SlideShare une entreprise Scribd logo
1  sur  6
CURRICULUM VITAE
A.JAYASEELAN
EMAIL : a. jeyaseelandj88@gmail.com
Mobile No : +91-8056960730
Objective:
A self disciplined, creative, challenging, professional Electrical Engineer seeking a
good career growth that can be utilized in the growth of the organization.
Educational Qualification:
 First Class Diploma in Electrical and Electronics from State Board of Technical
Education, Tamil Nadu - April 2009.
Experience summary:
 6 Years of Experience in the field of Electrical System at Power Plant Projects.
 Erection HT,LT Transformers, MV,LV Switchgears, Power and Control Panels, Junction
boxes, Cabinets, Distribution boxes, Primary and Secondary cable tray works, MV,LV
Power, control, instrument Cable Laying ,Termination and Testing works, Installation of
Field Instruments & hookup and Automatic Fire protection System components.
 Excellent Technical Skills to interact with Client, Sub contractors and Suppliers.
 Erection, Testing, Commissioning Experience and related Documentation preparation in
the developed prototype actual unit in Atomic Power Plant Projects and Super Critical
Thermal Power Plant Projects.
Employment History :
Period : September 2014 to September 2015
Employer : Equator Engineering SDN. BHD, Malaysia
Client : TANJUNG BIN ENERGY ISSUER BHD
Main Contractor : ALSTOM
Project : 1X 1000MW TANJUNG BIN 4 Coal Fired Power Plant Project ,Malaysia
Consultant : FICHTNER GMBH & CO.KG
Job Responsibility :-
• Primary and secondary Cable tray and Support Fabrication and Installation.
• MV,LV and DCS Panel Erection testing and Commissioning .
• HT,LT Power, Control and Instrumentation and Fiber Optic Cable laying and End
termination works.
• Distribution Board and Junction Boxes Installation.
• Planning and Execution of works.
• Quantity surveying of material for all the Site Erection activities.
• Making the work Execution Program, Work allocation of Manpower and Follow up.
• Arranging the materials for the allocated Manpower.
• Coordination with Site and Head Office.
• Coordinating with client and Subcontractor for all the Site Erection works.
• Athena Updation
• As built drawing Preparation and documentation.
Period : November 2013 to August 2014
Employer : Equator Engineering SDN. BHD, Malaysia
Client : TNB JANAMANJUNG
Main Contractor : ALSTOM
Project : 1X 1000MW MANJUNG 4 Coal Fired Power Plant Project ,Malaysia
Consultant : TEPSCO
Job Responsibility :-
• HT,LT Power, Control and Instrumentation and Fiber Optic Cable Laying, End
termination and Testing works .
• Planning the Execution of Work.
• Quantity surveying of material.
• Making the Work Execution Program,Work allocation of Manpower and Follow up.
• Arranging the Materials for the allocated Man Power.
• Coordinating with client for all the Site Erection works.
• Coordinating with Subcontractor for Site activities.
• Athena Updation
• As buit drawings Preparation And documentation
Period : February 2013 to October 2013
Employer : Microtec Engineers
Client : KUDANKULAM NUCLEAR POWER PROJECT, NPCIL
Project : 2X 1000MW Nuclear Power Plant Project
KudanKulam, Tamilnadu ,India
Consultant : Electronics Corporation of India Ltd
Job Responsibility :-
• Primary and secondary Cable tray and Support Fabrication and Installation .
• MV,LV and DCS Panel Erection and testing Commissioning .
• HT,LT Power, Control and Instrumentation Cable laying & End termination works.
• Distribution Board Installation & Dressing.
• Testing & Commissioning of Internal & External Works.
• Erection of all type of Light Fitting.
• Lux level Calculation for Internal & external Lighting Electrical Works.
• Planning the Execution of works.
• Quantity Surveying of material for all MEP Services.
• Making the work Execution Program,Work allocation of Manpower and Follow up.
• Arranging the materials for the allocated Manpower.
• Coordination with Site and Head Office.
• Preparing the Client Bills And Getting the Certification.
• As built drawing Preparation and documentation.
Period : January 2012 to December 2012
Employer : JEL Maintenance Pte Ltd
Client : TUAS POWER Utilities Pte.Ltd
Main Contractor : Marubeni Corporation.
Project : Tembusu Multi-Utilities Complex
120 MW Biomass & Coal Co-Firing Co-Generation Plant
(BMCC Project, Jurong Island, Singapore)
Consultant : Worley Parsons
Job Responsibility :-
• Erection of HT,LT Transformer, LV,MV Switchgears, junction boxes, cabinets,
control panels, distribution boxes, cable tray.
• Installation of cable Ladder and tray.
• Instrument installation (Transmitter, Valves, Thermocouples) .
• Coordinated with client for joint site survey and obtained field work clearance for
Electrical and Instrumentation erection activities.
• Coordinated with client for acceptance of completed works, as built drawings &
measurement for billing.
• Coordinated with sub-contractors for smooth execution of works as per client &
relevant Indian /Russian Standard requirements.
• Involved in testing, Calibration of field instruments.
• In charge for Power, Control and instrument cabling and termination works.
• Multicore and control cable testing and loop Check.
• MOV Installation and testing.
• Transformer Installation and testing.
• Earth testing.
• Lux Testing.
• HT/LT cable installation and testing.
• Punch list clearance.
Period : July 2009 to Dec 2011
Employer : Microtec Engineers
Client : KUDANKULAM NUCLEAR POWER PROJECT, NPCIL
Project : 2X 1000MW Nuclear Power Plant Project
KudanKulam, Tamilnadu ,India
Consultant : Electronics Corporation of India Ltd
Job Responsibility :-
• Primary and secondary Cable tray and Support Fabrication and Installation .
• MV,LV and DCS Panel Erection and testing Commissioning .
• HT,LT Power, Control and Instrumentation Cable laying & End termination works.
• Distribution Board Installation & Dressing.
• Testing & Commissioning of Internal & External Works.
• Erection of all type of Light Fitting.
• Lux level Calculation for Internal & external Lighting Electrical Works.
• Planning the Execution of works.
• Quantity Surveying of material for all MEP Services.
• Making the work Execution Program ,Work allocation of Manpower and Follow up.
• Arranging the materials for the allocated Manpower.
• Coordination with Site and Head Office.
• Preparing the Client Bills And Getting the Certification.
• As built drawing Preparation and documentation.
PERSONAL DATA:
Date of birth : 01.07.1988
Gender : Male
Marital Status : Single
Father’s Name : Mr.I.Arul Raj
Nationality : Indian
Languages Known : Tamil, English & Hindi
Passport No. : J 6938055
Passport expiry : 12/07/2021
Address : 6/39, CSI Church Street,
Kudankulam (PO)
Tirunelveli Dist.,
Tamilnadu – 627106
Email ID : a.jeyaseelandj88@gmail.com
Address : 6/39, CSI Church Street,
Kudankulam (PO)
Tirunelveli Dist.,
Tamilnadu – 627106
Email ID : a.jeyaseelandj88@gmail.com

Contenu connexe

Tendances

Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)Mohd ismail
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUMEselva raj
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Najim updated CV
Najim updated CVNajim updated CV
Najim updated CVNaji Mulla
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CVSamer Ali
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 

Tendances (20)

THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
update
updateupdate
update
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
reeshu_updated resume
reeshu_updated resumereeshu_updated resume
reeshu_updated resume
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
Najim updated CV
Najim updated CVNajim updated CV
Najim updated CV
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
srikrishna Shit
srikrishna Shitsrikrishna Shit
srikrishna Shit
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 

Similaire à Jeya CV - updated

Similaire à Jeya CV - updated (20)

RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
CV-suaib new
CV-suaib newCV-suaib new
CV-suaib new
 
Project Incharge -
Project Incharge -Project Incharge -
Project Incharge -
 
Udaya CV 10
Udaya CV 10Udaya CV 10
Udaya CV 10
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1
 
resume design engineer
resume design engineerresume design engineer
resume design engineer
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
Tanaji Update new
Tanaji Update newTanaji Update new
Tanaji Update new
 
Muthuselvan Bio
Muthuselvan BioMuthuselvan Bio
Muthuselvan Bio
 
Resume
ResumeResume
Resume
 
CV ( Muzamil)
CV ( Muzamil)  CV ( Muzamil)
CV ( Muzamil)
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Chet_FM 2 Rev
Chet_FM 2 RevChet_FM 2 Rev
Chet_FM 2 Rev
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Resume Engineer DB
Resume Engineer DBResume Engineer DB
Resume Engineer DB
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
Manoj Subhash Patil AD H
Manoj Subhash Patil AD HManoj Subhash Patil AD H
Manoj Subhash Patil AD H
 
Shamraj Kunnasagar (Resume)
Shamraj Kunnasagar (Resume)Shamraj Kunnasagar (Resume)
Shamraj Kunnasagar (Resume)
 
vedprakash Resume
vedprakash Resumevedprakash Resume
vedprakash Resume
 

Jeya CV - updated

  • 1. CURRICULUM VITAE A.JAYASEELAN EMAIL : a. jeyaseelandj88@gmail.com Mobile No : +91-8056960730 Objective: A self disciplined, creative, challenging, professional Electrical Engineer seeking a good career growth that can be utilized in the growth of the organization. Educational Qualification:  First Class Diploma in Electrical and Electronics from State Board of Technical Education, Tamil Nadu - April 2009. Experience summary:  6 Years of Experience in the field of Electrical System at Power Plant Projects.  Erection HT,LT Transformers, MV,LV Switchgears, Power and Control Panels, Junction boxes, Cabinets, Distribution boxes, Primary and Secondary cable tray works, MV,LV Power, control, instrument Cable Laying ,Termination and Testing works, Installation of Field Instruments & hookup and Automatic Fire protection System components.  Excellent Technical Skills to interact with Client, Sub contractors and Suppliers.  Erection, Testing, Commissioning Experience and related Documentation preparation in the developed prototype actual unit in Atomic Power Plant Projects and Super Critical Thermal Power Plant Projects. Employment History : Period : September 2014 to September 2015 Employer : Equator Engineering SDN. BHD, Malaysia Client : TANJUNG BIN ENERGY ISSUER BHD Main Contractor : ALSTOM Project : 1X 1000MW TANJUNG BIN 4 Coal Fired Power Plant Project ,Malaysia Consultant : FICHTNER GMBH & CO.KG Job Responsibility :- • Primary and secondary Cable tray and Support Fabrication and Installation. • MV,LV and DCS Panel Erection testing and Commissioning .
  • 2. • HT,LT Power, Control and Instrumentation and Fiber Optic Cable laying and End termination works. • Distribution Board and Junction Boxes Installation. • Planning and Execution of works. • Quantity surveying of material for all the Site Erection activities. • Making the work Execution Program, Work allocation of Manpower and Follow up. • Arranging the materials for the allocated Manpower. • Coordination with Site and Head Office. • Coordinating with client and Subcontractor for all the Site Erection works. • Athena Updation • As built drawing Preparation and documentation. Period : November 2013 to August 2014 Employer : Equator Engineering SDN. BHD, Malaysia Client : TNB JANAMANJUNG Main Contractor : ALSTOM Project : 1X 1000MW MANJUNG 4 Coal Fired Power Plant Project ,Malaysia Consultant : TEPSCO Job Responsibility :- • HT,LT Power, Control and Instrumentation and Fiber Optic Cable Laying, End termination and Testing works . • Planning the Execution of Work. • Quantity surveying of material. • Making the Work Execution Program,Work allocation of Manpower and Follow up. • Arranging the Materials for the allocated Man Power. • Coordinating with client for all the Site Erection works. • Coordinating with Subcontractor for Site activities. • Athena Updation • As buit drawings Preparation And documentation Period : February 2013 to October 2013 Employer : Microtec Engineers Client : KUDANKULAM NUCLEAR POWER PROJECT, NPCIL Project : 2X 1000MW Nuclear Power Plant Project KudanKulam, Tamilnadu ,India Consultant : Electronics Corporation of India Ltd Job Responsibility :- • Primary and secondary Cable tray and Support Fabrication and Installation . • MV,LV and DCS Panel Erection and testing Commissioning .
  • 3. • HT,LT Power, Control and Instrumentation Cable laying & End termination works. • Distribution Board Installation & Dressing. • Testing & Commissioning of Internal & External Works. • Erection of all type of Light Fitting. • Lux level Calculation for Internal & external Lighting Electrical Works. • Planning the Execution of works. • Quantity Surveying of material for all MEP Services. • Making the work Execution Program,Work allocation of Manpower and Follow up. • Arranging the materials for the allocated Manpower. • Coordination with Site and Head Office. • Preparing the Client Bills And Getting the Certification. • As built drawing Preparation and documentation. Period : January 2012 to December 2012 Employer : JEL Maintenance Pte Ltd Client : TUAS POWER Utilities Pte.Ltd Main Contractor : Marubeni Corporation. Project : Tembusu Multi-Utilities Complex 120 MW Biomass & Coal Co-Firing Co-Generation Plant (BMCC Project, Jurong Island, Singapore) Consultant : Worley Parsons Job Responsibility :- • Erection of HT,LT Transformer, LV,MV Switchgears, junction boxes, cabinets, control panels, distribution boxes, cable tray. • Installation of cable Ladder and tray. • Instrument installation (Transmitter, Valves, Thermocouples) . • Coordinated with client for joint site survey and obtained field work clearance for Electrical and Instrumentation erection activities. • Coordinated with client for acceptance of completed works, as built drawings & measurement for billing. • Coordinated with sub-contractors for smooth execution of works as per client & relevant Indian /Russian Standard requirements. • Involved in testing, Calibration of field instruments. • In charge for Power, Control and instrument cabling and termination works. • Multicore and control cable testing and loop Check. • MOV Installation and testing. • Transformer Installation and testing. • Earth testing. • Lux Testing. • HT/LT cable installation and testing.
  • 4. • Punch list clearance. Period : July 2009 to Dec 2011 Employer : Microtec Engineers Client : KUDANKULAM NUCLEAR POWER PROJECT, NPCIL Project : 2X 1000MW Nuclear Power Plant Project KudanKulam, Tamilnadu ,India Consultant : Electronics Corporation of India Ltd Job Responsibility :- • Primary and secondary Cable tray and Support Fabrication and Installation . • MV,LV and DCS Panel Erection and testing Commissioning . • HT,LT Power, Control and Instrumentation Cable laying & End termination works. • Distribution Board Installation & Dressing. • Testing & Commissioning of Internal & External Works. • Erection of all type of Light Fitting. • Lux level Calculation for Internal & external Lighting Electrical Works. • Planning the Execution of works. • Quantity Surveying of material for all MEP Services. • Making the work Execution Program ,Work allocation of Manpower and Follow up. • Arranging the materials for the allocated Manpower. • Coordination with Site and Head Office. • Preparing the Client Bills And Getting the Certification. • As built drawing Preparation and documentation. PERSONAL DATA: Date of birth : 01.07.1988 Gender : Male Marital Status : Single Father’s Name : Mr.I.Arul Raj Nationality : Indian Languages Known : Tamil, English & Hindi Passport No. : J 6938055 Passport expiry : 12/07/2021
  • 5. Address : 6/39, CSI Church Street, Kudankulam (PO) Tirunelveli Dist., Tamilnadu – 627106 Email ID : a.jeyaseelandj88@gmail.com
  • 6. Address : 6/39, CSI Church Street, Kudankulam (PO) Tirunelveli Dist., Tamilnadu – 627106 Email ID : a.jeyaseelandj88@gmail.com