2. Cautionary Notes
This presentation contains forward looking statements concerning future operations of Kilo Goldmines Ltd. All
forward looking statements concerning the Company's future plans and operations, including management's
assessment of the Company's project expectations or beliefs may be subject to certain assumptions, risks and
uncertainties beyond the Company's control. Investors are cautioned that any such statements are not guarantees of
future performance and that actual performance and exploration and financial results may differ materially from any
estimates or projections. The particulars contained herein were obtained from sources which we believe reliable but
are not guaranteed by us and may be incomplete. The opinions expressed are based upon our analysis and
interpretation and are not to be construed as a solicitation or offer to buy or sell the securities mentioned herein.
This presentation is being made available on a confidential basis and by viewing this presentation, the viewer agrees
that all the information contained herein will be used by the reader solely to determine his/her interest in Kilo
Goldmines Ltd., and that such information shall be retained exclusively for the benefit of Kilo Goldmines Ltd. The
viewer agrees that he/she will not, without the express written consent of Kilo Goldmines Ltd., make use
of, disseminate or in any way disclose any of the confidential information to any person, firm or business, except to
the extent necessary for negotiations, discussions, and consultations with personnel or authorized representatives of
the reader for the purpose of determining such interests in Kilo Goldmines Ltd.
No securities commission or other similar regulatory authority has reviewed or passed on the merits of this
presentation and any representation of the contrary is an offence. This presentation is not, and under no
circumstances is to be interpreted as, a prospectus, public information, solicitation or advertisement for the sale or
trade of securities.
Qualified Person
The “qualified person” (as such term is defined in National Instrument 43-101) for the purposes of technical
information in this presentation is Stanley Robinson, who is the consulting geologist of Kilo.
3. Highlights
EXPLORING FOR GOLD AND IRON IN
THE DEMOCRATIC REPUBLIC OF CONGO
“A NEW GOLD FRONTIER”
• Somituri project:
- Adumbi Deposit 1.87 Moz Au @ 1.63 g/t
(NI43-101 inferred resources)
Kisangani Goma
- open pitable, favourable metallurgy
- multi pit potential within 5Km radius
Kinshasa
- 8 Mining Licences – 606 km2
- colonial era Au production
- extensive artisanal workings
- drilling, soil sampling, metallurgical testing
ongoing Lubumbashi
• ca. 4 000 km2 Exploration Licenses:
- JV with Rio Tinto for iron at drilling stage
• DRC experienced team with proven exploration
successes
4. Board & Management
Board
David Netherway – Chairman (Non Exec) (AUS)
Mining Engineer, 35 years experience
Chairman of Aureus Mining, Afferro Mining,
non-executive director of Gryphon
Minerals, Crusader Resources and Altus Resources
Alex van Hoeken – President & CEO (NL)
Mining Engineer, 20 years (12 years in DRC)
Fellow, UK IMMM
Chartered Engineer (UK)
Jim Williams – (Non Exec) (UK) Loudon Owen (Non Exec) (CAN) Jim Mustard – (Non Exec) (CAN)
Geologist, Lawyer, Geologist,
Founder/CEO of Arian Silver. Founder , McLean Watson Capital VP Investment Banking, Mining
at PI Financial
Management
Stanley Robinson – Exploration Manager (CAN) Philip Gibbs – CFO (RSA) Stuart Thomson – VP Operations (NZ)
Geologist Chartered Management Accountant Chemical Engineer
35 years experience incl. 17 in Africa 35 years experience 20 years experience, including gold
Career experience includes Ashanti Service history with listed companies Career experience includes Anglo
Goldfields Company Ltd. American, Fluor, and AMEC
5. Share Capital
Institutional Shareholders
SHARE CAPITAL
Common Shares 217.4 M
Options 21.4 M
Warrants 49.1 M
Fully Diluted 87.9 M
Market Cap. C$40 M
6. Why explore in the DRC?
new mining regulation (2002) - catalyst for
significant investment by junior and major
miners (Freeport McMoran, Vale, Anglo
American…)
world class gold mines discovered since
vast untapped resource potential - limited
2004 by Banro (in production), AngloGold
exploration since 1960 independence
Ashanti, Moto Goldmines/Randgold
from Belgium
infrastructure development and economic
reconstruction ongoing
7. Regional Geological Setting - Africa
Anglo Gold Ashanti
Geita 18 MOz
African Barrick
North Mara 8 MOz
DRC Greenstone Belts Bulyanhulu 15 MOz
apparent extension of the Tulawaka 1 MOz
Tanzania Greenstone Belts Buswagi 5 MOz
Resolute
Golden Pride 6 MOz
8. Regional Geological Setting - Africa
DRC Discoveries in the
last 10 years Adumbi
Deposit
Anglo Gold Ashanti
Mongbwalu ca. 3 MOz
RandGold/AGA
Kibali ca. 30 MOz
Mwana Africa
Zani Kodo ca. 2 MOz
Kilo Gold
Adumbi ca. 2 MOz
9. Location and access
• road access from
- Kisangani (300 km)
- Kampala (800 km)
• project support office in Beni
• scheduled flights from
- Entebbe
- Kisangani Project Area
- Goma Somituri & Rio Tinto JV
air strip at Nia Nia Nia Nia
(50 km from Adumbi office)
100 Km
11. Somituri Project
• 8 Mining Licences – valid until 2039 • >300 k oz historic commercial Au production
• 606 km² total in the Ngayu Archean • Au host: shear zones within Banded
Greenstone Belt Iron Formation and meta-tuffaceous/
sedimentary rocks
Adumbi Deposit
12. Somituri Project – Ownership & Funding
Ownership Share Holding
Title held by KGL Somituri Sprl
• 71.25% - Kilo Goldmines
• 5% - DRC State (free carry)
• 23.75% - Property Vendors
(free carry through BFS)
Upon BFS completion:
up to 95% ownership by Kilo possible
subject to 2.5% State NSR & 1%
Vendor NSR
Randgold buy back:
10% of the project for $5M
if measured resources >2 M Oz
13. Adumbi Gold Deposit
Highlights
• Adumbi Gold Deposit
+ 1.87 million ounces gold @ 1.63 g/t
(NI43-101 compliant inferred resource estimate)
• part of gold bearing structure in excess of 5km
• recently upgraded resources
- higher grade structurally more robust than 2011 model
• significant historical mining activity
14. Adumbi Gold Deposit
Highlights
• Resource model delineated with ca 10 000 m diamond drilling
• • Adumbi length : open along million ounces gold
1.2 km strike Gold Deposit + 1.87 strike both ends
• @ 1.63 g/t as NI43-101 compliant resource
confirmed down to 350 m vertical; open at depth
• estimate
up to 130 vertical metres oxide ore
• part of gold bearing structure in excess of 5km
• gold occurs in three parallel zones hosted in BIF
• recently Upgraded Resources
- more robust structural model with a higher grade
• significant historical mining activity
15. Adumbi Interpreted Vertical Cross Section
March 2012 Model
major changes from 2011 model:
• from one to three distinct mineralised zones
• resource reduced from 46 to 35 Mt
• oxide increased from 13 to 30%
• grade increase:
• 0.5 g/t cutoff: 1.87 Moz @ 1.63 g/t
• 1.0 g/t cutoff: 1.63 Moz @ 2.04 g/t
16. Adumbi Deposit Intersections
Other drill Intersections include
34.80m @ 3.04 g/t Au
46.80m @ 2.69 g/t Au
21.20m @ 8.03 g/t Au
31.30m @ 3.51 g/t Au
64.45m @ 2.89 g/t Au
21.00m @ 5.02 g/t Au
34.30m @ 3.86 g/t Au
30.10m @ 5.79 g/t Au
17. Adumbi Weathering Profile
Oxide Zone
Adumbi deposit with weathering profile
Up to 94 % gold recovery in oxide
(gravity concentration and cyanide
leach)
Main gold deposit body hosted in BIF Contains 30% of total resource
350 m
1200 m
Oxidation plane
Sulphide Zone
up to 96 % gold recovery in sulphide
(gravity concentration and cyanide leach)
18. Adumbi Metallurgical Results
Gravity Concentration followed by Cyanide Leach Cyanide Leach
Cyanide Leach of
Gravity Concentrate Gravity Concentrate
Tails
Gold and Silver Recovery
Total
Recovered
Gold & Silver Recovery
Gold
(%)
Composite Au Ag Au Ag Au Ag
Sample (%) (%) (%) (%) (%) (%)
Oxide 1 46.1 33.4 85.6 96.9 92.2 80.6 75.9
Oxide 2 33.7 18.1 91.4 95.2 94.3 86.8 63.8
Oxide 3 & 4 32.8 14.0 88.4 98.3 92.2 90.0 81.3
Sulphide 1 5.6 3.5 39.5 48.8 42.9 38.2 59.6
Sulphide 2 35.0 25.8 88.5 99.0 92.5 93.8 99.6
Sulphide 3 36.6 11.5 94.1 65.5 96.2 87.3 99.6
19. Canal Prospect
• extensive artisanal workings
• strikes over 1.0 km
• splayed off Adumbi ?
• mineralization occurs in BIF
• drill values include:
11.45m @ 3.33 g/t Au
12.6 m @7 .71 g/t Au
• untested 400 m gap between Canal
and Adumbi drill results
20. Vatican, Monde Arabe, Kitenge NW
Prospects
• extensive artisanal workings
• Au veins hosted in sheared metatuffaceous rocks
• strike lengths vary from 0.5 km to > 2 km
• numerous untested geochemical anomalies on all prospects
21. Kitenge & Manzako Prospect
• mined from surface and underground in the
1940’s - produced ~ 80 000 oz Au
• strike northwest – southeast for over 2 km
each
• Au hosted in quartz veins within sheared
silicified tuffaceous metasedimentary rocks
• soil geochem survey carried out at 80m x 20m
Kitenge Drill assay results include
6.00m @ 2.46 g/t Au 5.30m @ 2.15 g/t Au
14.05m @ 1.35 g/t Au 3.30m @ 6.71 g/t Au
Manzako drill assay results include
2Km
4.70m @ 9.37 g/t Au 6.50m @ 7.76 g/t Au
11.20m @ 4.96 g/t Au 3.90m @ 4.63 g/t Au
23. Adumbi Permit Geophysics
(Flown April 2012) .
New Targets from airborne survey:
• multiple anomalies (isolated & linear)
• 2 km of BIF directly W of Adumbi
• 6 km linear magnetic feature
parallel to Kitenge and Canal
5 km Radius
24. Upside comparison
Somituri – a project with significant upside
similarities with Geita, Tanzania (20 Moz Au)
• gold hosted in BIF
• intrusives
• same mineralization strike – 310°
• significant artisanal mining
• multiple pits / prospects
25. ERW Project
• artisanal activity on outcropping quartz veins
• veins extend over a strike length of several hundred meters
• will be investigated in near future
26. Rio Tinto JV
PROPERTY OWNERSHIP & TERMS
• Exploration Licences held 100% by
KWR Iron Sprl
• Kilo owns 75% of KWR Iron Sprl
• Rio Tinto to earn up to 78.75%
pending :
- staged exploration expenditure
before 2020, plus
- staged payments to KWR
partners
• Rio Tinto JV only for iron
• gold rights retained by Kilo Goldmines
• December 2011 : RT purchased 15%
in KWR from minority partner ;
- adjusted KWR shareholding is
75% Kilo Goldmines,
15% Rio Tinto,
10% Suez Holdings
27. Rio Tinto JV
OBJECTIVES
• delineation of large bulk tonnage of direct
shipping high grade iron ore
• high quality low phosphorous, low silica
haematite ore grading + 64% iron
• exploration currently focused on a 10 km²
target on Asongo Mountain
• drilling in progress on Asongo Mountain
Drill intersections
include:
28. Hajigak Iron Project - Afghanistan
Block A - prefered bidder
Non compliant 450 M tonnes @ 62% Fe
---------------------------------------------------
Blocks B,C,D awarded to
Indian steel consortium
(non compliant 1.4 B
Kabul
tonnes resource)
KGL proposal incl.
25 km rail spur to
link with proposed
(Chinese financed)
rail lines
Project held in Kilo Iron
where Kilo Gold holds a 20% interest
29. Infrastructure
Currently 2 drill rigs operating
On the Somituri project
Established exploration camp
and facilities
Onsite sample preparation lab
30. Exploration Plans – Somituri Permits
(other than Adumbi)
Focus on Somituri (Regional):
• generate new drill targets on all 8
of the Exploitation Licences by
soil sampling, mapping and
trenching
31. Exploration Plans - Adumbi Permit
Exploration objective:
• multi pit global resource to feed central pit
I.87 Moz @ 1.63 g/t Au within 5 km radius
Action plan:
• expand on the Adumbi Gold Deposit resources
by drilling along strike, to depth and infilling
• evaluate the exploration prospects (Kitenge,
Manzako, etc) through trenching, soil sampling,
and drilling and define a gold resource
3.75 m@ 3.05 g/t • carry out petrographic and additional
2.70 m@ 2.66 g/t 4.70 m@ 9.37 g/t Au
3.90 m@ 4.63 g/t Au
metallurgical testing
• commence environmental base-line study
12.00 m@ 0.99 g/t
12.60 m@ 7.71 g/t
11.45 m@ 3.33 g/t
6.50 m@ 7.76 g/t Au
6.20 m@ 3.70 g/t 1.20 m@ 5.49 g/t Au
2.40 m@ 6.63 g/t Au
1.60 m@ 5.83 g/t Au
6.00 m@ 2.40 g/t
3.30 m@ 6.71 g/t 11.20 m@ 4.96 g/t Au
Soil Sampling
Soil Sampling 5.30 m@ 2.15 g/t Au
14.05 m@ 1.35 g/t Au
Incl 6.85 m @ 2.25 g/t Au 5.30 m@ 2.15 g/t Au
32. Contact Us
Web site: www.kilogoldmines.com
Email: info@kilogoldmines.com
Phone: +1-416-360-3415
Corporate Office: Exploration Office:
141 Adelaide Street West Boulevard Nyamwisi
Suite 1200 Nr 27 Boikene
Toronto Beni, Nord-Kivu
Ontario, Canada République Démocratique du
M5H 3L5 Congo
- With the initial whole Africa shot…..the space on the right needs to be filled in…..put in the close up shot of drc area on the right…with arrows indicating where it is
Make the legend lighter…add the legent at the top and change inpdf….
also show a label mentioning what the dots are (gold)
Bottom text box is 14 font…anyway to fit it….and change in the pdf
Chek in the pdf….the text does not align…………..
Change in PDF…..
Change in pdf….
Animate the text on as well….Put the legend on the left sideUse photo as background for the text