HTM is pleased to introduce a new series
of Common Mistakes in Hotel Planning,
Development and Operation. This series
has been prepared in support of owners,
developers, architects, designers and
project managers of hotels.
The following presents the most common
mistakes in Hotel Design. It outlines
frequent errors and omissions occurring
during the design process, which can have
long lasting negative impacts on the
property’s management, operation and
return on investment.
Please subscribe to our regular updates at
sales@ht-management.com.
Common Mistakes in Hotel Planning, Development and Operation
Hotel developments are different – they are very diverse and quite
complicated when compared to any other type of real estate investment
and property development. They involve complex and overlapping end-
to-end processes, multiple stakeholders, considerable strategic planning
and decision making, extensive technical know how and specialist
experience in project management, operational equipment, technical
services, pre-openings, management and operation of hotels.
Hotel developments are risky – they are more time-consuming and
costly. By floor space, an average hotel can cost 3 times as much and
take 3 times as long to build. 6,500 different items go into a hotel –
about 20 into an office block. An average 5 star hotel requires 27
different consultants and around 10‐15% of the budget, the pre‐opening
over 10%. Few owners have experience with hotels, few architects
specialize in hotel design and few project management firms know how
to manage hotel development processes.
Common Mistakes in Hotel Planning, Development and Operation
Hotel developments require specific know how – they frequently
attract financially potent owners with a background in various sectors –
real estate, banking, law, tourism and others, and with a great deal of
vanity, but little experience in hotel development. This often leads to
wrong decision making in conceptualization, branding, design,
construction, management, operation…and the failure of the hotel.
Common Mistakes in Hotel Planning, Development and Operation
Hotel Planning
Common Mistakes in Hotel Market Studies
Common Mistakes in Hotel Finance Studies
Common Mistakes in Hotel Property Evaluation
Common Mistakes in Hotel Property Site Selection
Common Mistakes in Hotel Investment Planning and Financing
Common Mistakes in Hotel Investment and Business Licensing
Common Mistakes in Hotel Conceptualization
Common Mistakes in Hotel Planning, Development and Operation
Common Mistakes in Hotel Branding
Common Mistakes in Hotel Architect Search and Selection
Common Mistakes in Hospitality Consultant Search and Selection
Common Mistakes in Hotel Master Planning
Common Mistakes in Hotel Business and Operation Models
Common Mistakes in Hotel Operator Search and Selection
Common Mistakes in Hotel Management Agreement Negotiation
Common Mistakes in Hotel Technical Services Contract Negotiation
Common Mistakes in Hotel Project Planning
Common Mistakes in Hotel Capital Expenditures Budgeting
Common Mistakes in Hotel Furniture, Fixtures and Equipment Reserves
Common Mistakes in Hotel Planning, Development and Operation
Hotel Design
Common Mistakes in Hotel Design
Common Mistakes in Hotel Access Design
Common Mistakes in Hotel Exterior Design
Common Mistakes in Hotel Interior Design
Common Mistakes in Hotel Operation and Work Flow Design
Common Mistakes in Hotel Public Area and Front-of-House Design
Common Mistakes in Hotel Back-of-House and Staff Areas Design
Common Mistakes in Hotel Guest Room Design
Common Mistakes in Hotel Engineering and Technical Design
Common Mistakes in Hotel Food and Beverage Conceptualization
Common Mistakes in Hotel Food and Beverage Outlet Branding
Common Mistakes in Hotel Food and Beverage Outlet Design
Common Mistakes in Hotel Kitchen and Laundry Design
Common Mistakes in Hotel Landscape Design
Common Mistakes in Hotel Planning, Development and Operation
Hotel Development
Common Mistakes in Hotel Project Manager Selection
Common Mistakes in Hotel Contractor Negotiations and Selection
Common Mistakes in Hotel Project Coordination and Implementation
Common Mistakes in Hotel Bill of Quantities
Common Mistakes in Hotel Quantity and Quality Surveillance
Common Mistakes in Hotel Construction and Site Supervision
Common Mistakes in Hotel Site Safety and Security
Common Mistakes in Hotel Mechanical and Electrical Engineering
Common Mistakes in Hotel Utility Conservation and Environmental Protection
Common Mistakes in Hotel Planning, Development and Operation
Common Mistakes in Hotel Technical Services Coordination
Common Mistakes in Hotel Pre-Opening
Common Mistakes in Hotel Standard Operating Equipment Budgeting
Common Mistakes in Hotel Brand Development
Common Mistakes in Hotel Marketing, Sales and Public Relations
Common Mistakes in Hotel Human Resources Planning
Common Mistakes in Hotel Recruitment, Selection and Training
Common Mistakes in Hotel Testing, Commissioning and Handover
Common Mistakes in Hotel Planning, Development and Operation
Hotel Operation
Common Mistakes in Hotel Soft-Openings
Common Mistakes in Hotel General Management
Common Mistakes in Hotel Strategic Positioning and Pricing Policies
Common Mistakes in Hotel Brand Development
Common Mistakes in Hotel Marketing and Sales
Common Mistakes in Hotel Strategic Communication and Public Relations
Common Mistakes in Hotel Promotion and Advertising
Common Mistakes in Hotel Sales and Marketing
Common Mistakes in Hotel Digital Marketing and Online Sales
Common Mistakes in Hotel Distribution Management
Common Mistakes in Hotel Customer Relationship Management
Common Mistakes in Hotel Revenue and Yield Management
Common Mistakes in Hotel Planning, Development and Operation
Common Mistakes in Hotel Human Resources Planning
Common Mistakes in Hotel Human Resources Management
Common Mistakes in Hotel Recruitment and Selection
Common Mistakes in Hotel Training and Staff Development
Common Mistakes in Hotel Rooms Division Management
Common Mistakes in Hotel Food and Beverage Management
Common Mistakes in Hotel Operations
Common Mistakes in Hotel Customer Service and Guest Relations
Common Mistakes in Hotel Finance and Accounting
Common Mistakes in Hotel Procurement and Purchasing
Common Mistakes in Hotel Revenue and Expense Forecasting
Common Mistakes in Hotel Operational Budgeting
Common Mistakes in Hotel Profit and Loss Analysis
Common Mistakes in Hotel Planning, Development and Operation
Critical Areas with Typical Design Errors
Hotel Access and Entrance
Hotel Exterior and Signage
Lobby and Public Areas
Front Office and Reception
Porter and Luggage Room
Elevators, Corridors and Pantries
Guest Rooms and Bathrooms
Connecting Rooms
Disabled Guest Rooms
Restaurants and Bars
Room Service
Meeting Rooms and Banqueting Areas
Spa, Gym and Swimming Pool
Common Mistakes in Hotel Planning, Development and Operation
Receiving and Purchasing Areas
Cooling and Storage Facilities
Kitchens and Laundry
Management Offices and Staff Areas
Staff Entrance and Locker Rooms
Staff Restaurants and Canteens
Guest and Staff Nursery
Closed-Circuit Television System
Private Automated Branch Exchange System
Heating, Ventilation and Air-Conditioning System
Water Supply, Treatment and Discharge System
Fire Safety and Sprinkler System
Main Frame Server and Computer System
Property Management System
Point-of-Sales System
Common Mistakes in Hotel Planning, Development and Operation
Top 10 Areas
with Most Design Errors in Hotels
1 Guest Rooms
2 Back-of-House
3 Guest Bathrooms
4 Fabric and Finishes
5 Food and Beverage Facilities
6 Elevators
7 Function Rooms
8 Lobby
9 Entrance
10 Kitchen
Source: http://www.wgdarchitects.com/survey/results/results.html
The following pages present
only a few of the myriad of
considerations which shall
be made in professional
hotel design. Most of them
seem like common sense,
but one would not believe
how frequent they are
disregarded.
Common Mistakes in Guest Room Design
We can’t expect architects to know the nuances of operating hotels. So
why do we expect them to know how to best design a hotel room in all
facets and details?
Seems like ‘common sense’, but still happens all too often.
Too Many Rooms Types and Categories
A common misperception is that having many types of rooms increases the
choice for guests, thereby widening the target market. The reality is, having
many different types of rooms creates confusion and pricing issues, affects
marketing and sales, and limits the ability to accommodate large groups. At
the same time, it increases room cleaning, fit-out and maintenance costs,
eating up owner’s profits.
Unsuitable Ratio between Room Types and Categories
The ratio between the number of different room types and categories – e.g.
single, double, twin or triple room, standard, superior or deluxe room,
junior, family or executive suite, connecting rooms, disabled rooms, smoker-
and non-smoking rooms…depends on many factors, which the developer or
architect do not necessarily know. This can lead to the difficult situation,
where the owner is forced to choose between low occupancy or decrease of
room rates. A ‘Make or Break’ scenario.
Room Design | Some Examples of What Could Go Wrong
Same Room Types and Categories with Different Configurations
The layout, configuration and fitting out of guest rooms depends on hotel
property dimensions, brand and operator standards, building design and
budgets, construction ratios etc. Without professional hotel advice,
mistakes are programmed and will lead to similar issues as before
mentioned – except that often the architect or hotel operator are blamed,
instead of the owner…
Room Design | Some Examples of What Could Go Wrong
The hotel investor, developer or owner should provide the architect or
interior designer a detailed design brief, including the guest room
design standards to apply across all rooms, and tailored to each size and
type of room. The design must be driven by maximizing the guest
experience and comfort during their stay. The interior designer must also
keep in mind the efficiency of daily hotel operation, including the
streamlining of guest check in, housekeeping and minimizing of
maintenance due to wear and tear.
The owner should appoint a hospitality management consultant, who
will work hand in hand with the architect and interior designer during
the design phase, in order to minimize costly mistakes that would
negatively impact operations, create poor guest experiences and effect
profitability and return on investment.
Room Design | Some Examples of What Should Have Occurred
The guest’s room experience is highly influenced by the quality of the
bathroom design. The configuration and fitting out very much depends
on factors such as hotel property, brand standards, target market,
guest preferences, owner’s budget and others.
The hospitality management consultant will support owner and
architects to make the right decisions.
Common Mistakes in Guest Bathroom Design
Bathroom is Too Large
Inefficient room configuration creates a waste of space and money to
build and clean. Visually not attractive.
Bathroom is Too Small
Even more important than the size of the bathroom is the efficiency and
practicality of design.
Shower or Bathtub?
Where are your guests from? France, Russia, Japan, Vietnam? Do they
travel for business or leisure? Do they stay for the long-term or short-
term? Choosing between a shower or bathtub depends on the answer to
these questions, and many more...
Towel Rack in the Wrong Location
Guests need to search or reach for the towel while dripping water all
over the floor creating a slippage hazard. Is your insurance policy up to
date?
Bathroom Design | Some Examples of What Could Go Wrong
No Electricity Socket for the Hairdryer
It wouldn’t be a problem if all your
guests were bald and didn’t need a hair
dryer.
Bathroom Window without Blinds
Some people like privacy.
Insufficient Hot Water Capacity
This is a very common mistake and it is
very annoying for the guest. It also
solicits very expensive negative reviews.
Mini Bar in the Bathroom
This is never a good idea.
Bathroom Design | Some Examples of What Could Go Wrong
Bathrooms need to be carefully planned and well designed. They need to
be a source of comfort, yet easy to clean and maintain. Lights, mirrors
and electrical outlets need to be carefully located so that they are always
within reach and in the exact place that the guest would expect.
The interior designer must work closely with the hospitality
management consultant during the design stage in order to avoid costly
mistakes that will lead to difficulties in operation or a poor experience for
the guests.
Bathroom Design | Some Examples of What Should Have Occurred
The profitability of the hotel’s food and beverage department depends very
much on functionality of operations, whereas owners and architects mostly
focus on form and design. Successful F&B businesses combine operational
functionality with aesthetic design. Factors must be considered such as
room numbers, house guests, walk-in guests, restaurant-, food and service
concept, menu, meal turnover, average covers, kitchen organization,
staffing….The hospitality management consultant will support owner and
architects to make the right decisions.
Common Mistakes in Food and Beverage Outlet Design
Mismatch between F&B Concept and Design
To be successful and attract guest, F&B concepts need to be attractive
and unique. Design must represent this and be consistent. The architect
and interior designer follow the hospitality concept, not the other way
round.
Poor Restaurant Layout and Work Flow Design
Inadequate design of F&B outlets by non-hospitality professionals with
severe results, such as poor food and service quality, low customer
satisfaction, food and beverage hygiene problems, high F&B and
breakage costs, occupational hazards and work accidents, low staff
morale and high turnover etc.
Wrong Restaurant Layout versus Number of Rooms
Difficulties to render efficient service with long cues for breakfast, lunch
and dinner.
F&B Outlet Design | Some Examples of What Could Go Wrong
Bad Buffet Design
Wrong location of lighting, selection of heights to display food offerings
and wrong location of electrical sockets, wrong buffet dimensions and
customer flow, confused design of cold, hot and dessert stations.
Bad Bar Design
Inadequate allocation of space, cooling units, water and electricity
supply, equipment etc., resulting in decreased effectiveness, higher costs
Kitchen Design does not match F&B Concept
Kitchen is designed too large or too small, layout and equipment are not
suitable with operational requirements, work efficiency is low. This
results in similar as before mentioned, problems with quality, consistency
and volume.
Inappropriate Kitchen Design and Installation
Kitchen design does not comply with international safety and hygiene
standards, leading to work flow problems, occupational hazards,
sanitation and pest problems…and ultimately to big headaches for
owners.
F&B Outlet Design | Some Examples of What Could Go Wrong
Presence of Hazardous Areas
Kitchen staff facing risks on a daily basis. Better ensure that the
insurance policies are up to date.
Inadequate Construction, Workmanship and Supervision
This needs to be aided by experienced hospitality project
professionals. Poor choice of materials and inadequate
installation will result in high safety and hygiene risks and non-
compliance with legal obligations.
Wrong Installation of Electrical Sockets in Kitchen
Difficulties to properly use equipment or to follow cleaning
procedures.
Bad Design of Exhaust, Ventilation, Air-conditioning, Exhaust
and Grease Trap Systems
Incorrect temperature, unwanted odors, hygiene and pest
problems, low staff motivation.
F&B Outlet Design | Some Examples of What Could Go Wrong
Lack of Emergency Light and Fire Systems
The fire safety license will not be granted, insurance policy will
be void and most importantly, the safety of guests and staff will
be compromised.
Clean Areas not Separated from Dirty Areas
Violation of forward flow principle and HACCP standards.
Wet Garbage Area not Separated from Dry Garbage Area
May be in breach of local regulations and pose fire safety and
hygiene risks.
F&B Outlet Design | Some Examples of What Could Go Wrong
The hotel owner should provide the architect, interior designer and
other contractors (kitchen) a detailed design brief, including the food
and beverage concept and design standards per outlet. Architect,
interior designer and contractors should have prior hospitality project
and F&B design experience. The design must be driven by maximizing
guest experience and comfort, and at the same time maximizing
operational efficiency for employees and revenue generation.
The architect and interior designer must work hand in hand with the
hospitality management consultant during the design phase, in order to
minimize costly mistakes that would negatively impact operations and
create a poor guest experience.
F&B Outlet Design | Some Examples of What Should Have Occurred
Common Mistakes in Lobby and Public Area Design
The hotel entrance and lobby are the face of the hotel, and owners and
architects pay rightly so much attention to it. However, layout and design of
this highly functional requires managerial and operational understanding of
hotels. A ‘chic’ and luxury lobby are a waste of money, if inadequate design
of reception and other crucial areas cause long queues and waiting of hotel
guests…
The hospitality management consultant will support owner and architects
to make the right decisions.
Size of Seating Area not in Proportion to Room Inventory
Crowded lobbies with long cues and lack of seating result in poor guest
perception.
Inadequate Available Parking Bays
Need to ensure that local regulations are followed by the architect.
Parking not Available for Physically Challenged Guests
This is very important to be able to offer as well as ramps to access
buildings.
Poor Lighting in Parking Areas
Safety and security risks.
Insufficient and Poorly Illuminated Signage
Guests will have trouble finding their way around the property. Poorly
lit signage is a common mistake.
Lobby & Public Area Design | Some Examples of What Could Go Wrong
Insufficient Electrical Sockets and in the Wrong Location
Operational difficulties especially for cleaning procedures.
Under- or Over-building Rather than Utilizing Space Productively
Wide and under-built spaces are unproductive and do not generate
revenue, but can make all the difference between a profitable or
unsuccessful hotel. Crammed and over-built spaces look tight and
messy, can effect guest experience and revenue. The hospitality
consultant possesses the specialist knowledge and operational
experience to develop the right concepts for maximizing use of space
and revenue, the owners or architects do not.
Lobby & Public Area Design | Some Examples of What Could Go Wrong
The Lobby and Public Areas need to be
carefully planned and well designed. These
areas will not only increase revenue, but
also improve the quality of work for all
staff.
The architect must work closely with the
hospitality management consultant during
the design phase, in order to avoid costly
mistakes that will lead to difficulties in
operation or a poor experience for the
guests.
Lobby & Public Area | Some Examples of What Should Have Occurred
Common Mistakes in Elevators and Corridors Design
The correct design and location of elevators and corridors will considerably
improve the mobility of guests and staff.
Elevator & Corridor Design | Some Examples of What Could Go Wrong
Lack of Guest Elevators
Long wait times will negatively affect the experience of guests.
Wrong Location of Elevators and Goods Lifts
Slows down operations and causes decline in service standards.
Elevators too Close to Guest Rooms
Guests will complain about noise, especially early in the morning when
housekeeping staff move around their trolleys.
Poor Lighting in Corridors and Pathways
Safety and security risks.
Inadequate Room Signage
Proper allocated and visible room signage is appreciated by guests.
Lack of Elevators near Key Outlets
Guest facing difficulties to access areas especially at peak times.
Mobility flows will be affecting daily operations of staff and the
experience for guests. The architect should be warned about the
potential pitfalls and have a thorough understanding of the function and
location of each area.
Elevator & Corridor | Some Examples of What Should Have Occurred
The Back-of-House Areas are the heart and muscles of the hotel. Bad
design without support from hospitality professionals will seriously
affect daily operation.
Common Mistakes in Back-of-House Design
Inadequate Supplier Entrance and Receiving Area
Either no existing separate back-of-house access for daily hotel supply
or an access to close to public and guest areas will seriously effect hotel
operation and guest experience.
Inadequate Staff Entrance and Lack of Staff Facilities
No suitable staff entrance, access control, staff changing areas and
facilities, staff canteens will result in problems with grooming standards
and staff motivation.
Inadequate Storage Space
Maintaining minimum stocks will forever be a challenge.
Wrong selection of Materials for Walls, Floors, Windows and Ceilings
Permanent problems of humidity, ventilation, cracks in the masonry
and slippery floors.
Lack of Water Points and Drainage in Storage Areas
Staff will not work efficiently and will fail to follow cleaning, health and
hygiene procedures.
Back-of-House Design | Some Examples of What Could Go Wrong
Insufficient Garbage Collection Space or in Wrong Location
Too small, too far, too close, not safe or not clean – all recipes to invite
pest, hinder effective operation or receive guest complaints.
Missing Linen, Uniform and Laundry Room
The housekeeping manager will have trouble to keep linen standards
and organize staff to meet operational needs.
Insufficient Working Space for Housekeeping Department
Problems to store linen, baby cots, extra beds and trolleys in close
proximity to the rooms.
Insufficient Departmental Office Space
The head’s of department will be obliged to work in improvised offices
far from the workflow and with inadequate loose furniture.
No Separate Staff Elevators
Hotel employees will use guest elevators or have to walk stairs. Not only
unsuitable for international standard hotel, but also detrimental to
operational costs and guest experience.
Back-of-House Design | Some Examples of What Could Go Wrong
Inadequate Hotel Technical Systems
Design not in line with professional hotel standards in terms of sewage
treatment, fire, air conditioning, grounding, lighting, rain water
harvesting, generator and gas. Will not only cause trouble with local
authorities, but even bigger troubles in operation.
Hot and Cold Water Capacity Issues
Guests experience an unpleasant surprise during their morning shower.
Inadequate TV, Camera, Background Music, Telephone, Computer and
Audio Visual Systems
Bland experience for guests.
Back-of-House Design | Some Examples of What Could Go Wrong
The owner, architect, engineering consultant and project manager shall
work and cooperate closely with the hospitality management
consultant from an early stage on to avoid costly errors
Back-of-House | Some Examples of What Should Have Occurred
These areas are especially important for guests who are looking for
getaway and leisure trips.
Common Mistakes in Spa, Gym and Pool Design
Inadequate Gym Design
Many hotel gym designs resemble fitness studios without warmth or
charm.
Inferior Spa and Gym Equipment
Equipment fails to meet expectations of guests and standards of the
brand.
Missing Light Dimmers and Sound System in Treatment Rooms
Negatively impact the experience of guests.
Insufficient Space for Lockers
Complaints from guests.
Insufficient Furniture in the Pool Area
The purpose of these areas are rest, relaxation and leisure for guests so
overcrowding should be avoided.
Recreation Areas Design | Some Examples of What Could Go Wrong
The interior designer should be provided with a detailed design brief,
including the concept for the spa and sports/recreation areas, as well as
the design standards for each area. The design must be driven by
maximizing guest experience and comfort during their stay as well as
streamlining the operation for all employees.
The architect must work closely with the hospitality management
consultant during the design phase, in order to avoid costly mistakes
that will lead to difficulties in operation or a poor experience for the
guest.
Recreation Areas | Some Examples of What Should Have Occurred
Contact
HTM Management Consultancy
Head Office Hanoi
No. 2, Alley 236/ 7, Au Co Street
Tay Ho District, Hanoi, Vietnam
E-mail: info@ht-management.com
Website: www.ht-management.com
Telephone: +84-4-3719 1850/1
Facsimile: +84-4-3719 1849
Branch Office Ho Chi Minh City
SITC Building, 2nd Floor, Room 209-210
311-319 Gia Phu Street, Ward 1
District 6, Ho Chi Minh City, Vietnam
E-mail: info@ht-management.com
Website: www.ht-management.com
Branch Office Danang (October 2015)
Branch Office Phnom Penh (June 2016)
Branch Office Vientiane (June 2017)
Branch Office Yangon (October 2017)

Contenu connexe

Tendances

Alternaty - Common mistakes in hotel design
Alternaty - Common mistakes in hotel designAlternaty - Common mistakes in hotel design
Alternaty - Common mistakes in hotel designAlternaty
 
Theme Park Design Seminar
Theme Park Design SeminarTheme Park Design Seminar
Theme Park Design SeminarCraig Jungwirth
 
Standards resort
Standards resortStandards resort
Standards resortAjila shiny
 
TOURISTIC RESORT THESIS
TOURISTIC RESORT THESISTOURISTIC RESORT THESIS
TOURISTIC RESORT THESISAysha Asaad
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel designhebasayeed
 
Hotel feasibility studies
Hotel feasibility studiesHotel feasibility studies
Hotel feasibility studiesAhmet Seymen
 
Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotelAr. Sahid Akhtar
 
Hotel design considerations
Hotel design considerationsHotel design considerations
Hotel design considerationsSubrata Mandal
 
Hotel Development - From Concept To Construction
Hotel Development - From Concept To ConstructionHotel Development - From Concept To Construction
Hotel Development - From Concept To Constructionmarkus_aklin
 
Hotel taj vivanta Vadodara
Hotel taj vivanta VadodaraHotel taj vivanta Vadodara
Hotel taj vivanta VadodaraZuber Memon
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Bookrajensen00
 
Mountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelinesMountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelinesAMALDASKH
 
Components of Hotel Industry
Components of Hotel IndustryComponents of Hotel Industry
Components of Hotel IndustryDr. Anita Rathod
 
Phases of resort development process
Phases of resort development processPhases of resort development process
Phases of resort development processAMALDASKH
 

Tendances (20)

Alternaty - Common mistakes in hotel design
Alternaty - Common mistakes in hotel designAlternaty - Common mistakes in hotel design
Alternaty - Common mistakes in hotel design
 
Theme Park Design Seminar
Theme Park Design SeminarTheme Park Design Seminar
Theme Park Design Seminar
 
Standards resort
Standards resortStandards resort
Standards resort
 
TOURISTIC RESORT THESIS
TOURISTIC RESORT THESISTOURISTIC RESORT THESIS
TOURISTIC RESORT THESIS
 
ITFT-Resort planing
ITFT-Resort planingITFT-Resort planing
ITFT-Resort planing
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel design
 
Hotel feasibility studies
Hotel feasibility studiesHotel feasibility studies
Hotel feasibility studies
 
Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotel
 
Hotel design considerations
Hotel design considerationsHotel design considerations
Hotel design considerations
 
Hotel Development - From Concept To Construction
Hotel Development - From Concept To ConstructionHotel Development - From Concept To Construction
Hotel Development - From Concept To Construction
 
Hotel taj vivanta Vadodara
Hotel taj vivanta VadodaraHotel taj vivanta Vadodara
Hotel taj vivanta Vadodara
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
History of Resort
History of ResortHistory of Resort
History of Resort
 
Mountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelinesMountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelines
 
Components of Hotel Industry
Components of Hotel IndustryComponents of Hotel Industry
Components of Hotel Industry
 
Resort design pdf
Resort design pdfResort design pdf
Resort design pdf
 
Savoy Hotel BORACAY NEW COAST
Savoy Hotel BORACAY NEW COASTSavoy Hotel BORACAY NEW COAST
Savoy Hotel BORACAY NEW COAST
 
My Architectural Portfolio.
My Architectural Portfolio.My Architectural Portfolio.
My Architectural Portfolio.
 
Phases of resort development process
Phases of resort development processPhases of resort development process
Phases of resort development process
 
Architectural programming
Architectural programmingArchitectural programming
Architectural programming
 

En vedette

Purchasing, Receiving, and Storing Food
Purchasing, Receiving, and Storing FoodPurchasing, Receiving, and Storing Food
Purchasing, Receiving, and Storing FoodThannia Sabado
 
Rooms division department
Rooms division departmentRooms division department
Rooms division departmentrheais
 
Changing the way your hotel works
Changing the way your hotel worksChanging the way your hotel works
Changing the way your hotel worksAnand Systems
 
Cem 350 hotel design construction fall 2016
Cem 350 hotel design construction fall 2016Cem 350 hotel design construction fall 2016
Cem 350 hotel design construction fall 2016miresmaeil
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Project Construction of 5 star hotel
Project Construction of 5 star hotelProject Construction of 5 star hotel
Project Construction of 5 star hotelMuhammad Farhan Javed
 
Project Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemProject Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemCharitha Gamage
 
Jane Lawrence
Jane LawrenceJane Lawrence
Jane Lawrencebexbd
 
Lesson 3 The Bare Essentials In Hospitality Industry
Lesson 3 The Bare Essentials In Hospitality IndustryLesson 3 The Bare Essentials In Hospitality Industry
Lesson 3 The Bare Essentials In Hospitality IndustryMarivic Macale
 
Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...
Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...
Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...HospitalityLawyer.com
 
The hotel event organization & and Planning
The hotel event organization & and PlanningThe hotel event organization & and Planning
The hotel event organization & and PlanningJames Mwangi
 
PRESENTATION HOSPITALITY ASSIGNMENT
PRESENTATION HOSPITALITY ASSIGNMENTPRESENTATION HOSPITALITY ASSIGNMENT
PRESENTATION HOSPITALITY ASSIGNMENTrahul gupta
 
4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect
4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect
4. Choosing between Franchise and Management Contract - Nov 2016, Hotel ConnectBeni Agrawal
 
Hyatt Annual Report Done
Hyatt Annual Report DoneHyatt Annual Report Done
Hyatt Annual Report DoneSera Köprek
 

En vedette (20)

Toland Portfolio
Toland PortfolioToland Portfolio
Toland Portfolio
 
Design of hotel
Design of hotelDesign of hotel
Design of hotel
 
Purchasing, Receiving, and Storing Food
Purchasing, Receiving, and Storing FoodPurchasing, Receiving, and Storing Food
Purchasing, Receiving, and Storing Food
 
Rooms division department
Rooms division departmentRooms division department
Rooms division department
 
Changing the way your hotel works
Changing the way your hotel worksChanging the way your hotel works
Changing the way your hotel works
 
Space Hotel Design
Space Hotel DesignSpace Hotel Design
Space Hotel Design
 
Cem 350 hotel design construction fall 2016
Cem 350 hotel design construction fall 2016Cem 350 hotel design construction fall 2016
Cem 350 hotel design construction fall 2016
 
Hotel departments
Hotel departmentsHotel departments
Hotel departments
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Project Construction of 5 star hotel
Project Construction of 5 star hotelProject Construction of 5 star hotel
Project Construction of 5 star hotel
 
Project Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemProject Proposal document for Hotel Management System
Project Proposal document for Hotel Management System
 
Jane Lawrence
Jane LawrenceJane Lawrence
Jane Lawrence
 
Lesson 3 The Bare Essentials In Hospitality Industry
Lesson 3 The Bare Essentials In Hospitality IndustryLesson 3 The Bare Essentials In Hospitality Industry
Lesson 3 The Bare Essentials In Hospitality Industry
 
Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...
Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...
Hospitality Law Conference 2010 - What Lawyers & Operators Need to know about...
 
The hotel event organization & and Planning
The hotel event organization & and PlanningThe hotel event organization & and Planning
The hotel event organization & and Planning
 
DesignHotelSupplies2015
DesignHotelSupplies2015 DesignHotelSupplies2015
DesignHotelSupplies2015
 
PRESENTATION HOSPITALITY ASSIGNMENT
PRESENTATION HOSPITALITY ASSIGNMENTPRESENTATION HOSPITALITY ASSIGNMENT
PRESENTATION HOSPITALITY ASSIGNMENT
 
Q3 2016 Investor Presentation
Q3 2016 Investor PresentationQ3 2016 Investor Presentation
Q3 2016 Investor Presentation
 
4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect
4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect
4. Choosing between Franchise and Management Contract - Nov 2016, Hotel Connect
 
Hyatt Annual Report Done
Hyatt Annual Report DoneHyatt Annual Report Done
Hyatt Annual Report Done
 

Similaire à HTM Series (Common Mistakes in Hotel Planning, Development and Operation - Hotel Design) 08.14

The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]
The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]
The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]Starfleet Media
 
280372587 common-mistake-in-hotel-planning-and-operation
280372587 common-mistake-in-hotel-planning-and-operation280372587 common-mistake-in-hotel-planning-and-operation
280372587 common-mistake-in-hotel-planning-and-operationCosticaVIDRASCU1
 
Hospitality Media Pack 2015
Hospitality Media Pack 2015Hospitality Media Pack 2015
Hospitality Media Pack 2015Elaine McCarrick
 
Smart decision guide hospitality revenue management
Smart decision guide hospitality revenue management Smart decision guide hospitality revenue management
Smart decision guide hospitality revenue management Infor
 
Optimizing the customer experience. an opportunity for the hotel and hospital...
Optimizing the customer experience. an opportunity for the hotel and hospital...Optimizing the customer experience. an opportunity for the hotel and hospital...
Optimizing the customer experience. an opportunity for the hotel and hospital...Markus Mueller
 
BRAND BUILDING WITH CUSTOMER FOCUS.pptx
BRAND BUILDING WITH CUSTOMER FOCUS.pptxBRAND BUILDING WITH CUSTOMER FOCUS.pptx
BRAND BUILDING WITH CUSTOMER FOCUS.pptxVikram Mishra
 
Internal Audit in Hospitality Industry UAE.pptx
Internal Audit in Hospitality Industry UAE.pptxInternal Audit in Hospitality Industry UAE.pptx
Internal Audit in Hospitality Industry UAE.pptxRishalHalid1
 
TradeShowSecretsDownload
TradeShowSecretsDownloadTradeShowSecretsDownload
TradeShowSecretsDownloadAmy Jalbert
 
Chapter 02 Managing Front Office Operations HOT 333
Chapter 02 Managing Front Office Operations HOT 333Chapter 02 Managing Front Office Operations HOT 333
Chapter 02 Managing Front Office Operations HOT 333Syed Qasim Anwar
 
Hotel Industry in India.
Hotel Industry in India.Hotel Industry in India.
Hotel Industry in India.Souvik Ghosh
 
Preview to the book "Modern Hotel Operations Management" edited by Michael N ...
Preview to the book "Modern Hotel Operations Management" edited by Michael N ...Preview to the book "Modern Hotel Operations Management" edited by Michael N ...
Preview to the book "Modern Hotel Operations Management" edited by Michael N ...Michael Chibili
 
Hotel industry
Hotel industryHotel industry
Hotel industryMa E.C.C.
 
Entreprenuer ship businessplan
Entreprenuer ship businessplanEntreprenuer ship businessplan
Entreprenuer ship businessplanMARAM SRAVAN KUMAR
 
Commonly made mistakes in Business Plans
Commonly made mistakes in Business PlansCommonly made mistakes in Business Plans
Commonly made mistakes in Business PlansChandni Sahgal
 
eXceed Asset Management Services 2015 TB
eXceed Asset Management Services 2015 TBeXceed Asset Management Services 2015 TB
eXceed Asset Management Services 2015 TBexceedhaa
 
Exceed asset management services 2015 tb
Exceed asset management services 2015 tbExceed asset management services 2015 tb
Exceed asset management services 2015 tbexceedhaa
 

Similaire à HTM Series (Common Mistakes in Hotel Planning, Development and Operation - Hotel Design) 08.14 (20)

The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]
The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]
The 2015 Smart Decision Guide to Hospitality Revenue Management [Chapter 1]
 
280372587 common-mistake-in-hotel-planning-and-operation
280372587 common-mistake-in-hotel-planning-and-operation280372587 common-mistake-in-hotel-planning-and-operation
280372587 common-mistake-in-hotel-planning-and-operation
 
Hospitality Media Pack 2015
Hospitality Media Pack 2015Hospitality Media Pack 2015
Hospitality Media Pack 2015
 
Smart decision guide hospitality revenue management
Smart decision guide hospitality revenue management Smart decision guide hospitality revenue management
Smart decision guide hospitality revenue management
 
Optimizing the customer experience. an opportunity for the hotel and hospital...
Optimizing the customer experience. an opportunity for the hotel and hospital...Optimizing the customer experience. an opportunity for the hotel and hospital...
Optimizing the customer experience. an opportunity for the hotel and hospital...
 
BRAND BUILDING WITH CUSTOMER FOCUS.pptx
BRAND BUILDING WITH CUSTOMER FOCUS.pptxBRAND BUILDING WITH CUSTOMER FOCUS.pptx
BRAND BUILDING WITH CUSTOMER FOCUS.pptx
 
Internal Audit in Hospitality Industry UAE.pptx
Internal Audit in Hospitality Industry UAE.pptxInternal Audit in Hospitality Industry UAE.pptx
Internal Audit in Hospitality Industry UAE.pptx
 
Self analysis[1]
Self analysis[1]Self analysis[1]
Self analysis[1]
 
TradeShowSecretsDownload
TradeShowSecretsDownloadTradeShowSecretsDownload
TradeShowSecretsDownload
 
Chapter 02 Managing Front Office Operations HOT 333
Chapter 02 Managing Front Office Operations HOT 333Chapter 02 Managing Front Office Operations HOT 333
Chapter 02 Managing Front Office Operations HOT 333
 
self_analysis[1]
self_analysis[1]self_analysis[1]
self_analysis[1]
 
Hotel Industry in India.
Hotel Industry in India.Hotel Industry in India.
Hotel Industry in India.
 
Preview to the book "Modern Hotel Operations Management" edited by Michael N ...
Preview to the book "Modern Hotel Operations Management" edited by Michael N ...Preview to the book "Modern Hotel Operations Management" edited by Michael N ...
Preview to the book "Modern Hotel Operations Management" edited by Michael N ...
 
Hotel industry
Hotel industryHotel industry
Hotel industry
 
Palestra Bob Gilbert - CEO HSMAI
Palestra Bob Gilbert  - CEO HSMAIPalestra Bob Gilbert  - CEO HSMAI
Palestra Bob Gilbert - CEO HSMAI
 
TAAJ-Ops Mgr Aug 16 (Copy)
TAAJ-Ops Mgr Aug 16 (Copy)TAAJ-Ops Mgr Aug 16 (Copy)
TAAJ-Ops Mgr Aug 16 (Copy)
 
Entreprenuer ship businessplan
Entreprenuer ship businessplanEntreprenuer ship businessplan
Entreprenuer ship businessplan
 
Commonly made mistakes in Business Plans
Commonly made mistakes in Business PlansCommonly made mistakes in Business Plans
Commonly made mistakes in Business Plans
 
eXceed Asset Management Services 2015 TB
eXceed Asset Management Services 2015 TBeXceed Asset Management Services 2015 TB
eXceed Asset Management Services 2015 TB
 
Exceed asset management services 2015 tb
Exceed asset management services 2015 tbExceed asset management services 2015 tb
Exceed asset management services 2015 tb
 

Dernier

Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...HyderabadDolls
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...ZurliaSoop
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证eeanqy
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789CristineGraceAcuyan
 
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...drmarathore
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfOffice Furniture Plus - Irving
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideDesign Studio UI UX
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyIsadora Agency
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahimamgadibrahim92
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...gargpaaro
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样awasv46j
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Nitya salvi
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxbalqisyamutia
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxbalqisyamutia
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证eqaqen
 

Dernier (20)

Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Hackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdfHackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdf
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 

HTM Series (Common Mistakes in Hotel Planning, Development and Operation - Hotel Design) 08.14

  • 1. HTM SERIES COMMON MISTAKES IN HOTEL PLANNING, DEVELOPMENT AND OPERATION HOTEL DESIGN August 2014 By Kai Schröter, General Director © HTM Management Consultancy
  • 2. Common Mistakes in Hotel Planning, Development and Operation HTM is pleased to introduce a new series of Common Mistakes in Hotel Planning, Development and Operation. This series has been prepared in support of owners, developers, architects, designers and project managers of hotels. The following presents the most common mistakes in Hotel Design. It outlines frequent errors and omissions occurring during the design process, which can have long lasting negative impacts on the property’s management, operation and return on investment. Please subscribe to our regular updates at sales@ht-management.com.
  • 3. Common Mistakes in Hotel Planning, Development and Operation Hotel developments are different – they are very diverse and quite complicated when compared to any other type of real estate investment and property development. They involve complex and overlapping end- to-end processes, multiple stakeholders, considerable strategic planning and decision making, extensive technical know how and specialist experience in project management, operational equipment, technical services, pre-openings, management and operation of hotels. Hotel developments are risky – they are more time-consuming and costly. By floor space, an average hotel can cost 3 times as much and take 3 times as long to build. 6,500 different items go into a hotel – about 20 into an office block. An average 5 star hotel requires 27 different consultants and around 10‐15% of the budget, the pre‐opening over 10%. Few owners have experience with hotels, few architects specialize in hotel design and few project management firms know how to manage hotel development processes.
  • 4. Common Mistakes in Hotel Planning, Development and Operation Hotel developments require specific know how – they frequently attract financially potent owners with a background in various sectors – real estate, banking, law, tourism and others, and with a great deal of vanity, but little experience in hotel development. This often leads to wrong decision making in conceptualization, branding, design, construction, management, operation…and the failure of the hotel.
  • 5. Common Mistakes in Hotel Planning, Development and Operation Hotel Planning Common Mistakes in Hotel Market Studies Common Mistakes in Hotel Finance Studies Common Mistakes in Hotel Property Evaluation Common Mistakes in Hotel Property Site Selection Common Mistakes in Hotel Investment Planning and Financing Common Mistakes in Hotel Investment and Business Licensing Common Mistakes in Hotel Conceptualization
  • 6. Common Mistakes in Hotel Planning, Development and Operation Common Mistakes in Hotel Branding Common Mistakes in Hotel Architect Search and Selection Common Mistakes in Hospitality Consultant Search and Selection Common Mistakes in Hotel Master Planning Common Mistakes in Hotel Business and Operation Models Common Mistakes in Hotel Operator Search and Selection Common Mistakes in Hotel Management Agreement Negotiation Common Mistakes in Hotel Technical Services Contract Negotiation Common Mistakes in Hotel Project Planning Common Mistakes in Hotel Capital Expenditures Budgeting Common Mistakes in Hotel Furniture, Fixtures and Equipment Reserves
  • 7. Common Mistakes in Hotel Planning, Development and Operation Hotel Design Common Mistakes in Hotel Design Common Mistakes in Hotel Access Design Common Mistakes in Hotel Exterior Design Common Mistakes in Hotel Interior Design Common Mistakes in Hotel Operation and Work Flow Design Common Mistakes in Hotel Public Area and Front-of-House Design Common Mistakes in Hotel Back-of-House and Staff Areas Design Common Mistakes in Hotel Guest Room Design Common Mistakes in Hotel Engineering and Technical Design Common Mistakes in Hotel Food and Beverage Conceptualization Common Mistakes in Hotel Food and Beverage Outlet Branding Common Mistakes in Hotel Food and Beverage Outlet Design Common Mistakes in Hotel Kitchen and Laundry Design Common Mistakes in Hotel Landscape Design
  • 8. Common Mistakes in Hotel Planning, Development and Operation Hotel Development Common Mistakes in Hotel Project Manager Selection Common Mistakes in Hotel Contractor Negotiations and Selection Common Mistakes in Hotel Project Coordination and Implementation Common Mistakes in Hotel Bill of Quantities Common Mistakes in Hotel Quantity and Quality Surveillance Common Mistakes in Hotel Construction and Site Supervision Common Mistakes in Hotel Site Safety and Security Common Mistakes in Hotel Mechanical and Electrical Engineering Common Mistakes in Hotel Utility Conservation and Environmental Protection
  • 9. Common Mistakes in Hotel Planning, Development and Operation Common Mistakes in Hotel Technical Services Coordination Common Mistakes in Hotel Pre-Opening Common Mistakes in Hotel Standard Operating Equipment Budgeting Common Mistakes in Hotel Brand Development Common Mistakes in Hotel Marketing, Sales and Public Relations Common Mistakes in Hotel Human Resources Planning Common Mistakes in Hotel Recruitment, Selection and Training Common Mistakes in Hotel Testing, Commissioning and Handover
  • 10. Common Mistakes in Hotel Planning, Development and Operation Hotel Operation Common Mistakes in Hotel Soft-Openings Common Mistakes in Hotel General Management Common Mistakes in Hotel Strategic Positioning and Pricing Policies Common Mistakes in Hotel Brand Development Common Mistakes in Hotel Marketing and Sales Common Mistakes in Hotel Strategic Communication and Public Relations Common Mistakes in Hotel Promotion and Advertising Common Mistakes in Hotel Sales and Marketing Common Mistakes in Hotel Digital Marketing and Online Sales Common Mistakes in Hotel Distribution Management Common Mistakes in Hotel Customer Relationship Management Common Mistakes in Hotel Revenue and Yield Management
  • 11. Common Mistakes in Hotel Planning, Development and Operation Common Mistakes in Hotel Human Resources Planning Common Mistakes in Hotel Human Resources Management Common Mistakes in Hotel Recruitment and Selection Common Mistakes in Hotel Training and Staff Development Common Mistakes in Hotel Rooms Division Management Common Mistakes in Hotel Food and Beverage Management Common Mistakes in Hotel Operations Common Mistakes in Hotel Customer Service and Guest Relations Common Mistakes in Hotel Finance and Accounting Common Mistakes in Hotel Procurement and Purchasing Common Mistakes in Hotel Revenue and Expense Forecasting Common Mistakes in Hotel Operational Budgeting Common Mistakes in Hotel Profit and Loss Analysis
  • 12. Common Mistakes in Hotel Planning, Development and Operation Critical Areas with Typical Design Errors Hotel Access and Entrance Hotel Exterior and Signage Lobby and Public Areas Front Office and Reception Porter and Luggage Room Elevators, Corridors and Pantries Guest Rooms and Bathrooms Connecting Rooms Disabled Guest Rooms Restaurants and Bars Room Service Meeting Rooms and Banqueting Areas Spa, Gym and Swimming Pool
  • 13. Common Mistakes in Hotel Planning, Development and Operation Receiving and Purchasing Areas Cooling and Storage Facilities Kitchens and Laundry Management Offices and Staff Areas Staff Entrance and Locker Rooms Staff Restaurants and Canteens Guest and Staff Nursery Closed-Circuit Television System Private Automated Branch Exchange System Heating, Ventilation and Air-Conditioning System Water Supply, Treatment and Discharge System Fire Safety and Sprinkler System Main Frame Server and Computer System Property Management System Point-of-Sales System
  • 14. Common Mistakes in Hotel Planning, Development and Operation Top 10 Areas with Most Design Errors in Hotels 1 Guest Rooms 2 Back-of-House 3 Guest Bathrooms 4 Fabric and Finishes 5 Food and Beverage Facilities 6 Elevators 7 Function Rooms 8 Lobby 9 Entrance 10 Kitchen Source: http://www.wgdarchitects.com/survey/results/results.html The following pages present only a few of the myriad of considerations which shall be made in professional hotel design. Most of them seem like common sense, but one would not believe how frequent they are disregarded.
  • 15. Common Mistakes in Guest Room Design We can’t expect architects to know the nuances of operating hotels. So why do we expect them to know how to best design a hotel room in all facets and details? Seems like ‘common sense’, but still happens all too often.
  • 16. Too Many Rooms Types and Categories A common misperception is that having many types of rooms increases the choice for guests, thereby widening the target market. The reality is, having many different types of rooms creates confusion and pricing issues, affects marketing and sales, and limits the ability to accommodate large groups. At the same time, it increases room cleaning, fit-out and maintenance costs, eating up owner’s profits. Unsuitable Ratio between Room Types and Categories The ratio between the number of different room types and categories – e.g. single, double, twin or triple room, standard, superior or deluxe room, junior, family or executive suite, connecting rooms, disabled rooms, smoker- and non-smoking rooms…depends on many factors, which the developer or architect do not necessarily know. This can lead to the difficult situation, where the owner is forced to choose between low occupancy or decrease of room rates. A ‘Make or Break’ scenario. Room Design | Some Examples of What Could Go Wrong
  • 17. Same Room Types and Categories with Different Configurations The layout, configuration and fitting out of guest rooms depends on hotel property dimensions, brand and operator standards, building design and budgets, construction ratios etc. Without professional hotel advice, mistakes are programmed and will lead to similar issues as before mentioned – except that often the architect or hotel operator are blamed, instead of the owner… Room Design | Some Examples of What Could Go Wrong
  • 18. The hotel investor, developer or owner should provide the architect or interior designer a detailed design brief, including the guest room design standards to apply across all rooms, and tailored to each size and type of room. The design must be driven by maximizing the guest experience and comfort during their stay. The interior designer must also keep in mind the efficiency of daily hotel operation, including the streamlining of guest check in, housekeeping and minimizing of maintenance due to wear and tear. The owner should appoint a hospitality management consultant, who will work hand in hand with the architect and interior designer during the design phase, in order to minimize costly mistakes that would negatively impact operations, create poor guest experiences and effect profitability and return on investment. Room Design | Some Examples of What Should Have Occurred
  • 19. The guest’s room experience is highly influenced by the quality of the bathroom design. The configuration and fitting out very much depends on factors such as hotel property, brand standards, target market, guest preferences, owner’s budget and others. The hospitality management consultant will support owner and architects to make the right decisions. Common Mistakes in Guest Bathroom Design
  • 20. Bathroom is Too Large Inefficient room configuration creates a waste of space and money to build and clean. Visually not attractive. Bathroom is Too Small Even more important than the size of the bathroom is the efficiency and practicality of design. Shower or Bathtub? Where are your guests from? France, Russia, Japan, Vietnam? Do they travel for business or leisure? Do they stay for the long-term or short- term? Choosing between a shower or bathtub depends on the answer to these questions, and many more... Towel Rack in the Wrong Location Guests need to search or reach for the towel while dripping water all over the floor creating a slippage hazard. Is your insurance policy up to date? Bathroom Design | Some Examples of What Could Go Wrong
  • 21. No Electricity Socket for the Hairdryer It wouldn’t be a problem if all your guests were bald and didn’t need a hair dryer. Bathroom Window without Blinds Some people like privacy. Insufficient Hot Water Capacity This is a very common mistake and it is very annoying for the guest. It also solicits very expensive negative reviews. Mini Bar in the Bathroom This is never a good idea. Bathroom Design | Some Examples of What Could Go Wrong
  • 22. Bathrooms need to be carefully planned and well designed. They need to be a source of comfort, yet easy to clean and maintain. Lights, mirrors and electrical outlets need to be carefully located so that they are always within reach and in the exact place that the guest would expect. The interior designer must work closely with the hospitality management consultant during the design stage in order to avoid costly mistakes that will lead to difficulties in operation or a poor experience for the guests. Bathroom Design | Some Examples of What Should Have Occurred
  • 23. The profitability of the hotel’s food and beverage department depends very much on functionality of operations, whereas owners and architects mostly focus on form and design. Successful F&B businesses combine operational functionality with aesthetic design. Factors must be considered such as room numbers, house guests, walk-in guests, restaurant-, food and service concept, menu, meal turnover, average covers, kitchen organization, staffing….The hospitality management consultant will support owner and architects to make the right decisions. Common Mistakes in Food and Beverage Outlet Design
  • 24. Mismatch between F&B Concept and Design To be successful and attract guest, F&B concepts need to be attractive and unique. Design must represent this and be consistent. The architect and interior designer follow the hospitality concept, not the other way round. Poor Restaurant Layout and Work Flow Design Inadequate design of F&B outlets by non-hospitality professionals with severe results, such as poor food and service quality, low customer satisfaction, food and beverage hygiene problems, high F&B and breakage costs, occupational hazards and work accidents, low staff morale and high turnover etc. Wrong Restaurant Layout versus Number of Rooms Difficulties to render efficient service with long cues for breakfast, lunch and dinner. F&B Outlet Design | Some Examples of What Could Go Wrong
  • 25. Bad Buffet Design Wrong location of lighting, selection of heights to display food offerings and wrong location of electrical sockets, wrong buffet dimensions and customer flow, confused design of cold, hot and dessert stations. Bad Bar Design Inadequate allocation of space, cooling units, water and electricity supply, equipment etc., resulting in decreased effectiveness, higher costs Kitchen Design does not match F&B Concept Kitchen is designed too large or too small, layout and equipment are not suitable with operational requirements, work efficiency is low. This results in similar as before mentioned, problems with quality, consistency and volume. Inappropriate Kitchen Design and Installation Kitchen design does not comply with international safety and hygiene standards, leading to work flow problems, occupational hazards, sanitation and pest problems…and ultimately to big headaches for owners. F&B Outlet Design | Some Examples of What Could Go Wrong
  • 26. Presence of Hazardous Areas Kitchen staff facing risks on a daily basis. Better ensure that the insurance policies are up to date. Inadequate Construction, Workmanship and Supervision This needs to be aided by experienced hospitality project professionals. Poor choice of materials and inadequate installation will result in high safety and hygiene risks and non- compliance with legal obligations. Wrong Installation of Electrical Sockets in Kitchen Difficulties to properly use equipment or to follow cleaning procedures. Bad Design of Exhaust, Ventilation, Air-conditioning, Exhaust and Grease Trap Systems Incorrect temperature, unwanted odors, hygiene and pest problems, low staff motivation. F&B Outlet Design | Some Examples of What Could Go Wrong
  • 27. Lack of Emergency Light and Fire Systems The fire safety license will not be granted, insurance policy will be void and most importantly, the safety of guests and staff will be compromised. Clean Areas not Separated from Dirty Areas Violation of forward flow principle and HACCP standards. Wet Garbage Area not Separated from Dry Garbage Area May be in breach of local regulations and pose fire safety and hygiene risks. F&B Outlet Design | Some Examples of What Could Go Wrong
  • 28. The hotel owner should provide the architect, interior designer and other contractors (kitchen) a detailed design brief, including the food and beverage concept and design standards per outlet. Architect, interior designer and contractors should have prior hospitality project and F&B design experience. The design must be driven by maximizing guest experience and comfort, and at the same time maximizing operational efficiency for employees and revenue generation. The architect and interior designer must work hand in hand with the hospitality management consultant during the design phase, in order to minimize costly mistakes that would negatively impact operations and create a poor guest experience. F&B Outlet Design | Some Examples of What Should Have Occurred
  • 29. Common Mistakes in Lobby and Public Area Design The hotel entrance and lobby are the face of the hotel, and owners and architects pay rightly so much attention to it. However, layout and design of this highly functional requires managerial and operational understanding of hotels. A ‘chic’ and luxury lobby are a waste of money, if inadequate design of reception and other crucial areas cause long queues and waiting of hotel guests… The hospitality management consultant will support owner and architects to make the right decisions.
  • 30. Size of Seating Area not in Proportion to Room Inventory Crowded lobbies with long cues and lack of seating result in poor guest perception. Inadequate Available Parking Bays Need to ensure that local regulations are followed by the architect. Parking not Available for Physically Challenged Guests This is very important to be able to offer as well as ramps to access buildings. Poor Lighting in Parking Areas Safety and security risks. Insufficient and Poorly Illuminated Signage Guests will have trouble finding their way around the property. Poorly lit signage is a common mistake. Lobby & Public Area Design | Some Examples of What Could Go Wrong
  • 31. Insufficient Electrical Sockets and in the Wrong Location Operational difficulties especially for cleaning procedures. Under- or Over-building Rather than Utilizing Space Productively Wide and under-built spaces are unproductive and do not generate revenue, but can make all the difference between a profitable or unsuccessful hotel. Crammed and over-built spaces look tight and messy, can effect guest experience and revenue. The hospitality consultant possesses the specialist knowledge and operational experience to develop the right concepts for maximizing use of space and revenue, the owners or architects do not. Lobby & Public Area Design | Some Examples of What Could Go Wrong
  • 32. The Lobby and Public Areas need to be carefully planned and well designed. These areas will not only increase revenue, but also improve the quality of work for all staff. The architect must work closely with the hospitality management consultant during the design phase, in order to avoid costly mistakes that will lead to difficulties in operation or a poor experience for the guests. Lobby & Public Area | Some Examples of What Should Have Occurred
  • 33. Common Mistakes in Elevators and Corridors Design The correct design and location of elevators and corridors will considerably improve the mobility of guests and staff.
  • 34. Elevator & Corridor Design | Some Examples of What Could Go Wrong Lack of Guest Elevators Long wait times will negatively affect the experience of guests. Wrong Location of Elevators and Goods Lifts Slows down operations and causes decline in service standards. Elevators too Close to Guest Rooms Guests will complain about noise, especially early in the morning when housekeeping staff move around their trolleys. Poor Lighting in Corridors and Pathways Safety and security risks. Inadequate Room Signage Proper allocated and visible room signage is appreciated by guests. Lack of Elevators near Key Outlets Guest facing difficulties to access areas especially at peak times.
  • 35. Mobility flows will be affecting daily operations of staff and the experience for guests. The architect should be warned about the potential pitfalls and have a thorough understanding of the function and location of each area. Elevator & Corridor | Some Examples of What Should Have Occurred
  • 36. The Back-of-House Areas are the heart and muscles of the hotel. Bad design without support from hospitality professionals will seriously affect daily operation. Common Mistakes in Back-of-House Design
  • 37. Inadequate Supplier Entrance and Receiving Area Either no existing separate back-of-house access for daily hotel supply or an access to close to public and guest areas will seriously effect hotel operation and guest experience. Inadequate Staff Entrance and Lack of Staff Facilities No suitable staff entrance, access control, staff changing areas and facilities, staff canteens will result in problems with grooming standards and staff motivation. Inadequate Storage Space Maintaining minimum stocks will forever be a challenge. Wrong selection of Materials for Walls, Floors, Windows and Ceilings Permanent problems of humidity, ventilation, cracks in the masonry and slippery floors. Lack of Water Points and Drainage in Storage Areas Staff will not work efficiently and will fail to follow cleaning, health and hygiene procedures. Back-of-House Design | Some Examples of What Could Go Wrong
  • 38. Insufficient Garbage Collection Space or in Wrong Location Too small, too far, too close, not safe or not clean – all recipes to invite pest, hinder effective operation or receive guest complaints. Missing Linen, Uniform and Laundry Room The housekeeping manager will have trouble to keep linen standards and organize staff to meet operational needs. Insufficient Working Space for Housekeeping Department Problems to store linen, baby cots, extra beds and trolleys in close proximity to the rooms. Insufficient Departmental Office Space The head’s of department will be obliged to work in improvised offices far from the workflow and with inadequate loose furniture. No Separate Staff Elevators Hotel employees will use guest elevators or have to walk stairs. Not only unsuitable for international standard hotel, but also detrimental to operational costs and guest experience. Back-of-House Design | Some Examples of What Could Go Wrong
  • 39. Inadequate Hotel Technical Systems Design not in line with professional hotel standards in terms of sewage treatment, fire, air conditioning, grounding, lighting, rain water harvesting, generator and gas. Will not only cause trouble with local authorities, but even bigger troubles in operation. Hot and Cold Water Capacity Issues Guests experience an unpleasant surprise during their morning shower. Inadequate TV, Camera, Background Music, Telephone, Computer and Audio Visual Systems Bland experience for guests. Back-of-House Design | Some Examples of What Could Go Wrong
  • 40. The owner, architect, engineering consultant and project manager shall work and cooperate closely with the hospitality management consultant from an early stage on to avoid costly errors Back-of-House | Some Examples of What Should Have Occurred
  • 41. These areas are especially important for guests who are looking for getaway and leisure trips. Common Mistakes in Spa, Gym and Pool Design
  • 42. Inadequate Gym Design Many hotel gym designs resemble fitness studios without warmth or charm. Inferior Spa and Gym Equipment Equipment fails to meet expectations of guests and standards of the brand. Missing Light Dimmers and Sound System in Treatment Rooms Negatively impact the experience of guests. Insufficient Space for Lockers Complaints from guests. Insufficient Furniture in the Pool Area The purpose of these areas are rest, relaxation and leisure for guests so overcrowding should be avoided. Recreation Areas Design | Some Examples of What Could Go Wrong
  • 43. The interior designer should be provided with a detailed design brief, including the concept for the spa and sports/recreation areas, as well as the design standards for each area. The design must be driven by maximizing guest experience and comfort during their stay as well as streamlining the operation for all employees. The architect must work closely with the hospitality management consultant during the design phase, in order to avoid costly mistakes that will lead to difficulties in operation or a poor experience for the guest. Recreation Areas | Some Examples of What Should Have Occurred
  • 44. Contact HTM Management Consultancy Head Office Hanoi No. 2, Alley 236/ 7, Au Co Street Tay Ho District, Hanoi, Vietnam E-mail: info@ht-management.com Website: www.ht-management.com Telephone: +84-4-3719 1850/1 Facsimile: +84-4-3719 1849 Branch Office Ho Chi Minh City SITC Building, 2nd Floor, Room 209-210 311-319 Gia Phu Street, Ward 1 District 6, Ho Chi Minh City, Vietnam E-mail: info@ht-management.com Website: www.ht-management.com Branch Office Danang (October 2015) Branch Office Phnom Penh (June 2016) Branch Office Vientiane (June 2017) Branch Office Yangon (October 2017)