SPM-UNIT II
ACTIVITY PLANNING
Prof. Kanchana Devi
Activity Planning – Intro..
 A detailed project must include a schedule
indicating the start and completion times for
each activity.
2
Prof. Kanchana Devi
So that…
 Ensure resources will be available when required.
 Avoid different activities competing for the same
resource at same time.
 Produce a detailed schedule showing which staff
carry out each activity.
 Produce a detailed plan against which actual
achievement may be measured.
 Produce a timed cash flow forecast.
 Re-plan the project – correct drift from target
3
Prof. Kanchana Devi
Objectives
Prof. Kanchana Devi
4
 Feasibility Assessment
 Resource Allocation
 Detailed Costing
 Motivation
 Co-ordination
When to plan..
Prof. Kanchana Devi
5
 Planning is an ongoing process of refinement,
each iteration becoming more detailed and
more accurate than the last.
 Feasibility Study:
 Timescale
 Risk of not achieving the target completion date
 Keeping within budget.
 Activity plan:
 Resource availability
 Cash-flow control
Projects and Activities
Prof. Kanchana Devi
6
 A project
 Composed of number of interrelated activities
 May start when at least one of its activities is ready to start.
 Will be completed when all of the activities have been completed
 An Activity
 Clearly define start and end-point
 Requires a resource then requirement must be forecastable
 Duration of an activity must be forecastable
 Some activity might require that others are completed before
they can begin “Precedence Requirement”
Identifying Activities
Prof. Kanchana Devi
7
 Three Approaches
 The activity based approach
 The product based approach
 The hybrid approach
I. Activity Based Approach
Prof. Kanchana Devi
8
 Consists of creating a list of all activities that
the project is thought to involve
 “Work Breakdown Structure”
Project
Analyse Design
Data Design
Relational
Data
Analysis
Logical Data
Analysis
Process
Design
Physical
Design
Build
II. Product Based Approach
Prof. Kanchana Devi
9
 It consists of producing a Product Breakdown
Structure and a Product Flow Diagram(PFD).
 A PFD can easily be converted into an ordered
list of activities
III. The Hybrid Approach
Prof. Kanchana Devi
10
 IBM recommend the following five levels
should be used in WBS:
 Level 1: Project
 Level 2:Deliverables
 Level 3: Components
 Level 4: Work-Packages
 Level 5: Tasks
Sequencing and Scheduling
Activities11
We
eks
1 2 3 4 5 6 7 8 9 10 11 12 13
A:
B:
C:
D:
E:
F:
G:
H:
I:
A: Overall Design E:Code Module 1 I: System Testing
B: Specify Module 1 F:Code Module 3
C: Specify Module 2G:Code Module 2
D: Specify Module 3H:Integration Testing

Contenu connexe

Tendances

Software estimation
Software estimationSoftware estimation
Software estimation
Md Shakir
 

Tendances (20)

Software project management- Software Engineering
Software project management- Software EngineeringSoftware project management- Software Engineering
Software project management- Software Engineering
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 
Spm unit 5
Spm unit 5Spm unit 5
Spm unit 5
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Software effort estimation
Software effort estimationSoftware effort estimation
Software effort estimation
 
Managing contracts
Managing contractsManaging contracts
Managing contracts
 
Resource Allocation In Software Project Management
Resource Allocation In Software Project ManagementResource Allocation In Software Project Management
Resource Allocation In Software Project Management
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approach
 
SPM PPT
SPM PPTSPM PPT
SPM PPT
 
Risk Mitigation, Monitoring and Management Plan (RMMM)
Risk Mitigation, Monitoring and Management Plan (RMMM)Risk Mitigation, Monitoring and Management Plan (RMMM)
Risk Mitigation, Monitoring and Management Plan (RMMM)
 
Unit 2 spm
Unit 2 spmUnit 2 spm
Unit 2 spm
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)
 
Software project estimation
Software project estimationSoftware project estimation
Software project estimation
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Spm unit2
Spm unit2Spm unit2
Spm unit2
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Software engineering project management
Software engineering project managementSoftware engineering project management
Software engineering project management
 

En vedette

Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Software project management
Software project managementSoftware project management
Software project management
R A Akerkar
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
Jeanette C. Patindol
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
Ali Heydari
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
Andreea Usatenco
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
akashsaini8
 
SDPM - Lecture 10 - Contract management
SDPM - Lecture 10 - Contract managementSDPM - Lecture 10 - Contract management
SDPM - Lecture 10 - Contract management
OpenLearningLab
 
DSDM (Dynamic System Development Method)
DSDM (Dynamic System Development Method)DSDM (Dynamic System Development Method)
DSDM (Dynamic System Development Method)
urumisama
 
Creating a positive learning environment
Creating a positive learning environmentCreating a positive learning environment
Creating a positive learning environment
Pippa Totraku
 
Waterfall model in Software engineering
Waterfall model in Software engineeringWaterfall model in Software engineering
Waterfall model in Software engineering
Ehtesham Mehmood
 
Teachers' Maxims in Language Teaching
Teachers' Maxims in Language TeachingTeachers' Maxims in Language Teaching
Teachers' Maxims in Language Teaching
JulieHowell
 

En vedette (20)

Activity planning
Activity planningActivity planning
Activity planning
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Software project management
Software project managementSoftware project management
Software project management
 
Risk management in software engineering
Risk management in software engineeringRisk management in software engineering
Risk management in software engineering
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
 
SDPM - Lecture 10 - Contract management
SDPM - Lecture 10 - Contract managementSDPM - Lecture 10 - Contract management
SDPM - Lecture 10 - Contract management
 
Resource management
Resource managementResource management
Resource management
 
DSDM (Dynamic System Development Method)
DSDM (Dynamic System Development Method)DSDM (Dynamic System Development Method)
DSDM (Dynamic System Development Method)
 
Creating a positive learning environment
Creating a positive learning environmentCreating a positive learning environment
Creating a positive learning environment
 
Av aids
Av aidsAv aids
Av aids
 
Waterfall model in Software engineering
Waterfall model in Software engineeringWaterfall model in Software engineering
Waterfall model in Software engineering
 
Chapter 7
Chapter 7Chapter 7
Chapter 7
 
Budgeting for comms. Making the case for comms workshop, 22 October 2014
Budgeting for comms. Making the case for comms workshop, 22 October 2014Budgeting for comms. Making the case for comms workshop, 22 October 2014
Budgeting for comms. Making the case for comms workshop, 22 October 2014
 
Teachers' Maxims in Language Teaching
Teachers' Maxims in Language TeachingTeachers' Maxims in Language Teaching
Teachers' Maxims in Language Teaching
 
waterfall model
waterfall modelwaterfall model
waterfall model
 
Use of audio visual aids in teaching
Use of audio visual aids in teachingUse of audio visual aids in teaching
Use of audio visual aids in teaching
 

Similaire à SPM Activity Planning Introduction

Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
Waqar Ahmed
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptx
ALI2H
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
briancrawford30935
 

Similaire à SPM Activity Planning Introduction (20)

Project Preparation and Management
Project Preparation and ManagementProject Preparation and Management
Project Preparation and Management
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003
 
PM using P6
PM using P6PM using P6
PM using P6
 
Microsoft Project Course with PMP Concepts
Microsoft Project Course with PMP ConceptsMicrosoft Project Course with PMP Concepts
Microsoft Project Course with PMP Concepts
 
Microsot project basics
Microsot project basicsMicrosot project basics
Microsot project basics
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptx
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
 
Project Management Notes 3
Project Management Notes 3Project Management Notes 3
Project Management Notes 3
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Project management teaching
Project management   teachingProject management   teaching
Project management teaching
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part b
 
Project Management Topic.pdf
Project Management Topic.pdfProject Management Topic.pdf
Project Management Topic.pdf
 
assignment on project planning
assignment on project planningassignment on project planning
assignment on project planning
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
 
Scheduling and scheduling personnel
Scheduling and scheduling personnelScheduling and scheduling personnel
Scheduling and scheduling personnel
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 

Plus de Kanchana Devi (12)

Spm unit v-software reliability-
Spm unit v-software reliability-Spm unit v-software reliability-
Spm unit v-software reliability-
 
Spm unit v-software maintenance-intro
Spm unit v-software maintenance-introSpm unit v-software maintenance-intro
Spm unit v-software maintenance-intro
 
Spm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilitiesSpm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilities
 
Spm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-introSpm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-intro
 
Spm unit iii-risk-working in teams
Spm unit iii-risk-working in teamsSpm unit iii-risk-working in teams
Spm unit iii-risk-working in teams
 
Spm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocationSpm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocation
 
Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pert
 
Spm unit iii-risk-monitoring & control1
Spm unit iii-risk-monitoring & control1Spm unit iii-risk-monitoring & control1
Spm unit iii-risk-monitoring & control1
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-intro
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
 
Open source spm tools
Open source spm toolsOpen source spm tools
Open source spm tools
 
Software project management introduction
Software project management introductionSoftware project management introduction
Software project management introduction
 

Dernier

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Dernier (20)

HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 

SPM Activity Planning Introduction

  • 2. Activity Planning – Intro..  A detailed project must include a schedule indicating the start and completion times for each activity. 2 Prof. Kanchana Devi
  • 3. So that…  Ensure resources will be available when required.  Avoid different activities competing for the same resource at same time.  Produce a detailed schedule showing which staff carry out each activity.  Produce a detailed plan against which actual achievement may be measured.  Produce a timed cash flow forecast.  Re-plan the project – correct drift from target 3 Prof. Kanchana Devi
  • 4. Objectives Prof. Kanchana Devi 4  Feasibility Assessment  Resource Allocation  Detailed Costing  Motivation  Co-ordination
  • 5. When to plan.. Prof. Kanchana Devi 5  Planning is an ongoing process of refinement, each iteration becoming more detailed and more accurate than the last.  Feasibility Study:  Timescale  Risk of not achieving the target completion date  Keeping within budget.  Activity plan:  Resource availability  Cash-flow control
  • 6. Projects and Activities Prof. Kanchana Devi 6  A project  Composed of number of interrelated activities  May start when at least one of its activities is ready to start.  Will be completed when all of the activities have been completed  An Activity  Clearly define start and end-point  Requires a resource then requirement must be forecastable  Duration of an activity must be forecastable  Some activity might require that others are completed before they can begin “Precedence Requirement”
  • 7. Identifying Activities Prof. Kanchana Devi 7  Three Approaches  The activity based approach  The product based approach  The hybrid approach
  • 8. I. Activity Based Approach Prof. Kanchana Devi 8  Consists of creating a list of all activities that the project is thought to involve  “Work Breakdown Structure” Project Analyse Design Data Design Relational Data Analysis Logical Data Analysis Process Design Physical Design Build
  • 9. II. Product Based Approach Prof. Kanchana Devi 9  It consists of producing a Product Breakdown Structure and a Product Flow Diagram(PFD).  A PFD can easily be converted into an ordered list of activities
  • 10. III. The Hybrid Approach Prof. Kanchana Devi 10  IBM recommend the following five levels should be used in WBS:  Level 1: Project  Level 2:Deliverables  Level 3: Components  Level 4: Work-Packages  Level 5: Tasks
  • 11. Sequencing and Scheduling Activities11 We eks 1 2 3 4 5 6 7 8 9 10 11 12 13 A: B: C: D: E: F: G: H: I: A: Overall Design E:Code Module 1 I: System Testing B: Specify Module 1 F:Code Module 3 C: Specify Module 2G:Code Module 2 D: Specify Module 3H:Integration Testing