Pavement Management System Presentation to Township of Langley Council, June 22, 2009
1.
2. The Township of Langley 2008 Pavement Management System Study Prepared by EBA Engineering Consultants Ltd.
3.
4.
5.
6. Township of Langley’s Road Network Road Network Classification Provincial Highways MRN Routes Arterial Routes Collector Routes Grid Local Routes Private/ new locals (Not Surveyed) Municipal Boundary
7. All Cracked Area (ACA) as a Measure of Pavement Condition 100% 30% V Poor 30% 10% Poor 10% 5% Fair 5% 1% Good 1% 0% V Good Colour To ACA From ACA Condition
10. Cracking (ACA) on Major Roads – 2007/08 0 – 1% (V Good) = 133 km 40% 1 – 5% (Good) = 98 km 30% 5 – 10% (Fair) = 42 km 13% 10 – 30% (Poor) = 50 km 15% Avg. Cracking measured in 2007 = 5.5% 30 – 100% (V Poor) = 5 km 2% Total = 328 km Avg. Cracking after 2008 Paving = 5.0%
11.
12.
13. Cracking (ACA) on MRN Roads 2005 0 – 1% (V Good) = 43 km 1 – 5% (Good) = 14 km 5 – 10% (Fair) = 2 km 10 – 30% (Poor) = 0 km Avg. Cracking = 1.0% 30 – 100% (V Poor) = 0 km
14. Cracking (ACA) on Local Roads - 2008 0 – 1% (V Good) = 156 km 1 – 5% (Good) = 125 km 5 – 10% (Fair) = 38 km 10 – 30% (Poor) = 72 km Avg. Cracking = 8.8% * 30 – 100% (V Poor) = 35 km Total = 426 km * Predicted condition in 2008 based on 2005/06 data
15. Analysis Inputs Example Pavement Strategies (combinations of treatments) 13 Years 10 Years 20 Years
16.
17. Analysis Results – Major Roads Deterioration 9% 16% 4% 6% 20% Cracking (ACA) % $2.0mill $3.0 mill $3.5 mill $4.0 mill $1.5 mill Recommended Recommended Actual Spending on annual maintenance for major roads is @ $250,000/ year Predicted
18. Analysis Results – Local Roads Deterioration 4% 11% 15% Cracking (ACA) % $3.0 mill $3.5 mill $4.0 mill $2.5 mill Recommended Recommended 7% Actual spending on annual maintenance for local roads is @ $250,000/ year versus required $500,000/ year shown Predicted
19. Cracking (ACA) on Major & Local Roads 2009 - 2025 Predicted condition in 2009 - 2025 Major: $2.0 million/ year Local: $2.0 million/ year Annual Spending: $4.0 million/ year
20. Cracking (ACA) on Major & Local Roads - 2009 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 5.0 % = Local 8.8 % * Predicted condition in 2009
21. Cracking (ACA) on Major & Local Roads - 2010 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 5.0 % = Local 9.3 % * Predicted condition in 2010
22. Cracking (ACA) on Major & Local Roads - 2011 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 5.2 % = Local 9.7 % * Predicted condition in 2011
23. Cracking (ACA) on Major & Local Roads - 2012 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 5.5 % = Local 10.2 % * Predicted condition in 2012
24. Cracking (ACA) on Major & Local Roads - 2013 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 5.7 % = Local 10.6 % * Predicted condition in 2013
25. Cracking (ACA) on Major & Local Roads - 2014 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 6.0 % = Local 11.1 % * Predicted condition in 2014
26. Cracking (ACA) on Major & Local Roads - 2015 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 6.5 % = Local 11.6 % * Predicted condition in 2015
27. Cracking (ACA) on Major & Local Roads - 2016 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 7.0 % = Local 12.0 % * Predicted condition in 2016
28. Cracking (ACA) on Major & Local Roads - 2017 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 7.6 % = Local 12.7 % * Predicted condition in 2017
29. Cracking (ACA) on Major & Local Roads - 2018 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 8.2 % = Local 13.4 % * Predicted condition in 2018
30. Cracking (ACA) on Major & Local Roads - 2019 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 8.9 % = Local 14.0 % * Predicted condition in 2019
31. Cracking (ACA) on Major & Local Roads - 2020 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 9.6 % = Local 14.9 % * Predicted condition in 2020
32. Cracking (ACA) on Major & Local Roads - 2021 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 10.3 % = Local 15.8 % * Predicted condition in 2021
33. Cracking (ACA) on Major & Local Roads - 2022 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 11.0 % = Local 16.7 % * Predicted condition in 2022
34. Cracking (ACA) on Major & Local Roads - 2023 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 11.8 % = Local 17.4 % * Predicted condition in 2023
35. Cracking (ACA) on Major & Local Roads - 2024 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 12.7 % = Local 18.1 % * Predicted condition in 2024
36. Cracking (ACA) on Major & Local Roads - 2025 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $4.0 million/ year *Avg. Cracking = Major 13.7 % = Local 19.1 % * Predicted condition in 2025
37. Cracking (ACA) on Major & Local Roads 2025 Predicted condition in 2025 Major & Local: $500,000/ year Annual Spending (Do Minimum) :
38. Cracking (ACA) on Major & Local Roads - 2025 0 – 1% (V Good) 1 – 5% (Good) 5 – 10% (Fair) 10 – 30% (Poor) 30 – 100% (V Poor) Annual Spending: $500,000/ year *Avg. Cracking = Major 26.3% = Local 30.2% * Predicted condition in 15 years
42. Calculating Pavement Value Pavement value = Cost of Excavation and Compaction + cost of Subbase + cost of Base + cost of Asphalt Original Ground Excavation and Compaction Subbase Base Asphalt
43. With time and traffic, pavement layers deteriorate Failure Rutting Cracking
44. Calculating current pavement asset value cracking Original Pavement value minus the cost in any given year to restore the pavement to as new condition New Asphalt