two story garage with stand-a-lone heating and septic system. Subdivided
property in into three building lots and constructed two, two story frame colonials with single attached garages. The work on this
project was in large part was self performed ($160k).

1994-1995
Renovation-land development; Estimated/Managed/Engineered/Purchased 1930 vintage, two story, frame structure;
performed complete renovation of: electrical, mechanical and all finishes. Modifications included, a new country kitchen, a new
powder and laundry room, addition of storage and closet space, a new rear deck, siding, windows, roof, HVAC system, a new
200 AMP electric service and a revised contemporary floor plan; Subdivided property into four separate building lots ($500k).

1997-1998
Renovations; Estimated/Managed complete renovation of two, three bedrooms homes, built in 1910 and a 1952 respectfully.
The work included: upgrade off all finishes, new kitchens, bathrooms, furnaces, replacement of windows, up-grade of
landscaping, and a new driveways. These projects were self performed. ($100k ea.)

1997-1998
Design-Build; Estimated/Managed the construction of a two story, 4500 sq. ft. stucco on frame, Tudor with an attached three car
garage. Re-designed structure from; a TGI construction method to standard framing and steel bearing to enable a more open
floor plan from the original design concept ($400k).

1998
Renovation-land development; Estimated/Engineered/Purchased 1930 vintage two story frame structure; Performed complete
renovation of electrical, mechanical and all finishes. Modifications included, a new country kitchen, a new powder and laundry
room, addition of storage and closet space, a new rear deck, siding, windows, roof, HVAC system, a new 200 AMP electric
service and a revised contemporary floor plan; Subdivided property into four separate building lots.($200k)

1998-2000
Semi Custom homes: Estimated/Managed/Constructed two, two story, frame colonial homes with attached two car garages.
These projects were modular units. Approximate 3000 sq. ft. of floor space each. Work consisted of: site development, interior
and exterior finishes, utility hook-ups, HVAC and plumbing installations ($350k ea.).

                                                                                                                                     1
JAMES R. ELSER
12 Shady Hill Road                                                                                                   (610) 627-2280
Moylan, Pennsylvania 19065                                                                                     jelser4228@aol.com



1998-1999
Family Room Addition and Renovation: Estimated/Managed/Constructed re-work of a 1950 two story frame and masonry
house. Work consisted of: up-grade of all finishes, new HVAC, new furnace, complete gutting of master-bath, installation of
whirlpool, tub and separate steam shower unit, construction of 500 sq. ft. great room with interior court yard, replacement of 2200
sq. ft. of flagstone patio deck, re-piping of pool filter and heating systems, window and door replacement through-out, expanded
CT 360 amp electric service with back-up generator, a 200’ long retaining wall, upgraded landscape package, remodel of three
full bathrooms and one powder-room ($225k).

1998-2000
Rental Property Upgrades and Renovations (Section 8); Estimated/Managed construction of: mechanical, electrical, plumbing
systems upgrades, as well as new finishes and kitchens for approximately 20 investment properties for an investment group who
focused on Section 8 rentals. Much of this work was self performed. ($200K)

2000-2001
St. Kevin, Office Wing and Family Life Center: Estimated/Managed; an office wing gym, located in Springfield Township,
Delaware County PA. This ground up 14, 0000 sq. ft., $1.5m, steel and masonry building, with EFIS exterior finish. Project
duration was eight months and was completed on time. Recommended design revisions and value engineering resulted in
substantial cost savings for the parish.

2001
Supercuts, Media PA; Estimated/Managed; $100,000.00 tenant fit-out; for franchiser of 2000 sq. ft. of retail space. Unit built to
specifications in approximately 100 days. Included; all finishes and plumbing, electrical and HVAC upgrades ($78k).

2001-2002
Cabrini College, Widener Building Fine Arts Center, Radnor, PA.: Estimated/Managed a $460,000.00
renovation of 6,000 class room and office space into a state of the art studio/printmaking/instructional space for a visual arts
program, as well as faculty offices and sound studio. The project was completed on a very tight schedule, on time, in support of
the college’s scheduled fall startup. Project included: demolition, complete mechanical and electrical upgrades and interior fit-out.

2002
Valley Forge, Military Academy and College, Wayne, PA: Estimated/Managed; approximately $400,000.00 in
renovations to various buildings within the campus. These included design build projects to the following: Mellon Hall Museum,
Price Hall Swimming Pool and Exercise Facility, ADA ramps, upgraded ADA bathrooms in numerous locations. In addition,
provided budgetary cost estimates, used by the Academy, for long term facility upgrades and maintenance planning.

2003
Wallingford Medical Center; Estimated/Managed; $250,000.00; complete retro fit, of slab on grade, medical office building.
Renovated; lobby, doctor’s offices, patient exam rooms, upgrading all finishes and all electrical and mechanical systems.
Modified; the parking lot, to adhere to Township requirements, for new business application.

2003
Media Real Estate, Old Boeing Facility, Rt. 420 Morton PA; Estimated/Managed $250,000.00 renovation and tenant fit-out of
vanilla box space. Converted second floor, approximately 6, 000 sq. ft into offices and support space for Keystone Healthcare
Transit, Converted the first floor approximately 5,000 sq. ft. into a child care facility. Renovation included; all finishes, and HVAC
and Electrical upgrades.


                                                                                                                                     2
JAMES R. ELSER
12 Shady Hill Road                                                                                                   (610) 627-2280
Moylan, Pennsylvania 19065                                                                                     jelser4228@aol.com


2003
Harcum College, Bryn Mawr, PA; Estimated a $300,000.00 renovation to Cohen Dental Lab. Work scope included 12
classrooms, waiting area/reception lounge, lavatories; all finishes, mechanical, electrical, med gases and sprinklers upgrades or
installation.


2004
St Charles Borromeo Church, Bensalem PA; Managed a $210,000 removal and replacement of interior chapel cathedral roof.
Work performed with minimum impact to daily church services; required the design of a rolling scaffold, unit 35 feet high. A
second scaffold unit was constructed to span the alter section, of granite and marble finish.

2004
Collingdale Borough, ADA, Access Upgrade: Estimated/Managed; $120,000.00 public works; ADA approach and elevator
installation. Project required facility modification, site and electrical upgrades.

2004
Delaware County, Government Center, Receiving Dock, Media, PA; Estimated/Managed a $450,000.00 interior
and exterior public works project. Project consisted of the removal and construction of a monolithically poured concrete brick
faced, 16’x 110’, retaining wall and concrete access ramp, interior and material access upgrades to receiving area and site work.

2004
Crozer Group Medical Healthplex and Hospital, Springfield Township, PA;
Estimated/Engineered/Managed a $250,000.00 renovation which included: structural design, construction and
modifications of; electrical and mechanical systems, interior fit out and finishes. The new facility created is now a state of the art;
two story exercise and nutrition area, where there was once; two-racquetball courts. Work was performing during normal
operating times with minimum impact to the facility’s clients and operation.

2004
Darby Borough Main Street Upgrade; Estimated a Public Works project, valued at $400,000.00; façade upgrades on fourteen
retail store-fronts; renovated operating businesses, coordinating construction activities to minimize impact to owners and their
clientele. Included; structural stabilizations, new windows, doors, paint, roof repairs and signage.

2004-2005
Rose Tree Tavern Relocation, Upper Providence Township Delaware County; Estimated/Engineered/Managed this
$1,400,000.00 public works project consisted of the moving of a three story 750 ton stone structure, 200’ horizontally, northeast
of the road intersection. Directed; the design build- stabilization process, as well as the site design and construction of the
required shoring installation and access road.

2004-2005
Shadyside Park, West Bradford Township; Estimated/Managed a 31 acre, $2,000,000.00, public works project, which
included: site grading, E&S controls, storm water system, parking lot, curbs and walking paths, tennis courts, basketball courts,
in-line-skate-rink, 4 pavilions, volley ball courts, horse pits, ampatheater, landscaping and hardscapes.

2005
Tiny “T” ‘s Deli; $150,000.00; Estimated/Managed addition and renovation, which included site storm water improvements and
revisions to building and parking access. Ground up addition of a prep kitchen including; a new pent roof and a total renovation
of the structures exterior finishes. Upgrade of electric service and HVAC unit.

                                                                                                                                     3
JAMES R. ELSER
12 Shady Hill Road                                                                                                  (610) 627-2280
Moylan, Pennsylvania 19065                                                                                    jelser4228@aol.com


2005
Cold Stone Creamery, Ardmore PA; Estimated/Managed a $200,000.00 retail fit out for a franchiser, totaling approximately
3000 sq. ft of retail space. Unit built to specifications in approximately 100 days. Included all finishes and electrical and HVAC
upgrades.

2005-2006
Underwood Memorial Hospital; facility upgrades; Estimated/Managed, approximately $2,000,000.00 in renovations including
all access corridors to a 320 bed facility; also renovated the following functional areas: Operating Rooms (OR), Employee’s
Cafeteria, Gift Shop, Snack Bar and Deli, Medical Arts Office Building, Administration Area, Admissions, and the “Downs
Building”. Also upgraded two areas; within the Radiation Department, including the replacement of on G.E. x-ray unit.
Negotiated and awarded contracts for the total facility roof replacement and for the replacement of approximately 15,000 sq. ft. of
access walk-ways and patios. Renovations included finish upgrades, electrical, mechanical and fire alarm systems interfaces.

2005-2007
Performed consulting services for: P. Agnes, scheduling of health care renovations, for the Bryn Mawr Hospital, and C.Raymond
Davis, assisted in value engineering the Quaker school, in Fort Washington.

2005-2006
Underwood Memorial Hospital; Engineering Project Manager/Owner’s Rep; $46,000,000.00 GMP;
110,000 square foot, seven story addition, and Emergency Room addition, a 6 Level Pre-Cast parking garage and, stand-alone
20,000 square foot medical building (MOB). Responsible for; managing Construction Manager (Bovis-Lend Lease) and
engineering consultants (RTKL) and interfacing with Hospital Executives involved in this project. Provide: value engineering,
design conflict resolutions, review/approve change orders and payment applications, facilitate and coordinate construction
activities and schedule within operating facility.

2007-KIMCO, Cottman Avenue, Philadelphia, PA
Lead in preparing estimated for two retail outlets, Pep Boys and Pet-Smart, approx. 70k Sq. ft. ($4.2M). Slab on grade masonry
buildings.

2007-Brown Hill Development: Fish Town, Philadelphia PA
Pop Corn Factory Conversion to 72 Condominiums, estimated, prepared work scopes, assisted in buy-outs, filled in as Project
manager, as required ($13m), completed within budget.

2007-Whole Foods, New York City
Assisted Chief Estimator in; preparing conceptual estimate for developing store location in downtown NY City ($20m). Project
included: 300 car two level parking garage.

2007- Lord & Taylor, Stamford Ct.
Assisted Chief Estimator in preparing conceptual estimate for; store expansion and site development ($35m).

2007-2008; Shops @ Trevis, Winchester, VA. Phase II, 76,000 Sq. ft. Retail.
Lead in preparing conceptual budget, assisted in presenting and selling project to Regency ($20m). Phase I completed by JMB,
Phase II under contract.

2007- Exton, PA, Target Off-Site Improvements.
Prepare conceptual budget for Township required store access improvements ($500k). Completed within budget.



                                                                                                                                     4
JAMES R. ELSER
12 Shady Hill Road                                                                                                 (610) 627-2280
Moylan, Pennsylvania 19065                                                                                   jelser4228@aol.com


2007-2008, Morgantown, PA Staples, a Wolfson Site.
Lead in preparing estimate, work scopes, hand-off; for out-of the ground Staples. ($2m). Completed within budget.

2007, Audubon Crossings, Audubon, NJ, a Wolfson Site.
Lead in preparing estimate, work scopes and hand-off of a 67,000 Sf. Retail shopping center ($6m). Currently being constructed
by JMB.

2007- Circuit City, Brooklyn Triangle, NY, NY.
Lead in preparing an estimate for this tenant fit out project ($4m).

2008 Somerton Springs, Philadelphia, PA, Berkshire Development.
Lead in preparing a conceptual budget for developer of a 120,000 sq. ft. retail shopping center, assisted in selling project to
Owner Group. ($15m).

2008 Brookfield Ct: Berkshire Development.
Lead in preparing conceptual estimate for a 20 Ac., 80K Sf. Ft. Retail Shopping Center. Assisted in selling project to Owner
Group ($20M).

2008 Franklin Mills, Simon, the Mills Group.
Lead in preparing conceptual budget for the renovation of existing Mall/Site space for addition of a Target anchor store.
Assisted in selling bid to Owner Group. ($6m).

2008 Springhouse Plaza, Montgomery Co. PA, Stoltz Property Group.
Lead in preparing conceptual budget for demo of existing retail strip mall, extensive site development, construction of new
anchor store, stand a lone restaurant and retail strip center. Assist in selling project to Owner group ($20m).

2008 Lexington Hotel House, Manhattan, NY, Herisa Group.
Lead in preparing estimate for this 25 story high rise, located in down town New York City. Prepared work scopes, assisted in
presenting/selling bid to Owners Group ($45m). Project currently being built by JMB.

2008 Sam’s Club, Allentown, PA, Wal-mart Group.
Prepared estimate for Sam’s club, including gas service station and site work. JMB awarded this project, scheduled to begin
construction spring 2009 ($8m).

2008 Wal-Mart, Flemington, NJ, Wal-mart Group.
Lead in preparing estimate for a pad sight, Wal-Mart retained out-let. ($8.3m).

2008 Voorhees, NJ Echelon Plaza 4 Parking Garage, Arden Group.
Lead in preparing conceptual estimate for the addition of a third level on an existing 76,000 sq. ft. parking garage.
($4.2m).

2008 TULIP Street, Philadelphia, PA, 5 Story Factory Renovation.
Brown Hill Development; concept estimate for converting a five story 1850 masonry factory into flex space office rental units.
Developed work scopes, refined design, prepared budget for financing. ($4.5m)

205 Race Street, Philadelphia, PA.
Brown Hill Development; 7 story mixed use modular design project. Developed conceptual bid for two levels under ground
parking garage, one level, 20,000 sf. retail with 6 levels, 70 rental units ($23m).

                                                                                                                                  5
JAMES R. ELSER
12 Shady Hill Road                                  (610) 627-2280
Moylan, Pennsylvania 19065                    jelser4228@aol.com




                                                                6

Contenu connexe

Tendances

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Swofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools ChurchesSwofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools Churches
kellyjohnson
 
Buildings & Projects
Buildings & ProjectsBuildings & Projects
Buildings & Projects
lchungarch
 
S.Palo portfolio
S.Palo portfolioS.Palo portfolio
S.Palo portfolio
Simona Palo
 

Tendances (20)

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
IV Consulting - Architectural Projects
IV Consulting - Architectural ProjectsIV Consulting - Architectural Projects
IV Consulting - Architectural Projects
 
Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)
 
Next Generation Infill Housing
 Next Generation Infill Housing Next Generation Infill Housing
Next Generation Infill Housing
 
hugh j bitz, architect porfolio brief
hugh j bitz, architect  porfolio briefhugh j bitz, architect  porfolio brief
hugh j bitz, architect porfolio brief
 
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
 
Swofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools ChurchesSwofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools Churches
 
Project list
Project listProject list
Project list
 
Acon premia ii dehradun
Acon premia ii dehradunAcon premia ii dehradun
Acon premia ii dehradun
 
Cavehill Residence brochure
Cavehill Residence brochureCavehill Residence brochure
Cavehill Residence brochure
 
Jeff Rosier Architectural Portfolio
Jeff Rosier Architectural PortfolioJeff Rosier Architectural Portfolio
Jeff Rosier Architectural Portfolio
 
Sta brochure 10 30-12
Sta brochure 10 30-12Sta brochure 10 30-12
Sta brochure 10 30-12
 
SL Projects Sheet1
SL Projects Sheet1SL Projects Sheet1
SL Projects Sheet1
 
Hillstone-en
Hillstone-enHillstone-en
Hillstone-en
 
Buildings & Projects
Buildings & ProjectsBuildings & Projects
Buildings & Projects
 
S.Palo portfolio
S.Palo portfolioS.Palo portfolio
S.Palo portfolio
 
C Schmitt Project Portfolio Oct2012
C Schmitt Project Portfolio Oct2012C Schmitt Project Portfolio Oct2012
C Schmitt Project Portfolio Oct2012
 
###RESUME###
###RESUME######RESUME###
###RESUME###
 
Basilica
BasilicaBasilica
Basilica
 
Wellesley High School Project
Wellesley High School ProjectWellesley High School Project
Wellesley High School Project
 

Similaire à James Elser Project List 2009

Mark Brock Project list
Mark Brock Project listMark Brock Project list
Mark Brock Project list
Mark Brock
 
Project List
Project ListProject List
Project List
Jim Ryan
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
wdemshar
 
Promotional Sheet - Grand Mound
Promotional Sheet - Grand MoundPromotional Sheet - Grand Mound
Promotional Sheet - Grand Mound
Linda Burman
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016
Kevin Seyko
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projects
rstinnett
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
Rodney Hibbard
 
Technical_Career_Accomplishments-R._Freeborn
Technical_Career_Accomplishments-R._FreebornTechnical_Career_Accomplishments-R._Freeborn
Technical_Career_Accomplishments-R._Freeborn
Bob Freeborn
 
Arl Project List
Arl Project ListArl Project List
Arl Project List
anthee13
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
Tj Dickey
 

Similaire à James Elser Project List 2009 (20)

Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof Replacement
 
Mark Brock Project list
Mark Brock Project listMark Brock Project list
Mark Brock Project list
 
Project List
Project ListProject List
Project List
 
Restoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioRestoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville Ohio
 
E. Kochaeva - projects (1)
E. Kochaeva - projects (1)E. Kochaeva - projects (1)
E. Kochaeva - projects (1)
 
Resume update 3
Resume  update 3Resume  update 3
Resume update 3
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
 
Promotional Sheet - Grand Mound
Promotional Sheet - Grand MoundPromotional Sheet - Grand Mound
Promotional Sheet - Grand Mound
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016
 
02 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 202 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 2
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projects
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
Technical_Career_Accomplishments-R._Freeborn
Technical_Career_Accomplishments-R._FreebornTechnical_Career_Accomplishments-R._Freeborn
Technical_Career_Accomplishments-R._Freeborn
 
Resume Y
Resume YResume Y
Resume Y
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
GETG's Savannah Trust Facility Overview
GETG's Savannah Trust Facility OverviewGETG's Savannah Trust Facility Overview
GETG's Savannah Trust Facility Overview
 
Arl Project List
Arl Project ListArl Project List
Arl Project List
 
Jim markey thru 2011
Jim markey thru 2011Jim markey thru 2011
Jim markey thru 2011
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

James Elser Project List 2009

  • 1. JAMES R. ELSER 12 Shady Hill Road (610) 627-2280 Moylan, Pennsylvania 19065 jelser4228@aol.com Projects managed and/or estimated: 1973-1994 PECo Projects, Engineering Staff Team Member; Peach Bottom and Limerick Emergency Response Controls and System Installation and Design ($5m), Eddystone Generating Station, Units 3 and 4 Gas Conversion ($18m), Eddystone Generating Station, Unit 1 & 2 Turbine Rotor Replacement ($8m), Cromby Generating Station, Scrubber Replacement ($20m), Peach Bottom Unit 2 and 3 Condenser Replacement ($15m), Baldwin-Lima Plant Demolition and Remediation Project.($1m), Limerick Construction Site Demobilization ($11m), Peach Bottom Generating Station Spent Fuel Rack Upgrade(10M), Eddystone Generating Station, Feed-water Heater(s) Replacement ($1.5m), Managed the sale of all PECo capital assets for a period of 5 years, fleet vehicles, cranes, scrap metals, inventory, computer systems, generating units, jet engines, ($5-$1m annually), etc. Limerick Generating Station Radiology and Chemical Labs; managed as part of the nuclear generating station licensing and startup. Coordinated and managed activates of owner purchased and installed equipment and systems for fuel load of new facility; Implemented Nuclear Regulatory design changes, post Three Mile Island accident. Involved modification of backup electrical systems, upgrading of HVAC and rad-waste controls; Managed a team of consultants and craft in execution of a fast track project to meet plant startup milestone dates ($10m). 1978-1980 Design- Build; PA Designed/Estimated/Managed construction of: a three bedroom, two bathroom contemporary, passive solar frame house. This included a detached three car, two story garage with stand-a-lone heating and septic system. Subdivided property in into three building lots and constructed two, two story frame colonials with single attached garages. The work on this project was in large part was self performed ($160k). 1994-1995 Renovation-land development; Estimated/Managed/Engineered/Purchased 1930 vintage, two story, frame structure; performed complete renovation of: electrical, mechanical and all finishes. Modifications included, a new country kitchen, a new powder and laundry room, addition of storage and closet space, a new rear deck, siding, windows, roof, HVAC system, a new 200 AMP electric service and a revised contemporary floor plan; Subdivided property into four separate building lots ($500k). 1997-1998 Renovations; Estimated/Managed complete renovation of two, three bedrooms homes, built in 1910 and a 1952 respectfully. The work included: upgrade off all finishes, new kitchens, bathrooms, furnaces, replacement of windows, up-grade of landscaping, and a new driveways. These projects were self performed. ($100k ea.) 1997-1998 Design-Build; Estimated/Managed the construction of a two story, 4500 sq. ft. stucco on frame, Tudor with an attached three car garage. Re-designed structure from; a TGI construction method to standard framing and steel bearing to enable a more open floor plan from the original design concept ($400k). 1998 Renovation-land development; Estimated/Engineered/Purchased 1930 vintage two story frame structure; Performed complete renovation of electrical, mechanical and all finishes. Modifications included, a new country kitchen, a new powder and laundry room, addition of storage and closet space, a new rear deck, siding, windows, roof, HVAC system, a new 200 AMP electric service and a revised contemporary floor plan; Subdivided property into four separate building lots.($200k) 1998-2000 Semi Custom homes: Estimated/Managed/Constructed two, two story, frame colonial homes with attached two car garages. These projects were modular units. Approximate 3000 sq. ft. of floor space each. Work consisted of: site development, interior and exterior finishes, utility hook-ups, HVAC and plumbing installations ($350k ea.). 1
  • 2. JAMES R. ELSER 12 Shady Hill Road (610) 627-2280 Moylan, Pennsylvania 19065 jelser4228@aol.com 1998-1999 Family Room Addition and Renovation: Estimated/Managed/Constructed re-work of a 1950 two story frame and masonry house. Work consisted of: up-grade of all finishes, new HVAC, new furnace, complete gutting of master-bath, installation of whirlpool, tub and separate steam shower unit, construction of 500 sq. ft. great room with interior court yard, replacement of 2200 sq. ft. of flagstone patio deck, re-piping of pool filter and heating systems, window and door replacement through-out, expanded CT 360 amp electric service with back-up generator, a 200’ long retaining wall, upgraded landscape package, remodel of three full bathrooms and one powder-room ($225k). 1998-2000 Rental Property Upgrades and Renovations (Section 8); Estimated/Managed construction of: mechanical, electrical, plumbing systems upgrades, as well as new finishes and kitchens for approximately 20 investment properties for an investment group who focused on Section 8 rentals. Much of this work was self performed. ($200K) 2000-2001 St. Kevin, Office Wing and Family Life Center: Estimated/Managed; an office wing gym, located in Springfield Township, Delaware County PA. This ground up 14, 0000 sq. ft., $1.5m, steel and masonry building, with EFIS exterior finish. Project duration was eight months and was completed on time. Recommended design revisions and value engineering resulted in substantial cost savings for the parish. 2001 Supercuts, Media PA; Estimated/Managed; $100,000.00 tenant fit-out; for franchiser of 2000 sq. ft. of retail space. Unit built to specifications in approximately 100 days. Included; all finishes and plumbing, electrical and HVAC upgrades ($78k). 2001-2002 Cabrini College, Widener Building Fine Arts Center, Radnor, PA.: Estimated/Managed a $460,000.00 renovation of 6,000 class room and office space into a state of the art studio/printmaking/instructional space for a visual arts program, as well as faculty offices and sound studio. The project was completed on a very tight schedule, on time, in support of the college’s scheduled fall startup. Project included: demolition, complete mechanical and electrical upgrades and interior fit-out. 2002 Valley Forge, Military Academy and College, Wayne, PA: Estimated/Managed; approximately $400,000.00 in renovations to various buildings within the campus. These included design build projects to the following: Mellon Hall Museum, Price Hall Swimming Pool and Exercise Facility, ADA ramps, upgraded ADA bathrooms in numerous locations. In addition, provided budgetary cost estimates, used by the Academy, for long term facility upgrades and maintenance planning. 2003 Wallingford Medical Center; Estimated/Managed; $250,000.00; complete retro fit, of slab on grade, medical office building. Renovated; lobby, doctor’s offices, patient exam rooms, upgrading all finishes and all electrical and mechanical systems. Modified; the parking lot, to adhere to Township requirements, for new business application. 2003 Media Real Estate, Old Boeing Facility, Rt. 420 Morton PA; Estimated/Managed $250,000.00 renovation and tenant fit-out of vanilla box space. Converted second floor, approximately 6, 000 sq. ft into offices and support space for Keystone Healthcare Transit, Converted the first floor approximately 5,000 sq. ft. into a child care facility. Renovation included; all finishes, and HVAC and Electrical upgrades. 2
  • 3. JAMES R. ELSER 12 Shady Hill Road (610) 627-2280 Moylan, Pennsylvania 19065 jelser4228@aol.com 2003 Harcum College, Bryn Mawr, PA; Estimated a $300,000.00 renovation to Cohen Dental Lab. Work scope included 12 classrooms, waiting area/reception lounge, lavatories; all finishes, mechanical, electrical, med gases and sprinklers upgrades or installation. 2004 St Charles Borromeo Church, Bensalem PA; Managed a $210,000 removal and replacement of interior chapel cathedral roof. Work performed with minimum impact to daily church services; required the design of a rolling scaffold, unit 35 feet high. A second scaffold unit was constructed to span the alter section, of granite and marble finish. 2004 Collingdale Borough, ADA, Access Upgrade: Estimated/Managed; $120,000.00 public works; ADA approach and elevator installation. Project required facility modification, site and electrical upgrades. 2004 Delaware County, Government Center, Receiving Dock, Media, PA; Estimated/Managed a $450,000.00 interior and exterior public works project. Project consisted of the removal and construction of a monolithically poured concrete brick faced, 16’x 110’, retaining wall and concrete access ramp, interior and material access upgrades to receiving area and site work. 2004 Crozer Group Medical Healthplex and Hospital, Springfield Township, PA; Estimated/Engineered/Managed a $250,000.00 renovation which included: structural design, construction and modifications of; electrical and mechanical systems, interior fit out and finishes. The new facility created is now a state of the art; two story exercise and nutrition area, where there was once; two-racquetball courts. Work was performing during normal operating times with minimum impact to the facility’s clients and operation. 2004 Darby Borough Main Street Upgrade; Estimated a Public Works project, valued at $400,000.00; façade upgrades on fourteen retail store-fronts; renovated operating businesses, coordinating construction activities to minimize impact to owners and their clientele. Included; structural stabilizations, new windows, doors, paint, roof repairs and signage. 2004-2005 Rose Tree Tavern Relocation, Upper Providence Township Delaware County; Estimated/Engineered/Managed this $1,400,000.00 public works project consisted of the moving of a three story 750 ton stone structure, 200’ horizontally, northeast of the road intersection. Directed; the design build- stabilization process, as well as the site design and construction of the required shoring installation and access road. 2004-2005 Shadyside Park, West Bradford Township; Estimated/Managed a 31 acre, $2,000,000.00, public works project, which included: site grading, E&S controls, storm water system, parking lot, curbs and walking paths, tennis courts, basketball courts, in-line-skate-rink, 4 pavilions, volley ball courts, horse pits, ampatheater, landscaping and hardscapes. 2005 Tiny “T” ‘s Deli; $150,000.00; Estimated/Managed addition and renovation, which included site storm water improvements and revisions to building and parking access. Ground up addition of a prep kitchen including; a new pent roof and a total renovation of the structures exterior finishes. Upgrade of electric service and HVAC unit. 3
  • 4. JAMES R. ELSER 12 Shady Hill Road (610) 627-2280 Moylan, Pennsylvania 19065 jelser4228@aol.com 2005 Cold Stone Creamery, Ardmore PA; Estimated/Managed a $200,000.00 retail fit out for a franchiser, totaling approximately 3000 sq. ft of retail space. Unit built to specifications in approximately 100 days. Included all finishes and electrical and HVAC upgrades. 2005-2006 Underwood Memorial Hospital; facility upgrades; Estimated/Managed, approximately $2,000,000.00 in renovations including all access corridors to a 320 bed facility; also renovated the following functional areas: Operating Rooms (OR), Employee’s Cafeteria, Gift Shop, Snack Bar and Deli, Medical Arts Office Building, Administration Area, Admissions, and the “Downs Building”. Also upgraded two areas; within the Radiation Department, including the replacement of on G.E. x-ray unit. Negotiated and awarded contracts for the total facility roof replacement and for the replacement of approximately 15,000 sq. ft. of access walk-ways and patios. Renovations included finish upgrades, electrical, mechanical and fire alarm systems interfaces. 2005-2007 Performed consulting services for: P. Agnes, scheduling of health care renovations, for the Bryn Mawr Hospital, and C.Raymond Davis, assisted in value engineering the Quaker school, in Fort Washington. 2005-2006 Underwood Memorial Hospital; Engineering Project Manager/Owner’s Rep; $46,000,000.00 GMP; 110,000 square foot, seven story addition, and Emergency Room addition, a 6 Level Pre-Cast parking garage and, stand-alone 20,000 square foot medical building (MOB). Responsible for; managing Construction Manager (Bovis-Lend Lease) and engineering consultants (RTKL) and interfacing with Hospital Executives involved in this project. Provide: value engineering, design conflict resolutions, review/approve change orders and payment applications, facilitate and coordinate construction activities and schedule within operating facility. 2007-KIMCO, Cottman Avenue, Philadelphia, PA Lead in preparing estimated for two retail outlets, Pep Boys and Pet-Smart, approx. 70k Sq. ft. ($4.2M). Slab on grade masonry buildings. 2007-Brown Hill Development: Fish Town, Philadelphia PA Pop Corn Factory Conversion to 72 Condominiums, estimated, prepared work scopes, assisted in buy-outs, filled in as Project manager, as required ($13m), completed within budget. 2007-Whole Foods, New York City Assisted Chief Estimator in; preparing conceptual estimate for developing store location in downtown NY City ($20m). Project included: 300 car two level parking garage. 2007- Lord & Taylor, Stamford Ct. Assisted Chief Estimator in preparing conceptual estimate for; store expansion and site development ($35m). 2007-2008; Shops @ Trevis, Winchester, VA. Phase II, 76,000 Sq. ft. Retail. Lead in preparing conceptual budget, assisted in presenting and selling project to Regency ($20m). Phase I completed by JMB, Phase II under contract. 2007- Exton, PA, Target Off-Site Improvements. Prepare conceptual budget for Township required store access improvements ($500k). Completed within budget. 4
  • 5. JAMES R. ELSER 12 Shady Hill Road (610) 627-2280 Moylan, Pennsylvania 19065 jelser4228@aol.com 2007-2008, Morgantown, PA Staples, a Wolfson Site. Lead in preparing estimate, work scopes, hand-off; for out-of the ground Staples. ($2m). Completed within budget. 2007, Audubon Crossings, Audubon, NJ, a Wolfson Site. Lead in preparing estimate, work scopes and hand-off of a 67,000 Sf. Retail shopping center ($6m). Currently being constructed by JMB. 2007- Circuit City, Brooklyn Triangle, NY, NY. Lead in preparing an estimate for this tenant fit out project ($4m). 2008 Somerton Springs, Philadelphia, PA, Berkshire Development. Lead in preparing a conceptual budget for developer of a 120,000 sq. ft. retail shopping center, assisted in selling project to Owner Group. ($15m). 2008 Brookfield Ct: Berkshire Development. Lead in preparing conceptual estimate for a 20 Ac., 80K Sf. Ft. Retail Shopping Center. Assisted in selling project to Owner Group ($20M). 2008 Franklin Mills, Simon, the Mills Group. Lead in preparing conceptual budget for the renovation of existing Mall/Site space for addition of a Target anchor store. Assisted in selling bid to Owner Group. ($6m). 2008 Springhouse Plaza, Montgomery Co. PA, Stoltz Property Group. Lead in preparing conceptual budget for demo of existing retail strip mall, extensive site development, construction of new anchor store, stand a lone restaurant and retail strip center. Assist in selling project to Owner group ($20m). 2008 Lexington Hotel House, Manhattan, NY, Herisa Group. Lead in preparing estimate for this 25 story high rise, located in down town New York City. Prepared work scopes, assisted in presenting/selling bid to Owners Group ($45m). Project currently being built by JMB. 2008 Sam’s Club, Allentown, PA, Wal-mart Group. Prepared estimate for Sam’s club, including gas service station and site work. JMB awarded this project, scheduled to begin construction spring 2009 ($8m). 2008 Wal-Mart, Flemington, NJ, Wal-mart Group. Lead in preparing estimate for a pad sight, Wal-Mart retained out-let. ($8.3m). 2008 Voorhees, NJ Echelon Plaza 4 Parking Garage, Arden Group. Lead in preparing conceptual estimate for the addition of a third level on an existing 76,000 sq. ft. parking garage. ($4.2m). 2008 TULIP Street, Philadelphia, PA, 5 Story Factory Renovation. Brown Hill Development; concept estimate for converting a five story 1850 masonry factory into flex space office rental units. Developed work scopes, refined design, prepared budget for financing. ($4.5m) 205 Race Street, Philadelphia, PA. Brown Hill Development; 7 story mixed use modular design project. Developed conceptual bid for two levels under ground parking garage, one level, 20,000 sf. retail with 6 levels, 70 rental units ($23m). 5
  • 6. JAMES R. ELSER 12 Shady Hill Road (610) 627-2280 Moylan, Pennsylvania 19065 jelser4228@aol.com 6