SlideShare une entreprise Scribd logo
1  sur  22
Name:- Karnail Singh
Choudhary
Class:- ‘IX’ section:- ‘B’
Roll:- 20
Subject:- social science
Take source from :-Take source from :-
The Internet
CYCLONEDamage
Potential
Society
Poorer than
before
Disruption of
Normal life &
Development
Suffers
Huge Losses/
Damages
Elements at Risk
HAZARHAZAR:- is a dangerous event
natural or human induced that
could cause injury loss of life or
damage to property livelihood or
environment.
HAZARDDamage
Potential
Awareness- Effect
on Elements
Society
Quicker
Recovery
Action
Plans
Communities
More
ResilientHuge Losses/
Damages
Reduced
Losses
Elements at Risk
More Stable Society
HAZARDDamage
Potential
Elements at Risk
Slopes of hills
Sea & Sea-coast
Low-lying Areas
River/Stream Banks
Natural Features
Unsecured personal assets
Livelihood tools / Equipment
Public Infrastructure
Agri. & Horticultural crops
Weak Buildings
Huts & Semi-permanent Houses
People & Live-stock
Societal Elements
AA Based on the speed
Slow onset disaster
Rapid-onset disaster
BB Based on the cause
Natural disaster
Human-induced disaster
Scale of Disaster
Is Dependent on :Is Dependent on :
Lead Time Available.Lead Time Available.
Intensity of Hazard.Intensity of Hazard.
Duration.Duration.
Spatial Extent.Spatial Extent.
Density of Population & Assets.Density of Population & Assets.
Time of Occurrence.Time of Occurrence.
Vulnerabilities existing in the Elements at Risk.Vulnerabilities existing in the Elements at Risk.
Hazard X Vulnerability =Hazard X Vulnerability =
DisasterDisaster
ELEMENTS AT RISK
PeoplePeople
LivestockLivestock
Rural Housing StockRural Housing Stock
Houses VulnerableHouses Vulnerable
Crops, Trees, Telephone, Electric polesCrops, Trees, Telephone, Electric poles
Boats, Looms, Working ImplementsBoats, Looms, Working Implements
Personal PropertyPersonal Property
Electricity, Water and Food SuppliesElectricity, Water and Food Supplies
Infrastructure SupportInfrastructure Support
AIMS OF DISASTER MANAGEMENT
Reduce (Avoid, if possible) theReduce (Avoid, if possible) the
potential losses from hazards.potential losses from hazards.
Assure prompt and appropriateAssure prompt and appropriate
assistance to victims whenassistance to victims when
necessary.necessary.
Achieve rapid and durableAchieve rapid and durable
recoveryrecovery..
 
 
DURING DISASTER
DISASTER MANAGEMENT CYCLE
PRE-DISASTER 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
POST-
DISASTER
  
Stages of Disaster
Cyclone
Well Before
Weeks-Months
Just Before -
Hours
Actual Time
Period
Rescue RehabilitationRelief Reconstruction
BEFORE AFTERDURING
Jan - Apr MAY June- Oct
Well Before
Weeks-Months
Just Before -
Hours
Actual Time
Period
Well Before
Weeks-Months
Just Before -
Hours
Rescue RehabilitationRelief Reconstruction
Actual Time
Period
Well Before
Weeks-Months
Just Before -
Hours
Rescue RehabilitationRelief Reconstruction
Actual Time
Period
Well Before
Weeks-Months
Just Before -
Hours
Just Before -
Hours
Actual Time
Period
Just Before -
Hours
Just Before -
Hours
Actual Time
Period
Just Before -
Hours
Just Before -
Hours
Actual Time
Period
Just Before -
Hours
Rescue RehabilitationRelief Reconstruction
Actual Time
Period
Just Before -
Hours
Rescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief Reconstruction
Role Players in Disasters
 PeoplePeople : Individuals, House -Holds,: Individuals, House -Holds,
VolunteersVolunteers
 Gram PanchayatGram Panchayat : Sarpanch, Panchayati: Sarpanch, Panchayati
Secretary, Panchayati MembersSecretary, Panchayati Members
 Village EldersVillage Elders : Caste/Community/Religious: Caste/Community/Religious
Leaders, Teachers, Doctors, Engineers,Leaders, Teachers, Doctors, Engineers,
Retired Army & Police PersonnelRetired Army & Police Personnel
 Govt. Deptl. Officers : Agriculture, Medical,
Engineers (Housing, Roads & Buildings,
Irrigation) Revenue Department, Public
Health, Police etc. NGOs
DEFINITIONS OF “VULNERABILITY”
““The extent to which a community,The extent to which a community,
structure, service or geographic areastructure, service or geographic area
is likely to be damaged or disruptedis likely to be damaged or disrupted
by the impact of particular disasterby the impact of particular disaster
hazard…”hazard…”
““Vulnerability is the propensity ofVulnerability is the propensity of
things to be damaged by a hazard”.things to be damaged by a hazard”.
DISASTER PREPAREDNESSDISASTER PREPAREDNESS
 Disaster preparedness aims atDisaster preparedness aims at
minimizing the adverse effects of a hazard -minimizing the adverse effects of a hazard -
Through effective precautionary actionsThrough effective precautionary actions
Ensure timely, appropriate and efficientEnsure timely, appropriate and efficient
organisation and delivery of emergencyorganisation and delivery of emergency
response following the impact of a disasterresponse following the impact of a disaster..
PREPAREDNESS
Vulnerability Analysis and Mapping to includeVulnerability Analysis and Mapping to include
Resources.Resources.
Assess strengthening requirements and executeAssess strengthening requirements and execute.
Funding for preparedness must be arranged.Funding for preparedness must be arranged.
Peoples’ cooperation through Political leaders,Peoples’ cooperation through Political leaders,
elders, Volunteers and NGOselders, Volunteers and NGOs
Create lead time by interpreting WarningsCreate lead time by interpreting Warnings
Plan to include movement of resources with timePlan to include movement of resources with time
frame.frame.
Aim to reduce the destructive potential ofAim to reduce the destructive potential of
cyclones, timely & appropriate relief to victimscyclones, timely & appropriate relief to victims
and quick & durable recoveryand quick & durable recovery
Disaster Preparedness Framework
RehearsalsPublic
Education
and Training
Response
Mechanisms
Warning
Systems
Resource
Base
Information
System
Institutional
Framework
PlanningVulnerability
Assessment
COMPONENTS OF PREPAREDNESS
Disaster Response Activities
WarningWarning
Evacuation/MitigationEvacuation/Mitigation
Search and RescueSearch and Rescue
Assessment
Emergency ReliefEmergency Relief
Logistics and SupplyLogistics and Supply
Communication and information ManagementCommunication and information Management
Survivor Response and copingSurvivor Response and coping
SecuritySecurity
EOC & coordinationEOC & coordination
Expedite rehabilitation and reconstruction.Expedite rehabilitation and reconstruction.
Floods and Water Hazards
Elements at RiskElements at Risk
Everything in theEverything in the
flood plain.flood plain.
Earthen or solubleEarthen or soluble
structuresstructures
Buried services
and utilities
Food storesFood stores
Crops andCrops and
livestocklivestock
Main MitigationMain Mitigation
StrategiesStrategies..
Land use controlLand use control
Engineering ofEngineering of
stricturesstrictures
Elevation of structuresElevation of structures
Flood controlFlood control
structuresstructures
Reforestation projectsReforestation projects
(watershed(watershed
management)management)
Strong Winds
Elements at Risk
Lightweight structures.
Elevated utilities (Power
and communication
lines)
Fishing boats and other
maritime industries.
Main Mitigation
Strategies.
Structural
engineering
measures.
Planting of
windbreaks.
Migration sst ix  b

Contenu connexe

Tendances (10)

Village disaster management plan
Village disaster management planVillage disaster management plan
Village disaster management plan
 
Resilience paradigm
Resilience paradigm Resilience paradigm
Resilience paradigm
 
Disaster management an overview
Disaster management an overviewDisaster management an overview
Disaster management an overview
 
Principles of disater management
Principles of disater managementPrinciples of disater management
Principles of disater management
 
Disasters and Ecosystem: Philippine Setting
Disasters and Ecosystem: Philippine SettingDisasters and Ecosystem: Philippine Setting
Disasters and Ecosystem: Philippine Setting
 
Disaster characteristics
Disaster characteristics Disaster characteristics
Disaster characteristics
 
Health and Safety Issues in Natural Disasters
Health and Safety Issues in Natural DisastersHealth and Safety Issues in Natural Disasters
Health and Safety Issues in Natural Disasters
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Emergency Watershed Protection Program
Emergency Watershed Protection ProgramEmergency Watershed Protection Program
Emergency Watershed Protection Program
 
DISASTER MANAGEMENT -GENERAL
DISASTER MANAGEMENT -GENERALDISASTER MANAGEMENT -GENERAL
DISASTER MANAGEMENT -GENERAL
 

Similaire à Migration sst ix b

Managing disaster ppt presentation
Managing disaster  ppt presentation Managing disaster  ppt presentation
Managing disaster ppt presentation pawan rai
 
Older Person's (OPs) Needs in Times of Emergencies
Older Person's (OPs) Needs in Times of EmergenciesOlder Person's (OPs) Needs in Times of Emergencies
Older Person's (OPs) Needs in Times of EmergenciesMichelle Avelino
 
Disaster overview
Disaster overviewDisaster overview
Disaster overviewNanjil Arul
 
disaster_overview.detailed picturisation
disaster_overview.detailed picturisationdisaster_overview.detailed picturisation
disaster_overview.detailed picturisationjinsigeorge
 
affinity categories
affinity categoriesaffinity categories
affinity categoriesVidhi Mehta
 
3 ndma vinod.ppt
3 ndma vinod.ppt3 ndma vinod.ppt
3 ndma vinod.pptParvez Alam
 
Activity 6Emergency Response Planning Emergency response.docx
Activity 6Emergency Response Planning Emergency response.docxActivity 6Emergency Response Planning Emergency response.docx
Activity 6Emergency Response Planning Emergency response.docxSALU18
 
Prin.of disastermgt. in india
Prin.of disastermgt. in indiaPrin.of disastermgt. in india
Prin.of disastermgt. in indiaABHISHEK KUMAR
 
TEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
TEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
TEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxKayeTrisha
 
QUIPPER DRRR SHS ANSWER KEY
QUIPPER DRRR SHS ANSWER KEYQUIPPER DRRR SHS ANSWER KEY
QUIPPER DRRR SHS ANSWER KEYJohn Labrador
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management pptMeely Panda
 
disasterreliefandrescueoperation-130524025501-phpapp02.pdf
disasterreliefandrescueoperation-130524025501-phpapp02.pdfdisasterreliefandrescueoperation-130524025501-phpapp02.pdf
disasterreliefandrescueoperation-130524025501-phpapp02.pdfKazimAli80
 
Disaster relief and rescue operation
Disaster relief and rescue operationDisaster relief and rescue operation
Disaster relief and rescue operationRudy Flores
 
Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...
Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...
Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...Bambang PWD Association, Inc.
 

Similaire à Migration sst ix b (20)

Disaster overview
Disaster overviewDisaster overview
Disaster overview
 
Disaster overview
Disaster overviewDisaster overview
Disaster overview
 
Managing disaster ppt presentation
Managing disaster  ppt presentation Managing disaster  ppt presentation
Managing disaster ppt presentation
 
Older Person's (OPs) Needs in Times of Emergencies
Older Person's (OPs) Needs in Times of EmergenciesOlder Person's (OPs) Needs in Times of Emergencies
Older Person's (OPs) Needs in Times of Emergencies
 
Disaster overview
Disaster overviewDisaster overview
Disaster overview
 
disaster management
disaster managementdisaster management
disaster management
 
disaster_overview.detailed picturisation
disaster_overview.detailed picturisationdisaster_overview.detailed picturisation
disaster_overview.detailed picturisation
 
Disaster Management
Disaster ManagementDisaster Management
Disaster Management
 
affinity categories
affinity categoriesaffinity categories
affinity categories
 
Disaster management
Disaster managementDisaster management
Disaster management
 
3 ndma vinod.ppt
3 ndma vinod.ppt3 ndma vinod.ppt
3 ndma vinod.ppt
 
Activity 6Emergency Response Planning Emergency response.docx
Activity 6Emergency Response Planning Emergency response.docxActivity 6Emergency Response Planning Emergency response.docx
Activity 6Emergency Response Planning Emergency response.docx
 
Prin.of disastermgt. in india
Prin.of disastermgt. in indiaPrin.of disastermgt. in india
Prin.of disastermgt. in india
 
TEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
TEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
TEMPLATE PLAN (1).pptxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
 
QUIPPER DRRR SHS ANSWER KEY
QUIPPER DRRR SHS ANSWER KEYQUIPPER DRRR SHS ANSWER KEY
QUIPPER DRRR SHS ANSWER KEY
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management ppt
 
disasterreliefandrescueoperation-130524025501-phpapp02.pdf
disasterreliefandrescueoperation-130524025501-phpapp02.pdfdisasterreliefandrescueoperation-130524025501-phpapp02.pdf
disasterreliefandrescueoperation-130524025501-phpapp02.pdf
 
Disaster relief and rescue operation
Disaster relief and rescue operationDisaster relief and rescue operation
Disaster relief and rescue operation
 
disaster management ppt
disaster management pptdisaster management ppt
disaster management ppt
 
Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...
Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...
Barangay Bambang Disaster Risk Reduction and Management Planning (BDRRMP) Wor...
 

Dernier

Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...kumargunjan9515
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...HyderabadDolls
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...Sareena Khatun
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsMonica Sydney
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionGlenn Rambach
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...Mark Jaeno P. Duyan
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...kumargunjan9515
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotelkumargunjan9515
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiMonica Sydney
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...kumargunjan9515
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevicekumargunjan9515
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 

Dernier (20)

Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 

Migration sst ix b

  • 1.
  • 2. Name:- Karnail Singh Choudhary Class:- ‘IX’ section:- ‘B’ Roll:- 20 Subject:- social science
  • 3. Take source from :-Take source from :- The Internet
  • 4. CYCLONEDamage Potential Society Poorer than before Disruption of Normal life & Development Suffers Huge Losses/ Damages Elements at Risk
  • 5. HAZARHAZAR:- is a dangerous event natural or human induced that could cause injury loss of life or damage to property livelihood or environment.
  • 7. HAZARDDamage Potential Elements at Risk Slopes of hills Sea & Sea-coast Low-lying Areas River/Stream Banks Natural Features Unsecured personal assets Livelihood tools / Equipment Public Infrastructure Agri. & Horticultural crops Weak Buildings Huts & Semi-permanent Houses People & Live-stock Societal Elements
  • 8. AA Based on the speed Slow onset disaster Rapid-onset disaster BB Based on the cause Natural disaster Human-induced disaster
  • 9. Scale of Disaster Is Dependent on :Is Dependent on : Lead Time Available.Lead Time Available. Intensity of Hazard.Intensity of Hazard. Duration.Duration. Spatial Extent.Spatial Extent. Density of Population & Assets.Density of Population & Assets. Time of Occurrence.Time of Occurrence. Vulnerabilities existing in the Elements at Risk.Vulnerabilities existing in the Elements at Risk. Hazard X Vulnerability =Hazard X Vulnerability = DisasterDisaster
  • 10. ELEMENTS AT RISK PeoplePeople LivestockLivestock Rural Housing StockRural Housing Stock Houses VulnerableHouses Vulnerable Crops, Trees, Telephone, Electric polesCrops, Trees, Telephone, Electric poles Boats, Looms, Working ImplementsBoats, Looms, Working Implements Personal PropertyPersonal Property Electricity, Water and Food SuppliesElectricity, Water and Food Supplies Infrastructure SupportInfrastructure Support
  • 11. AIMS OF DISASTER MANAGEMENT Reduce (Avoid, if possible) theReduce (Avoid, if possible) the potential losses from hazards.potential losses from hazards. Assure prompt and appropriateAssure prompt and appropriate assistance to victims whenassistance to victims when necessary.necessary. Achieve rapid and durableAchieve rapid and durable recoveryrecovery..
  • 12.     DURING DISASTER DISASTER MANAGEMENT CYCLE PRE-DISASTER                                    POST- DISASTER   
  • 13. Stages of Disaster Cyclone Well Before Weeks-Months Just Before - Hours Actual Time Period Rescue RehabilitationRelief Reconstruction BEFORE AFTERDURING Jan - Apr MAY June- Oct Well Before Weeks-Months Just Before - Hours Actual Time Period Well Before Weeks-Months Just Before - Hours Rescue RehabilitationRelief Reconstruction Actual Time Period Well Before Weeks-Months Just Before - Hours Rescue RehabilitationRelief Reconstruction Actual Time Period Well Before Weeks-Months Just Before - Hours Just Before - Hours Actual Time Period Just Before - Hours Just Before - Hours Actual Time Period Just Before - Hours Just Before - Hours Actual Time Period Just Before - Hours Rescue RehabilitationRelief Reconstruction Actual Time Period Just Before - Hours Rescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief ReconstructionRescue RehabilitationRelief Reconstruction
  • 14. Role Players in Disasters  PeoplePeople : Individuals, House -Holds,: Individuals, House -Holds, VolunteersVolunteers  Gram PanchayatGram Panchayat : Sarpanch, Panchayati: Sarpanch, Panchayati Secretary, Panchayati MembersSecretary, Panchayati Members  Village EldersVillage Elders : Caste/Community/Religious: Caste/Community/Religious Leaders, Teachers, Doctors, Engineers,Leaders, Teachers, Doctors, Engineers, Retired Army & Police PersonnelRetired Army & Police Personnel  Govt. Deptl. Officers : Agriculture, Medical, Engineers (Housing, Roads & Buildings, Irrigation) Revenue Department, Public Health, Police etc. NGOs
  • 15. DEFINITIONS OF “VULNERABILITY” ““The extent to which a community,The extent to which a community, structure, service or geographic areastructure, service or geographic area is likely to be damaged or disruptedis likely to be damaged or disrupted by the impact of particular disasterby the impact of particular disaster hazard…”hazard…” ““Vulnerability is the propensity ofVulnerability is the propensity of things to be damaged by a hazard”.things to be damaged by a hazard”.
  • 16. DISASTER PREPAREDNESSDISASTER PREPAREDNESS  Disaster preparedness aims atDisaster preparedness aims at minimizing the adverse effects of a hazard -minimizing the adverse effects of a hazard - Through effective precautionary actionsThrough effective precautionary actions Ensure timely, appropriate and efficientEnsure timely, appropriate and efficient organisation and delivery of emergencyorganisation and delivery of emergency response following the impact of a disasterresponse following the impact of a disaster..
  • 17. PREPAREDNESS Vulnerability Analysis and Mapping to includeVulnerability Analysis and Mapping to include Resources.Resources. Assess strengthening requirements and executeAssess strengthening requirements and execute. Funding for preparedness must be arranged.Funding for preparedness must be arranged. Peoples’ cooperation through Political leaders,Peoples’ cooperation through Political leaders, elders, Volunteers and NGOselders, Volunteers and NGOs Create lead time by interpreting WarningsCreate lead time by interpreting Warnings Plan to include movement of resources with timePlan to include movement of resources with time frame.frame. Aim to reduce the destructive potential ofAim to reduce the destructive potential of cyclones, timely & appropriate relief to victimscyclones, timely & appropriate relief to victims and quick & durable recoveryand quick & durable recovery
  • 18. Disaster Preparedness Framework RehearsalsPublic Education and Training Response Mechanisms Warning Systems Resource Base Information System Institutional Framework PlanningVulnerability Assessment COMPONENTS OF PREPAREDNESS
  • 19. Disaster Response Activities WarningWarning Evacuation/MitigationEvacuation/Mitigation Search and RescueSearch and Rescue Assessment Emergency ReliefEmergency Relief Logistics and SupplyLogistics and Supply Communication and information ManagementCommunication and information Management Survivor Response and copingSurvivor Response and coping SecuritySecurity EOC & coordinationEOC & coordination Expedite rehabilitation and reconstruction.Expedite rehabilitation and reconstruction.
  • 20. Floods and Water Hazards Elements at RiskElements at Risk Everything in theEverything in the flood plain.flood plain. Earthen or solubleEarthen or soluble structuresstructures Buried services and utilities Food storesFood stores Crops andCrops and livestocklivestock Main MitigationMain Mitigation StrategiesStrategies.. Land use controlLand use control Engineering ofEngineering of stricturesstrictures Elevation of structuresElevation of structures Flood controlFlood control structuresstructures Reforestation projectsReforestation projects (watershed(watershed management)management)
  • 21. Strong Winds Elements at Risk Lightweight structures. Elevated utilities (Power and communication lines) Fishing boats and other maritime industries. Main Mitigation Strategies. Structural engineering measures. Planting of windbreaks.

Notes de l'éditeur

  1. If you look at the right half of the slide you will find that the damage potential in the hazard causes the damages to the society Life comes to a halt and the poorer sections of the society can never recover to the pre-disaster causes serious disruption to life of the society But with awareness and preparation through action plans the society suffers less damages and is thus a more stable society.to recover faster.
  2. If you look at the right half of the slide you will find that the damage potential in the hazard causes the damages to the society Life comes to a halt and the poorer sections of the society can never recover to the pre-disaster causes serious disruption to life of the society But with awareness and preparation through action plans the society suffers less damages and is thus a more stable society.to recover faster.
  3. If you look at the right half of the slide you will find that the damage potential in the hazard causes the damages to the society Life comes to a halt and the poorer sections of the society can never recover to the pre-disaster causes serious disruption to life of the society But with awareness and preparation through action plans the society suffers less damages and is thus a more stable society.to recover faster.