Who am I, and how would I know the answer to this
question?
 Today, 37 years out of Iowa State in 1980 with a BSCE
 Registered PE in CO, and Iowa (PLS too), Previously in OK,
though about it in several other states, but not really
wanting to collect registrations … , but ….
 17 years in Consulting (Land Development, City and IDOT
type projects)
 20th year in County Engineering.
That said, …
Specific PCC Overlay Experience?
 Hired as Dallas County Engineer in 1989, after less than two years in
Montgomery County
 Within a month of arrival, before I turned 30, Contractors started on 18 miles
of PCC Overlays that had been let before my arrival. All over old HMA.
 It was kind of a “throw the baby in the pool and see if it swims” approach, but
the contracts were in place and the paving plant was being moved in.
 I didn’t make the call, but I learned why it was decided and lived with it ever
since.
 Since then, I have managed another ten miles or so of PCC Overlays, 16 lane-
miles of widening, plenty of full depth highways and City streets - overall
more than sixty miles of PCC Pavements
 I’ve also done about thirty miles of HMA Overlays over HMA or Seal Coat –
because it was the right thing to do for the situation at hand
So first, decide if an overlay is appropriate, then we will get to what type.
 Existing pavement (PCC or HMA) not too bad, but not enough.
 Can the existing hold up during hauling of the mix?
 Good enough structure present that you don’t need to start from
scratch?
 Future traffic can be accurately estimated.
 Adjacent access and road-top width can accommodate the additional
thickness?
 Funding is available to do something more than routine surface
maintenance.
 Is a recycled in place pavement covered with a new slab really “just
another type of overlay”?
Also, need to know what you want out of an overlay, if a reasonable choice.
 Add structure?
 Correct grades? If so, isolated or wide spread?
 Generate smoothness?
 Good enough condition for an HMA Overlay? PCC Overlay can
accommodate more underlying problems – long term. Less need for prep
patching with PCC onto HMA
 Minor wheel tracks? Problem to be addressed for HMA, beneficial for
PCC.
 You can use a little black stuff to buy time.
 Or, go for an enduring pavement with a true addition of structure
 HOW MUCH FUNDING IS AVAILABLE WHEN THE WORK IS NEEDED
$$$$$$$$$$$$$$$$
?
Bottom line is Overlays are not the cookbook solution we tend to
get into with standard pavement replacement or new
development.
 Nice to use some engineering judgement once in a while, with
or without punching a bunch of numbers.
 Seldom a toss-up based upon pavement condition, but PCC
and HMA industry, as well as ASHTTO and others have
structural number calcs that you can use to compare
outcomes. Please be aware each formula tends to favor their
sponsor!***
HMA Pluses:
1. Shallow “T” potential because strength isn’t an issue
a. Maybe in a residential subdivision
b. Facelift on an already substantial section
2. A Band-aid will do … for now. . Ease of maintenance in ensuing years (but
always doing maintenance?)
3. Maybe save $ short term with a thin overlay – budget pinch with a pending
disaster (avoid “losing a pavement”), but you’ll be back again sooner than
you want.
4. Fewer adjacent grade adjustments, if a couple inches matters?
5. If over a Seal Coat, creates an actual maintainable pavement, as a product
of several Overlays
PCC Pluses:
1. Minimal thickness (<4”) might work in those residential subdivisions or
in a “bonded” situation
2. Longer life cycle which normally means better life cycle costs (totally
market dependent)
3. Less maintenance over the life of slab
4. Annualized cost is almost always less if using honest future maintenance
projections
5. Project access usually much better than on a fresh grade
6. An extra inch will buy years more performance – geometric
improvement on performance
7. Doubtful you need to go back during your career to repave – not so
much with HMA
Ultimately, HMA is a placeholder, short term, or Band-aid – sorry to my friends
that sell the black stuff. Or it can be a way of life, a default process, seldom the
engineered solution. PCC, on the other hand, can only perform well if it has a
proper foundation.
Another point, HMA makes a great base to place PCC on!
If you can afford it, and it fits geometrically, PCC overlays have been a good life-
cycle cost choice (where an improvement is needed) throughout my thirty some
year career, and I don’t see that changing.
$
$
STRUCTURE
$
STRUCTURE
(Fit the)
SITUATION?

Contenu connexe

Plus de Jill Reeves

Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
Jill Reeves
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
Jill Reeves
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Jill Reeves
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
Jill Reeves
 

Plus de Jill Reeves (20)

PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA Workshop
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform Better
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly Ash
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and Regulations
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation Equipment
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel Bridge
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport Projects
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset Management
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City Agreements
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended Cements
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement Company
 
Smart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsSmart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of Roads
 
Repair Options for Concrete Roadways
Repair Options for Concrete RoadwaysRepair Options for Concrete Roadways
Repair Options for Concrete Roadways
 

Dernier

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

How Local Agencies Decide to Use PCC Overlays

  • 1. HOW LOCAL AGENCIES DECIDE TO USE PCC OVERLAYS NCPA Concrete Paving Conference January 16, 2018
  • 2. Who am I, and how would I know the answer to this question?  Today, 37 years out of Iowa State in 1980 with a BSCE  Registered PE in CO, and Iowa (PLS too), Previously in OK, though about it in several other states, but not really wanting to collect registrations … , but ….  17 years in Consulting (Land Development, City and IDOT type projects)  20th year in County Engineering. That said, …
  • 3. Specific PCC Overlay Experience?  Hired as Dallas County Engineer in 1989, after less than two years in Montgomery County  Within a month of arrival, before I turned 30, Contractors started on 18 miles of PCC Overlays that had been let before my arrival. All over old HMA.  It was kind of a “throw the baby in the pool and see if it swims” approach, but the contracts were in place and the paving plant was being moved in.  I didn’t make the call, but I learned why it was decided and lived with it ever since.  Since then, I have managed another ten miles or so of PCC Overlays, 16 lane- miles of widening, plenty of full depth highways and City streets - overall more than sixty miles of PCC Pavements  I’ve also done about thirty miles of HMA Overlays over HMA or Seal Coat – because it was the right thing to do for the situation at hand
  • 4. So first, decide if an overlay is appropriate, then we will get to what type.  Existing pavement (PCC or HMA) not too bad, but not enough.  Can the existing hold up during hauling of the mix?  Good enough structure present that you don’t need to start from scratch?  Future traffic can be accurately estimated.  Adjacent access and road-top width can accommodate the additional thickness?  Funding is available to do something more than routine surface maintenance.  Is a recycled in place pavement covered with a new slab really “just another type of overlay”?
  • 5. Also, need to know what you want out of an overlay, if a reasonable choice.  Add structure?  Correct grades? If so, isolated or wide spread?  Generate smoothness?  Good enough condition for an HMA Overlay? PCC Overlay can accommodate more underlying problems – long term. Less need for prep patching with PCC onto HMA  Minor wheel tracks? Problem to be addressed for HMA, beneficial for PCC.  You can use a little black stuff to buy time.  Or, go for an enduring pavement with a true addition of structure
  • 6.  HOW MUCH FUNDING IS AVAILABLE WHEN THE WORK IS NEEDED $$$$$$$$$$$$$$$$ ?
  • 7. Bottom line is Overlays are not the cookbook solution we tend to get into with standard pavement replacement or new development.  Nice to use some engineering judgement once in a while, with or without punching a bunch of numbers.  Seldom a toss-up based upon pavement condition, but PCC and HMA industry, as well as ASHTTO and others have structural number calcs that you can use to compare outcomes. Please be aware each formula tends to favor their sponsor!***
  • 8. HMA Pluses: 1. Shallow “T” potential because strength isn’t an issue a. Maybe in a residential subdivision b. Facelift on an already substantial section 2. A Band-aid will do … for now. . Ease of maintenance in ensuing years (but always doing maintenance?) 3. Maybe save $ short term with a thin overlay – budget pinch with a pending disaster (avoid “losing a pavement”), but you’ll be back again sooner than you want. 4. Fewer adjacent grade adjustments, if a couple inches matters? 5. If over a Seal Coat, creates an actual maintainable pavement, as a product of several Overlays
  • 9. PCC Pluses: 1. Minimal thickness (<4”) might work in those residential subdivisions or in a “bonded” situation 2. Longer life cycle which normally means better life cycle costs (totally market dependent) 3. Less maintenance over the life of slab 4. Annualized cost is almost always less if using honest future maintenance projections 5. Project access usually much better than on a fresh grade 6. An extra inch will buy years more performance – geometric improvement on performance 7. Doubtful you need to go back during your career to repave – not so much with HMA
  • 10. Ultimately, HMA is a placeholder, short term, or Band-aid – sorry to my friends that sell the black stuff. Or it can be a way of life, a default process, seldom the engineered solution. PCC, on the other hand, can only perform well if it has a proper foundation. Another point, HMA makes a great base to place PCC on! If you can afford it, and it fits geometrically, PCC overlays have been a good life- cycle cost choice (where an improvement is needed) throughout my thirty some year career, and I don’t see that changing.
  • 11. $