Broken Bow Municipal AirportBroken Bow Municipal Airport
Airport Improvement ProgramAirport Improvement Program
• The federal AIP grants reimburse most airport sponsorsThe federal AIP grants reimburse most airport sponsors
for up to 90% of eligible costs.for up to 90% of eligible costs.
• AuthorizationAuthorization
– The FAA Modernization and Reform Act of 2012 wasThe FAA Modernization and Reform Act of 2012 was
signed February 14, 2012 and expired September 30,signed February 14, 2012 and expired September 30,
2015.2015.
– The program is operating under a short termThe program is operating under a short term
extension until March 31, 2018.extension until March 31, 2018.
• AppropriationAppropriation
– FY2017 funding is planned at the same level as lastFY2017 funding is planned at the same level as last
year. The program is funded through January 19,year. The program is funded through January 19,
2018.2018.
AIP EligibilityAIP Eligibility
• Airport must be open to the public.Airport must be open to the public.
• Airport must be included in the NPIASAirport must be included in the NPIAS
(National Plan of Integrated Airport(National Plan of Integrated Airport
Systems).Systems).
• General aviation airports must beGeneral aviation airports must be
classified.classified.
• Airport sponsor must agree to FAAAirport sponsor must agree to FAA
Federal Grant Assurances.Federal Grant Assurances.
• Project requested must be eligible andProject requested must be eligible and
justified as determined by the FAA.justified as determined by the FAA.
2017 Federal Grants2017 Federal Grants
Nebraska airports received 29 grantsNebraska airports received 29 grants
– Grant funds of just over $33MGrant funds of just over $33M
– Construction projects include:Construction projects include:
• Crete, Fairbury, Hartington, Holdrege: hangarsCrete, Fairbury, Hartington, Holdrege: hangars
• Grand Island: crack & joint sealGrand Island: crack & joint seal
• Hebron: rehab taxilaneHebron: rehab taxilane
• Kearney: runway rehabKearney: runway rehab
• Norfolk: storm sewer rehabNorfolk: storm sewer rehab
• North Platte: wildlife fenceNorth Platte: wildlife fence
• Omaha: reconstruct cargo apronOmaha: reconstruct cargo apron
• Plattsmouth: hangar and taxiway relocationPlattsmouth: hangar and taxiway relocation
• Wayne: partial parallel taxiwayWayne: partial parallel taxiway
Federal Funding BreakdownFederal Funding Breakdown
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
$80,000,000
Stimulus Discretionary Primary & Cargo
NonPrimary State Apportionment
AIP Grants Issued for GAAIP Grants Issued for GA
AirportsAirports
0
5
10
15
20
25
30
35
40
45
50
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
State Grant ProgramState Grant Program
• The program includes state grants andThe program includes state grants and
matching grants for federal projects.matching grants for federal projects.
• All licensed public-use airports are eligibleAll licensed public-use airports are eligible
to receive state grants.to receive state grants.
– 80 eligible airports,80 eligible airports,
– 8 of the public-use airports are not eligible for8 of the public-use airports are not eligible for
federal funds and have used this program tofederal funds and have used this program to
construct and maintain their pavement.construct and maintain their pavement.
• Funded from aviation fuel taxes.Funded from aviation fuel taxes.
State Grant ProgramState Grant Program
• 2016 State Grant Allocated on Oct. 132016 State Grant Allocated on Oct. 13
– State GrantsState Grants
• Blair – taxilane to a new hangarBlair – taxilane to a new hangar
• Burwell, Hebron, Loup City – tree removalBurwell, Hebron, Loup City – tree removal
– State Matching Grants to a Federal GrantState Matching Grants to a Federal Grant
• Alliance, Aurora, Beatrice, and OshkoshAlliance, Aurora, Beatrice, and Oshkosh
• All runway rehabilitation projectsAll runway rehabilitation projects
• $304,430 in allocations$304,430 in allocations
Non-NPIAS airport pavementNon-NPIAS airport pavement
State Grant ProgramState Grant Program
• Funds Allocated to the State Grant ProgramFunds Allocated to the State Grant Program
Current Unfunded NeedsCurrent Unfunded Needs• Ainsworth: parallel taxiway to runway 13/31Ainsworth: parallel taxiway to runway 13/31
• Ainsworth: replace VASI with PAPIAinsworth: replace VASI with PAPI
• Alliance: parallel taxiway to runway 12/30Alliance: parallel taxiway to runway 12/30
• Alliance: access road and parking improvementsAlliance: access road and parking improvements
• Alliance: terminal enhancements (as gateway to community)Alliance: terminal enhancements (as gateway to community)
• Alma: parallel taxiway (pave: $915,000; light: $128,000)Alma: parallel taxiway (pave: $915,000; light: $128,000)
• Alma: T-hangarAlma: T-hangar
• Alma: construct spray apronAlma: construct spray apron
• Arapahoe: runway rehabilitation (reconstruction: $1,091,100)Arapahoe: runway rehabilitation (reconstruction: $1,091,100)
• Arapahoe: install runway lights, beacon ($113,460)Arapahoe: install runway lights, beacon ($113,460)
• Arapahoe: runway extension to meet FAA minimum length standardsArapahoe: runway extension to meet FAA minimum length standards
• Auburn: taxilanes ($280,000)Auburn: taxilanes ($280,000)
• Auburn: hangar rehabilitation, replace doorsAuburn: hangar rehabilitation, replace doors
• Auburn: snow removal equipmentAuburn: snow removal equipment
• Aurora: Taxiway & apron reconstruction ($00,000 – may not have localAurora: Taxiway & apron reconstruction ($00,000 – may not have local
match)match)
• Beatrice: rehabilitate taxilanes to hangars A, B, C ($407,500)Beatrice: rehabilitate taxilanes to hangars A, B, C ($407,500)
• Beatrice: PAPI runway 18, NSPBeatrice: PAPI runway 18, NSP
• Blair: taxilanes, apron expansion ($200,000)Blair: taxilanes, apron expansion ($200,000)
• Blair: extend runway and taxiway to 5,500’ ($2,640,000)Blair: extend runway and taxiway to 5,500’ ($2,640,000)
• Blair: T-hangar additionBlair: T-hangar addition
• Blair: Executive hangarBlair: Executive hangar
• Bloomfield: runway rehabilitation (reconstruction: $981,990; overlay: $672,300)Bloomfield: runway rehabilitation (reconstruction: $981,990; overlay: $672,300)
• Bloomfield: install runway lights, beacon ($102,120)Bloomfield: install runway lights, beacon ($102,120)
• Bloomfield: taxiway and taxilane reconstructionBloomfield: taxiway and taxilane reconstruction
• Bloomfield: T-hangar rehabilitation/replacementBloomfield: T-hangar rehabilitation/replacement
• Broken Bow: apron expansion ($284,250)Broken Bow: apron expansion ($284,250)
• Cambridge: hangar rehabilitationCambridge: hangar rehabilitation
• Central City: hangar rehabilitationCentral City: hangar rehabilitation
• Central City: pave access road and parking lotCentral City: pave access road and parking lot
• Chadron: parallel taxiway to runway 02/20, NSP ($1,210,000; project could beChadron: parallel taxiway to runway 02/20, NSP ($1,210,000; project could be
broken into phases)broken into phases)
• Chadron: apron expansionChadron: apron expansion
• Chadron: terminal building renovations/updateChadron: terminal building renovations/update
• Chadron: extend runway 11/29 700’, NSPChadron: extend runway 11/29 700’, NSP
• Chappell: runway rehabilitation (reconstruction: $1,600,000)Chappell: runway rehabilitation (reconstruction: $1,600,000)
• Chappell: apron expansion ($125,000)Chappell: apron expansion ($125,000)
• Columbus: terminal buildingColumbus: terminal building
• Columbus: taxilanes and apron for hangar developmentColumbus: taxilanes and apron for hangar development
• Columbus: pave crosswind runway, NSPColumbus: pave crosswind runway, NSP
• Cozad: Taxilane reconstruction & apron expansion ($160,000)Cozad: Taxilane reconstruction & apron expansion ($160,000)
• Crete: Hangar taxilanes replacement and drainage improvements ($1,100,000)Crete: Hangar taxilanes replacement and drainage improvements ($1,100,000)
• Crete: Parking lot and road rehabilitation ($385,000)Crete: Parking lot and road rehabilitation ($385,000)
• Grand Island: utility upgrades (sewer)($1,500,000)Grand Island: utility upgrades (sewer)($1,500,000)
• Grant: AWOS III P/TGrant: AWOS III P/T
• Grant: parallel taxiwayGrant: parallel taxiway
• Hartington: light parallel taxiway ($275,000)Hartington: light parallel taxiway ($275,000)
• Harvard: taxiway rehabilitation (reconstruct: $502,000; overlay: $343,620)Harvard: taxiway rehabilitation (reconstruct: $502,000; overlay: $343,620)
• Hastings: relocate ASOSHastings: relocate ASOS
• Hastings: install MALSR, NSP (not AIP eligible)Hastings: install MALSR, NSP (not AIP eligible)
• Holdrege: install water mainHoldrege: install water main
• Hyannis: pavement rehabilitation (reconstruction: $1,445,700)Hyannis: pavement rehabilitation (reconstruction: $1,445,700)
• Imperial: site developmentImperial: site development
• Kearney: extend runway 13/31 200’, NSPKearney: extend runway 13/31 200’, NSP
• Lexington: parallel taxiwayLexington: parallel taxiway
• Lexington: rehab road and parking lot ($366,000)Lexington: rehab road and parking lot ($366,000)
• McCook: SRE and SRE buildingMcCook: SRE and SRE building
• McCook: hangar and/or hangar rehabilitationMcCook: hangar and/or hangar rehabilitation
• McCook: extend runway 4/22, NSPMcCook: extend runway 4/22, NSP
• Nebraska City: parallel taxiway to runway 33 ($1,268,955; includes federal ineligibleNebraska City: parallel taxiway to runway 33 ($1,268,955; includes federal ineligible
section)section)
• Nebraska Department of Aeronautics: PCI software update to include PCN valuesNebraska Department of Aeronautics: PCI software update to include PCN values
($80,000)($80,000)
• Nebraska Department of Aeronautics: Economic Impact StudyNebraska Department of Aeronautics: Economic Impact Study
• Neligh: AWOS III P/TNeligh: AWOS III P/T
• North Platte: relocate utilities ($1,000,000)North Platte: relocate utilities ($1,000,000)
• North Omaha: correct licensing violationsNorth Omaha: correct licensing violations
• North Omaha: pavement rehabilitationNorth Omaha: pavement rehabilitation
• O’Neill: runway 4/22 lights ($290,000)O’Neill: runway 4/22 lights ($290,000)
• O’Neill: pave access road and parking ($600,000)O’Neill: pave access road and parking ($600,000)
• O’Neill: complete parallel taxiway to runway 13O’Neill: complete parallel taxiway to runway 13
• Ogallala: parallel taxiway ($1,720,000; project could be broken into phases)Ogallala: parallel taxiway ($1,720,000; project could be broken into phases)
• Ord: complete parallel taxiway to runway 13Ord: complete parallel taxiway to runway 13
• Oshkosh: terminal building to meet ADA requirementsOshkosh: terminal building to meet ADA requirements
• Plattsmouth: construct crosswind runway, NSPPlattsmouth: construct crosswind runway, NSP
• Plattsmouth: install MALSR, NSPPlattsmouth: install MALSR, NSP
• Red Cloud: AWOS III P/TRed Cloud: AWOS III P/T
• Sargent: 200’ runway extension and survey for approach eligibility (pavement: $87,000Sargent: 200’ runway extension and survey for approach eligibility (pavement: $87,000
survey: $120,00)survey: $120,00)
• Scottsbluff: pave west access road to airport ($1,951,260)Scottsbluff: pave west access road to airport ($1,951,260)
• Scottsbluff: parallel taxiway to runway 23 (pave: $2,822,400; light: $454,860)Scottsbluff: parallel taxiway to runway 23 (pave: $2,822,400; light: $454,860)
• Scribner: PAPIScribner: PAPI
• Seward: apron ($625,000)Seward: apron ($625,000)
• Sidney: pave runway 3/21, NSPSidney: pave runway 3/21, NSP
• Sidney: install MALSR, NSPSidney: install MALSR, NSP
• South Sioux City: runway rehabilitation (reconstruction: $1,208,600)South Sioux City: runway rehabilitation (reconstruction: $1,208,600)
• Tecumseh: Reconstruct T-hangarTecumseh: Reconstruct T-hangar
• Thedford: PAPIThedford: PAPI
• Valentine: extend/widen runway 1432 to C-II, NSPValentine: extend/widen runway 1432 to C-II, NSP
• Valentine: full parallel taxiwayValentine: full parallel taxiway
Hangars and Fuel Systems are theHangars and Fuel Systems are the
most common capital improvementmost common capital improvement
request.request.
Projects Constructed in 2017Projects Constructed in 2017
Nebraska City Municipal AirportNebraska City Municipal Airport
Construct PartialConstruct Partial
Parallel TaxiwayParallel Taxiway
Tekamah Municipal AirportTekamah Municipal Airport
Kearney Regional AirportKearney Regional Airport
Eppley AirfieldEppley Airfield
Eppley AirfieldEppley Airfield
Projects Funded in 2017,Projects Funded in 2017,
Planned construction in 2018Planned construction in 2018
Plattsmouth Municipal AirportPlattsmouth Municipal Airport
Relocate Partial ParallelRelocate Partial Parallel
TaxiwayTaxiway
Wayne Municipal AirportWayne Municipal Airport
Planned concrete projects for 2018Planned concrete projects for 2018
funding include:funding include:
• Aurora Municipal AirportAurora Municipal Airport
– Runway rehabilitationRunway rehabilitation
• Beatrice Municipal AirportBeatrice Municipal Airport
– Runway rehabilitationRunway rehabilitation
Future OpportunitiesFuture Opportunities
and Challengesand Challenges
Thank You.Thank You.

Contenu connexe

Similaire à Upcoming Airport Projects

California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project OverviewVoice Malaysia
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Michael Hewitt, GISP
 
Transportation Funding Sources and Alternatives
Transportation Funding Sources and AlternativesTransportation Funding Sources and Alternatives
Transportation Funding Sources and AlternativesCity of College Station
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelR Ray Saikus
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)AGC of California
 
10 090.public consultation
10 090.public consultation10 090.public consultation
10 090.public consultationafloat
 
Bipartisan Infrastructure Law Eminent Domain Presentation.pptx
Bipartisan Infrastructure Law Eminent Domain Presentation.pptxBipartisan Infrastructure Law Eminent Domain Presentation.pptx
Bipartisan Infrastructure Law Eminent Domain Presentation.pptxJeremy Young
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationAGC of California
 
California Hsr
California HsrCalifornia Hsr
California Hsranxora
 
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...Tim Thompson, AICP
 
NCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the RegionNCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the RegionNCEast Alliance
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectUrbanSystemsCanada
 
July 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway TunnelJuly 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway TunnelCity of Corona
 
Measure K 2015-2016 Annual Report
Measure K 2015-2016 Annual ReportMeasure K 2015-2016 Annual Report
Measure K 2015-2016 Annual ReportChristine Corrales
 

Similaire à Upcoming Airport Projects (20)

California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project Overview
 
Congressman Oberstar Stimulus Proposal
Congressman Oberstar Stimulus ProposalCongressman Oberstar Stimulus Proposal
Congressman Oberstar Stimulus Proposal
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
 
TeamTX Austin 2015 Presentations
TeamTX Austin 2015 PresentationsTeamTX Austin 2015 Presentations
TeamTX Austin 2015 Presentations
 
Transportation Funding Sources and Alternatives
Transportation Funding Sources and AlternativesTransportation Funding Sources and Alternatives
Transportation Funding Sources and Alternatives
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
 
10 090.public consultation
10 090.public consultation10 090.public consultation
10 090.public consultation
 
Bipartisan Infrastructure Law Eminent Domain Presentation.pptx
Bipartisan Infrastructure Law Eminent Domain Presentation.pptxBipartisan Infrastructure Law Eminent Domain Presentation.pptx
Bipartisan Infrastructure Law Eminent Domain Presentation.pptx
 
CDOT South Loop Chicago Overview
CDOT South Loop Chicago OverviewCDOT South Loop Chicago Overview
CDOT South Loop Chicago Overview
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
 
Dock Proposal
Dock ProposalDock Proposal
Dock Proposal
 
California Hsr
California HsrCalifornia Hsr
California Hsr
 
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
 
NCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the RegionNCEast Alliance 2016 State of the Region
NCEast Alliance 2016 State of the Region
 
Vanoc
VanocVanoc
Vanoc
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
 
Galveston
GalvestonGalveston
Galveston
 
July 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway TunnelJuly 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway Tunnel
 
Measure K 2015-2016 Annual Report
Measure K 2015-2016 Annual ReportMeasure K 2015-2016 Annual Report
Measure K 2015-2016 Annual Report
 

Plus de Jill Reeves

Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsJill Reeves
 
Drone Applications in Concrete Paving
Drone Applications in Concrete PavingDrone Applications in Concrete Paving
Drone Applications in Concrete PavingJill Reeves
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionJill Reeves
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial GroupJill Reeves
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular ConcreteJill Reeves
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA WorkshopJill Reeves
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement ConcreteJill Reeves
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyJill Reeves
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterJill Reeves
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangeJill Reeves
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly AshJill Reeves
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsJill Reeves
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentJill Reeves
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeJill Reeves
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport ProjectsJill Reeves
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectJill Reeves
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset ManagementJill Reeves
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsJill Reeves
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended CementsJill Reeves
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement CompanyJill Reeves
 

Plus de Jill Reeves (20)

Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
 
Drone Applications in Concrete Paving
Drone Applications in Concrete PavingDrone Applications in Concrete Paving
Drone Applications in Concrete Paving
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA Workshop
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform Better
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly Ash
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and Regulations
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation Equipment
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel Bridge
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport Projects
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset Management
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City Agreements
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended Cements
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement Company
 

Dernier

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Dernier (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Upcoming Airport Projects

  • 1. 3939thth AnnualAnnual Concrete Paving WorkshopConcrete Paving Workshop Upcoming Airport ProjectsUpcoming Airport Projects January 16, 2018January 16, 2018
  • 2. Broken Bow Municipal AirportBroken Bow Municipal Airport
  • 3.
  • 4.
  • 5. Airport Improvement ProgramAirport Improvement Program • The federal AIP grants reimburse most airport sponsorsThe federal AIP grants reimburse most airport sponsors for up to 90% of eligible costs.for up to 90% of eligible costs. • AuthorizationAuthorization – The FAA Modernization and Reform Act of 2012 wasThe FAA Modernization and Reform Act of 2012 was signed February 14, 2012 and expired September 30,signed February 14, 2012 and expired September 30, 2015.2015. – The program is operating under a short termThe program is operating under a short term extension until March 31, 2018.extension until March 31, 2018. • AppropriationAppropriation – FY2017 funding is planned at the same level as lastFY2017 funding is planned at the same level as last year. The program is funded through January 19,year. The program is funded through January 19, 2018.2018.
  • 6. AIP EligibilityAIP Eligibility • Airport must be open to the public.Airport must be open to the public. • Airport must be included in the NPIASAirport must be included in the NPIAS (National Plan of Integrated Airport(National Plan of Integrated Airport Systems).Systems). • General aviation airports must beGeneral aviation airports must be classified.classified. • Airport sponsor must agree to FAAAirport sponsor must agree to FAA Federal Grant Assurances.Federal Grant Assurances. • Project requested must be eligible andProject requested must be eligible and justified as determined by the FAA.justified as determined by the FAA.
  • 7. 2017 Federal Grants2017 Federal Grants Nebraska airports received 29 grantsNebraska airports received 29 grants – Grant funds of just over $33MGrant funds of just over $33M – Construction projects include:Construction projects include: • Crete, Fairbury, Hartington, Holdrege: hangarsCrete, Fairbury, Hartington, Holdrege: hangars • Grand Island: crack & joint sealGrand Island: crack & joint seal • Hebron: rehab taxilaneHebron: rehab taxilane • Kearney: runway rehabKearney: runway rehab • Norfolk: storm sewer rehabNorfolk: storm sewer rehab • North Platte: wildlife fenceNorth Platte: wildlife fence • Omaha: reconstruct cargo apronOmaha: reconstruct cargo apron • Plattsmouth: hangar and taxiway relocationPlattsmouth: hangar and taxiway relocation • Wayne: partial parallel taxiwayWayne: partial parallel taxiway
  • 8. Federal Funding BreakdownFederal Funding Breakdown $0 $10,000,000 $20,000,000 $30,000,000 $40,000,000 $50,000,000 $60,000,000 $70,000,000 $80,000,000 Stimulus Discretionary Primary & Cargo NonPrimary State Apportionment
  • 9. AIP Grants Issued for GAAIP Grants Issued for GA AirportsAirports 0 5 10 15 20 25 30 35 40 45 50 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
  • 10. State Grant ProgramState Grant Program • The program includes state grants andThe program includes state grants and matching grants for federal projects.matching grants for federal projects. • All licensed public-use airports are eligibleAll licensed public-use airports are eligible to receive state grants.to receive state grants. – 80 eligible airports,80 eligible airports, – 8 of the public-use airports are not eligible for8 of the public-use airports are not eligible for federal funds and have used this program tofederal funds and have used this program to construct and maintain their pavement.construct and maintain their pavement. • Funded from aviation fuel taxes.Funded from aviation fuel taxes.
  • 11. State Grant ProgramState Grant Program • 2016 State Grant Allocated on Oct. 132016 State Grant Allocated on Oct. 13 – State GrantsState Grants • Blair – taxilane to a new hangarBlair – taxilane to a new hangar • Burwell, Hebron, Loup City – tree removalBurwell, Hebron, Loup City – tree removal – State Matching Grants to a Federal GrantState Matching Grants to a Federal Grant • Alliance, Aurora, Beatrice, and OshkoshAlliance, Aurora, Beatrice, and Oshkosh • All runway rehabilitation projectsAll runway rehabilitation projects • $304,430 in allocations$304,430 in allocations
  • 12.
  • 14. State Grant ProgramState Grant Program • Funds Allocated to the State Grant ProgramFunds Allocated to the State Grant Program
  • 15. Current Unfunded NeedsCurrent Unfunded Needs• Ainsworth: parallel taxiway to runway 13/31Ainsworth: parallel taxiway to runway 13/31 • Ainsworth: replace VASI with PAPIAinsworth: replace VASI with PAPI • Alliance: parallel taxiway to runway 12/30Alliance: parallel taxiway to runway 12/30 • Alliance: access road and parking improvementsAlliance: access road and parking improvements • Alliance: terminal enhancements (as gateway to community)Alliance: terminal enhancements (as gateway to community) • Alma: parallel taxiway (pave: $915,000; light: $128,000)Alma: parallel taxiway (pave: $915,000; light: $128,000) • Alma: T-hangarAlma: T-hangar • Alma: construct spray apronAlma: construct spray apron • Arapahoe: runway rehabilitation (reconstruction: $1,091,100)Arapahoe: runway rehabilitation (reconstruction: $1,091,100) • Arapahoe: install runway lights, beacon ($113,460)Arapahoe: install runway lights, beacon ($113,460) • Arapahoe: runway extension to meet FAA minimum length standardsArapahoe: runway extension to meet FAA minimum length standards • Auburn: taxilanes ($280,000)Auburn: taxilanes ($280,000) • Auburn: hangar rehabilitation, replace doorsAuburn: hangar rehabilitation, replace doors • Auburn: snow removal equipmentAuburn: snow removal equipment • Aurora: Taxiway & apron reconstruction ($00,000 – may not have localAurora: Taxiway & apron reconstruction ($00,000 – may not have local match)match) • Beatrice: rehabilitate taxilanes to hangars A, B, C ($407,500)Beatrice: rehabilitate taxilanes to hangars A, B, C ($407,500) • Beatrice: PAPI runway 18, NSPBeatrice: PAPI runway 18, NSP • Blair: taxilanes, apron expansion ($200,000)Blair: taxilanes, apron expansion ($200,000) • Blair: extend runway and taxiway to 5,500’ ($2,640,000)Blair: extend runway and taxiway to 5,500’ ($2,640,000) • Blair: T-hangar additionBlair: T-hangar addition • Blair: Executive hangarBlair: Executive hangar • Bloomfield: runway rehabilitation (reconstruction: $981,990; overlay: $672,300)Bloomfield: runway rehabilitation (reconstruction: $981,990; overlay: $672,300) • Bloomfield: install runway lights, beacon ($102,120)Bloomfield: install runway lights, beacon ($102,120) • Bloomfield: taxiway and taxilane reconstructionBloomfield: taxiway and taxilane reconstruction • Bloomfield: T-hangar rehabilitation/replacementBloomfield: T-hangar rehabilitation/replacement • Broken Bow: apron expansion ($284,250)Broken Bow: apron expansion ($284,250) • Cambridge: hangar rehabilitationCambridge: hangar rehabilitation • Central City: hangar rehabilitationCentral City: hangar rehabilitation • Central City: pave access road and parking lotCentral City: pave access road and parking lot • Chadron: parallel taxiway to runway 02/20, NSP ($1,210,000; project could beChadron: parallel taxiway to runway 02/20, NSP ($1,210,000; project could be broken into phases)broken into phases) • Chadron: apron expansionChadron: apron expansion • Chadron: terminal building renovations/updateChadron: terminal building renovations/update • Chadron: extend runway 11/29 700’, NSPChadron: extend runway 11/29 700’, NSP • Chappell: runway rehabilitation (reconstruction: $1,600,000)Chappell: runway rehabilitation (reconstruction: $1,600,000) • Chappell: apron expansion ($125,000)Chappell: apron expansion ($125,000) • Columbus: terminal buildingColumbus: terminal building • Columbus: taxilanes and apron for hangar developmentColumbus: taxilanes and apron for hangar development • Columbus: pave crosswind runway, NSPColumbus: pave crosswind runway, NSP • Cozad: Taxilane reconstruction & apron expansion ($160,000)Cozad: Taxilane reconstruction & apron expansion ($160,000) • Crete: Hangar taxilanes replacement and drainage improvements ($1,100,000)Crete: Hangar taxilanes replacement and drainage improvements ($1,100,000) • Crete: Parking lot and road rehabilitation ($385,000)Crete: Parking lot and road rehabilitation ($385,000) • Grand Island: utility upgrades (sewer)($1,500,000)Grand Island: utility upgrades (sewer)($1,500,000) • Grant: AWOS III P/TGrant: AWOS III P/T • Grant: parallel taxiwayGrant: parallel taxiway • Hartington: light parallel taxiway ($275,000)Hartington: light parallel taxiway ($275,000) • Harvard: taxiway rehabilitation (reconstruct: $502,000; overlay: $343,620)Harvard: taxiway rehabilitation (reconstruct: $502,000; overlay: $343,620) • Hastings: relocate ASOSHastings: relocate ASOS • Hastings: install MALSR, NSP (not AIP eligible)Hastings: install MALSR, NSP (not AIP eligible) • Holdrege: install water mainHoldrege: install water main • Hyannis: pavement rehabilitation (reconstruction: $1,445,700)Hyannis: pavement rehabilitation (reconstruction: $1,445,700) • Imperial: site developmentImperial: site development • Kearney: extend runway 13/31 200’, NSPKearney: extend runway 13/31 200’, NSP • Lexington: parallel taxiwayLexington: parallel taxiway • Lexington: rehab road and parking lot ($366,000)Lexington: rehab road and parking lot ($366,000) • McCook: SRE and SRE buildingMcCook: SRE and SRE building • McCook: hangar and/or hangar rehabilitationMcCook: hangar and/or hangar rehabilitation • McCook: extend runway 4/22, NSPMcCook: extend runway 4/22, NSP • Nebraska City: parallel taxiway to runway 33 ($1,268,955; includes federal ineligibleNebraska City: parallel taxiway to runway 33 ($1,268,955; includes federal ineligible section)section) • Nebraska Department of Aeronautics: PCI software update to include PCN valuesNebraska Department of Aeronautics: PCI software update to include PCN values ($80,000)($80,000) • Nebraska Department of Aeronautics: Economic Impact StudyNebraska Department of Aeronautics: Economic Impact Study • Neligh: AWOS III P/TNeligh: AWOS III P/T • North Platte: relocate utilities ($1,000,000)North Platte: relocate utilities ($1,000,000) • North Omaha: correct licensing violationsNorth Omaha: correct licensing violations • North Omaha: pavement rehabilitationNorth Omaha: pavement rehabilitation • O’Neill: runway 4/22 lights ($290,000)O’Neill: runway 4/22 lights ($290,000) • O’Neill: pave access road and parking ($600,000)O’Neill: pave access road and parking ($600,000) • O’Neill: complete parallel taxiway to runway 13O’Neill: complete parallel taxiway to runway 13 • Ogallala: parallel taxiway ($1,720,000; project could be broken into phases)Ogallala: parallel taxiway ($1,720,000; project could be broken into phases) • Ord: complete parallel taxiway to runway 13Ord: complete parallel taxiway to runway 13 • Oshkosh: terminal building to meet ADA requirementsOshkosh: terminal building to meet ADA requirements • Plattsmouth: construct crosswind runway, NSPPlattsmouth: construct crosswind runway, NSP • Plattsmouth: install MALSR, NSPPlattsmouth: install MALSR, NSP • Red Cloud: AWOS III P/TRed Cloud: AWOS III P/T • Sargent: 200’ runway extension and survey for approach eligibility (pavement: $87,000Sargent: 200’ runway extension and survey for approach eligibility (pavement: $87,000 survey: $120,00)survey: $120,00) • Scottsbluff: pave west access road to airport ($1,951,260)Scottsbluff: pave west access road to airport ($1,951,260) • Scottsbluff: parallel taxiway to runway 23 (pave: $2,822,400; light: $454,860)Scottsbluff: parallel taxiway to runway 23 (pave: $2,822,400; light: $454,860) • Scribner: PAPIScribner: PAPI • Seward: apron ($625,000)Seward: apron ($625,000) • Sidney: pave runway 3/21, NSPSidney: pave runway 3/21, NSP • Sidney: install MALSR, NSPSidney: install MALSR, NSP • South Sioux City: runway rehabilitation (reconstruction: $1,208,600)South Sioux City: runway rehabilitation (reconstruction: $1,208,600) • Tecumseh: Reconstruct T-hangarTecumseh: Reconstruct T-hangar • Thedford: PAPIThedford: PAPI • Valentine: extend/widen runway 1432 to C-II, NSPValentine: extend/widen runway 1432 to C-II, NSP • Valentine: full parallel taxiwayValentine: full parallel taxiway
  • 16. Hangars and Fuel Systems are theHangars and Fuel Systems are the most common capital improvementmost common capital improvement request.request.
  • 17. Projects Constructed in 2017Projects Constructed in 2017
  • 18. Nebraska City Municipal AirportNebraska City Municipal Airport Construct PartialConstruct Partial Parallel TaxiwayParallel Taxiway
  • 19. Tekamah Municipal AirportTekamah Municipal Airport
  • 23. Projects Funded in 2017,Projects Funded in 2017, Planned construction in 2018Planned construction in 2018
  • 24. Plattsmouth Municipal AirportPlattsmouth Municipal Airport Relocate Partial ParallelRelocate Partial Parallel TaxiwayTaxiway
  • 25. Wayne Municipal AirportWayne Municipal Airport
  • 26. Planned concrete projects for 2018Planned concrete projects for 2018 funding include:funding include: • Aurora Municipal AirportAurora Municipal Airport – Runway rehabilitationRunway rehabilitation • Beatrice Municipal AirportBeatrice Municipal Airport – Runway rehabilitationRunway rehabilitation

Notes de l'éditeur

  1. Good Morning I have a short review of the state and federal grant programs available to Nebraska airport sponsors and recent and proposed projects. Pictured is the Division’s King Air Last week flew the Governor to the State of the State addresses Today the Governor is scheduled to Broken Bow
  2. The Broken Bow Municipal Airport is located north of Broken Bow and serves Custer County and the surrounding area. There businesses that operate from the airport. The runway was originally paved with concrete and has been widened and extended a couple times. The original runway section has significant distresses and has been identified as in need of rehabilitation. We had requested federal funding in 2018 but the project did not make the FAA’s list. The airport is currently working with their consultant to start a preliminary design phase to define the scope of the project. We hope for short term funding.
  3. Airplanes need a place to land Otherwise the airways are like an interstate with no exit ramps Economic impact of paving the runway private hangars businesses flight instruction occasional medical flights (doctor coming in) Community outreach
  4. There are 80 public use airports in the state, which serve many different roles. All public-use airports are required to be licensed by the Division of Aeronautics. (Licenses are issued after the airport passes a licensing inspection done by Division inspections. Last summer we were assisted by DOT district personnel.). 9 airports have commercial air service (Omaha, Lincoln, Grand Island, Kearney, North Platte, McCook, Scottsbluff, Alliance and Chadron) and are identified with red and green. The remaining 71 airports are general aviation airports. There are also a large number of private-use airports in Nebraska 9 commercial service airports include: Alliance, Chadron, McCook; serviced by Boutique Air. Kearney, North Platte, Scottsbluff currently do not have service but will have a new carrier in 2018, SkyWest Airline. Grand Island: Allegiant and American Eagle Lincoln: Delta and United Omaha: Air Canada, Alaska Airlines, Allegiant Air, American, Delta, Frontier, OneJet, Southwest Airlines, United The airports with commercial service are required to have a Part 139 Certificate from the FAA and are inspected annual by FAA Certification Inspectors. A 20 year capital improvement plan is maintained for the airport eligible for federal funds. The plans are sent to the airports each November for editing. I take the requests and the expected federal funds and balance project request for the next three years. The plans for non-NPIAS airports are no longer maintained since it has been so long since funding has been available to meet their needs.
  5. The airports receive federal funds through the Airport Improvement Program. The grants in Nebraska cover 90% of the eligible project costs with two exceptions. Omaha Eppley is a medium hub airport and received 75% grants. Chadron and Grand Island meet the requirements to receive 95% grants, they have scheduled subsidized airline service and are in an economically depressed area as defined by the FHWA. The FAA can not run their formulas until they had at least 6 months of appropriations (funded through end of March). We are on schedule to bid our state apportionment project and be ready for a March grant but the funding is not yet ready so bidding is on hold.
  6. To received federal funds, the airport sponsor must meet a series of eligibility and justification requirements. Agree to grant assurances for the life of the project, construction projects have a 20 year obligation.
  7. In 2017 Nebraska airports received just over $33 in AIP funds.
  8. This is a breakdown of the federal funding. The amount of discretionary funds (green tab) varies significantly from year to year. The entitlements and apportionment are set by formula but Nebraska airports compete for the discretionary funds. High priority rehabilitation projects were groups together to be able to access discretionary funds for general aviation airports. This was successfully done in 2010 and 2014. Discretionary funded were requested/denied in 2018. The FAA has indicated that we should not expect discretionary funds for GA project in the future.
  9. In 2017, there were 23 grant issued to general aviation airports, 5 grant to primary airports, and one to NDA. There were a couple reasons for the decrease in grants in 2015. The biggest reason, the FAA was able to issue multi-year grants. Multi-year grant include funding from future year entitlements. This allows the airports to initiate their projects before all the funds are available. If they are able to carry costs for future reimbursement, this allows airports to complete their projects earlier. There were 6 airports that took advantage of this option and used their 2015 entitlement to fund earlier grants. The multi-year grants are not an option under the current continuing resolutions.
  10. State grants can reimburse 90% of the eligible costs of a state grant or 2% matching for a federal grant.
  11. The Aeronautics commission was able to give more in allocations in 2017 than in the past several years. $325 remaining in state grant fund. The state grant projects are done and are ready to be closed. The grants tied to a federal project will not be issued until after the federal grant has been issued.
  12. Of the 81 public-use airports in Nebraska, 73 are eligible to receive federal AIP grants. 66 airports have received federal funds through AIP. The airports highlighted in red are the eight airports are not identified in the NPIAS and therefore not eligible for federal funding. These airport have historically relied on state grant funds. Since sufficient funds to assist these airports with their current needs are not available, the future of these airport is uncertain. The impact of these airports on the aviation system varied greatly as several have large numbers of based aircraft while others have little development. The FAA released the ASSET 2 report which classified the general aviation airports and required airports to be classified in order to received entitlement funding. Four of Nebraska’s airport are currently unclassified and the FAA has indicated that they plan to unclassify an additional 6. NPIAS airport without obligations: Chappell, Greeley, Fairmont, Harvard, Hyannis, Scribner, and Wallace.
  13. Bloomfield has the newest pavement of the non-NPIAS airports Constructed in 2002 with a state grant Existing pavement section 4” of NDR type 14 Businesses operate from the airport What is their future?
  14. The current challenge to the state aid program is the lack of available funds. Historically, the aviation fuel tax went to the state grant fund. However, since the later 1990s the funds are now needed for operating expenses for the department. Fuel Tax 1945: 5 cents/gallon with 2 cent rebate on jet 1965: 5 cent for AV, 3 cent on jet, no net change
  15. This is a list a current unfunded airport needs that was generated in our office. The list includes needed rehabilitation and the development identified in the Nebraska Aviation System Plan. Note: list does not fit on one slide, apron in photo not on the list
  16. New hangar construction and hangar rehabilitation New: larger doors, turning radius Rehab: new doors, hangar ramps Fuel: add credit card reader, new system
  17. Airport located south of Nebraska City, east side of hwy 75 First grant of FY16. Construction completed in 2017 Identify ineligible section, why ineligible Discuss why short section of turf runway is paved Nebraska City Airport Authority Olsson Associates Constructors, Inc.
  18. Reconstruction of taxilanes and apron Drainage improvements Funded with a 2015 grant, completed in 2017, currently in closeout phase Able to receive a grant adjustment with expiring funds to cover cost of a change order (typically, increased costs due to change orders are airport funded until after the final documents are submitted and the FAA issues a grant amendment) M.E. Collins Construction
  19. Reconstruct runway 18/36, formed WWII airbase Includes runway width reduction from 150’ to 100’, correction of line of sight, realign existing taxiway connectors, runway lighting & signage, relocation of FAA owned NAVAIDS Received a 2017 grant, original planned for spring 2018 construction start, city desired earlier completion date so worked with contractor to start this year. Talked with airport manager last week and they are very pleased with progress Consultant: Alfred Benesch & Company Contractor: Paulsen
  20. Eppley – reconstruct terminal ramp Sponsor: Omaha Airport Authority Consultant: Lamp Rynearson Contractor: Hawkins
  21. Reconstruction of Cargo Apron A
  22. The 2017 grant were issued later than usual. The congressional releases were delayed and the grants must be released before they can be issued. We were ready for grants in March but the first grants were not issued until the end of May. Most of the grants were issued in June.
  23. The Plattsmouth Municipal Airport was originally designed as an airport with visual approaches supporting light aircraft. Their role has changed as there is demand to serve larger aircraft. The airport currently has non-precision GPS approaches and there are possibilities of future approaches with precision type minimums. The problem: The first three T-hangars were constructed in the object free area for C-II aircraft. Finding funding the relocation has been an struggle for many years. Funded in FY2017 with NPE transferred from other Nebraska airport. Construction/grading started last fall. Paving is scheduled for next spring.
  24. Construct partial parallel taxiway A complicated EA was needed as full parallel taxiway impacts Soldier Creek. Hope to complete taxiway before EA expires.
  25. Requested 12 projects, received funding for 2. AIP is currently funded through January 19. not sufficient funds to run FAA formula. Aurora – original project scope included rehab of all asphalt pavement Beatrice – original scope included taxiway and apron work as well runway width will be reduced by 25% new lights installed plans have been submitted for review
  26. Funding for construction projects remains one of our biggest challenges. Includes local, state, and federal funding. The runway pictured in these slides was constructed in 1997 for light aircraft with a state grant. The airport is currently being used by heaver jets and the pavement is feeling the stress. These operations are supporting the economic activity in several counties. Although the airport is eligible for federal funding, the airport sponsor does not know if they will be able to fund their share of an AIP grant.