Interested in learning more disaster recovery?

         Learn about the disaster recovery sessions offered at the upcoming Fall
         2012 Data Center World Conference at:

         www.datacenterworld.com.




    This presentation was given during the Spring, 2012 Data Center World Conference and Expo.
    Contents contained are owned by AFCOM and Data Center World and can only be reused with the
    express permission of ACOM. Questions or for permission contact: jater@afcom.com.

© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Disaster Recovery:
The New Imperative

By: Clemens Pfeiffer, CTO
March 2012
The Purpose of a Data Center

Provide IT equipment a healthy environment to
guarantee application service levels




© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Data Center Requirements

  •    Reliability

  •    Required levels of power & cooling

  •    Support for future growth

  •    Service level guarantees



  •    Tier Definition:
             –    1: Non redundant
             –    2: N+1, redundant components
             –    3: 2N, active/passive
             –    4: 2(N+1), fault tolerant
© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Today’s Typical Data Center Setup

  •    Tier 3 or Tier 4 Data Center
             –    Redundancy within the data center

  •    At least 2 redundant data centers
             –    Redundancy across data centers

  •    Hot/Hot or Hot/Cold application failover configuration
             –    Redundancy of the application




                                                   Data Center 1   Data Center 2
                                                    West Coast      East Coast

© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Is This Sufficient?

  Is It Efficient?
Disaster Areas




                   Physical                                 Hardwar    Running
                   damage                                    e and      out of
                                                            software    power
                                                             failure




© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Disasters - People Can’t Get There

                                                            Natural Disasters
                                                            •Tsunami   in Japan
                                                            •Earthquake   in New York
                                                            •Hurricane   on East Coast

                                                            Impact
                                                            •No   power for a week
                                                            •No   refueling for generators

                                                            Results
                                                            •Datacenter failure when backup
                                                            generation runs out




© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Out of Electricity - Out of Fuel

•     In a 7 day electricity outage – delivery vehicles run out
      of fuel

•     Diesel generators run out of fuel, as no supply is
      available




© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Demand Response / Rolling Blackouts

                                                            •   Required power
                                                                reduction

                                                            •   Temporary outages

                                                            •   Limited hours for
                                                                generators

                                                            •   It can happen
                                                                everywhere and at all
                                                                times

                                                            •   Heat waves, snow,
                                                                hurricanes, water

© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Cooling failure

                                                            •   ASHRAE Limit 80.6F

                                                            •   Physical Server Limit 95F



                                                            •   What about 102.5F and
                                                                more?
                                                                 –   Servers shut down
                                                                 –   Cabling problems
                                                                 –   Outages




© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Failover does not work

•    Primary site down

•    Secondary site not
     coming up


•    People take
     actions

•    Manual recovery

•    Delays and service                                         ABB Decathlon™
     outages


    © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
The Key: Minimize the Application Risk

  •    Focus on application reliability NOT physical reliability

  •    Real-Time monitoring across facilities and IT

  •    Define Service Level requirements for applications

  •    Remove obsolete and unused equipment to reduce power

  •    Optimize cooling and facility infrastructure

  •    Consolidate and group applications by service level

  •    Virtualize / setup private clouds across sites

  •    Automate standard operating procedures

  •    Participate in ancillary services and demand response


© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Virtualization and Consolidation
  Default Virtualization                                              Fixed Reservation                                   Shared Reservation
Provisioned as 1 VM per Physical                                With QoS, Individually Provisioned                      With QoS, Group Provisioned
                                                                 (use max utilization as limit for low QoS apps)   (use spare capacity for low QoS apps, shared buffer)

           Total Resources: 14                                  Total Resources: 11-13, Savings: 7%-20%               Total Resources: 7-8, Savings: 43%-50%



    14




                                          Tier 2
                                          Low QoS




                                          Tier 4
                                          High QoS
     0




                                                                                                                         Run LOW QoS Apps for Free!
                                                                Power Assure and PARC patents pending


    © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Result: Hot/Cold Savings

                                                             reserve
                                                             capacity
                                                               with
                                                             dynamic
                                                              on/off
                                                              buffer


                                                              used



                                                     Power Savings: 72%
                                                     Peak Capacity: 1.6x
© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Result: Hot/Hot Savings


                                                              reserve
                                                              capacity
                                                                with
                                                              dynamic
                                                               on/off

                                                                buffer
                                                                used



                                                      Power Savings: 72%
                                                      Peak Capacity: 3.5x
© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Setup Emergency Procedures
                                                            Cooling Error:

                                                             Power Cap
                                                              Servers




© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
Intelligent Power Distribution

Today – Automatic Transfer Switch Tomorrow – AC or DC Distribution Bus

                                                                               Utility
 Utility                        ATS                                            Power
                                                              Generator                                    UPS                IT
 Power
                                                                              Generator

               UPS                                                            Batteries                   Cooling
                                               Cooling
                 IT                                                          Solar/Wind



       Either / or configuration                                          Synchronized configuration with
       If Utility feed is off:                                               variable input control
                    -- UPS holds IT load                                  If Utility feed is off:
                    -- Cooling stops                                                   -- UPS holds load for IT
       Cooling back as soon as                                                         -- Cooling can run off the batteries
          generator comes on                                              Co-generation capabilities
       Generator maintenance requires                                     Generator maintenance cycles usable
          load bank or ATS flip                                           Battery capacity usable for regulation


  © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
The Impact of an Outage for Data Centers
                                                            Today – Reactive:
                                                            •Tier 3/4 facility redundancy
                                                            •Hot/Hot or Hot/Cold setup
                                                            •Upon failure:
                                                                 –   Generator kicks in, offline from grid
                                                                 –   Shift to secondary data center
                                                                 –   Run double peak capacity 24x7




                                                            Tomorrow – Proactive:
                                                            •Integration into Utility Services for
                                                            preventive actions
                                                                 –   Leverage co-generation capabilities
                                                                 –   Integrate alternative energy sources
                                                                 –   Automated shift and shed across sites
                                                                 –   Tier applications by service level
                                                                 –   Application reliability over facility reliability
                                                                 –   Data centers get paid for upgrades by
                                                                     participation in energy markets
© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
THANK YOU
Interested in learning more disaster recovery?

         Learn about the disaster recovery sessions offered at the upcoming Fall
         2012 Data Center World Conference at:

         www.datacenterworld.com.




    This presentation was given during the Spring, 2012 Data Center World Conference and Expo.
    Contents contained are owned by AFCOM and Data Center World and can only be reused with the
    express permission of ACOM. Questions or for permission contact: jater@afcom.com.

© Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED

Contenu connexe

Tendances

Vmug da-wm-vplex-vmware
Vmug   da-wm-vplex-vmwareVmug   da-wm-vplex-vmware
Vmug da-wm-vplex-vmware
subtitle
 
Vfm v mware vdi tco and roi framework
Vfm v mware vdi tco and roi frameworkVfm v mware vdi tco and roi framework
Vfm v mware vdi tco and roi framework
vfmindia
 
Using Server Virtualization for Manufacturing Operations
Using Server Virtualization for Manufacturing OperationsUsing Server Virtualization for Manufacturing Operations
Using Server Virtualization for Manufacturing Operations
ARC Advisory Group
 

Tendances (19)

Integrated Endpoint Security Management in Novell ZENworks 11 Configuration M...
Integrated Endpoint Security Management in Novell ZENworks 11 Configuration M...Integrated Endpoint Security Management in Novell ZENworks 11 Configuration M...
Integrated Endpoint Security Management in Novell ZENworks 11 Configuration M...
 
OWF12/Java Sacha labourey
OWF12/Java Sacha laboureyOWF12/Java Sacha labourey
OWF12/Java Sacha labourey
 
What an Enterprise Should Look for in a Cloud Provider
What an Enterprise Should Look for in a Cloud ProviderWhat an Enterprise Should Look for in a Cloud Provider
What an Enterprise Should Look for in a Cloud Provider
 
Adaptive Computing Using PlateSpin Orchestrate
Adaptive Computing Using PlateSpin OrchestrateAdaptive Computing Using PlateSpin Orchestrate
Adaptive Computing Using PlateSpin Orchestrate
 
Novell Success Stories: Endpoint Management in Education
Novell Success Stories: Endpoint Management in EducationNovell Success Stories: Endpoint Management in Education
Novell Success Stories: Endpoint Management in Education
 
Migrating from Novell ZENworks 7 Desktop Management to Novell ZENworks Config...
Migrating from Novell ZENworks 7 Desktop Management to Novell ZENworks Config...Migrating from Novell ZENworks 7 Desktop Management to Novell ZENworks Config...
Migrating from Novell ZENworks 7 Desktop Management to Novell ZENworks Config...
 
Novell Success Stories: Endpoint Management in High Tech and Professional Ser...
Novell Success Stories: Endpoint Management in High Tech and Professional Ser...Novell Success Stories: Endpoint Management in High Tech and Professional Ser...
Novell Success Stories: Endpoint Management in High Tech and Professional Ser...
 
Finding Virtual Coins in the Couch
Finding Virtual Coins in the CouchFinding Virtual Coins in the Couch
Finding Virtual Coins in the Couch
 
Green IT: Start Saving Money
Green IT: Start Saving MoneyGreen IT: Start Saving Money
Green IT: Start Saving Money
 
How to Implement Cloud Security: The Nuts and Bolts of Novell Cloud Security ...
How to Implement Cloud Security: The Nuts and Bolts of Novell Cloud Security ...How to Implement Cloud Security: The Nuts and Bolts of Novell Cloud Security ...
How to Implement Cloud Security: The Nuts and Bolts of Novell Cloud Security ...
 
Introducing Novell Privileged User Manager and Securing Novell Open Enterpris...
Introducing Novell Privileged User Manager and Securing Novell Open Enterpris...Introducing Novell Privileged User Manager and Securing Novell Open Enterpris...
Introducing Novell Privileged User Manager and Securing Novell Open Enterpris...
 
Hadoop Summit 2012 | Improving HBase Availability and Repair
Hadoop Summit 2012 | Improving HBase Availability and RepairHadoop Summit 2012 | Improving HBase Availability and Repair
Hadoop Summit 2012 | Improving HBase Availability and Repair
 
IBM Cloud Burst postavená na platforme IBM System x
IBM Cloud Burst postavená na platforme IBM System xIBM Cloud Burst postavená na platforme IBM System x
IBM Cloud Burst postavená na platforme IBM System x
 
Novell Success Stories: Collaboration in Education
Novell Success Stories: Collaboration in EducationNovell Success Stories: Collaboration in Education
Novell Success Stories: Collaboration in Education
 
Novell ZENworks Advanced Application Management
Novell ZENworks Advanced Application ManagementNovell ZENworks Advanced Application Management
Novell ZENworks Advanced Application Management
 
Vmug da-wm-vplex-vmware
Vmug   da-wm-vplex-vmwareVmug   da-wm-vplex-vmware
Vmug da-wm-vplex-vmware
 
Novell Success Stories: Endpoint Management in Government
Novell Success Stories: Endpoint Management in GovernmentNovell Success Stories: Endpoint Management in Government
Novell Success Stories: Endpoint Management in Government
 
Vfm v mware vdi tco and roi framework
Vfm v mware vdi tco and roi frameworkVfm v mware vdi tco and roi framework
Vfm v mware vdi tco and roi framework
 
Using Server Virtualization for Manufacturing Operations
Using Server Virtualization for Manufacturing OperationsUsing Server Virtualization for Manufacturing Operations
Using Server Virtualization for Manufacturing Operations
 

Similaire à Disaster recovery the new imperative

Veros Systems on SAP
Veros Systems on SAPVeros Systems on SAP
Veros Systems on SAP
Allan Wilson
 
Avamar weekly webcast
Avamar weekly webcastAvamar weekly webcast
Avamar weekly webcast
stefriche0199
 
Veros Systems on IBM
Veros Systems on IBMVeros Systems on IBM
Veros Systems on IBM
Allan Wilson
 
ConnectWise and eFolder Webinar: From Destruction to Production in 72 Hours
ConnectWise and eFolder Webinar: From Destruction to Production in 72 HoursConnectWise and eFolder Webinar: From Destruction to Production in 72 Hours
ConnectWise and eFolder Webinar: From Destruction to Production in 72 Hours
Dropbox
 
BranchReduce Distributed Branch-and-Bound on YARN
BranchReduce Distributed Branch-and-Bound on YARNBranchReduce Distributed Branch-and-Bound on YARN
BranchReduce Distributed Branch-and-Bound on YARN
DataWorks Summit
 

Similaire à Disaster recovery the new imperative (20)

Are We Ready?
Are We Ready?Are We Ready?
Are We Ready?
 
102 1600-1630
102 1600-1630102 1600-1630
102 1600-1630
 
Veros Systems on SAP
Veros Systems on SAPVeros Systems on SAP
Veros Systems on SAP
 
Is Your JD Edwards Recoverable?
Is Your JD Edwards Recoverable?Is Your JD Edwards Recoverable?
Is Your JD Edwards Recoverable?
 
Avamar weekly webcast
Avamar weekly webcastAvamar weekly webcast
Avamar weekly webcast
 
CPN208 Failures at Scale & How to Ride Through Them - AWS re: Invent 2012
CPN208 Failures at Scale & How to Ride Through Them - AWS re: Invent 2012CPN208 Failures at Scale & How to Ride Through Them - AWS re: Invent 2012
CPN208 Failures at Scale & How to Ride Through Them - AWS re: Invent 2012
 
Veros Systems on IBM
Veros Systems on IBMVeros Systems on IBM
Veros Systems on IBM
 
Company Presentation
Company PresentationCompany Presentation
Company Presentation
 
High Availability og virtualisering, IBM Power Event
High Availability og virtualisering, IBM Power EventHigh Availability og virtualisering, IBM Power Event
High Availability og virtualisering, IBM Power Event
 
Disaster Recovery & Business Resilience Trends - CloudSmartz | Smarter Transf...
Disaster Recovery & Business Resilience Trends - CloudSmartz | Smarter Transf...Disaster Recovery & Business Resilience Trends - CloudSmartz | Smarter Transf...
Disaster Recovery & Business Resilience Trends - CloudSmartz | Smarter Transf...
 
Operational Realities of a Large Office & Research Campus Microgrids
Operational Realities of a Large Office & Research Campus MicrogridsOperational Realities of a Large Office & Research Campus Microgrids
Operational Realities of a Large Office & Research Campus Microgrids
 
HDFS NameNode High Availability
HDFS NameNode High AvailabilityHDFS NameNode High Availability
HDFS NameNode High Availability
 
ConnectWise and eFolder Webinar: From Destruction to Production in 72 Hours
ConnectWise and eFolder Webinar: From Destruction to Production in 72 HoursConnectWise and eFolder Webinar: From Destruction to Production in 72 Hours
ConnectWise and eFolder Webinar: From Destruction to Production in 72 Hours
 
Tuning Android Applications (Part Deux)
Tuning Android Applications (Part Deux)Tuning Android Applications (Part Deux)
Tuning Android Applications (Part Deux)
 
Presentation deduplication backup software and system
Presentation   deduplication backup software and systemPresentation   deduplication backup software and system
Presentation deduplication backup software and system
 
SolarEye Platform - Solar Photovoltaic Monitoring
SolarEye Platform  - Solar Photovoltaic MonitoringSolarEye Platform  - Solar Photovoltaic Monitoring
SolarEye Platform - Solar Photovoltaic Monitoring
 
Congress 2012: Enterprise Cloud Adoption – an Evolution from Infrastructure ...
Congress 2012:  Enterprise Cloud Adoption – an Evolution from Infrastructure ...Congress 2012:  Enterprise Cloud Adoption – an Evolution from Infrastructure ...
Congress 2012: Enterprise Cloud Adoption – an Evolution from Infrastructure ...
 
Save Money by Implementing Power Management Policies with Novell ZENworks Con...
Save Money by Implementing Power Management Policies with Novell ZENworks Con...Save Money by Implementing Power Management Policies with Novell ZENworks Con...
Save Money by Implementing Power Management Policies with Novell ZENworks Con...
 
BranchReduce Distributed Branch-and-Bound on YARN
BranchReduce Distributed Branch-and-Bound on YARNBranchReduce Distributed Branch-and-Bound on YARN
BranchReduce Distributed Branch-and-Bound on YARN
 
Performing Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin ForgePerforming Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin Forge
 

Plus de AFCOM

Plus de AFCOM (12)

Maximizing the life of existing equipment
Maximizing the life of existing equipmentMaximizing the life of existing equipment
Maximizing the life of existing equipment
 
Lowering operating costs through cooling system design
Lowering operating costs through cooling system designLowering operating costs through cooling system design
Lowering operating costs through cooling system design
 
Cloudy with a chance of downtime
Cloudy with a chance of downtimeCloudy with a chance of downtime
Cloudy with a chance of downtime
 
Adding intelligence to your dcim solution rf code
Adding intelligence to your dcim solution rf codeAdding intelligence to your dcim solution rf code
Adding intelligence to your dcim solution rf code
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data Center
 
Understanding And Evaluating Colocation Data Centers
Understanding And Evaluating Colocation Data CentersUnderstanding And Evaluating Colocation Data Centers
Understanding And Evaluating Colocation Data Centers
 
Buy vs Build Considerations in Today's Data Center Marketplace
Buy vs Build Considerations in Today's Data Center Marketplace Buy vs Build Considerations in Today's Data Center Marketplace
Buy vs Build Considerations in Today's Data Center Marketplace
 
Data Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet BraunData Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet Braun
 
Taming the DCIM Wave with ITIL
Taming the DCIM Wave with ITILTaming the DCIM Wave with ITIL
Taming the DCIM Wave with ITIL
 
How to Design a Scalable Private Cloud
How to Design a Scalable Private CloudHow to Design a Scalable Private Cloud
How to Design a Scalable Private Cloud
 
Best Practices To Mitigate Risks When Retiring IT Assets
Best Practices To Mitigate Risks When Retiring IT AssetsBest Practices To Mitigate Risks When Retiring IT Assets
Best Practices To Mitigate Risks When Retiring IT Assets
 
Balancing Trends in Data Center Migration, Site Selection, and Operating Costs
Balancing Trends in Data Center Migration, Site Selection, and Operating CostsBalancing Trends in Data Center Migration, Site Selection, and Operating Costs
Balancing Trends in Data Center Migration, Site Selection, and Operating Costs
 

Dernier

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 

Dernier (20)

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

Disaster recovery the new imperative

  • 1. Interested in learning more disaster recovery? Learn about the disaster recovery sessions offered at the upcoming Fall 2012 Data Center World Conference at: www.datacenterworld.com. This presentation was given during the Spring, 2012 Data Center World Conference and Expo. Contents contained are owned by AFCOM and Data Center World and can only be reused with the express permission of ACOM. Questions or for permission contact: jater@afcom.com. © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 2. Disaster Recovery: The New Imperative By: Clemens Pfeiffer, CTO March 2012
  • 3. The Purpose of a Data Center Provide IT equipment a healthy environment to guarantee application service levels © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 4. Data Center Requirements • Reliability • Required levels of power & cooling • Support for future growth • Service level guarantees • Tier Definition: – 1: Non redundant – 2: N+1, redundant components – 3: 2N, active/passive – 4: 2(N+1), fault tolerant © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 5. Today’s Typical Data Center Setup • Tier 3 or Tier 4 Data Center – Redundancy within the data center • At least 2 redundant data centers – Redundancy across data centers • Hot/Hot or Hot/Cold application failover configuration – Redundancy of the application Data Center 1 Data Center 2 West Coast East Coast © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 6. Is This Sufficient? Is It Efficient?
  • 7. Disaster Areas Physical Hardwar Running damage e and out of software power failure © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 8. Disasters - People Can’t Get There Natural Disasters •Tsunami in Japan •Earthquake in New York •Hurricane on East Coast Impact •No power for a week •No refueling for generators Results •Datacenter failure when backup generation runs out © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 9. Out of Electricity - Out of Fuel • In a 7 day electricity outage – delivery vehicles run out of fuel • Diesel generators run out of fuel, as no supply is available © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 10. Demand Response / Rolling Blackouts • Required power reduction • Temporary outages • Limited hours for generators • It can happen everywhere and at all times • Heat waves, snow, hurricanes, water © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 11. Cooling failure • ASHRAE Limit 80.6F • Physical Server Limit 95F • What about 102.5F and more? – Servers shut down – Cabling problems – Outages © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 12. Failover does not work • Primary site down • Secondary site not coming up • People take actions • Manual recovery • Delays and service ABB Decathlon™ outages © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 13. The Key: Minimize the Application Risk • Focus on application reliability NOT physical reliability • Real-Time monitoring across facilities and IT • Define Service Level requirements for applications • Remove obsolete and unused equipment to reduce power • Optimize cooling and facility infrastructure • Consolidate and group applications by service level • Virtualize / setup private clouds across sites • Automate standard operating procedures • Participate in ancillary services and demand response © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 14. Virtualization and Consolidation Default Virtualization Fixed Reservation Shared Reservation Provisioned as 1 VM per Physical With QoS, Individually Provisioned With QoS, Group Provisioned (use max utilization as limit for low QoS apps) (use spare capacity for low QoS apps, shared buffer) Total Resources: 14 Total Resources: 11-13, Savings: 7%-20% Total Resources: 7-8, Savings: 43%-50% 14 Tier 2 Low QoS Tier 4 High QoS 0 Run LOW QoS Apps for Free! Power Assure and PARC patents pending © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 15. Result: Hot/Cold Savings reserve capacity with dynamic on/off buffer used Power Savings: 72% Peak Capacity: 1.6x © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 16. Result: Hot/Hot Savings reserve capacity with dynamic on/off buffer used Power Savings: 72% Peak Capacity: 3.5x © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 17. Setup Emergency Procedures Cooling Error: Power Cap Servers © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 18. Intelligent Power Distribution Today – Automatic Transfer Switch Tomorrow – AC or DC Distribution Bus Utility Utility ATS Power Generator UPS IT Power Generator UPS Batteries Cooling Cooling IT Solar/Wind Either / or configuration Synchronized configuration with If Utility feed is off: variable input control -- UPS holds IT load If Utility feed is off: -- Cooling stops -- UPS holds load for IT Cooling back as soon as -- Cooling can run off the batteries generator comes on Co-generation capabilities Generator maintenance requires Generator maintenance cycles usable load bank or ATS flip Battery capacity usable for regulation © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 19. The Impact of an Outage for Data Centers Today – Reactive: •Tier 3/4 facility redundancy •Hot/Hot or Hot/Cold setup •Upon failure: – Generator kicks in, offline from grid – Shift to secondary data center – Run double peak capacity 24x7 Tomorrow – Proactive: •Integration into Utility Services for preventive actions – Leverage co-generation capabilities – Integrate alternative energy sources – Automated shift and shed across sites – Tier applications by service level – Application reliability over facility reliability – Data centers get paid for upgrades by participation in energy markets © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED
  • 21. Interested in learning more disaster recovery? Learn about the disaster recovery sessions offered at the upcoming Fall 2012 Data Center World Conference at: www.datacenterworld.com. This presentation was given during the Spring, 2012 Data Center World Conference and Expo. Contents contained are owned by AFCOM and Data Center World and can only be reused with the express permission of ACOM. Questions or for permission contact: jater@afcom.com. © Copyright 2012 Power Assure, Inc. – ALL RIGHTS RESERVED

Notes de l'éditeur

  1. Disaster Recovery: The New Imperative Clemens Pfeiffer, Chief Technology Officer, Power Assure In the wake of the Japanese tsunami, it has become very clear that power availability can no longer be taken for granted. Robust, up-to-date, well-documented disaster recovery and business continuity planning is essential for all enterprise data centers, particularly in light of recent natural disasters, socioeconomic unrest and with changes to regulations impacting businesses. This session will discuss how to increase application reliability while decreasing energy consumption; how to utilize historical trending data to plan responses to alerts and situations; and the steps to structuring a data center to respond to both planned and unplanned events.