Case Study of
Flyover /Bridge
And
Various problems and it’s
solution
The objective of this study is to find out the different
problems arising while and after construction.
Moreover, We have also found remedial solutions to it.
Our objective is to give fundamental knowledge
regarding construction and maintenance of Flyover
Bridge and how to minimize the problems related with
all the functions of Flyover Bridge..
To make the roads easily accessible for day to day
traffic.
OBJECTIVE
Definition
 A bridge is a structure providing
passage over an obstacle without
closing the way beneath. The required
passage may be for a road, a railway,
pedestrians, a canal or a pipeline. The
obstacle to be crossed may by a river, a
road, railway or a valley.
Components of a Bridge
The main parts of a bridge structure are
as below:
 Decking, consisting of slab, girders, trusses,
etc…
 Bearings for the decking.
Abutments and piers.
 Foundations for the abutments and piers.
River training works, like revetment for
slopes at abutment, aprons at bed level, etc.
 Approaches to the bridge to connect the
bridge proper to the roads on either side;
 Handrails, guard stones, etc…
Importance of bridge
To reduce the travel time.
To minimize the congestion on roads.
To reduce the accidents arising day by day.
When the widening of road cannot be done a 3rd
dimension is to be used by constructing a flyover.
How are Bridges Used?
 Walkways
 Highways/Roads
 Railways
 Pipelines
 Connecting Lands
 Crossing Rivers
 Stadiums
 Roofs
 Arch
 Truss
 Cantilever
 Cable Stayed
 Suspension
 Flyover
Reason behind going for a
flyover
As the traffic on the road goes on
increasing and we don’t have any space
left in both the dimensions, then the only
option left will be to go to the third
dimension and that is done through
flyover construction.
Flyover
It is a bridge that carries one road or
railway line above another either
with or without subsidiary roads, for
communication between the two.
TYPE OF FLYOVER
BRIDGE
Road Crossing
Simple Flyover Cloverleaf Junction
Railway
Crossing
 At railway crossing where there is high traffic
congestion in terms of the frequency of trains
passing by or the traffic on the road, in both the
cases the flyover should be provided along the
road. Here the flyover becomes indispensable.
Railway Crossing
Simple Flyovers
In this case, the main road is used for fast traffic,
which is made to pass at a high level by a bridge,
providing ramps on both the approaches; and the
slow traffic is made to pass underneath. Thus the
traffics pass at two different levels, and leave no
chance for an accident.

Road Crossing
 It requires a very large area of land. All
conflicting streams of traffic are avoided, and
so traffic can move at its own speed. This is
more advantageous than a roundabout, as there
is no necessity for weaving and slowing down
of traffic.
Cloverleaf Junction
Methodology Of Flyover
Problems Arise In Different
Aspect Of Flyover
Earth work
 Surplus excavated earth not leveled and neatly
dressed at the disposal place.
 Less sand filling done under floors.
 Proper compaction of earth under floors not done.
 Compaction of earth work in filling not done as
stipulated in the contract.
 Lead chart for disposal of surplus earth not
maintained.
 Excavation of foundation less than specified in
drawing.
Concrete work.
i) Oversize/ disintegrated/soft aggregate used.
ii) Sand with more silt content used.
iii) Honey combed concrete.
iv) Concrete found bulged and not in plumb.
v) Less thickness of PCC.
vi) Proper overlaps in reinforcement not provided.
vii) Reinforcement found exposed.
viii) Lesser diameter binding wire used.
ix) Expansion joint not properly located/ provided.
x) Improper curing and compaction
xi) Timber form work used through contract provides for
steel form work.
xii) Clear cover to reinforcement not as per drawing.
Steel Work
i) Non-standard steel sections used
ii) Priming coat either not done or poor quality
priming coat done on steel works
iii) Tack welding done instead of continuous welding
iv) Extra slag of welding not removed
v) Thickness of sheets in rolling shutter found less
vi) Inferior quality hinges and fittings provided
vii) Steel hinges in M.S. frames not fixed by cutting
slots.
viii) Flash butt welding not done in steel windows
Major Problems With Bearing
Failure
Excessive Loads
Overheating
Normal Fatigue Failure
Reversal Load
Contamination
Lubricant Failure
Misalignment
Corrosion
Loose Fit
Tight Fits
General Problems
With Solutions
Solutions
Excessive Loads
The solution is to reduce the load or redesign using a
bearing with greater capacity.
Normal Fatigue Failure
The remedy is to replace the bearing or consider
redesigning to use a bearing having a greater
calculated fatigue life.
Contamination
Clean work areas, tools, fixtures, and hands help
reduce contamination failures. Keep grinding
operations away from bearing assembly areas and
keep bearings in their original packaging until you are
ready to install them
Corrosion
Correct by diverting corrosive fluids away from
bearing areas and use integrally sealed bearings
whenever possible.
Misalignment
Inspecting shafts and housings for run out of
shoulders and bearing seats; use of single point-turned
or ground threads on non hardened shafts and ground
threads only on hardened shafts; and using precision
grade locknuts.
Tight Fits
Corrective action includes a decrease in total
interference.
Corrosion
Causes Of Corrosion
 Water Permeability
 Oxygen Permeability
 Carbonation
 Chloride Ingress
Prevention Methods
1) Keep concrete always dry, so that there is no H2O
to form rust. Also aggressive agents cannot easily
diffuse into dry concrete. If concrete is always
wet, then there is no oxygen to form rust.
2) Stainless steel or cladded stainless steel is used in
lieu of conventional black bars.
3) A portion of the chloride ions diffusing through
the concrete can be sequestered in the concrete by
combining them with the tricalcium aluminate to
form a calcium chloro-aluminate (Friedel’s salt).
It can have a significant effect in reducing the
amount of available chlorides thereby reducing
corrosion.
4) Electrochemical injection of the organic base
corrosion inhibitors, ethanolamine and guanidine, into
carbonated concrete.
5) The rougher the steel surface, the better it adheres
to concrete. oxidation treatment (by water immersion
and ozone exposure) of rebar increases the bond
strength between steel and cement paste to a value
higher than that attained by clean rebars. In addition,
surface deformations on the rebar (such as ribs)
enhance the bond due to mechanical interlocking
between rebar and concrete.
Literature Review
1. Jinghui Wang (et.al.2011) Presented Problems and
solutions in the protection of historical urban areas
2. S.K. Mahajan (et.al.2013) Presented New Concept of
Traffic Rotary Design at Road Intersections
3. D.M. Siringoringo (et.al.2011) Presented Vibration
Characteristics of an Overpass Bridge During Full-
Scale Destructive Testing
4. R. K. Gupta (et.al.2013) Presented Closed Form
Solution for Deflection of Flexible Composite Bridges
5. Sarfaraz Hashemkhani Zolfani (et.al.2013) Presented
Selecting the Best Design Scenario of the Smart
Structure of Bridges for Probably Future Earthquakes
6. Tehmina Ayub (et.al.2014) Presented Effect of
overloaded vehicles on the performance of highway
bridge girder: A case study
Thank You

Contenu connexe

Tendances

Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
Abhishek Gupta
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
Halcrow
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
Ankit Singh
 
Civil Engineering Project Presentation
Civil Engineering Project PresentationCivil Engineering Project Presentation
Civil Engineering Project Presentation
Ibrahim Ali
 
Structural Steel and Timber Design EV306 Project Report
Structural Steel and Timber Design EV306 Project ReportStructural Steel and Timber Design EV306 Project Report
Structural Steel and Timber Design EV306 Project Report
herry924
 

Tendances (20)

PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
types of bridges
types of bridgestypes of bridges
types of bridges
 
Inspection and maintenance of bridge
Inspection and maintenance of bridgeInspection and maintenance of bridge
Inspection and maintenance of bridge
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Bridges
BridgesBridges
Bridges
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
Classification of bridges
Classification of bridgesClassification of bridges
Classification of bridges
 
project final year civil
project final year civilproject final year civil
project final year civil
 
7 losses in prestress
7 losses in prestress7 losses in prestress
7 losses in prestress
 
Civil engineering
Civil engineeringCivil engineering
Civil engineering
 
Bridge report
Bridge reportBridge report
Bridge report
 
Civil Engineering Project Presentation
Civil Engineering Project PresentationCivil Engineering Project Presentation
Civil Engineering Project Presentation
 
Structural Steel and Timber Design EV306 Project Report
Structural Steel and Timber Design EV306 Project ReportStructural Steel and Timber Design EV306 Project Report
Structural Steel and Timber Design EV306 Project Report
 
Bridges in hilly areas
Bridges in hilly areasBridges in hilly areas
Bridges in hilly areas
 
Types of Bridges
Types of Bridges Types of Bridges
Types of Bridges
 

En vedette

Spaces below flyovers
Spaces below flyoversSpaces below flyovers
Spaces below flyovers
Ashok Datar
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVER
Syed Rizvi
 
Bridge
Bridge Bridge
Bridge
illpa
 

En vedette (20)

Flyover bridge
Flyover bridgeFlyover bridge
Flyover bridge
 
Spaces below flyovers
Spaces below flyoversSpaces below flyovers
Spaces below flyovers
 
Aiims flyover presentation
Aiims flyover presentationAiims flyover presentation
Aiims flyover presentation
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Bridge
BridgeBridge
Bridge
 
Composite deck bridge systems
Composite deck bridge systemsComposite deck bridge systems
Composite deck bridge systems
 
Road and flyover planning v2.0
Road and flyover planning v2.0Road and flyover planning v2.0
Road and flyover planning v2.0
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges
 
Types of bridge(theory.explanation)
Types of bridge(theory.explanation)Types of bridge(theory.explanation)
Types of bridge(theory.explanation)
 
Bridges, Collection by Dr. Aziz I. Abdulla
Bridges, Collection by Dr. Aziz I. AbdullaBridges, Collection by Dr. Aziz I. Abdulla
Bridges, Collection by Dr. Aziz I. Abdulla
 
Bridge Lecture Slide by Micotol
Bridge Lecture Slide by MicotolBridge Lecture Slide by Micotol
Bridge Lecture Slide by Micotol
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVER
 
Composite structures of steel and concrete
Composite structures of steel and concreteComposite structures of steel and concrete
Composite structures of steel and concrete
 
Bridge
Bridge Bridge
Bridge
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
 
Under water concreting
Under water concretingUnder water concreting
Under water concreting
 
LIFT IRRIGATION SYSTEM
LIFT IRRIGATION SYSTEMLIFT IRRIGATION SYSTEM
LIFT IRRIGATION SYSTEM
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elements
 
PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
 

Similaire à flyover and bridge problems and its solutions

introductiontobridges07-08-090507223401-phpapp02.pdf
introductiontobridges07-08-090507223401-phpapp02.pdfintroductiontobridges07-08-090507223401-phpapp02.pdf
introductiontobridges07-08-090507223401-phpapp02.pdf
abhinavbharat9
 
introductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.pptintroductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.ppt
JoeBankerS1
 
introductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.pptintroductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.ppt
JoeBankerS1
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
rajdutt1111
 
Introductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-convertedIntroductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-converted
naveen kumar
 

Similaire à flyover and bridge problems and its solutions (20)

Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In India
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Transport enggineering
Transport enggineeringTransport enggineering
Transport enggineering
 
L4- TYPES OF SEWERS.pptx
L4-  TYPES OF SEWERS.pptxL4-  TYPES OF SEWERS.pptx
L4- TYPES OF SEWERS.pptx
 
Essay On Bridges
Essay On BridgesEssay On Bridges
Essay On Bridges
 
introductiontobridges07-08-090507223401-phpapp02.pdf
introductiontobridges07-08-090507223401-phpapp02.pdfintroductiontobridges07-08-090507223401-phpapp02.pdf
introductiontobridges07-08-090507223401-phpapp02.pdf
 
introductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.pptintroductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.ppt
 
introductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.pptintroductiontobridges07-08-090507223401-phpapp02.ppt
introductiontobridges07-08-090507223401-phpapp02.ppt
 
Bridges Functionality and Aesthetics
Bridges Functionality and AestheticsBridges Functionality and Aesthetics
Bridges Functionality and Aesthetics
 
Lane ave bridge report
Lane ave bridge reportLane ave bridge report
Lane ave bridge report
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
Suspension bridge
Suspension bridge Suspension bridge
Suspension bridge
 
Introductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-convertedIntroductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-converted
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
CULVERTS.pdf
CULVERTS.pdfCULVERTS.pdf
CULVERTS.pdf
 
Bridge
Bridge Bridge
Bridge
 
Introduction to Bridges.pdf
Introduction to Bridges.pdfIntroduction to Bridges.pdf
Introduction to Bridges.pdf
 
Application of plate girders in steel construction
Application of plate girders in steel constructionApplication of plate girders in steel construction
Application of plate girders in steel construction
 

Plus de Practicing In Some Infra Company

Plus de Practicing In Some Infra Company (11)

Thermal Insulation Understanding and Techniques
Thermal Insulation Understanding and TechniquesThermal Insulation Understanding and Techniques
Thermal Insulation Understanding and Techniques
 
Slums
SlumsSlums
Slums
 
Remote sensing
Remote sensingRemote sensing
Remote sensing
 
Types of wires and cables
Types of wires and cablesTypes of wires and cables
Types of wires and cables
 
Types of excavating tools and machine
Types of excavating tools and machineTypes of excavating tools and machine
Types of excavating tools and machine
 
Electrical wiring
Electrical wiringElectrical wiring
Electrical wiring
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 
Flood
FloodFlood
Flood
 
Water softing by reverse osmosis method
Water softing by reverse osmosis methodWater softing by reverse osmosis method
Water softing by reverse osmosis method
 
Engineering graphics
Engineering graphicsEngineering graphics
Engineering graphics
 
Contributor personality development
Contributor personality developmentContributor personality development
Contributor personality development
 

Dernier

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Dernier (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

flyover and bridge problems and its solutions

  • 1. Case Study of Flyover /Bridge And Various problems and it’s solution
  • 2. The objective of this study is to find out the different problems arising while and after construction. Moreover, We have also found remedial solutions to it. Our objective is to give fundamental knowledge regarding construction and maintenance of Flyover Bridge and how to minimize the problems related with all the functions of Flyover Bridge.. To make the roads easily accessible for day to day traffic. OBJECTIVE
  • 3. Definition  A bridge is a structure providing passage over an obstacle without closing the way beneath. The required passage may be for a road, a railway, pedestrians, a canal or a pipeline. The obstacle to be crossed may by a river, a road, railway or a valley.
  • 4. Components of a Bridge The main parts of a bridge structure are as below:  Decking, consisting of slab, girders, trusses, etc…  Bearings for the decking. Abutments and piers.  Foundations for the abutments and piers.
  • 5. River training works, like revetment for slopes at abutment, aprons at bed level, etc.  Approaches to the bridge to connect the bridge proper to the roads on either side;  Handrails, guard stones, etc…
  • 6. Importance of bridge To reduce the travel time. To minimize the congestion on roads. To reduce the accidents arising day by day. When the widening of road cannot be done a 3rd dimension is to be used by constructing a flyover.
  • 7. How are Bridges Used?  Walkways  Highways/Roads  Railways  Pipelines  Connecting Lands  Crossing Rivers  Stadiums  Roofs  Arch  Truss  Cantilever  Cable Stayed  Suspension  Flyover
  • 8. Reason behind going for a flyover As the traffic on the road goes on increasing and we don’t have any space left in both the dimensions, then the only option left will be to go to the third dimension and that is done through flyover construction.
  • 9. Flyover It is a bridge that carries one road or railway line above another either with or without subsidiary roads, for communication between the two.
  • 10. TYPE OF FLYOVER BRIDGE Road Crossing Simple Flyover Cloverleaf Junction Railway Crossing
  • 11.  At railway crossing where there is high traffic congestion in terms of the frequency of trains passing by or the traffic on the road, in both the cases the flyover should be provided along the road. Here the flyover becomes indispensable. Railway Crossing
  • 12. Simple Flyovers In this case, the main road is used for fast traffic, which is made to pass at a high level by a bridge, providing ramps on both the approaches; and the slow traffic is made to pass underneath. Thus the traffics pass at two different levels, and leave no chance for an accident.  Road Crossing
  • 13.  It requires a very large area of land. All conflicting streams of traffic are avoided, and so traffic can move at its own speed. This is more advantageous than a roundabout, as there is no necessity for weaving and slowing down of traffic. Cloverleaf Junction
  • 15. Problems Arise In Different Aspect Of Flyover Earth work  Surplus excavated earth not leveled and neatly dressed at the disposal place.  Less sand filling done under floors.  Proper compaction of earth under floors not done.  Compaction of earth work in filling not done as stipulated in the contract.  Lead chart for disposal of surplus earth not maintained.  Excavation of foundation less than specified in drawing.
  • 16. Concrete work. i) Oversize/ disintegrated/soft aggregate used. ii) Sand with more silt content used. iii) Honey combed concrete. iv) Concrete found bulged and not in plumb. v) Less thickness of PCC. vi) Proper overlaps in reinforcement not provided. vii) Reinforcement found exposed. viii) Lesser diameter binding wire used. ix) Expansion joint not properly located/ provided. x) Improper curing and compaction xi) Timber form work used through contract provides for steel form work. xii) Clear cover to reinforcement not as per drawing.
  • 17. Steel Work i) Non-standard steel sections used ii) Priming coat either not done or poor quality priming coat done on steel works iii) Tack welding done instead of continuous welding iv) Extra slag of welding not removed v) Thickness of sheets in rolling shutter found less vi) Inferior quality hinges and fittings provided vii) Steel hinges in M.S. frames not fixed by cutting slots. viii) Flash butt welding not done in steel windows
  • 18. Major Problems With Bearing Failure Excessive Loads Overheating Normal Fatigue Failure Reversal Load Contamination Lubricant Failure Misalignment Corrosion Loose Fit Tight Fits
  • 20. Solutions Excessive Loads The solution is to reduce the load or redesign using a bearing with greater capacity. Normal Fatigue Failure The remedy is to replace the bearing or consider redesigning to use a bearing having a greater calculated fatigue life. Contamination Clean work areas, tools, fixtures, and hands help reduce contamination failures. Keep grinding operations away from bearing assembly areas and keep bearings in their original packaging until you are ready to install them
  • 21. Corrosion Correct by diverting corrosive fluids away from bearing areas and use integrally sealed bearings whenever possible. Misalignment Inspecting shafts and housings for run out of shoulders and bearing seats; use of single point-turned or ground threads on non hardened shafts and ground threads only on hardened shafts; and using precision grade locknuts. Tight Fits Corrective action includes a decrease in total interference.
  • 22. Corrosion Causes Of Corrosion  Water Permeability  Oxygen Permeability  Carbonation  Chloride Ingress
  • 23. Prevention Methods 1) Keep concrete always dry, so that there is no H2O to form rust. Also aggressive agents cannot easily diffuse into dry concrete. If concrete is always wet, then there is no oxygen to form rust. 2) Stainless steel or cladded stainless steel is used in lieu of conventional black bars. 3) A portion of the chloride ions diffusing through the concrete can be sequestered in the concrete by combining them with the tricalcium aluminate to form a calcium chloro-aluminate (Friedel’s salt). It can have a significant effect in reducing the amount of available chlorides thereby reducing corrosion.
  • 24. 4) Electrochemical injection of the organic base corrosion inhibitors, ethanolamine and guanidine, into carbonated concrete. 5) The rougher the steel surface, the better it adheres to concrete. oxidation treatment (by water immersion and ozone exposure) of rebar increases the bond strength between steel and cement paste to a value higher than that attained by clean rebars. In addition, surface deformations on the rebar (such as ribs) enhance the bond due to mechanical interlocking between rebar and concrete.
  • 25. Literature Review 1. Jinghui Wang (et.al.2011) Presented Problems and solutions in the protection of historical urban areas 2. S.K. Mahajan (et.al.2013) Presented New Concept of Traffic Rotary Design at Road Intersections 3. D.M. Siringoringo (et.al.2011) Presented Vibration Characteristics of an Overpass Bridge During Full- Scale Destructive Testing 4. R. K. Gupta (et.al.2013) Presented Closed Form Solution for Deflection of Flexible Composite Bridges 5. Sarfaraz Hashemkhani Zolfani (et.al.2013) Presented Selecting the Best Design Scenario of the Smart Structure of Bridges for Probably Future Earthquakes 6. Tehmina Ayub (et.al.2014) Presented Effect of overloaded vehicles on the performance of highway bridge girder: A case study