• Terminology and introduction to storage racking
• Briefly introduce the various types of racking and
their vulnerabilities
• Understand the Standards and how often racks
need to be inspected (frequency)
• Describing the process of inspection and how to
respond
• Capacity and ensuring racks are not overloaded
Rack Safety & Compliance Agenda
Rack Safety & Compliance:
Components of Racking
Row Spacer
Beam
Bracket
Beam
Section
Post
Protector
Diagonal
Brace
Horizontal
Brace
Post/Column
Post/Column
Rack Safety & Compliance:
Components of Racking
Baseplate/Shims
Post
Protector
Diagonal
Brace
Horizontal
Brace
Post/upright/
column
Anchor
• Most common type of pallet rack
• Rack is arranged in a single or a
series of rows such that every
pallet loaded on the rack faces
an aisle
• Common damage: front post in
the lower 5’
• Collapse: rare, except for single
rows (10 times as likely than a
connected row)
Rack Safety & Compliance:
Vulnerabilities of Selective Rack
• Tunnel use for passage of lift truck to
place pallets on rails
• Rails run the length of the tunnel on both
sides and support pallets on their edge
• Damage: rear frames and lower 8’ of all
uprights
• Collapse: prone, especially if no transverse
bracing
Rack Safety & Compliance
Vulnerabilities of Drive In Racks
• Similar to selective rack except
beam levels support a system of
tracks and carts that allow the
pallets to be moved to the rear.
• Damage: typically lower front post –
carts can get hung up if not
maintained
• Collapse: rare
Rack Safety & Compliance
Vulnerabilities of Push Back Racks
• Rack usually consists of column
with perpendicular arms used to
support long items
• Damage: arms by dropping loads
• Collapse: rare, unless constructed in-
house
Rack Safety & Compliance
Vulnerabilities of Drive In Racks
• ANSI MH16.1 – Racking Manufacturers
Institute (RMI)
• European EN15635 – European Committee
for Standardization
• CSA – A344 Canadian Standards
Association
• prime reference in Canada
• Meets or exceed most of the
requirements of RMI & EN
• Today we will refer to A344 – 2016 even
though it is not formally approved yet
Rack Safety & Compliance
Regulations & Requirements
• CSA A344 – clause 8.1.9 calls for
routine inspections (typically
monthly) as well as ‘expert
inspections’.
• “Expert inspections are typically
done under the supervision of a
professional engineer, with the
engineer taking responsibility for
the damage inspection process
and reporting.
CSA A344 - clause 8.1.5
addresses frequency inspections.
The expert establishes the
frequency of inspections based on
a risk analysis.
Rack Safety & Compliance
Regulations & Requirements
• Damage comes in many forms and each situation can be
unique – not easy to evaluate severity
• We use a method based on the CSA and European Rack
Standard – and call it the RAG method (Red Amber
Green)
• When doing expert inspections we also use engineering
judgment to set the limit of structural imperfection
Rack Safety & Compliance
Inspection Methods – RAG
• Damaged is measured over
500mm or 20” (not 1000mm
as in the EN standard)
• Items in the chart are not all
in the EN guideline and can
vary from site to site
• Example of recognizing
structural vulnerability is :
• 4 mm on diagonal brace of
single row is more conservative
than 5 mm on connected row
Rack Safety & Compliance
Damage Severity
• CSA A344 requires the expert to establish the damage limits for a
particular site or structure
• Additional parameters can come into play that are specific to site,
such as out of plumb, twisted posts, beam damage, etc.
• The charts below illustrate how these limits can be established for a
site
Rack Safety & Compliance
Damage Severity
• Each damage requires a response, using the RAG Method this chart illustratesappropriate responses:
• Classifyingand Tagging items as Red Amber Green sets up Immediate Action
• Immediate Action – unloading/locking out of service, avoid loading if possible, monitor for further
damage
• Corrective Action is a secondary decision that deals with the repair or other remedial action
Rack Safety & Compliance
Responding to Damages
FIND ITEM
CLASSIFY & TAG
RED
AMBER
GREEN
UNLOAD
AVOID LOADING IF POSSIBLE
REVISE PRACTICES OR
TRAIN
ONLY REQUIRES FUTURE
MONITORING
HAZARD RESOLVED
REPAIR OR REPLACE
FIND | CLASSIFY | DETERMINE IMMEDIATE ACTION | SPECIFY CORRECTIVE ACTION | CLOSE OUT
• RAG Method requires inspection items be treated with a multi-stage RESPONSE:
• Categorize & Tag items as Red Amber Green thereby setting up Immediate Action
• Immediate Action – specify immediately put out of service, corrective action required,
may require corrective action – monitor
• Corrective Action - a secondary decision that deals with remediation and prevention
Rack Safety & Compliance
Responding to Damages
FIND
ITEM
CATAGORIZE &
TAG
RED
AMBER
GREEN
immediate danger
immediately put out of service
seek guidance as per clause 8.2.1.3.
remediation required
may remain in service
corrective action is required
REVISE PRACTICES OR
TRAIN
minor deficiencies
may require repair, column
protection, and/or modified
operating practice
& monitor to ensure the condition does not worsen
CLOSE OUT
HAZARD
RESOLVED
REPAIR OR REPLACE
FIND CLASSIFY IMPLEMENT IMMEDIATE ACTION SPECIFY CORRECTIVE ACTION CLOSE OUT
bad operating practice
instruct the operators
• We recommend severity be represented by numbers 1 to 9
as it allows what is in effects “shades” of each color
1-3 GREEN 4-6 AMBER 7-9 RED
• The numbers are essentially a RISK index - a relationship
between probability and consequence
Rack Safety & Compliance
Assessing Damages
high 4-­6 7-­8 9 9
moderate 4-­6 4-­6 7-­8 9
low 2-­3 4-­6 4-­6 7-­8
minimal 1 2-­3 4-­6 4-­6
minor significant critical catastrophic
Probability	
  or	
  Likelihood
Consequence
• CSA A344, clause 8.2 - The engineer supervising the expert
inspections should establish time guidelines for corrective
action
• The chart below is how severity can be assessed a response
time
Rack Safety & Compliance
Assessing Damages
Total Unloading Partial or Center-to-center off loading
Rack Safety & Compliance
Unloading Types
• CSA and EN both require unloading if RED
• EN standard has special requirements on AMBER – do not reload
• There are two types of unloading (total and partial)
• CSA A344.1 clause 8.2.2 calls for method to clearly identify
rack that is unsafe by “marking or tagging”
• Below is one way to tag out a level or bay
Rack Safety & Compliance
Marking Damaged Racks
Rack Safety & Compliance
Case Study – Training and Monitoring
• Racks  inspected,  plus employees  
were  trained  on  Rack  Awareness  and  
Inspection
• Damage  immediately  was  reduced  -­
inspections  continued
• Damage  began  to  increase
• Additional  training  was  provided  and  
again  damage  incidents  decreased
• Big  gains  -­ Increase  in  safety,  and  
decrease  in  maintenance
• Inspection  and  training  is  a  cost  saver  
206
85
34
87
102
29
0
50
100
150
200
250
2010 2011 2012 2013 2014 2015
number of recorded deficiencies
• CSA clause 7.3 - the weight of loads placed in the racks must not
exceed the load capacity of the rack structure
Rack Safety & Compliance
Capacity Signage
• Clause 7.3.1.2 - Load plaque need to include a reference to documents
that establish the maximum permissible loading
• The method used should be selected based on the
nature of the facility, and achieved by:
• use of warehouse management software (WMS)
• load plaques & awareness of the weight of the
pallets
• trained operators using approved storage
procedures
• insuring the capacity of the rack can support the
heaviest pallet in the facility
PLANNING  YOUR  NEXT  STEPS
1. Arrange to have an inspection done by an expert third party
2.
Ensure the capacity of racks is formally established by an engineer &
review documents to ensure they are up to date
3.
Set up a program to have staff conduct monthly inspections and
ensure they are trained to do so
4.
Make arrangements for having the damaged racks repaired or
replaced. If repaired, ensure repairs are formally approved
5.
Implement the recommendations of the Expert inspection (frequency
of inspection, documentation, response time, damage limits)
For more information
www.nimonik.com
1-888-608-7511
info@nimonik.com

Contenu connexe

Tendances

Aegis motor-repair-handbook edition-2-2013
Aegis motor-repair-handbook edition-2-2013Aegis motor-repair-handbook edition-2-2013
Aegis motor-repair-handbook edition-2-2013Daniel García
 
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESANA ISABEL R.R.
 
Gsw physician teleflex
Gsw physician teleflexGsw physician teleflex
Gsw physician teleflexEuro CTO Club
 
SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0SolarDock
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
FusionTech TechMate
FusionTech TechMateFusionTech TechMate
FusionTech TechMatefusiontech
 
Career Choices 25 08 2008
Career Choices 25 08 2008Career Choices 25 08 2008
Career Choices 25 08 2008Mona El-Tahan
 
Addressing Unexpected Fall Protection Needs
Addressing Unexpected Fall Protection NeedsAddressing Unexpected Fall Protection Needs
Addressing Unexpected Fall Protection NeedsLJB Inc.
 
OCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCOCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCMuanisa Waras
 
"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”Muanisa Waras
 
Euro cto club breakfast symposium
Euro cto club breakfast symposiumEuro cto club breakfast symposium
Euro cto club breakfast symposiumEuro CTO Club
 
Mobile crane inspector training student manual
Mobile crane inspector training   student manualMobile crane inspector training   student manual
Mobile crane inspector training student manualSaul Ramirez
 

Tendances (20)

Aegis motor-repair-handbook edition-2-2013
Aegis motor-repair-handbook edition-2-2013Aegis motor-repair-handbook edition-2-2013
Aegis motor-repair-handbook edition-2-2013
 
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
 
Imcasf12 14
Imcasf12 14Imcasf12 14
Imcasf12 14
 
Aerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSVAerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSV
 
Gsw physician teleflex
Gsw physician teleflexGsw physician teleflex
Gsw physician teleflex
 
SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0
 
Nl70197 en oil-gas-brochure
Nl70197 en oil-gas-brochureNl70197 en oil-gas-brochure
Nl70197 en oil-gas-brochure
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates
 
FusionTech TechMate
FusionTech TechMateFusionTech TechMate
FusionTech TechMate
 
2015_J_Kilmister_Resume
2015_J_Kilmister_Resume2015_J_Kilmister_Resume
2015_J_Kilmister_Resume
 
Career Choices 25 08 2008
Career Choices 25 08 2008Career Choices 25 08 2008
Career Choices 25 08 2008
 
Addressing Unexpected Fall Protection Needs
Addressing Unexpected Fall Protection NeedsAddressing Unexpected Fall Protection Needs
Addressing Unexpected Fall Protection Needs
 
OCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCOCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADC
 
"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”
 
2016 CRW - Hands-on Crane Inspection
2016 CRW - Hands-on Crane Inspection2016 CRW - Hands-on Crane Inspection
2016 CRW - Hands-on Crane Inspection
 
22 electrical safety
22 electrical safety22 electrical safety
22 electrical safety
 
Euro cto club breakfast symposium
Euro cto club breakfast symposiumEuro cto club breakfast symposium
Euro cto club breakfast symposium
 
Lockout Tagout by FirstSource
Lockout Tagout by FirstSourceLockout Tagout by FirstSource
Lockout Tagout by FirstSource
 
Mobile crane inspector training student manual
Mobile crane inspector training   student manualMobile crane inspector training   student manual
Mobile crane inspector training student manual
 
Stiction webinar 2013
Stiction webinar 2013Stiction webinar 2013
Stiction webinar 2013
 

En vedette

Great ISO 14001 Compliance Obligations and Legal Requirements
Great ISO 14001 Compliance Obligations and Legal RequirementsGreat ISO 14001 Compliance Obligations and Legal Requirements
Great ISO 14001 Compliance Obligations and Legal RequirementsNimonik
 
The link between risk management critical controls and auditing
The link between risk management critical controls and auditingThe link between risk management critical controls and auditing
The link between risk management critical controls and auditingNimonik
 
Internal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality AuditsInternal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality AuditsNimonik
 
Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...
Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...
Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...Nimonik
 
Excel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolExcel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolTim Matthews
 
Risk Assessment For Internal Auditors
Risk Assessment For Internal AuditorsRisk Assessment For Internal Auditors
Risk Assessment For Internal Auditorsminkhollow
 
Risk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal AuditRisk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal AuditSmitesh Bhosale
 
Audit planning and risk assessment
Audit planning and risk assessmentAudit planning and risk assessment
Audit planning and risk assessmentcasahiljain1992
 
ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet Tim Matthews
 
ISO 14001:2015/2004 GAP analysis tool
ISO 14001:2015/2004 GAP analysis toolISO 14001:2015/2004 GAP analysis tool
ISO 14001:2015/2004 GAP analysis toolTim Matthews
 

En vedette (10)

Great ISO 14001 Compliance Obligations and Legal Requirements
Great ISO 14001 Compliance Obligations and Legal RequirementsGreat ISO 14001 Compliance Obligations and Legal Requirements
Great ISO 14001 Compliance Obligations and Legal Requirements
 
The link between risk management critical controls and auditing
The link between risk management critical controls and auditingThe link between risk management critical controls and auditing
The link between risk management critical controls and auditing
 
Internal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality AuditsInternal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality Audits
 
Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...
Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...
Three Ways the New US Hazardous Waste Generator Rules Could Affect Your Opera...
 
Excel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolExcel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation tool
 
Risk Assessment For Internal Auditors
Risk Assessment For Internal AuditorsRisk Assessment For Internal Auditors
Risk Assessment For Internal Auditors
 
Risk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal AuditRisk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal Audit
 
Audit planning and risk assessment
Audit planning and risk assessmentAudit planning and risk assessment
Audit planning and risk assessment
 
ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet
 
ISO 14001:2015/2004 GAP analysis tool
ISO 14001:2015/2004 GAP analysis toolISO 14001:2015/2004 GAP analysis tool
ISO 14001:2015/2004 GAP analysis tool
 

Similaire à Nimonik Expert EHS Series: Rack Safety and Compliance

const_cranes_090310 (1).ppt
const_cranes_090310 (1).pptconst_cranes_090310 (1).ppt
const_cranes_090310 (1).pptRonald Aranha
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptxNeethu241454
 
5-step guide for selecting the right cranes for steel warehousing
5-step guide for selecting the right cranes for steel warehousing5-step guide for selecting the right cranes for steel warehousing
5-step guide for selecting the right cranes for steel warehousingKonecranes
 
Crane_&_Sling_baysrgrys wyruyv egeryuey1.ppt
Crane_&_Sling_baysrgrys wyruyv egeryuey1.pptCrane_&_Sling_baysrgrys wyruyv egeryuey1.ppt
Crane_&_Sling_baysrgrys wyruyv egeryuey1.pptSurajAmbekar7
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsMatthew Clemens
 
Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance IAAPI HQ
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLift Events
 
Asset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines rAsset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines rrmorgan1209
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergrLuisValente37
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10vtsiri
 
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 

Similaire à Nimonik Expert EHS Series: Rack Safety and Compliance (20)

INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
const_cranes_090310 (1).ppt
const_cranes_090310 (1).pptconst_cranes_090310 (1).ppt
const_cranes_090310 (1).ppt
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
5-step guide for selecting the right cranes for steel warehousing
5-step guide for selecting the right cranes for steel warehousing5-step guide for selecting the right cranes for steel warehousing
5-step guide for selecting the right cranes for steel warehousing
 
Crane_&_Sling_baysrgrys wyruyv egeryuey1.ppt
Crane_&_Sling_baysrgrys wyruyv egeryuey1.pptCrane_&_Sling_baysrgrys wyruyv egeryuey1.ppt
Crane_&_Sling_baysrgrys wyruyv egeryuey1.ppt
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
 
Asset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines rAsset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines r
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
 
FMEA.pdf
FMEA.pdfFMEA.pdf
FMEA.pdf
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10
 
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
FMEA.pptx
FMEA.pptxFMEA.pptx
FMEA.pptx
 

Plus de Nimonik

Generative AI for Regulatory Analysis
Generative AI for Regulatory AnalysisGenerative AI for Regulatory Analysis
Generative AI for Regulatory AnalysisNimonik
 
Nimonik Brochure
Nimonik BrochureNimonik Brochure
Nimonik BrochureNimonik
 
ISO 37301 Compliance Management Systems
ISO 37301 Compliance Management SystemsISO 37301 Compliance Management Systems
ISO 37301 Compliance Management SystemsNimonik
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Nimonik
 
Best Practices for Regulatory Change Management
Best Practices for Regulatory Change ManagementBest Practices for Regulatory Change Management
Best Practices for Regulatory Change ManagementNimonik
 
Build a business case for compliance March 2022
Build a business case for compliance March 2022Build a business case for compliance March 2022
Build a business case for compliance March 2022Nimonik
 
ESG and Compliance: Where do we go from here?
ESG and Compliance: Where do we go from here?ESG and Compliance: Where do we go from here?
ESG and Compliance: Where do we go from here?Nimonik
 
State of Compliance 2021 at Mid-Market Firms - Nimonik
State of Compliance 2021 at Mid-Market Firms - NimonikState of Compliance 2021 at Mid-Market Firms - Nimonik
State of Compliance 2021 at Mid-Market Firms - NimonikNimonik
 
ISO 19600 Section 4.5 - Know your Obligations
ISO 19600 Section 4.5 - Know your ObligationsISO 19600 Section 4.5 - Know your Obligations
ISO 19600 Section 4.5 - Know your ObligationsNimonik
 
COVID-19 Biological Risk Assessment Webinar
COVID-19 Biological Risk Assessment WebinarCOVID-19 Biological Risk Assessment Webinar
COVID-19 Biological Risk Assessment WebinarNimonik
 
Preparing for a Post Covid World
Preparing for a Post Covid WorldPreparing for a Post Covid World
Preparing for a Post Covid WorldNimonik
 
Identify Applicable EHS Regulatory Documents
Identify Applicable EHS Regulatory DocumentsIdentify Applicable EHS Regulatory Documents
Identify Applicable EHS Regulatory DocumentsNimonik
 
19600 Compliance Management System Guidelines
19600 Compliance Management System Guidelines19600 Compliance Management System Guidelines
19600 Compliance Management System GuidelinesNimonik
 
19600 compliance management system guidelines
19600   compliance management system guidelines19600   compliance management system guidelines
19600 compliance management system guidelinesNimonik
 
Survey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed complianceSurvey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed complianceNimonik
 
Continous compliance october 2019 webinar (2)
Continous compliance   october 2019 webinar (2)Continous compliance   october 2019 webinar (2)
Continous compliance october 2019 webinar (2)Nimonik
 
The not so hidden costs of non-compliance
The not so hidden costs of non-complianceThe not so hidden costs of non-compliance
The not so hidden costs of non-complianceNimonik
 
The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)Nimonik
 
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Nimonik
 
Process Area Site Assessments techniques for the Management
Process Area Site Assessments techniques for the ManagementProcess Area Site Assessments techniques for the Management
Process Area Site Assessments techniques for the ManagementNimonik
 

Plus de Nimonik (20)

Generative AI for Regulatory Analysis
Generative AI for Regulatory AnalysisGenerative AI for Regulatory Analysis
Generative AI for Regulatory Analysis
 
Nimonik Brochure
Nimonik BrochureNimonik Brochure
Nimonik Brochure
 
ISO 37301 Compliance Management Systems
ISO 37301 Compliance Management SystemsISO 37301 Compliance Management Systems
ISO 37301 Compliance Management Systems
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
 
Best Practices for Regulatory Change Management
Best Practices for Regulatory Change ManagementBest Practices for Regulatory Change Management
Best Practices for Regulatory Change Management
 
Build a business case for compliance March 2022
Build a business case for compliance March 2022Build a business case for compliance March 2022
Build a business case for compliance March 2022
 
ESG and Compliance: Where do we go from here?
ESG and Compliance: Where do we go from here?ESG and Compliance: Where do we go from here?
ESG and Compliance: Where do we go from here?
 
State of Compliance 2021 at Mid-Market Firms - Nimonik
State of Compliance 2021 at Mid-Market Firms - NimonikState of Compliance 2021 at Mid-Market Firms - Nimonik
State of Compliance 2021 at Mid-Market Firms - Nimonik
 
ISO 19600 Section 4.5 - Know your Obligations
ISO 19600 Section 4.5 - Know your ObligationsISO 19600 Section 4.5 - Know your Obligations
ISO 19600 Section 4.5 - Know your Obligations
 
COVID-19 Biological Risk Assessment Webinar
COVID-19 Biological Risk Assessment WebinarCOVID-19 Biological Risk Assessment Webinar
COVID-19 Biological Risk Assessment Webinar
 
Preparing for a Post Covid World
Preparing for a Post Covid WorldPreparing for a Post Covid World
Preparing for a Post Covid World
 
Identify Applicable EHS Regulatory Documents
Identify Applicable EHS Regulatory DocumentsIdentify Applicable EHS Regulatory Documents
Identify Applicable EHS Regulatory Documents
 
19600 Compliance Management System Guidelines
19600 Compliance Management System Guidelines19600 Compliance Management System Guidelines
19600 Compliance Management System Guidelines
 
19600 compliance management system guidelines
19600   compliance management system guidelines19600   compliance management system guidelines
19600 compliance management system guidelines
 
Survey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed complianceSurvey results - Centrally vs Locally managed compliance
Survey results - Centrally vs Locally managed compliance
 
Continous compliance october 2019 webinar (2)
Continous compliance   october 2019 webinar (2)Continous compliance   october 2019 webinar (2)
Continous compliance october 2019 webinar (2)
 
The not so hidden costs of non-compliance
The not so hidden costs of non-complianceThe not so hidden costs of non-compliance
The not so hidden costs of non-compliance
 
The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)
 
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
 
Process Area Site Assessments techniques for the Management
Process Area Site Assessments techniques for the ManagementProcess Area Site Assessments techniques for the Management
Process Area Site Assessments techniques for the Management
 

Dernier

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 

Dernier (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Nimonik Expert EHS Series: Rack Safety and Compliance

  • 1. Rack Safety & Compliance Tony Mulholland & Brian Rusciolelli
  • 2. Kim Chanel Vallée-Séguin Communications Manager, Nimonik Brian Rusciolelli Lead Rack Inspector, Rack-Net-Works Tony Mulholland P.Eng. Principle Engineer, Rack-Net-Works
  • 3. • Terminology and introduction to storage racking • Briefly introduce the various types of racking and their vulnerabilities • Understand the Standards and how often racks need to be inspected (frequency) • Describing the process of inspection and how to respond • Capacity and ensuring racks are not overloaded Rack Safety & Compliance Agenda
  • 4. Rack Safety & Compliance: Components of Racking Row Spacer Beam Bracket Beam Section Post Protector Diagonal Brace Horizontal Brace Post/Column Post/Column
  • 5. Rack Safety & Compliance: Components of Racking Baseplate/Shims Post Protector Diagonal Brace Horizontal Brace Post/upright/ column Anchor
  • 6. • Most common type of pallet rack • Rack is arranged in a single or a series of rows such that every pallet loaded on the rack faces an aisle • Common damage: front post in the lower 5’ • Collapse: rare, except for single rows (10 times as likely than a connected row) Rack Safety & Compliance: Vulnerabilities of Selective Rack
  • 7. • Tunnel use for passage of lift truck to place pallets on rails • Rails run the length of the tunnel on both sides and support pallets on their edge • Damage: rear frames and lower 8’ of all uprights • Collapse: prone, especially if no transverse bracing Rack Safety & Compliance Vulnerabilities of Drive In Racks
  • 8. • Similar to selective rack except beam levels support a system of tracks and carts that allow the pallets to be moved to the rear. • Damage: typically lower front post – carts can get hung up if not maintained • Collapse: rare Rack Safety & Compliance Vulnerabilities of Push Back Racks
  • 9. • Rack usually consists of column with perpendicular arms used to support long items • Damage: arms by dropping loads • Collapse: rare, unless constructed in- house Rack Safety & Compliance Vulnerabilities of Drive In Racks
  • 10. • ANSI MH16.1 – Racking Manufacturers Institute (RMI) • European EN15635 – European Committee for Standardization • CSA – A344 Canadian Standards Association • prime reference in Canada • Meets or exceed most of the requirements of RMI & EN • Today we will refer to A344 – 2016 even though it is not formally approved yet Rack Safety & Compliance Regulations & Requirements
  • 11. • CSA A344 – clause 8.1.9 calls for routine inspections (typically monthly) as well as ‘expert inspections’. • “Expert inspections are typically done under the supervision of a professional engineer, with the engineer taking responsibility for the damage inspection process and reporting. CSA A344 - clause 8.1.5 addresses frequency inspections. The expert establishes the frequency of inspections based on a risk analysis. Rack Safety & Compliance Regulations & Requirements
  • 12. • Damage comes in many forms and each situation can be unique – not easy to evaluate severity • We use a method based on the CSA and European Rack Standard – and call it the RAG method (Red Amber Green) • When doing expert inspections we also use engineering judgment to set the limit of structural imperfection Rack Safety & Compliance Inspection Methods – RAG
  • 13. • Damaged is measured over 500mm or 20” (not 1000mm as in the EN standard) • Items in the chart are not all in the EN guideline and can vary from site to site • Example of recognizing structural vulnerability is : • 4 mm on diagonal brace of single row is more conservative than 5 mm on connected row Rack Safety & Compliance Damage Severity
  • 14. • CSA A344 requires the expert to establish the damage limits for a particular site or structure • Additional parameters can come into play that are specific to site, such as out of plumb, twisted posts, beam damage, etc. • The charts below illustrate how these limits can be established for a site Rack Safety & Compliance Damage Severity
  • 15. • Each damage requires a response, using the RAG Method this chart illustratesappropriate responses: • Classifyingand Tagging items as Red Amber Green sets up Immediate Action • Immediate Action – unloading/locking out of service, avoid loading if possible, monitor for further damage • Corrective Action is a secondary decision that deals with the repair or other remedial action Rack Safety & Compliance Responding to Damages FIND ITEM CLASSIFY & TAG RED AMBER GREEN UNLOAD AVOID LOADING IF POSSIBLE REVISE PRACTICES OR TRAIN ONLY REQUIRES FUTURE MONITORING HAZARD RESOLVED REPAIR OR REPLACE FIND | CLASSIFY | DETERMINE IMMEDIATE ACTION | SPECIFY CORRECTIVE ACTION | CLOSE OUT
  • 16. • RAG Method requires inspection items be treated with a multi-stage RESPONSE: • Categorize & Tag items as Red Amber Green thereby setting up Immediate Action • Immediate Action – specify immediately put out of service, corrective action required, may require corrective action – monitor • Corrective Action - a secondary decision that deals with remediation and prevention Rack Safety & Compliance Responding to Damages FIND ITEM CATAGORIZE & TAG RED AMBER GREEN immediate danger immediately put out of service seek guidance as per clause 8.2.1.3. remediation required may remain in service corrective action is required REVISE PRACTICES OR TRAIN minor deficiencies may require repair, column protection, and/or modified operating practice & monitor to ensure the condition does not worsen CLOSE OUT HAZARD RESOLVED REPAIR OR REPLACE FIND CLASSIFY IMPLEMENT IMMEDIATE ACTION SPECIFY CORRECTIVE ACTION CLOSE OUT bad operating practice instruct the operators
  • 17. • We recommend severity be represented by numbers 1 to 9 as it allows what is in effects “shades” of each color 1-3 GREEN 4-6 AMBER 7-9 RED • The numbers are essentially a RISK index - a relationship between probability and consequence Rack Safety & Compliance Assessing Damages high 4-­6 7-­8 9 9 moderate 4-­6 4-­6 7-­8 9 low 2-­3 4-­6 4-­6 7-­8 minimal 1 2-­3 4-­6 4-­6 minor significant critical catastrophic Probability  or  Likelihood Consequence
  • 18. • CSA A344, clause 8.2 - The engineer supervising the expert inspections should establish time guidelines for corrective action • The chart below is how severity can be assessed a response time Rack Safety & Compliance Assessing Damages
  • 19. Total Unloading Partial or Center-to-center off loading Rack Safety & Compliance Unloading Types • CSA and EN both require unloading if RED • EN standard has special requirements on AMBER – do not reload • There are two types of unloading (total and partial)
  • 20. • CSA A344.1 clause 8.2.2 calls for method to clearly identify rack that is unsafe by “marking or tagging” • Below is one way to tag out a level or bay Rack Safety & Compliance Marking Damaged Racks
  • 21. Rack Safety & Compliance Case Study – Training and Monitoring • Racks  inspected,  plus employees   were  trained  on  Rack  Awareness  and   Inspection • Damage  immediately  was  reduced  -­ inspections  continued • Damage  began  to  increase • Additional  training  was  provided  and   again  damage  incidents  decreased • Big  gains  -­ Increase  in  safety,  and   decrease  in  maintenance • Inspection  and  training  is  a  cost  saver   206 85 34 87 102 29 0 50 100 150 200 250 2010 2011 2012 2013 2014 2015 number of recorded deficiencies
  • 22. • CSA clause 7.3 - the weight of loads placed in the racks must not exceed the load capacity of the rack structure Rack Safety & Compliance Capacity Signage • Clause 7.3.1.2 - Load plaque need to include a reference to documents that establish the maximum permissible loading • The method used should be selected based on the nature of the facility, and achieved by: • use of warehouse management software (WMS) • load plaques & awareness of the weight of the pallets • trained operators using approved storage procedures • insuring the capacity of the rack can support the heaviest pallet in the facility
  • 23. PLANNING  YOUR  NEXT  STEPS 1. Arrange to have an inspection done by an expert third party 2. Ensure the capacity of racks is formally established by an engineer & review documents to ensure they are up to date 3. Set up a program to have staff conduct monthly inspections and ensure they are trained to do so 4. Make arrangements for having the damaged racks repaired or replaced. If repaired, ensure repairs are formally approved 5. Implement the recommendations of the Expert inspection (frequency of inspection, documentation, response time, damage limits)