SlideShare une entreprise Scribd logo
1  sur  36
TORREY PINES ROAD CORRIDOR PROJECT January 2011
HISTORY OF PROJECT ,[object Object]
The Ad Hoc Torrey Pines Road Committee met numerous times between November 8, 2004 and November 6, 2006.  The Torrey Pines Corridor Study Report was completed in October 2007.,[object Object]
THE CORRIDOR STUDY The Study identified 20 proposed recommendations on Torrey Pines Road including: ,[object Object]
Sidewalks
Medians
Bike Lanes
Transverse Striping
Lighting
Fences
Drain Systems
View Corridors
Noise Reduction Pavement
Retaining Walls,[object Object]
ACCIDENT INFORMATION RATE:  0.30 MVM MVM=Million Vehicle Miles
SPEED SURVEY
TRANSVERSE STRIPING Before: Average Speed:  39.1 mph 85th Percentile:  45 mph After: Average Speed:  39.2 85th Percentile:  46 mph There was no significant change since the installation of the transverse striping.
TRAN CONSULTING ENGINEERS ,[object Object]
Status of Contract
Contract amount:  $167,149.00
Balance as of January 2011: $30,853.00
83% Complete ,[object Object]
Estrada Land Planning On July 27, 2010, City retained Estrada Land Planning, a landscape architect, to provide a computer simulation to help illustrate concepts for the proposed improvements to the community. ,[object Object]
Aerial Maps
Displays/Exhibits
Cross Section
Graphics Design
Computer Simulation
Status of Contract
Contract Amount: $49,900.00
Balance as of January 2011: $0.00
Status of project: 100% Complete ,[object Object]
Task 2:  Constraints Analysis
Task 3:  Archeological Testing Program Development
Task 4:  Implementation of approved archeological testing plan
Task 5:  Discovery/Curation

Contenu connexe

Tendances

Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15VDOT Northern Virginia
 
Jonathan Danos Valuable Experience and Works
Jonathan Danos Valuable Experience and WorksJonathan Danos Valuable Experience and Works
Jonathan Danos Valuable Experience and WorksJonathan Danos
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationCrosstown TO
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsTysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsFairfax County
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Crosstown TO
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open houseCrosstown TO
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open houseCrosstown TO
 
Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open houseCrosstown TO
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open houseCrosstown TO
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)City of Midland
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017Crosstown TO
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation VDOT Northern Virginia
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingVDOT Northern Virginia
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16David Beverly
 

Tendances (20)

Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15
 
Jonathan Danos Valuable Experience and Works
Jonathan Danos Valuable Experience and WorksJonathan Danos Valuable Experience and Works
Jonathan Danos Valuable Experience and Works
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsTysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open house
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 

Similaire à Torrey pines road corridor study final

2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishmentsmckay
 
Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road WalkwayFairfax County
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank
 
Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1Daryl Kellner
 
OTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End DevelopmentOTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End DevelopmentFrancesca Wagner
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor HarperTaylor Harper
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)Sunny Mahajan
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road WalkwayFairfax County
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 
Substantial Completion: Franconia Road Sidewalk
Substantial Completion: Franconia Road SidewalkSubstantial Completion: Franconia Road Sidewalk
Substantial Completion: Franconia Road SidewalkFairfax County
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQPhilip Mok
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2AFairfax County
 

Similaire à Torrey pines road corridor study final (20)

2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments
 
Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road Walkway
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1Exposition Light Rail Transit Project 1
Exposition Light Rail Transit Project 1
 
West Toronto Rail Path - Preferred Alignment
West Toronto Rail Path - Preferred AlignmentWest Toronto Rail Path - Preferred Alignment
West Toronto Rail Path - Preferred Alignment
 
OTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End DevelopmentOTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End Development
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
2015_Bridge_Road
2015_Bridge_Road2015_Bridge_Road
2015_Bridge_Road
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 
Substantial Completion: Franconia Road Sidewalk
Substantial Completion: Franconia Road SidewalkSubstantial Completion: Franconia Road Sidewalk
Substantial Completion: Franconia Road Sidewalk
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Exec Team Update 6 6 11
Exec Team Update 6 6 11Exec Team Update 6 6 11
Exec Team Update 6 6 11
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
 
convert_255356
convert_255356convert_255356
convert_255356
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2A
 

Torrey pines road corridor study final

Notes de l'éditeur

  1. In 2015, The City is scheduled to receive $680,000 if Transnet funds.
  2. Others that were on the list was: Maintenance Assessment District, Signage, Bluff Stablization, Parkway Trees, Little Street Park, Amalfi Park, Speed Indicator, Street Cross Sections.