University Link Project
I-5 Ramp Closure Update




   Capitol Hill Open House
        May 7, 2009
Agenda
    6:00 PM - Open House
    6:30 PM - Presentation
       • University Link, Capitol Hill Station and I-5 Construction
          – Ron Endlich, Deputy Project Director, Sound Transit
       • Q&A
    7:30 PM - Return to Open House
    8:00 PM - Close




2
University Link
           • 3.15-mile extension of Initial
             Segment and Airport Link
              – Capitol Hill Station
              – UW Station and crossover
           • Schedule
              –   Design: completed early 2009
              –   Construction: 6.5 years
              –   System testing: 6 months
              –   Open for Service: 2016

           • Adds 70,000 daily riders,
             114,000 riders systemwide
             (2030)


3
Capitol Hill Station

• Underground station with 3
  entrances
• Staging area - station and    N
  tunnel excavation at site
• Ridership: 14,000 daily
  boardings
• Travel time:
   – 6 minutes to downtown
     Seattle (University St.)
   – 3 minutes to UW Station



   4
Capitol Hill Station Schedule




                1
                    2

                        3
                                    4




5
1. Demolition and Remediation
• Jan. 2009 to mid-2009
• 75% Recycling and salvage
  goal
• Denny remains open
• Sidewalks remain open
     – Will be few short term closures
• Site will be paved and remain
  fenced




 6
Recycled and Salvaged Items
A large amount of materials that otherwise would have been taken to landfills was removed
for re-use. Among some of the items salvaged were:
*Recycled Demolition Material to Date: 1,450 Tons
• 224 doors
• 180 cabinets
• 18 restaurant booths
• 50 light fixtures
• 29 ranges
• 31 refrigerators
• 13 claw foot tubs
• 21 sinks and toilets
• 60 radiator fins
• 121 ft. wrought iron railing
• 90 ft. wood railing
• Hundreds of feet of trim and molding
• 3500 sq. ft. fir flooring
• 500 sq. ft. tin ceiling panels

 7
2. I-5 Undercrossing Work Vicinity
                                                                 I-5 undercrossing contract awarded
                                                                                 in February
Convention Place Station
                                T
                              EE
                            TR


                                                BO
                          ES
                       PIN
                                                                    -Prepares I-5 structures for future tunnel
                                                   RE W
                                                     N
                                                       ST
                                              ork A
                                    NB I-




                                                          RE
                                                                    boring machines
                                5
                           SB I-




                                                            ET
           Work Area
                                                   re a
                                          5




                                                                    -Work being done now to avoid conflicts
                                                                    with other WSDOT freeway work and later
 Paramount
 Theater
                                                                    U-Link contracts
                                                                    -Coordinated agency outreach to public
                                                                    on ramp closures
                                                                    -Contractor incentives to complete the
                                                                    work early




     8
Work Pit Locations

                 ve.
               nA
        re
      Bo               SBE Pit



                                  NBE Pit


                                      NB I
                                               -5
     SBW Pit



                                   SB I-
         St.




                                           5
                        NBW Pit
       e
    Pin




9
10
I-5 Ramp Closures



     Pine Street

                         Pike Street




                     t
                   ee
                Str
              y
        err
      Ch




11
Olive Way Off-Ramp Closure Detour




12
Cherry Street On-Ramp Detours




ϖ    Cherry St. express lane on-ramp will
     be open to all traffic (currently only
     HOV) during detour




    13
Agency Coordination & Public
          Outreach Efforts
 • Coordination with WSDOT, SDOT and KC Metro
 • Sound Transit website
 • U-Link Website www.soundtransit.org/u-link
 • E-mail alerts
 • WSDOT construction information website
 • SDOT construction webpage
 • Portable Vehicle Messaging Systems along I-5
 • Highway Advisory Radio System (HARS)
 • Vehicle Message System with notification of
   closures
 • Detour cards for businesses affected by closure
   to educate patrons
 • Door-to-door business outreach

14
3. Station Excavation, Tunneling
•   Jan. 2010 to Dec. 2012
•   Plywood wall surrounding site
•   Denny and parts of Nagle closed to
    traffic
•   Sidewalks open
     – Will be few short term closures
•   Single Tunnel Boring Machine (TBM)
•   24/7 surface activity to support
    tunneling
•   High truck volumes




    15
Capitol Hill Site Noise Variance
     •Sound Transit preparing noise variance application for the
     Capitol Hill site
         -Construction wall will contain most but not all work
          noise
         -24/7 site activities to support tunneling work
         -Work activities and equipment restrictions, other
          mitigation
     •Noise informational meeting June 3, 2009
     •DPD will schedule a public meeting on the technical noise
     variance in late Summer 2009




16
4. Station Construction
• Jan. 2013 to Dec. 2015
• Less trucking activity
• Sidewalks open
   – Will be few short term closures
• Cut and cover pedestrian tunnel
  across Broadway (6 months)
   – Roadway remains open
   – Parking restrictions near work




 17
Transit Oriented Development (TOD)
 • 4-5 sites available for TOD
 • TOD community forums scheduled during 2009
     – June 24th forum on housing and retail
 • Developer(s) to be selected in 2012-2013
 • Construction of some sites could begin prior to station
   opening (2015)




18
                                               N
Questions?




19
Staying Informed
•    Monthly electronic newsletters
     www.soundtransit.org/subscribe
•    Printed and electronic construction
     alerts
•    Regular construction update meetings
•    Full time outreach staff
•    24 hour construction hotline
     1-888-298-2395
•    www.soundtransit.org/u-link




20
Truck Haul Route
      (beginning 2010)




21

Contenu connexe

Tendances

Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 
PCW_Community_Report_2016-web
PCW_Community_Report_2016-webPCW_Community_Report_2016-web
PCW_Community_Report_2016-webMary Murphy
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationCrosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open houseCrosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck finalCrosstown TO
 
Prueba visio
Prueba visioPrueba visio
Prueba visioronald
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road WalkwayFairfax County
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house Crosstown TO
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house Crosstown TO
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road WalkwayFairfax County
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open houseCrosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 

Tendances (20)

Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
PCW_Community_Report_2016-web
PCW_Community_Report_2016-webPCW_Community_Report_2016-web
PCW_Community_Report_2016-web
 
Fairfax Community Leaders Conference
Fairfax Community Leaders ConferenceFairfax Community Leaders Conference
Fairfax Community Leaders Conference
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Prueba visio
Prueba visioPrueba visio
Prueba visio
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house
 
Const-Gardens
Const-GardensConst-Gardens
Const-Gardens
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 

En vedette

Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...
Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...
Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...Ashish Shah
 
The International Comparative Legal Guide to: Data Protection 2014
The International Comparative Legal Guide to: Data Protection 2014The International Comparative Legal Guide to: Data Protection 2014
The International Comparative Legal Guide to: Data Protection 2014Hogan Lovells BSTL
 
Progrmacion Neurolinguistica
Progrmacion NeurolinguisticaProgrmacion Neurolinguistica
Progrmacion Neurolinguisticasalvador arellano
 
Cáncer de mama
Cáncer de mamaCáncer de mama
Cáncer de mamamario2705
 
Talent Moves_April - August 2013_PlenumGroup
Talent Moves_April - August 2013_PlenumGroupTalent Moves_April - August 2013_PlenumGroup
Talent Moves_April - August 2013_PlenumGroupPlenumGroupResearch
 
Stadienecho Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09
Stadienecho  Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09Stadienecho  Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09
Stadienecho Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09SCM Fussball
 
Usando dos pronombres
Usando dos pronombresUsando dos pronombres
Usando dos pronombresLily Butcher
 
El argentino n° 2593 2 06-2011
El argentino n° 2593 2 06-2011El argentino n° 2593 2 06-2011
El argentino n° 2593 2 06-2011fede_bour
 
Sociolinguistic survey, advancement of indigenous languages in relationship t...
Sociolinguistic survey, advancement of indigenous languages in relationship t...Sociolinguistic survey, advancement of indigenous languages in relationship t...
Sociolinguistic survey, advancement of indigenous languages in relationship t...Alexander Decker
 
Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)
Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)
Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)Franklin Calle Zapata
 
Tafsir Almaraghi Mraghi01
Tafsir Almaraghi Mraghi01 Tafsir Almaraghi Mraghi01
Tafsir Almaraghi Mraghi01 Muhammad Idris
 
Cannes Lions 2014: Food for thought
Cannes Lions 2014: Food for thoughtCannes Lions 2014: Food for thought
Cannes Lions 2014: Food for thoughtMEC Russia
 
Como Accedo a Sexy Chat - Claro
Como Accedo a Sexy Chat - ClaroComo Accedo a Sexy Chat - Claro
Como Accedo a Sexy Chat - ClaroPluki Puntocom
 
Proyecto aragón. Aprendizaje Basado en Proyectos
Proyecto aragón. Aprendizaje Basado en ProyectosProyecto aragón. Aprendizaje Basado en Proyectos
Proyecto aragón. Aprendizaje Basado en Proyectosyolyinfantil
 

En vedette (20)

Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...
Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...
Asset Management Australian Indian Engineers Forum 19 Sept 2015 by Gopinath C...
 
The International Comparative Legal Guide to: Data Protection 2014
The International Comparative Legal Guide to: Data Protection 2014The International Comparative Legal Guide to: Data Protection 2014
The International Comparative Legal Guide to: Data Protection 2014
 
Bangkok www.giiaa.com
Bangkok www.giiaa.comBangkok www.giiaa.com
Bangkok www.giiaa.com
 
Progrmacion Neurolinguistica
Progrmacion NeurolinguisticaProgrmacion Neurolinguistica
Progrmacion Neurolinguistica
 
Buzz 2010 presentation
Buzz 2010 presentationBuzz 2010 presentation
Buzz 2010 presentation
 
Cáncer de mama
Cáncer de mamaCáncer de mama
Cáncer de mama
 
Social wi fi v1 5
Social wi fi v1 5Social wi fi v1 5
Social wi fi v1 5
 
Talent Moves_April - August 2013_PlenumGroup
Talent Moves_April - August 2013_PlenumGroupTalent Moves_April - August 2013_PlenumGroup
Talent Moves_April - August 2013_PlenumGroup
 
La Iglesia en España
La Iglesia en EspañaLa Iglesia en España
La Iglesia en España
 
Stadienecho Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09
Stadienecho  Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09Stadienecho  Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09
Stadienecho Spieltag 31 - SC Melle 03 gegen FC Schüttorf 09
 
Usando dos pronombres
Usando dos pronombresUsando dos pronombres
Usando dos pronombres
 
El argentino n° 2593 2 06-2011
El argentino n° 2593 2 06-2011El argentino n° 2593 2 06-2011
El argentino n° 2593 2 06-2011
 
Sociolinguistic survey, advancement of indigenous languages in relationship t...
Sociolinguistic survey, advancement of indigenous languages in relationship t...Sociolinguistic survey, advancement of indigenous languages in relationship t...
Sociolinguistic survey, advancement of indigenous languages in relationship t...
 
Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)
Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)
Sistema Integral de Gestión académico administrativo 2.0 (H3M - SIGA2)
 
Tafsir Almaraghi Mraghi01
Tafsir Almaraghi Mraghi01 Tafsir Almaraghi Mraghi01
Tafsir Almaraghi Mraghi01
 
Cannes Lions 2014: Food for thought
Cannes Lions 2014: Food for thoughtCannes Lions 2014: Food for thought
Cannes Lions 2014: Food for thought
 
Arnaldo ghersi aprendizaje espaciado y la clase invertida
Arnaldo ghersi aprendizaje espaciado y la clase invertidaArnaldo ghersi aprendizaje espaciado y la clase invertida
Arnaldo ghersi aprendizaje espaciado y la clase invertida
 
Informe de gestión secretaria de salud y bienestar
Informe de gestión secretaria de salud y bienestarInforme de gestión secretaria de salud y bienestar
Informe de gestión secretaria de salud y bienestar
 
Como Accedo a Sexy Chat - Claro
Como Accedo a Sexy Chat - ClaroComo Accedo a Sexy Chat - Claro
Como Accedo a Sexy Chat - Claro
 
Proyecto aragón. Aprendizaje Basado en Proyectos
Proyecto aragón. Aprendizaje Basado en ProyectosProyecto aragón. Aprendizaje Basado en Proyectos
Proyecto aragón. Aprendizaje Basado en Proyectos
 

Similaire à Ch Open House0905

FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docxFibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docxThandabantu Magengelele
 
Sound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction MeetingSound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction Meetingjseattle
 
Minutes of Meeting-39Weekly Progress Meeting
Minutes of Meeting-39Weekly Progress MeetingMinutes of Meeting-39Weekly Progress Meeting
Minutes of Meeting-39Weekly Progress Meetingjimit langalia
 
Applications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil EngineeringApplications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil EngineeringLawrence Le Roux
 
Excavation method rectified 13-11-2010
Excavation method   rectified 13-11-2010Excavation method   rectified 13-11-2010
Excavation method rectified 13-11-2010Minh Bui Si
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptAkdDeshmukh
 
Verdun sud ouest good neighbourly relations committee meeting minutes - nov...
Verdun   sud ouest good neighbourly relations committee meeting minutes - nov...Verdun   sud ouest good neighbourly relations committee meeting minutes - nov...
Verdun sud ouest good neighbourly relations committee meeting minutes - nov...Pont Samuel-De Champlain Bridge
 

Similaire à Ch Open House0905 (8)

FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docxFibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
 
3rd Street Project Overview
3rd Street Project Overview3rd Street Project Overview
3rd Street Project Overview
 
Sound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction MeetingSound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction Meeting
 
Minutes of Meeting-39Weekly Progress Meeting
Minutes of Meeting-39Weekly Progress MeetingMinutes of Meeting-39Weekly Progress Meeting
Minutes of Meeting-39Weekly Progress Meeting
 
Applications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil EngineeringApplications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil Engineering
 
Excavation method rectified 13-11-2010
Excavation method   rectified 13-11-2010Excavation method   rectified 13-11-2010
Excavation method rectified 13-11-2010
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.ppt
 
Verdun sud ouest good neighbourly relations committee meeting minutes - nov...
Verdun   sud ouest good neighbourly relations committee meeting minutes - nov...Verdun   sud ouest good neighbourly relations committee meeting minutes - nov...
Verdun sud ouest good neighbourly relations committee meeting minutes - nov...
 

Plus de jseattle

First hillstreetcarartpresentation6.16.10
First hillstreetcarartpresentation6.16.10First hillstreetcarartpresentation6.16.10
First hillstreetcarartpresentation6.16.10jseattle
 
Budget20100614 3
Budget20100614 3Budget20100614 3
Budget20100614 3jseattle
 
2010 4-14 open house
2010 4-14 open house2010 4-14 open house
2010 4-14 open housejseattle
 
Streetcar Recommendation for City Council Transportation Cmte
Streetcar Recommendation for City Council Transportation CmteStreetcar Recommendation for City Council Transportation Cmte
Streetcar Recommendation for City Council Transportation Cmtejseattle
 
Mayor Stakeholders 3172010
Mayor Stakeholders 3172010Mayor Stakeholders 3172010
Mayor Stakeholders 3172010jseattle
 
Capitol Hill Light Rail TOD Forum 2/23/10
Capitol Hill Light Rail TOD Forum 2/23/10Capitol Hill Light Rail TOD Forum 2/23/10
Capitol Hill Light Rail TOD Forum 2/23/10jseattle
 
Broadway Tod Report 2 Charrette
Broadway Tod Report 2 CharretteBroadway Tod Report 2 Charrette
Broadway Tod Report 2 Charrettejseattle
 
Broadway Tod Report 1 Precedents
Broadway Tod Report 1 PrecedentsBroadway Tod Report 1 Precedents
Broadway Tod Report 1 Precedentsjseattle
 
Broadway Tod Report 3 Recommendations
Broadway Tod Report 3 RecommendationsBroadway Tod Report 3 Recommendations
Broadway Tod Report 3 Recommendationsjseattle
 
2010 2 11 Noise Public Meeting
2010 2 11 Noise Public Meeting2010 2 11 Noise Public Meeting
2010 2 11 Noise Public Meetingjseattle
 
Capitol Hill Cc 12110
Capitol Hill Cc 12110Capitol Hill Cc 12110
Capitol Hill Cc 12110jseattle
 
DRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations ReportDRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations Reportjseattle
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open Housejseattle
 
Heroin Bust
Heroin BustHeroin Bust
Heroin Bustjseattle
 
Ch Station Constructionschedule
Ch Station ConstructionscheduleCh Station Constructionschedule
Ch Station Constructionschedulejseattle
 
Seattle City Council Budget Briefing
Seattle City Council Budget BriefingSeattle City Council Budget Briefing
Seattle City Council Budget Briefingjseattle
 
4 6 09 Forecast Mtg Council
4 6 09 Forecast Mtg Council4 6 09 Forecast Mtg Council
4 6 09 Forecast Mtg Counciljseattle
 

Plus de jseattle (17)

First hillstreetcarartpresentation6.16.10
First hillstreetcarartpresentation6.16.10First hillstreetcarartpresentation6.16.10
First hillstreetcarartpresentation6.16.10
 
Budget20100614 3
Budget20100614 3Budget20100614 3
Budget20100614 3
 
2010 4-14 open house
2010 4-14 open house2010 4-14 open house
2010 4-14 open house
 
Streetcar Recommendation for City Council Transportation Cmte
Streetcar Recommendation for City Council Transportation CmteStreetcar Recommendation for City Council Transportation Cmte
Streetcar Recommendation for City Council Transportation Cmte
 
Mayor Stakeholders 3172010
Mayor Stakeholders 3172010Mayor Stakeholders 3172010
Mayor Stakeholders 3172010
 
Capitol Hill Light Rail TOD Forum 2/23/10
Capitol Hill Light Rail TOD Forum 2/23/10Capitol Hill Light Rail TOD Forum 2/23/10
Capitol Hill Light Rail TOD Forum 2/23/10
 
Broadway Tod Report 2 Charrette
Broadway Tod Report 2 CharretteBroadway Tod Report 2 Charrette
Broadway Tod Report 2 Charrette
 
Broadway Tod Report 1 Precedents
Broadway Tod Report 1 PrecedentsBroadway Tod Report 1 Precedents
Broadway Tod Report 1 Precedents
 
Broadway Tod Report 3 Recommendations
Broadway Tod Report 3 RecommendationsBroadway Tod Report 3 Recommendations
Broadway Tod Report 3 Recommendations
 
2010 2 11 Noise Public Meeting
2010 2 11 Noise Public Meeting2010 2 11 Noise Public Meeting
2010 2 11 Noise Public Meeting
 
Capitol Hill Cc 12110
Capitol Hill Cc 12110Capitol Hill Cc 12110
Capitol Hill Cc 12110
 
DRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations ReportDRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations Report
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
 
Heroin Bust
Heroin BustHeroin Bust
Heroin Bust
 
Ch Station Constructionschedule
Ch Station ConstructionscheduleCh Station Constructionschedule
Ch Station Constructionschedule
 
Seattle City Council Budget Briefing
Seattle City Council Budget BriefingSeattle City Council Budget Briefing
Seattle City Council Budget Briefing
 
4 6 09 Forecast Mtg Council
4 6 09 Forecast Mtg Council4 6 09 Forecast Mtg Council
4 6 09 Forecast Mtg Council
 

Dernier

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 

Dernier (20)

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 

Ch Open House0905

  • 1. University Link Project I-5 Ramp Closure Update Capitol Hill Open House May 7, 2009
  • 2. Agenda 6:00 PM - Open House 6:30 PM - Presentation • University Link, Capitol Hill Station and I-5 Construction – Ron Endlich, Deputy Project Director, Sound Transit • Q&A 7:30 PM - Return to Open House 8:00 PM - Close 2
  • 3. University Link • 3.15-mile extension of Initial Segment and Airport Link – Capitol Hill Station – UW Station and crossover • Schedule – Design: completed early 2009 – Construction: 6.5 years – System testing: 6 months – Open for Service: 2016 • Adds 70,000 daily riders, 114,000 riders systemwide (2030) 3
  • 4. Capitol Hill Station • Underground station with 3 entrances • Staging area - station and N tunnel excavation at site • Ridership: 14,000 daily boardings • Travel time: – 6 minutes to downtown Seattle (University St.) – 3 minutes to UW Station 4
  • 5. Capitol Hill Station Schedule 1 2 3 4 5
  • 6. 1. Demolition and Remediation • Jan. 2009 to mid-2009 • 75% Recycling and salvage goal • Denny remains open • Sidewalks remain open – Will be few short term closures • Site will be paved and remain fenced 6
  • 7. Recycled and Salvaged Items A large amount of materials that otherwise would have been taken to landfills was removed for re-use. Among some of the items salvaged were: *Recycled Demolition Material to Date: 1,450 Tons • 224 doors • 180 cabinets • 18 restaurant booths • 50 light fixtures • 29 ranges • 31 refrigerators • 13 claw foot tubs • 21 sinks and toilets • 60 radiator fins • 121 ft. wrought iron railing • 90 ft. wood railing • Hundreds of feet of trim and molding • 3500 sq. ft. fir flooring • 500 sq. ft. tin ceiling panels 7
  • 8. 2. I-5 Undercrossing Work Vicinity I-5 undercrossing contract awarded in February Convention Place Station T EE TR BO ES PIN -Prepares I-5 structures for future tunnel RE W N ST ork A NB I- RE boring machines 5 SB I- ET Work Area re a 5 -Work being done now to avoid conflicts with other WSDOT freeway work and later Paramount Theater U-Link contracts -Coordinated agency outreach to public on ramp closures -Contractor incentives to complete the work early 8
  • 9. Work Pit Locations ve. nA re Bo SBE Pit NBE Pit NB I -5 SBW Pit SB I- St. 5 NBW Pit e Pin 9
  • 10. 10
  • 11. I-5 Ramp Closures Pine Street Pike Street t ee Str y err Ch 11
  • 12. Olive Way Off-Ramp Closure Detour 12
  • 13. Cherry Street On-Ramp Detours ϖ Cherry St. express lane on-ramp will be open to all traffic (currently only HOV) during detour 13
  • 14. Agency Coordination & Public Outreach Efforts • Coordination with WSDOT, SDOT and KC Metro • Sound Transit website • U-Link Website www.soundtransit.org/u-link • E-mail alerts • WSDOT construction information website • SDOT construction webpage • Portable Vehicle Messaging Systems along I-5 • Highway Advisory Radio System (HARS) • Vehicle Message System with notification of closures • Detour cards for businesses affected by closure to educate patrons • Door-to-door business outreach 14
  • 15. 3. Station Excavation, Tunneling • Jan. 2010 to Dec. 2012 • Plywood wall surrounding site • Denny and parts of Nagle closed to traffic • Sidewalks open – Will be few short term closures • Single Tunnel Boring Machine (TBM) • 24/7 surface activity to support tunneling • High truck volumes 15
  • 16. Capitol Hill Site Noise Variance •Sound Transit preparing noise variance application for the Capitol Hill site -Construction wall will contain most but not all work noise -24/7 site activities to support tunneling work -Work activities and equipment restrictions, other mitigation •Noise informational meeting June 3, 2009 •DPD will schedule a public meeting on the technical noise variance in late Summer 2009 16
  • 17. 4. Station Construction • Jan. 2013 to Dec. 2015 • Less trucking activity • Sidewalks open – Will be few short term closures • Cut and cover pedestrian tunnel across Broadway (6 months) – Roadway remains open – Parking restrictions near work 17
  • 18. Transit Oriented Development (TOD) • 4-5 sites available for TOD • TOD community forums scheduled during 2009 – June 24th forum on housing and retail • Developer(s) to be selected in 2012-2013 • Construction of some sites could begin prior to station opening (2015) 18 N
  • 20. Staying Informed • Monthly electronic newsletters www.soundtransit.org/subscribe • Printed and electronic construction alerts • Regular construction update meetings • Full time outreach staff • 24 hour construction hotline 1-888-298-2395 • www.soundtransit.org/u-link 20
  • 21. Truck Haul Route (beginning 2010) 21